Practical SON for

optimisation: Huawei
Solution

Radio LTE optimization and LTE SON & Site Integration

process workshop

Milan , 26-27 May 2015


SON

2
C2 – Vodafone restricted
Practical SON implementation:
Huawei

7
SON Project’s Purpose
• Reach and maintain a high level of KPI
Automation of network parameters adjust KPI improvement over baseline expected
Continuous fine tuning and adjust
Open loop management also covers sharing environment VOICE
CS DCR 4%
% cells DCR >5% 5%
• Improve Radio network performance
CS setup failure rate (CSFR) 8%
Always the best performance achievable in both Voice & Data
CS Erlangs 2%
Main KPIs impacted:
CS IRAT Handover Ratio (%) 3%
• Voice & PS DCRs
• Voice & PS Accessibility DATA
• Tputs DL & UL PS or HSDPA DCR 4%
PS or HSDPA setup failure rate (CSFR) 5%
• Speed up the changes to the real network PS or HSDPA Data volume (Gb) 3%
Cells self detection and closed loop process PS or HSUPA data volume (Gb) 3%
All impacted elements self tuned when cells added or removed

• Increase of network effective network capacity


The optimized resources allow to manage a higher number of
network elements

C2 – Vodafone restricted
SON Results: Huawei Solution

C2 – Vodafone restricted
SON Results: Huawei Solution
HW already deployed in Zona 1 (Madrid) & started in Zona 2 (Barcelona)– Rest of RNCs migration process on going
Current status: 3 RNCs in Madrid and 2 RNCs in Barcelona
Features involved:
- ANR: Automatic Neighbour Relation 13% improvement in DCR
- PSCO: Primary Scrambling Code Optimization
- CCO: UMTS DL Capacity Optimization RRM Based 3,9% improvement in Tput

Improvements Summary

C2 – Vodafone restricted
SON Results: PSC Optimisation Case

C2 – Vodafone restricted