1 Project Name : CONSTRUCTION OF CATITUAN SMALL WATER IMPOUNDING PROJECT 9 Date Expiry : Programmed
: 10 Revised Contract Amount This Month
2 Location : Barangay Catituan, Malangas, Zamboanga Sibugay due to Extra Work / Previous
3 Net Length or Change Order :
Physical Descri : 11 No. Of Days Extension :
4 Contractor Genetian Builders 12 No. Of Days Suspension :
1 TEMPORARY FACILITIES AND MOBILIZATION 2.451 226,043.01 164,215.05 72.648 0.000 72.648
3 RESERVOIR AND BARROW AREA 6.972 643,010.75 321,505.38 50.00 0.000 50.000
GENETIAN BUILDERS
Contractor Regional Director
STATEMENTS OF WORK ACCOMPLISHMENT
As of : April 25, 2018
1 Project Name : CONSTRUCTION OF CATITUAN SMALL WATER IMPOUNDING PROJECT 9 Date Expiry : Programmed
: 10 Revised Contract Amount This Month
2 Location : Barangay Catituan, Malangas, Zamboanga Sibugay due to Extra Work / Previous
3 Net Length or Change Order :
Physical Descri : 11 No. Of Days Extension :
4 Contractor Genetian Builders 12 No. Of Days Suspension :
5.0 SPILLWAY
5.1 Excavation 4.345 324,075.00 3,724.00 cu.m. 87.00 0.000 100.000
5.2 Structural Bakfill 1.201 89,550.00 150.00 cu.m. 597.00 0.000 100.000
5.3 Concrete Class "A"
5.3.1 Concreting 160.00 cu.m.
Portland Cement 6.565 489,661.00 1,453.00 bag 337.00 0.000 0.000
Screened Sand 0.837 62,400.00 80.00 cum. 780.00 0.000 0.000
Screened Gravel 2.510 187,200.00 160.00 cum. 1,170.00 0.000 0.000
5.3.2 Form Work
Plywood 3/8" thick 0.668 49,855.00 59.00 pcs 845.00 0.000 0.000
Form Lumber 1.183 88,218.00 5,220.00 bd.ft. 16.90 0.000 0.000
Nail & Hardware 0.125 9,295.00 130.00 kg. 71.50 0.000 0.000
5.4 Reinforcing Steel 6,144.00 kg.
16mm x 6m Reinforcing Bar 1.040 77,571.00 102.00 pc 760.00 0.000 0.000
12mm x 6m Reinforcing Bar 4.421 329,745.00 890.00 pc 370.50 0.000 0.000
10mm x 6m Reinforcing Bar 0.304 22,703.20 118.00 pc 192.40 0.000 0.000
Tie Wire # 16 0.237 17,680.00 170.00 pc 104.00 0.000 0.000
5.5 Leveling Coarse (River run materials) 1.274 95,040.00 72.00 cu.m. 1,320.00 0.000 0.000
5.6 Grouted Riprap (down stream of spillway) 12.00 cu.m. 0.000 0.000
Boulder 0.180 13,404.00 12.00 cu.m. 1,117.00 0.000 0.000
Cement 0.222 16,575.00 51.00 cu.m. 325.00 0.000 0.000
Screened Sand 0.042 3,120.00 4.00 cu.m. 780.00 0.000 0.000
TOTAL 25.154 1,876,092.20
1) Accomplishment for item marked asteries (*) include materials on project site at 70 % of its unit cost. Total Percent Accomp.
2) Accomplishment report herein shall not be used as basis of contractors billing purposes.
GENETIAN BUILDERS
Contractor Regional Director
:
:
:
: On-going
% ITEM % WEIGHT
ACCOMP. TO ACCOMP. TO
TO DATE DATE
72.648 1.781
100.000 5.363
50.000 3.486
27.934 7.224
22.047 5.546
56.198 17.094
22.250 0.841
41.335
*
Director
:
:
:
: On-going
% ITEM % WEIGHT
ACCOMP. ACCOMP. TO
TO DATE DATE
100.000 1.110
50.000 0.670
1.781
100.000 5.363
5.363
50.000 3.486
3.486
100.000 0.327
65.300 0.657
0.000 0.000
45.800 1.137
46.340 1.726
45.800 2.675
45.800 0.702
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
7.224
100.000 4.345
100.000 1.201
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
5.546
50.000 5.217
50.000 7.117
100.000 0.407
100.000 0.052
100.000 0.157
100.000 0.057
100.000 0.095
100.000 0.010
100.000 0.373
100.000 0.017
100.000 3.258
100.000 0.173
100.000 0.164
0.000 0.000
0.000 0.000
17.094
22.250 0.153
22.250 0.208
22.250 0.027
22.250 0.080
22.250 0.040
22.250 0.070
22.250 0.007
22.250 0.144
22.250 0.100
22.250 0.012
0.841
41.335