The daily commissioning report for Unit-1 of the 4x135 MW DCPP power plant dated January 14, 2010 provides an update on the status of commissioning activities from the previous day, including the trial run of clarifier and flash mixer motors. The report also outlines the planned activities for January 14, such as trial runs of various fans and motors, as well as turbine lube oil flushing. One critical concern is noted that refractory dry out cannot begin until feed water line flushing is completed, and the agency responsible for pre-boiler system cleaning is delayed.
The daily commissioning report for Unit-1 of the 4x135 MW DCPP power plant dated January 14, 2010 provides an update on the status of commissioning activities from the previous day, including the trial run of clarifier and flash mixer motors. The report also outlines the planned activities for January 14, such as trial runs of various fans and motors, as well as turbine lube oil flushing. One critical concern is noted that refractory dry out cannot begin until feed water line flushing is completed, and the agency responsible for pre-boiler system cleaning is delayed.
The daily commissioning report for Unit-1 of the 4x135 MW DCPP power plant dated January 14, 2010 provides an update on the status of commissioning activities from the previous day, including the trial run of clarifier and flash mixer motors. The report also outlines the planned activities for January 14, such as trial runs of various fans and motors, as well as turbine lube oil flushing. One critical concern is noted that refractory dry out cannot begin until feed water line flushing is completed, and the agency responsible for pre-boiler system cleaning is delayed.
1 Trial run of Clarifier and flash mixer motors taken 2 3 4 5 6 7 8
S.No. Planning for today Remarks
1 Trial run of ID fan # 1B motor 2 Trial run of PA fan # 1A motor 3 Trial run of Clarifier agitator & scrapper and flash mixer 4 TG lube oil flushing through oil filters 5 6 7 8
S.No. Exceptions (Delays, if any) Remarks
1 2 3 4 5 6 7 8
S.No. Critical concerns Remarks
1. Feed water line flushing to be
completed before commencement of dry 1 Refractory dry out out. Agency for pre boiler system cleaning getting delayed. 2. Compressed air of 6kg/cm2 is required. 3. CCOE clearance for filling LDO in tanks is required 2 3 4 5 6 7 8