Rate Analyais for Kathmandu

Kathmandu Valley
Date: 2016 August

1.0 Earthwork
1.1Hard excavarion
Clay and soft type gravel mix soil up to 30 cm depth, transported up to 10 m. and
lift 1.5 m.
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.5 0 0.00
Unskille
2 dMaterials
2.1 Hand 0
Equipme
nts3% of
unskilled
Total 0.00
Rate Nrs. 0.00 per.Cu.m.
Nrs. 0.00 per.Cu.Ft.
1.2 Soft and silts type clay excavation, transported 10 m lead and 1.5m lift
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 0.7 0 0.00
Unskille
2 dMaterials
2.1 Hand 0
Equipme
nts3% of
unskilled
Total 0.00
Rate Nrs. 0.00 per.Cu.m.
Nrs.by ordinary soil
Earth filling 0.00inper.Cu.Ft.
15-cm. Layer spraying sprinkling water and
2.0 compacted by labor transported by soil from 10 m. distant.
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 0.5 0 0.00
Unskille
d Total 0.00
Rate Nrs. 0.00 per.Cu.m.
Nrs. 0.00 per.Cu.Ft.
it doesn’t include carrying of water cost
3.0 Flat Brick Soling (Per 10 Sq.m. )
Per 10.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 0.5 0.00 0.00
Skilled
1.2 No. 1 0.00 0.00
Unskille
2 dMaterals
2.1 Brick No. 420 12.00 5040.00
2.3 Sand cum 0.71 3400.00 2414.00
Total 7454.00
Rate Nrs. 745.40 per.Sq.m.
Nrs. 69.29 per.Sq.Ft.
4 Brick work
4.1 First floor and above, chimney made brick, making mix (1:4) C/S mortar,
transportation of materials up to 30 m. distance.
Per 1.00(Per 1 cu. m.)
per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.5 0.00 0.00
Skilled
1.2 No. 2.2 0.00 0.00
Unskille
d1.3. No. 0.7 0.00 0.00
Helper
2 Materals
2.1 Brick No. 560 15.00 8400.00
2.2 MT 0.1 20000.00 2000.00
Cement
2.3 Sand cum 0.28 3400.00 952.00
2.4 0.00
Scafoldi
ng 3% of
helper
Total 11352.00
Rate Nrs. 11352.00 per.Cu.m.
Nrs. 321.70 per.Cu.Ft.
4.1 First floor and above, chimney made brick, making mix (1:6) C/S mortar,
transportation of materials up to 30 m. distance. (Per 1 cu. m.)
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.5 0.00 0.00
Skilled
1.2 No. 2.2 0.00 0.00
Unskille
d1.3. No. 0.7 0.00 0.00
Helper
2 Materals 0.00
2.1 Brick No. 560 15.00 8400.00
2.2 MT 0.07 20000.00 1400.00
Cement
2.3 Sand cum 0.3 3400.00 1020.00
2.4 0.00
Scafoldi
ng 3% of
helper
Total 10820.00
Rate Nrs. 10820.00 per.Cu.m.
Nrs. 306.63 per.Cu.Ft.

5 Stone Masonry Works


5.1
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.5 0.00 0.00
Skilled
1.2 No. 4.2 0.00 0.00
Unskille
2 dMaterals
2.1 cum 1 2787.12 2787.12
Block
stone
2.2 Bond cum 0.1 2787.12 278.71
stone
2.3 M.T 0.106 20000.00 2120.00
Cement
2.4 Sand cum 0.47 3400.00 1598.00
Total 6783.83
Rate Nrs. 6783.83 per.Cu.m.
Nrs. 192.25 per.Cu.Ft.
5.2 Stone filling on foundation plinth, leveled, transportation of material up to 30 m.
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.2 No. 1.5 0.00 0.00
Unskille
2 dMaterals
2.1 cum 1 2787.12 2787.12
Block
stone
2.2 Bond cum 0.2 2787.12 557.42
stone
Total 3344.54
Rate Nrs. 3344.54 per.Cu.m.
Nrs. 94.78 per.Cu.Ft.
6 Plain Cement Concrete (PCC)
6.1
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1 0.00 0.00
Skilled
1.2 No. 4 0.00 0.00
Unskille
2 dMaterals
2.1 M.T 0.22 20000.00 4400.00
Cement
2.2 cum 0.65 4400.00 2860.00
40mm
Aggrigat
e
2.3 20 cum 0.24 1056.00
mm
Aggrigat
e
4400
2.4 Sand cum 0.47 3400.00 1598.00
Total 9914.00
Rate Nrs. 9914.00 per.Cu.m.
Nrs. 280.95 per.Cu.Ft.
6.2
Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1 0.00 0.00
Skilled
1.2 No. 4 0.00 0.00
Unskille
2 dMaterals
2.1 M.T 0.32 20000.00 6400.00
Cement
2.2 cum 0.52 4400.00 2288.00
40mm
Aggrigat
e
2.3 20 cum 0.22 968.00
mm
Aggrigat
e
4400
2.4 10 cum 0.11 484.00
mm
Aggrigat
e
4400
2.4 Sand cum 0.445 3400.00 1513.00
Total 11653.00
Rate Nrs. 11653.00 per.Cu.m.
Nrs. 330.23 per.Cu.Ft.

6.3 PCC (1:2:4) on superstructure, deck, slab, beam on cement concrete, up to 30 m.


transportation Per 1.00 per.Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.5 0.00 0.00
Skilled
1.2 No. 7 0.00 0.00
Unskille
2 dMaterals
2.1 M.T 0.32 20000.00 6400.00
Cement
2.2 cum 0.52 4400.00 2288.00
40mm
Aggrigat
e
2.3 20 cum 0.22 968.00
mm
Aggrigat
e
4400
2.4 10 cum 0.11 484.00
mm
Aggrigat
e
4400
2.4 Sand cum 0.445 3400.00 1513.00
Total 11653.00
Rate Nrs. 11653.00 per.Cu.m.
Nrs. 330.23 per.Cu.Ft.

7.0 Wooden form work as per drawing after casting


Per 10.00 per.sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.72 0.00 0.00
Skilled
1.2 No. 2.56 0.00 0.00
Unskille
2 dMaterals
2.1 cum 0.07 45687.60 3198.13
General
wood
2.2 Nail kg 2.5 100.00 250.00
Total 3448.13
Rate Nrs. 344.81 per.S.M.
Nrs. 32.05 per.S.Ft

8.0
Per 1.00 M.T.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 8 0.00 0.00
Skilled
1.2 No. 12 0.00 0.00
Unskille
2 dMaterals
2.1 M.S. M.T 1.05 86000.00 90300.00
rod
2.2 Kg. 10 100.00 1000.00
Binding
wire
Total 91300.00
Rate Nrs. 91300.00 per M.T.

Roofing
9 Works.
9.1 CGI Sheet roofing
Per 10.00 per.Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.1 0.00 0.00
Skilled
1.2 No. 1.25 0.00 0.00
Unskille
2 dMaterals
2.1 CGI Sqm 294.00 3528.00
Sheet 26
Gauge 12
2.2 8mm No. 30 30.00 900.00
nut and
bolt
2.3 J No. 25 375.00
hook 15.00
2.4 No. 55 110.00
bitumen
washer 2.00
Total 4913.00
Rate Nrs. 491.30 per.Sq.m.
Nrs. 45.67 per.Sq.Ft.
Note : 1 bundile CGI sheet = length72'-0"&bredrh=2'-7.5"=17.56Sq.m.

9.2 G.I. Plain sheet ridge / valley cover making and fitting
Per 10.00 R.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 2 0.00 0.00
Skilled
1.2 No. 2 0.00 0.00
Unskille
2 dMaterals
2.1 Plain Rm 100.00 1200.00
Sheet 26
Gauge 12 90cmwide
2.2 nut Lump sum 125.00
and bolt
Total 1325.00
Rate Nrs. 132.50 per.Sq.m.
Nrs. 12.32 per.Sq.Ft.
10 Wood Works
10.1 Sal wood door/window wooden size (3” x 4”) For Per 1cu.m.
Per 1.00 Cu.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 34 0.00 0.00
Skilled
1.2 No. 3.4 0.00 0.00
Unskille
2 dMaterals
2.1 Sal cum 210798.00 231877.80
wood 1.1
2.2 Hold No. 92 125.00 11500.00
fast
2.6 No. 184 3.00 552.00
Screw
nail
Total 243929.80
Rate Nrs. 243929.80 per.Cu.m.
Nrs. 6912.74 per.Cu.Ft.

10.2 1½” thick Sal wood shutter with dilla khapa for door
Per 2.114 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 10 0.00 0.00
Skilled
1.2 No. 1 0.00 0.00
Unskille
2 dMaterals
2.1 Sal cum 210798.00 17707.03
wood 0.084
2.2 100 No. 6 28.00 168.00
mm
hinge
2.3 150 No. 1 67.00 67.00
mm
chukul
2.4 No. 1 107.00 107.00
300mm
Chukul
2.5 250 No. 1 227.00 227.00
mm
locking
set
2.6 set. 2 32.00 64.00
Handle
2.7 lump sum 60.00
Screw
nail
Total 18400.03
Rate Nrs. 8703.89 per.Sq.m.
Nrs. 809.03 per.Sq.Ft.
10.3 Making window shutter having (1 ½” x 3”) size sal wood frame and 3mm thick
glass fittings. Per 2.230 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 9 0.00 0.00
Skilled
1.2 No. 0.9 0.00 0.00
Unskille
2 dMaterals
2.1 Sal cum 210798.00 10329.10
wood 0.049
2.2 4mm Sqm 1.085 710.05 770.41
glass
2.3 75 No. 8 43.00 344.00
mm
Kabja
2.4 No. 4 60.00 240.00
100mm
Chukul
2.5 No. 2 32.00 64.00
Handle
2.6 lump sum 60.00
Screw
nail
Total 11807.51
Rate Nrs. 5294.85 per.Sq.m.
Nrs. 492.16 per.Sq.Ft.
11 Flooring Works
11.1 1½ ” thick cement concrete flooring (1:2:4) and finishing of rough surface by
rubbing. (For Per 10 sq.m.) Per 10.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1 0.00 0.00
Skilled
1.2 No. 4 0.00 0.00
Unskille
2 dMaterals
2.1 MT 20000.00 2600.00
Cement 0.13
2.2 cum 0.36 4400.00 1584.00
12mm
Aggrigat
e
2.3 Sand cum 0.18 3400.00 612.00
Total 4796.00
Rate Nrs. 479.60 per.Sq.m.
Nrs. 44.58 per.Sq.Ft.

11.2 3 ” thick cement concrete flooring (1:2:4) and finishing of rough surface by
rubbing. (For Per 10 sq.m.) Per 10.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1 0.00 0.00
Skilled
1.2 No. 4 0.00 0.00
Unskille
2 dMaterals
2.1 MT 20000.00 5200.00
Cement 0.26
2.2 cum 0.68 4400.00 2992.00
12mm
Aggrigat
e
2.3 Sand cum 0.34 3400.00 1156.00
Total 9348.00
Rate Nrs. 934.80 per.Sq.m.
Nrs. 86.89 per.Sq.Ft.

Plasteri
ng
12 Works.
12.1 12.5 (½” thick) cement / Sand (1:4) Plastering on ceiling.
Per 100.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 15 0.00 0.00
Skilled
1.2 No. 20 0.00 0.00
Unskille
2 dMaterals
2.1 MT 20000.00 10760.00
Cement 0.538
2.3 Sand cum 1.46 3400.00 4964.00
Total 15724.00
Rate Nrs. 157.24 per.Sq.m.
Nrs. 14.62 per.Sq.Ft.

12.2 12.5 (½” thick) cement / Sand (1:6) Plastering on wall and other surfaces.
Per 100.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 12 0.00 0.00
Skilled
1.2 No. 16 0.00 0.00
Unskille
2 dMaterals
2.1 MT 20000.00 7640.00
Cement 0.382
2.3 Sand cum 1.57 3400.00 5338.00
Total 12978.00
Rate Nrs. 129.78 per.Sq.m.
Nrs. 12.06 per.Sq.Ft.

11
Painting
13 Works
13.1 White cement paint single coat for new surface
Per 100.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 9 0.00 0.00
Skilled
1.2 No. 0.66 0.00 0.00
Unskille
2 dMaterals
2.1 Kg 26.38 290.13
White
Cement 11
2.3 Gum Kg 0.44 180.00 79.20
Total 369.33
Rate Nrs. 3.69 per.Sq.m.
Nrs. 0.34 per.Sq.Ft.

13.2 White cement paint double coat for new surface


Per 100.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 1.5 0.00 0.00
Skilled
1.2 No. 1.1 0.00 0.00
Unskille
2 dMaterals
2.1 Kg 26.38 580.25
White
Cement 22
2.3 Gum Kg 0.88 180.00 158.40
Total 738.65
Rate Nrs. 7.39 per.Sq.m.
Nrs. 0.69 per.Sq.Ft.
13.3 water proof cement (snoceam) paint double coat for new surface
Per 100.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 5 0.00 0.00
Skilled
1.2 No. 5 0.00 0.00
Unskille
2 dMaterals
Snoceam Kg 48.5 65.00 3152.50
2.3 Gum Kg 0.88 180.00 158.40
Total 3310.90
Rate Nrs. 33.11 per.Sq.m.
Nrs. 3.08 per.Sq.Ft.

13.4 Enamel paint double coat for new surface on wood with single coat primer
Per 100.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 12 0.00 0.00
Skilled
1.2 No. 8 0.00 0.00
Unskille
2 dMaterals
2.1 Astar lit. 8.1 268.00 2170.80
2.2 lit. 16 250.00 4000.00
Enamel
Total 6170.80
Rate Nrs. 61.71 per.Sq.m.
Nrs. 5.74 per.Sq.Ft.

14.0 Porcelain Glazed Tile cladding on floor and wall in toilet


Per 10.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 13 0.00 0.00
Skilled
1.2 No. 4.5 0.00 0.00
Unskille
d
2 Materals
2.1 Kg 20000.00 1120.00
Cement 0.056
2.2 Sand Kg 0.152 3400.00 516.80
2.3 white Kg 3.228 26.38 85.14
cement
2.4 sqm 11 1400.00 15400.00
porcelin
glazed
tiles
Total 17121.94
Rate Nrs. 1712.19 per.Sq.m.
Nrs. 159.15 per.Sq.Ft.

15.0 Iron collapsible Gate with fitting and painting


Per 10.000 Sq.m.
S.N. Descript Unit Quantity Rate Per Unit Amount Remarks
ion
1 Labors
1.1 No. 13 0.00 0.00
Skilled
1.2 No. 4.5 0.00 0.00
Unskille
2 dMaterals
2.1 Kg 20000.00 1120.00
Cement 0.056
2.2 Sand Kg 0.152 3400.00 516.80
2.3 white Kg 3.228 26.38 85.14
cement
2.4 sqm 11 1400.00 15400.00
porcelin
glazed
tiles
Total 17121.94
Rate Nrs. 1712.19 per.Sq.m.
Nrs. 159.15 per.Sq.Ft.
Materials Unit Rate Remarks
1 Skilled NO. 0

2 Unskilld 0
3 Brick NO. 15

4 Stone cum 2787.12


5 Bond stone cum 2787.12 For Beam and Slab

6 Cement( For Column and Foundation) mt 20000 16000


7 Sand cum 3400
8 Aggrigate above 20m cum 4400
9 Aggrigate below 20 mm cum 4400
10 Sal wood cum 210798
11 Common wood for scafoldimg cum 45687.6

12 Reinforcement above10 mt 86000


13 Binding wire kg 100

14 Nail and peg kg 100


15 White cement kg 26.375

16 Snocempaint kg 65
17 Enamel paint lit. 250
18 Astar (Primer) lit. 268
19 Gum kg 180
20 150mm chukul NO. 67
21 300mm chukul NO. 107

22 100mm hing/kabja NO. 28


23 75mm hing /kabja NO. 43

24 Handle set. 32
25 250 mm locking set NO. 227
26 4 mm glass sqm 710.0544
27 3 mm glass sqm 559.4368
28 Hold fast NO. 125
29 Screw nail NO. 3
30 Listic rm 59.04

31 26 gauge CGI sheet sqm 237


32 24 gauge CGI sheet sqm 281

33 26 Gauge CGI sheet (color ) sqm 294

34 24 gauge CGI sheet ( color ) sqm 370


35 26 gaugeCGI sheet ridge ( color) rm 100
36 CGI sheet ridge rm 100
37 7mm nut and bolt NO. 30
38 bitween washer NO. 2
39 8mm J K hook NO. 15
40 porcelin glazed tiles sqm 1400
41 100mm chukul NO. 60
PCC (1:1.5:3) on superstructure, deck, slab, beam on cement concrete, up to 30 m. transportation
Per
S.N. Description Unit Quantity Rate Per Unit

1 Labors
1.1 Skilled No. 0.8 0.00

1.2 Unskilled No. 7 0.00

2 Materals
2.1 Cement M.T 0.4 18000.00
2.2 40mm Aggrigate cum 0 4400.00

2.3 20 mm Aggrigate cum 0.57

4400
2.4 10 mm Aggrigate cum 0.29

4400
2.4 Sand cum 0.425 4400.00
Total
Rate Nrs. 12854.00 per.Cu.m.
Nrs. 330.00 per.Cu.Ft.
For Brick Masonary

45030.5
e, up to 30 m. transportation
1.00 per.Cu.m.
Amount Remark
s

0.00

0.00

7200.00
0.00

2508.00

1276.00

1870.00
12854.00
SN Description No. Length BreadthHeight
1 Site Clearance 1

2 Earthwork
2.1 Excavation
2.1.1 Footing (F1) 8 6 6 5.5
2.1.2 Footing(F2) 1 8 8 5.5
2.1.3 Footing (F3) 0 8 8 5.5
Footing (F4) 0 9 9 5.5
Footing (F5) 0 10 10 5.5
2.1.4 Combined Footing (CF1) 0 9.75 6 6.42

2.2 For tie beam wall


All around 1 102.26 2 4

2.3 Toe Wall 1 52.25 2 2

3 1 Layer Brick Soling with Second Class Brick


Below Footing
3.1.1 Footing (F1) 8 6 6
Footing(F2) 1 8 8
Footing (F3) 0 8 8
Footing (F4) 0 9 9
Footing (F5) 0 10 10
Combined Footing (CF1) 0 9.75 6

3.1.2 For tie beam wall


All around 1 102.26 2

3.1.3 Toe Wall 1 52.25 2

3.1.4 Ground floor brick soling befor PCC


all round 1 790.25

3.2 Sand Filling above Brick Soling of atleast half inch


3.2.1 Footing (F1) 8 6 6
Footing(F2) 1 8 8
Footing (F3) 0 8 8
Footing (F4) 0 9 9
Footing (F5) 0 10 10
Combined Footing (CF1) 0 9.75 6
3.2.2 For tie beam wall
All around 1 102.26 2

Toe Wall 1 52.25 2

3.2.3 Ground floor Sand Filling above brick befor PCC


all round 1 790.25

4 75mm ThickP.C.C (1:3:6)


4.1 Footing (F1) 8 6 6 0.33
4.2 Footing(F2) 1 8 8 0.33
4.3 Footing (F3) 0 8 8 0.33
Footing (F4) 0 9 9 0.33
Footing (F5) 0 10 10 0.33
4.4 Combined Footing (CF1) 0 9.75 6 0.33

3.2.2 For tie beam wall


All around 1 102.26 2 0.33

Toe Wall 1 52.25 1.5 0.33

4.5 Ground floor PCC


all round 1 790.25 0.33

5 Concrete for RCC work of minimum strenght M20


5.1 Footing
5.1.1 Footing (F1) 8 5 5 0.68
8 18.852204
5.1.2 Footing (F2) 1 7 7 0.68
1 36.4327
5.1.3 Footing (F3) 0 7 7 1.167
0 36.4327
5.1.3 Footing (F4) 0 8 8 1.167
0 47.42051
5.1.3 Footing (F5) 0 9 9 1.167
0 59.8733613333
Combined Footing (CF1) 0 8.75 5 1.42
Total footing concreting
5.2 Column
5.2.1 Column Below Plinth beam
Column (Isotale) 9 1 1 4.67
0 1.166667 1.166667 4.67
Column (Combined) 0 1 1 4.67

5.2.2 Ground Floor Column


Column 9 1 1 9.33
0 1.166667 1.166667 8.17

5.2.3 1st Floor Column


Column 9 1 1 9.33
0 1.166667 1.166667 8.17

5.2.4 2nd Floor Column


Column 8 1 1 9.33
0 1.166667 1.166667 9.33

5.2.5 Top Floor Column


Columns 0 1.166667 1.166667 9.33

Total Column Concreting


5.3 Slabs
5.3.1 First floor slab
Total 1 825.98 0.42
Deduction of staircase void -1 92.64 0.42

5.3.2 Second floor slab


Total 1 825.98 0.42
Deduction of staircase void -1 92.64 0.42

5.3.3 Third floor slab


Total 1 633.01 0.42
Deduction of staircase void 0 87.27 0.42

5.3.4 Top floor slab


Total 0 262.71 0.42

Total Slab Concreting


5.4 Beams
5.4.1 Plinth Beam and Tie Beam
All round 1 157.59 0.75 1
1 102.26 0.75 1

5.4.2 Toe wall Beam


All round 1 52.25 0.75 0.75
5.4.3 Strap Beam
All around 1 55.33 2 1.17
0 13.33 2 1.17

5.4.4 1st Floor Beam


All round 1 157.59 0.75 0.75
Secondary beam 0 9.42 0.75 0.58
Cantilever 1 13 0.75 0.75

5.4.5 2nd Floor Beam


All round 1 157.59 0.75 0.75
Secondary beam 0 9.42 0.75 0.58
Cantilever 1 13 0.75 0.75

5.4.6 3rd Floor Beam


All round 1 131.04 0.75 0.75
Secondary beam 0 9.75 0.75 0.58
Cantilever 0 3.25 0.75 0.75

5.4.7 Top Floor Beam


All round 0 67.583 0.75 0.75

Total Beam Concreting


5.5 Staircase
5.5.1 Ground floor to first floor
1 Landing 1 32.07 0.42
Incline 1 16.5 3.5 0.42
0 2.02 3.5 0.42
Steps 16 0.833333 3.5 0.583333

5.5.2 First -Second floor & 2nd-3rd Floor


Landing 1 21.6 0.42
Incline 1 16.5 3.5 0.42
0 2.02 3.5 0.42
Steps 16 0.833333 3.5 0.583333

5.5.3 Second to top floor


Landing 0 16.05 0.42
0 14.45 0.42
Incline 0 14.245 3.5 0.42
Steps 0 0.833333 3.5 0.583333

Total Staircase Concreting


5.6 Concrete Bands
Ground floor
Sill Band 1 98.54 0.75 0.33
1 41.05 0.33 0.33
Lintel Band 1 105.04 0.75 0.33
1 52.55 0.33 0.33
First floor
Sill Band 1 99.04 0.75 0.33
1 41.05 0.33 0.33
Lintel Band 1 105.04 0.75 0.33
1 52.55 0.33 0.33
Second floor
Sill Band 1 71.34 0.75 0.33
1 47.7 0.33 0.33
Lintel Band 1 77.34 0.75 0.33
1 53.7 0.33 0.33
top floor
Sill Band 0 65.33 0.75 0.25
Lintel Band 0 22.583 0.75 0.25
Total Concrete Band Concreting
Total Concrete RCC works
6 Reinforcement
6.1 Rebar Footing
6.2 column
6.3 Rebar for Beam
6.4 Rebar for Slab
6.5 Rebar for Staircase
6.6 Rebar for Concrete Band
Total Reinforcement
7 Masonary Walls
7.1 For tie beam wall
All round 1 153.59 0.75 4.67
7.2 Toe wall
1 52.25 1.5 2
0 52.25 0.75 1.17

7.2 Ground floor


9" wall 1 105.04 0.75 8.17
4" wall 1 80.23 0.33 8.91
Deductions
Door Md -2 3.5 0.54 7
Door D1 -2 3 0.33 7
Door D2 -2 2.5 0.33 7
Window W -1 6.833 0.75 5
Window W1 -2 5 0.75 5
Window W2 -1 8 0.75 4.5
Ventilation V1 -1 4 0.75 2
7.3 First Floor
9" wall 1 105.04 0.75 8.16
4" wall 1 86.23 0.33 8.91
Parapet wall 1 34.41 0.33 2.16
Deductions
Door mD -1 3.5 0.54 7
Door D1 -2 3 0.33 7
Door D2 -1 2.5 0.33 7
Window W2 -1 8 0.75 4.5
DW1 -1 10.58 0.75 8.17
Door Window DW2 -1 11 0.75 8.17
Ventilation V1 -1 4 0.75 2

7.4 Second Floor


9" wall 1 90.04 0.75 8.16
4" wall 1 59.62 0.33 8.91
Parapet wall 1 10.5 0.33 2.16
Deductions
Door D1 -3 3 0.33 7
Door D2 -2 2.5 0.33 7
Window W2 -1 8 0.75 4.5
Window W3 -1 1 0.75 4.5
Window W4 -1 4.5 0.75 4.5
V1 -1 4 0.75 2
SD -1 6.5 0.75 8.17

7.5 Top floor


9" wall 0 53.66333 0.75 8.16
4" wall 0 18.75 0.33 8.91
Parapet wall 1 28.58 0.33 3.75
0 49.415 0.33 3.25
Deductions
Door D2 0 3 0.33 7
Window W5 0 5 0.75 6

Total Masonary Works


8 Paster Work
8.1 Exterior Plaster
8.1.1 Ground floor
All round 1 109.04 9.33
Deductions
Door Md -2 3.5 7
Window W -1 6.833 5
Window W1 -2 5 5
Window W2 -1 8 4.5
Ventilation V1 -1 4 2

8.1.2 First floor


All round 1 109.04 9.33
Parapet wall 2 34.41 2.16
Deductions
Door mD -1 3.5 7
Window W2 -1 8 4.5
DW1 -1 10.58 8.17
Door Window DW2 -1 11 8.17
Ventilation V1 -1 4 2

8.1.3 Second floor


All round 1 94.04 9.33
Parapet wall 2 10.5 2.16
Deductions
Window W2 -1 8 4.5
Window W3 -1 1 4.5
Window W4 -1 4.5 4.5
V1 -1 4 2
SD -1 6.5 8.17

8.1.4 Top Floor


All round 0 53.66333 9.33
Parapet wall 2 28.58 3.25
0 49.415 3.25
Deductions
Door D2 0 3 7
Window W5 0 5 6

Total Exterior wall plaster


8.2 Interior plaster
8.2.1 Ground floor
all round 1 271.5 8.92
Deductions
Door Md -2 3.5 7
Door D1 -2 3 7
Door D2 -2 2.5 7
Window W -1 6.833 5
Window W1 -2 5 5
Window W2 -1 8 4.5
Ventilation V1 -1 4 2
8.2.2 First Floor
all round 1 271.5 8.92
Deductions
Door mD -1 3.5 7
Door D1 -2 3 7
Door D2 -1 2.5 7
Window W2 -1 8 4.5
DW1 -1 10.58 8.17
Door Window DW2 -1 11 8.17
Ventilation V1 -1 4 2

8.2.3 Second Floor


all round 1 217.28 8.92
Deductions
Door D1 -3 3 7
Door D2 -2 2.5 7
Window W2 -1 8 4.5
Window W3 -1 1 4.5
Window W4 -1 4.5 4.5
V1 -1 4 2
SD -1 6.5 8.17

8.2.4 Top Floor


All round 0 78.67 8.92
Deductions
Door D2 0 3 7
Window W5 0 5 6

Total Interior wall Plaster


8.3 Cielling Plaster
8.3.1 Ground floor
All Around 1 825.98

8.3.2 First Floor


All around 1 825.98

8.3.3 Second Floor


All around 1 633.01

8.3.4 Top Floor


total 0
Total Cielling Plaster
9 Floor Finishing
9.1 Screeding
9.1.1 Ground floor
All around 1 790.25

9.1.2 First Floor


All around 1 825.98

9.1.3 Second Floor


All around 1 825.98

9.1.4 Top Floor


Total in top floor 0 633.01
Upper Terrace 1 164.16

Total Finishing by Screeding


9.2 Tile on Kitchen Floor and Terrace
Kitchen 1 120
1 183.29
Balcony 2 31.23
1 28.7
Terrace 0 320.8
1 164.16
Total Tile work on kitchen & Terraces

9.3 Tile on Toilet


9.3.1 Ground floor
Toilet 1 5 6
1 22 6
Deduction Ventilation V1 -1 4 2
deductions Door D2 -1 2.5 7

9.3.2 First Floor


C. Toilet 1 1 5 6
1 22 6
A. Toilet 2 0 5 6
0 22 6
Deduction Ventilation V1 -1 4 2
deductions Door D2 -1 2.5 7

9.3.3 Second Floor


C. Toilet 1 1 5 5.5
0 21 6
Deduction Ventilation V1 -1 4 2
deductions Door D2 -1 2.5 7

Total Tile work on Toilet


10 Marble Works in staircase and kitchen
10.1 Ground floor
Landing 1 32.07
Steps
Tread 13 3.5 0.83
Riser 16 3.5 0.58
Kitchen Slab 1 21.28

10.2 1st floor


Landing 1 32.07
Steps
Tread 13 3.5 0.83
Riser 16 3.5 0.58

2nd Floor
Landing 0 10.05
0 14.45
Steps
Tread 0 3.5 0.83
Riser 0 3.5 0.58
Kitchen Slab 1 37.48

Total Marble work in Kitchen


Marble skirting
1 Ground Floor
Landing 1 26
Incline 1 16.5

2 First floor
Landing 1 26
Incline 1 16.5

3 Second Floor
Landing 0 8.17
0 7.5
Steps 0
Tread 0 0.83
Riser 0 0.583
TotalMarble skirting work
11 Paint
11.1 Exterior Paint
11.1.1 Ground floor
All round 0 171.58 11.08
Deductions 0
Door MD 0 5 7
Door D2 0 2.5 7
Window W 0 5 4
Window W1 0 9 5
Window W3 0 7 4.5
Window W4 0 6 4.5
Window W5 0 1.25 4.5
Window W8 0 7 2
Window W9 0 3 2
0
11.1.2 First floor 0
All round 0 198 9.33
Parapet wall 0 35.25 2.16
Deductions 0
Door D1 0 3 7
Window W 0 10 6
Window DW1 0 9 7
Window W2 0 7.5 7
Window W3 0 7 4.5
Window W4 0 6 4.5
Window W5 0 1.25 4.5
Window W7 0 8 2
Window W8 0 7 2
Window W9 0 3 2
0
11.1.3 Second floor 0
All round 0 129.42 9.33
Parapet wall 0 101.25 2.16
Deductions 0
Door D1 0 3 7
Door Window DW 0 12.25 7
Window W 0 4 5
Window W4 0 6 4.5
Window W6 0 10 2
Window W7 0 8 2
Window W9 0 3 2
0
11.1.5 Top Floor 0
All round 0 53.66333 9.33
Parapet wall 0 8.17 3.25
0 49.415 3.25
Deductions 0
Door D2 0 3 7
Window W5 0 5 6
0
Total Exterior Paint 0
11.2 Interior Paint 0
11.2.1 Ground floor 0
all round 0 294 8.92
Deductions 0
Door D1 0 3.5 7
Door D2 0 3 7
Door D3 0 2.5 7
Window W2 0 9.67 3
Window W3 0 8.33 3
Window W4 0 6 6
Window W5 0 5 6
Window W6 0 2 5
Window W8 0 1.5 5
Window W 0 8 33
0
11.2.2 First Floor 0
all round 0 317.67 8.92
Deductions 0
Door D 0 4 7
Door D2 0 3 7
Door D3 0 2.5 7
Window W1 0 10 6
Window W2 0 9.67 3
Window W3 0 8.33 3
Window W5 0 5 6
Window W7 0 2 3
Window W8 0 1.5 5
0
11.2.3 Second Floor 0
all round 0 317.67 8.92
Deductions 0
Door D 0 4 7
Door D2 0 3 7
Door D3 0 2.5 7
Sliding door 0 7 8
Window W1 0 10 6
Window W2 0 9.67 3
Window W3 0 8.33 3
Window W5 0 5 6
Window W7 0 2 3
Window W8 0 1.5 5
0
11.2.4 Top floor 0
All round 0 78.67 8.92
Deductions 0
Door D2 0 3 7
Window W5 0 5 6

Total Interior wall Paint


11.3 Cielling Paint
11.3.1 Ground floor
Bed Room 1 0 12.33 11.83
Bed Room 2 0 12.75 9.17
Kitchen 0 10 6.5
Dining 0 10 9.75
Living room 0 10.83 10.33
Staircase passage 0 9.75 4.17
Toilet 0 8 5
Car Park 0 16 8.33

11.3.2 First Floor


Master Bedroom 0 14.083 11.75
Bed Room 1 0 12.25 10.5
Bed Room 2 0 11.75 9.17
Family room 0 16.5 10
Staircase passage 0 9.75 4.17
Toilet 0 8.17 5
0 8 5
Balcony 0 9.58 4.75

11.3.3 Second Floor


Bed Room 1 0 11.83 12.083
Kitchen 0 10.5 9.17
Dining 0 11.67 10
Living Room 0 16.5 10
Staircase passage 0 9.75 4.17
Toilet 0 8 5
Store Room 0 9.25 6
Balcony 0 9.33 10.5

11.3.4 Top Floor


total 0
Total ceiling Paint
Total Interior Paint
12 Wood Works
12.1 Door
MD 3 17.5 0.104
D1 7 17 0.083
D2 4 16.5 0.083
Total Doors
Total Door
12.3 Shutter
12.3.1 Door Shutter
MD 3 3.5 7
D1 7 3 7
D2 4 2.5 7
Total Door Shutters
Total Door

13 Railings
Staircase 2 16.83
Balcony 1 51.08
0 7.66
Terrace 1 28.58
0 8.83

14 Parqueting
Living Room 0 10.83 10.33
0 16.5 10
0 16.5 10

15 Wood Paint Work


Door
MD 3 17.5 0.92
D1 7 17 0.83
D2 4 16.5 0.83
Total Door Paint
Total Door paint
16 Shutter
Door Shutter
MD 3 3.5 7
D1 7 3 7
D2 4 2.5 7
Total Door Shutters Paint
17 Aluminium windows
Window W 1 6.833 21.75
Window W1 2 5 4.5
Window W2 3 8 4.5
Window W3 1 1 4.5
Window W4 1 4.5 4.5
Door Window DW1 1 10.58 8.17
Door Window DW2 1 11 8.17
SD 1 6.5 8.17
Ventilation V1 1 4 2

18 Total Aluminium windows


Skirting
Ground floor
All round 1 265.5

First Floor
All round 1 265.5

Second Floor
All round 1 213.28

Top Floor 0 78.67

19 Total Skirting
Tile Skirting
Ground Floor
Kitchen 1 46.66

1st floor
Balcony 1 40.58

Second floor
Balcony&Terrace&kitchen 1 118.43

Top Floor
Terrace 0 91.04

Total Tile Skirting


20
Iron Grill works
Window W 1 6.833 21.75
Window W1 2 5 4.5
Window W2 3 8 4.5
Window W3 1 1 4.5
Window W4 1 4.5 4.5
Door Window DW1 1 10.58 8.17
Door Window DW2 1 11 8.17
SD 1 6.5 8.17
Ventilation V1 1 4 2
21 total iron grill work

22 Boundary wall 1 146.66 0.75 5


23 Boundary wall plaster 2 146.66 5
23 Boundary wall paint 2 146.66 5
24 Boundary wall fence 1 146.66 3
25 Circular Staircase 1
26 Main Gate 1
Stone Cladding on outside wall
South elevation 1 313.84
East 1 198.1
0 14
Deduction
Window W8 0 1.5 5
Window W5 0 5 6
27 Total Stone cladding work
28 Stone Flooring in car park 1 135.78
18.5 Overhead Water Tank 1
Puning work
Ground floor 1 640.25
First floor 1 736.0500
Second Floor 1 375.13
Total puning
Septic Tank (10X5X5)ft3
Earth work (excavation) 1 12 7 5.5
18.6 Brick Soling 1 11.5 6.6
18.7 Sand Filling above Brick Soling of atleast half inch 1 11.5 6.6
18.8 75mm PCC 1 11.5 6.6 0.25
19 Brick Work 1 11.5 0.75 5
19.1 1 5 0.75 5
19.2 Total Brick Work
19.3 RCC Work 1 11.5 5 0.33
19.4 Reinforcement 1 18.98
19.5 Formwork 1 11.50 6.6
Water Tank(12.75X6.5X5.5)ft3
Earth work (excavation) 1 14.75 8.5 6.5
Brick Soling 1 13.75 7.5
Sand Filling above Brick Soling of atleast half inch
1 13.75 7.5
19.6 75mm PCC 1 13.75 7.5 0.25
RCC Slab
4"Slab 2 13.75 7.5 0.33
6"Shearwall Concreting 2 13.75 0.5 5.5
19.7 2 6.5 0.5 5.5
Total RCC
Reinforcement
Slab Reinforcement 143.69
Shearwall Rainforcement 75.63
19.8 Total Reinforcement
Chemical Treatment
4"RCC Slab 1 12.75 6.5
6"Shearwall Concreting 2 12.75 5.5
19.9 2 6.5 5.5
Total Chemical Tritment
iron Shutter
Freme 1 2 2
Shutter 1 2 2
Total iron
Form Work
RCC Slab 1 12.75 6.5
Shearwall Concreting 2 12.75 5
2 6.5 5
6
Quantity Unit Remarks
1,500.00 ft^2 Lumpsum

1,584.00 ft^3 6" extra on both sides


352.00 ft^3
0.00 ft^3
0.00
0.00
0.00 ft^3
1,936.00 ft^3

818.08

209.00
2,963.08

288.00
64.00
0.00
0.00
0.00
0.00
352.00 ft^2

204.52

104.50

790.25
790.25
1,451.27 ft^2

288.00 ft^2
64.00 ft^2
0.00 ft^2
0.00
0.00
0.00
352.00 ft^2

204.52
204.52
104.50
104.50

790.25
790.25
1,451.27 ft^2

95.04
21.12 ft^3
0.00 ft^3
0.00
0.00
0.00 ft^3
116.16

67.49

25.86

260.78
260.78
470.30 ft^3
ft^3

136.00
150.82 ft^3
33.32
36.43
0.00 ft^3
0.00
0.00
0.00
0.00
0.00
0.00
356.57

42.03
0.00
0.00
42.03 ft^3

83.97
0.00
83.97 ft^3

83.97
0.00
83.97 ft^3

74.64
0.00
74.64 ft^3

0.00 ft^3
0.00
284.61 ft^3

346.91 ft^3
-38.91
308.00 ft^3

346.91 ft^3
-38.91
308.00 ft^3

265.86 ft^3
0.00
265.86 ft^3

0.00 ft^3

0.00 ft^3
881.87

118.19 ft^3
76.70
194.89 ft^3

29.39
29.39 ft^3
129.47
0.00
129.47

88.64
0.00
7.31
95.96 ft^3

88.64
0.00
7.31
95.96 ft^3

73.71
0.00
0.00
73.71 ft^3

0.00
0.00 ft^3
619.37 ft^3

13.47 ft^3
24.26 ft^3
0.00
13.61 ft^3
51.34

9.07 ft^3
24.26 ft^3
0.00
13.61 ft^3
46.94

0.00 ft^3
0.00 ft^3
0.00 ft^3
0.00 ft^3
0.00
98.27
24.39
4.47
26.00
5.72

24.51
4.47
26.00
5.72

17.66
5.19
19.14
5.85

0.00
0.00
169.12
2,409.82 ft^3

0.79 Taking 1% of conc vol


1.51 Taking 2.4% of conc vol
2.05 Taking 1.5% of conc vol
1.95 Taking 1% of conc vol
0.26 Taking 1.2% of conc vol
0.37 Taking 1% of conc vol
6.93 MT

115.19

78.38
0.00
193.57

643.63 ft^3
235.90 ft^3

-26.46
-13.86
-11.55
-25.62
-37.50
-27.00
-6.00
731.54 ft^3

642.84 ft^3
253.54 ft^3
24.53 ft^3

-13.23
-13.86
-5.78
-27.00
-64.83
-67.40
-6.00
722.82 ft^3

551.04 ft^3
175.30 ft^3
7.48 ft^3

-20.79
-11.55
-27.00 ft^3
-3.38
-15.19
-6.00
-39.83
610.10 ft^3

0.00
0.00 ft^3
35.37
0.00

0.00
0.00
35.37 ft^3
2,293.39 ft^3

1,017.34 ft^2

-49.00
-34.17
-50.00
-36.00
-8.00
840.18 ft^2

1,017.34 ft^2
148.65 ft^2

-24.50
-36.00
-86.44
-89.87
-8.00

921.19 ft^2

877.39 ft^2
45.36 ft^2

-36.00
-4.50
-20.25
-8.00
-53.11
800.90 ft^2

0.00
185.77
0.00

0.00
0.00
185.77 ft^2
2,748.0322 ft^2

2,421.78

-49.00
-42.00
-35.00
-34.17
-50.00
-36.00
-8.00
2,167.62 ft^2

2,421.78

-24.50
-42.00
-17.50
-36.00
-86.44
-89.87
-8.00

2,117.47

1,938.14

-63.00
-35.00
-36.00
-4.50
-20.25
-8.00
-53.11
1,718.28

0.00

0.00
0.00
0.00
6,003.37 ft^2

825.98
825.98 ft^2

825.98
825.98

633.01
633.01

0.00
0.00
2,284.9700 ft^2

790.25
790.25 ft^2

825.98
825.98

825.98
825.98
ft^2
0.00
164.16 ft^2
164.16
2,606.3700 ft^2

120.00 ft^2
183.29
62.46
28.70
0.00
164.16
558.61 ft^2

30.00 floor
132.00 wall
-8.00
-17.50 ft^2
136.50

30.00 floor
132.00 wall
0.00 floor
0.00 wall
-8.00
-17.50 ft^2
136.50
27.50 floor
0.00 wall
-8.00
-17.50 ft^2
2.00 ft^2
275.00

32.07

37.77
32.48
21.28 ft^2
123.60

32.07

37.77
32.48
102.32

0.00
0.00

0.00
0.00
37.48
37.48 ft^2
263.39

26.00
16.50
42.50

26.00
16.50
42.50

0.00
0.00

0.00
0.00
0.00 rft
85.00

0.00 ft^2

0.00 ft^2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2
ft^2
0.00 ft^2
0.00 ft^2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2
ft^2
0.00 ft^2
0.00 ft^2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2

0.00
0.00
0.00

0.00
0.00
0.00 ft^2
2,748.03 Same as plaster

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
6,003.37

ft^2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ft^2
0.00
ft^2
190.33
190.33 ft^2
2,284.97
8,288.34 Same as plaster

5.46
9.88
5.48
20.82 ft^3
20.82
ft^2

73.50 ft^2
147.00
70.00
290.50 ft^2
290.50

33.66 rft
51.08
0.00
28.58
0.00
113.32 rft

0.00
0.00 ft^2
0.00
0.00 ft^2
ft^2
ft^2
48.30 ft^2
98.77
54.78
201.85
201.85
ft^2 Both side paint
ft^2
147.00 ft^2
294.00
140.00
581.00
148.62
45.00
108.00
4.50
20.25
86.44
89.87
53.11
8.00
563.78
563.8
rft

265.50
265.50 rft

265.50
265.50 rft

213.28
213.28 rft
0.00
0.00
744.28 2 floor

rft
46.66
46.66 rft

40.58
40.58

118.43
118.43
rft
0.00
0.00
205.7

148.61775
45
108
4.5
20.25
86.4386
89.87
53.105
8
8.00 ft2
1,779.66 kg
549.98 ft2
1,466.60 ft2
1,466.60 rft
146.66 sq.ft
1.00 no.
1.00 no.
ft2
313.84 ft2
198.10 ft2
0.00 ft2

0.00
0.00
511.94 ft2
135.78 no.
1.00

640.25
736.05
375.13
1,751.43 Ft^2

462.00 ft3
75.90 ft3
75.90 MT
18.98
43.13 ft3
18.75 mt
61.88 ft2
18.98 ft2
0.04 ft3
75.90
ft3
814.94 Taking 1% of conc vol
103.13 Taking 2% of conc vol
103.13 ft3
25.78

68.06
75.63 ft3
35.75
143.69

0.32
0.33 ft3
0.65

82.88
140.25
71.50 4'-4"-2"=3.5
294.63 ft2 1'9"*2+1'6"=5'
ft2
4.00 ft2
4.00 ft2
8

82.88
127.50
65.00
275.38
Bill of Quantity
Project No:
Residential
Projec building of Mrs.Meena Neupane
Site : …………………,………………, Nepal

Rat
S.N. Description of Work Quantity Unit
In Figure
c AS BUILT DRAWING PROVISION
Preparation of as built Architetectural,Sanitory& Electrical drawings per instruction all complete. 1.00 job 49948.00
A CIVIL WORKS
1 Site clearence work
1.00 job
2 Earthwork in excavation in ordinary soils

2963.08 cuft
3 Earth filling in 150 mm thick layer with watering and ramming

42.52 cuft
4 Earth filling in 150 mm thick layer with watering and ramming

199.34 cuft
5 Sand filling including supply of filling materials.

1451.27 cuft
6 providing and laying machine mixed Plain cement Concrete (PCC) in for foundations, flooring and walls.

6.2 P.C.C works upto Ground floor


470.30 cuft
7 providing and laying machine mixed Plain cement Concrete (PCC) for RCC works for slab/lintels column tie
beam
7.1 Plain cement Concrete (PCC) for RCC works (1:1.5:3) for slab/lintels
2409.82 cuft
8 Formwork, shuttering, centering with approved materials.

- sqm

Construction of District Advocate office Building , Dhankuta 56


9 Tor steel reinforcement bar of fe 415/500 grade.
6.93 MT
10 MASONARY WORKS
10 Boundary wall

549.98 cum
10 Good quality local chimney made Brickwork in 1:4C/S mortar up to ground floor.

193.57 cu.ft
10 Good quality local chimney made Brickwork in 1:4C/S mortar in superstructure.

2099.82 cu.ft
11 DOOR AND WINDOW WORK

11 Aluminium Doors and window works 563.78 sqft


12 STEEL WORK
12 3x20mm size M.S. grill with almunium paints. 8.00 sqft
12 Staircase railing 113.32 rft
13 FLOOR FINISHING WORK
13 Floor finishing by screeding
2606.37 cu.ft
13 16mm thick marble flooring-38mm (1:2:4) cement conc. 263.39 sq.ft
13 Supplying and laying of 9mm thick glazed or non glazed tiles in cement sand mortar (1:4) ratio with approved colour on
wall and floor all complete. 833.61 sqft
13 Skirting work of Cement sand
744.28 r.ft
13 Tile skirting works
205.67 r.ft
13 Marble skirting
85.00 r.ft
14 PLASTERING WORK
14 12.5mm thick cement sand plaster in (1:4) ratio on wall .
6003.37 sqft
14 12.5mm thick cement sand plaster in (1:4) ratio on ceiling.

2284.97 sqft
14 12.5mm thick cement sand plaster in (1:4) ratio on outter Face of wall .
4214.63 sqft

Construction of District Advocate office Building , Dhankuta 57


15 PAINTING WORK

15 Colouring with two coat weather guard paint with one coat primer to give uniform colouring after rendering the surface
all complete.
4214.63 sqft
15 Two coats of Washable Distemper paint of approved colour with one Coat primer Painting over porperly cleaned
surface all complete

8288.34 sqft
15 Two coats of aluminium paint over one coat of primer in metal surface

563.78 sqft
15 Supplying and fitting of railing with 20mm X 20mm M.S. square pipe and 75mm X 100mm Sal/Sisam handrail .

39.07 sqft
16 WOOD WORKS
16 Door frames of (3"x4")
20.82 cu.ft
16 Plywood panel doors of 18 mm thickness with all finishing and accessories cost

290.50 sqft
17 WOOD PAINT WORKS
17 Door painting(frames+Shutters)

782.85 sqft
18 MISCELLENEOUS WORKS
18 Spiral staircase

1.00 no.
18 Main gate
1.00 no.
18 Boundry wall fence
146.66 sq.ft

Construction of District Advocate office Building , Dhankuta 58


Rate Excluding VAT
Amount
In Words ( NRS )

Forty nine thousand Nine hundred and forty eight only

Construction of District Advocate office Building , Dhankuta 59


Construction of District Advocate office Building , Dhankuta 60
Construction of District Advocate office Building , Dhankuta 61
task_code wbs_id
Activity ID WBS Code
A1000 ResidenceBuild.Preparations
A1010 ResidenceBuild.Preparations
A1020 ResidenceBuild.Preparations
A1030 ResidenceBuild.Preparations
A1040 ResidenceBuild.Preparations
A1050 ResidenceBuild.Preparations
A1060 ResidenceBuild.Sub Structure.Earthwork
A1070 ResidenceBuild.Sub Structure.Earthwork
A1080 ResidenceBuild.Sub Structure.BrickWork
A1090 ResidenceBuild.Sub Structure.ConcreteWork

A1100 ResidenceBuild.Sub Structure.ConcreteWork


A1110 ResidenceBuild.Sub Structure.ConcreteWork
A1120 ResidenceBuild.Sub Structure.ConcreteWork
A1130 ResidenceBuild.Sub Structure.ConcreteWork
A1140 ResidenceBuild.Sub Structure.Earthwork
A1230 ResidenceBuild.Sub Structure.BrickWork

A1150 ResidenceBuild.Sub Structure.ConcreteWork


A1160 ResidenceBuild.Sub Structure.ConcreteWork
A1170 ResidenceBuild.Sub Structure.ConcreteWork
A1180 ResidenceBuild.Sub Structure.ConcreteWork
A1190 ResidenceBuild.Sub Structure.Earthwork
A1200 ResidenceBuild.Sub Structure.Earthwork
A1210 ResidenceBuild.Sub Structure.Earthwork
A1220 ResidenceBuild.Sub Structure.Earthwork

A1240 ResidenceBuild.Sub Structure.BrickWork


A1250 ResidenceBuild.Sub Structure.BrickWork
A1260 ResidenceBuild.Sanitary Works
A1270 ResidenceBuild.Sub Structure.Earthwork
A1280 ResidenceBuild.Sub Structure.ConcreteWork
A1290 ResidenceBuild.Sub Structure.ConcreteWork
A1300 ResidenceBuild.Sub Structure.ConcreteWork
A1310 ResidenceBuild.Sub Structure.ConcreteWork
A1320 ResidenceBuild.Sub Structure.Earthwork
A1330 ResidenceBuild.Super Structure 1.BrickWork
A1340 ResidenceBuild.Super Structure 1.ConcreteWork
A1350 ResidenceBuild.Sub Structure.ConcreteWork
A1360 ResidenceBuild.Sub Structure.ConcreteWork
A1370 ResidenceBuild.Super Structure 1.ConcreteWork
A1380 ResidenceBuild.Super Structure 1.ConcreteWork
A1390 ResidenceBuild.Super Structure 1.BrickWork
A1400 ResidenceBuild.Super Structure 1.Door Window
A1410 ResidenceBuild.Super Structure 1.BrickWork
A1420 ResidenceBuild.Super Structure 1.ConcreteWork
A1430 ResidenceBuild.Super Structure 1.ConcreteWork
A1440 ResidenceBuild.Super Structure 1.BrickWork
A1450 ResidenceBuild.Super Structure 1.ConcreteWork
A1460 ResidenceBuild.Super Structure 1.ConcreteWork
A1470 ResidenceBuild.Super Structure 1.ConcreteWork
A1480 ResidenceBuild.Electrical Works
A1490 ResidenceBuild.Electrical Works
A1500 ResidenceBuild.Electrical Works
A1510 ResidenceBuild.Super Structure 1.Plaster
A1520 ResidenceBuild.Super Structure 1.Plaster
A1530 ResidenceBuild.Super Structure 1.Plaster
A1540 ResidenceBuild.Finishing
A1550 ResidenceBuild.Finishing
A1560 ResidenceBuild.Finishing
A1570 ResidenceBuild.Finishing
A1590 ResidenceBuild.Finishing
A1600 ResidenceBuild.Finishing
A1610 ResidenceBuild.Finishing
A1620 ResidenceBuild.Finishing
A1630 ResidenceBuild.Finishing
A1660 ResidenceBuild.Super Structure 2.ConcreteWork
A1670 ResidenceBuild.Super Structure 2.ConcreteWork
A1680 ResidenceBuild.Super Structure 2.BrickWork
A1690 ResidenceBuild.Super Structure 2.Door Window
A1700 ResidenceBuild.Super Structure 2.BrickWork
A1710 ResidenceBuild.Super Structure 2.ConcreteWork
A1720 ResidenceBuild.Super Structure 2.ConcreteWork
A1730 ResidenceBuild.Super Structure 2.BrickWork
A1740 ResidenceBuild.Super Structure 2.ConcreteWork
A1750 ResidenceBuild.Super Structure 2.ConcreteWork
A1760 ResidenceBuild.Super Structure 2.ConcreteWork
A1770 ResidenceBuild.Super Structure 2.Plaster
A1780 ResidenceBuild.Super Structure 2.Plaster
A1790 ResidenceBuild.Super Structure 2.Plaster
A1820 ResidenceBuild.Super Structure 3.ConcreteWork
A1830 ResidenceBuild.Super Structure 3.ConcreteWork
A1840 ResidenceBuild.Super Structure 3.BrickWork
A1850 ResidenceBuild.Super Structure 3.Door Window
A1860 ResidenceBuild.Super Structure 3.BrickWork
A1870 ResidenceBuild.Super Structure 3.ConcreteWork
A1880 ResidenceBuild.Super Structure 3.ConcreteWork
A1890 ResidenceBuild.Super Structure 3.BrickWork
A1900 ResidenceBuild.Super Structure 3.ConcreteWork
A1910 ResidenceBuild.Super Structure 3.ConcreteWork
A1920 ResidenceBuild.Super Structure 3.ConcreteWork
A1930 ResidenceBuild.Super Structure 3.Plaster
A1940 ResidenceBuild.Super Structure 3.Plaster
A1950 ResidenceBuild.Super Structure 3.Plaster
A1960 ResidenceBuild.Super Structure 3.BrickWork
A1640 ResidenceBuild.Finishing
A1650 ResidenceBuild.Finishing
A1800 ResidenceBuild.Finishing
A1580 ResidenceBuild.Sanitary Works
A1810 ResidenceBuild.Sanitary Works
A1970 ResidenceBuild.Sanitary Works
A1980 ResidenceBuild.Sub Structure.BrickWork
A1990 ResidenceBuild.Sub Structure.BrickWork
A2000 ResidenceBuild.Sub Structure.BrickWork
A2010 ResidenceBuild.Sub Structure.BrickWork
A2020 ResidenceBuild.Sub Structure.ConcreteWork
A2030 ResidenceBuild.Sub Structure.ConcreteWork
A2040 ResidenceBuild.Sub Structure.ConcreteWork
A2050 ResidenceBuild.Sub Structure.ConcreteWork
A2060 ResidenceBuild.Sub Structure.ConcreteWork
A2070 ResidenceBuild.Sub Structure.ConcreteWork
A2080 ResidenceBuild.Sub Structure.ConcreteWork
A2090 ResidenceBuild.Sub Structure.ConcreteWork
A2100 ResidenceBuild.Sub Structure.ConcreteWork
A2130 ResidenceBuild.Electrical Works
A2140 ResidenceBuild.Electrical Works
A2150 ResidenceBuild.Sanitary Works
A2160 ResidenceBuild.Electrical Works
A2170 ResidenceBuild.Electrical Works
A2180 ResidenceBuild.Electrical Works
A2190 ResidenceBuild.Electrical Works
A2200 ResidenceBuild.Electrical Works
A2210 ResidenceBuild.Electrical Works
A2220 ResidenceBuild.Final
A2230 ResidenceBuild.Final
A2240 ResidenceBuild.Final
A2250 ResidenceBuild.Final
A2260 ResidenceBuild.Final
A2270 ResidenceBuild.Final
A2110 ResidenceBuild.Sub Structure.ConcreteWork
A2120 ResidenceBuild.Sub Structure.ConcreteWork
A2280 ResidenceBuild.Sub Structure.ConcreteWork
A2290 ResidenceBuild.Super Structure 1.ConcreteWork
task_name
Activity Name Estimated Qty Actual Qty
Site Clearance 1500
Foudation Layout 2 engineer
Labor Quarter Construction
Storage Site Fixing
Water Source (Well)
Electricity Source Finalization
Foundation Excavation 1936
Removal of Earth 2904
Brick Soling for Foundation pad and Strap Beam 352
PCC For Foundation Pad and Strap Beam 116.16
Sand filling for foundation 352
Rebar Cutting And Bending for Foundation, Column Strap Beam
Foundation mat placement
Column Placement
Foundation Concrete Work 356.570332
Excavation for Tie Beam 204.52
Brick Soling For Tie Beam 104.5
Sand filling for tie beam 204.52
Tie Beam Rebar Cutting and Bending
Tie Beam Rebar Placement
Tie Beam Formwork
Tie Beam Concreting 29.390625
Excavation for Toe Wall
Excavation for Water Tank 814.9375
Excavation for Septic Tank 462
Excavation for Soak Pit
Column below plinth level 42.03
9 inch brick wall above tie Beam 193.5675
Stepped Brick Work for Toe Wall
Fixing Sewer and Soil line (Under Ground)
Filling of Earth upto Plinth Level
Plinth Beam Rebar Cutting and Bending
Plinth Beam Rebar Placement
Plinth Beam Formwork
Plinth Beam Concreting 29.390625
Earth Filling Compaction after Plinth Beam Casting
Brick Soling for Ground Floor PCC 790.25
1:2:4 PCC Work in Ground Floor Slab 260.7825
Rebar Cutting and Bending For Strap Beam
Rebar Placement for Strap Beam
Form Work For Column ( Groudn Floor)
Concreting of Column (Ground Floor) 83.97
Masonary Work upto Sill Level Ground Floor
Fixing Door Window Frame Ground Floor
Masonary Work Above Sill Level upto Lintel Level (Ground Floor)
Sill Band (Ground Floor)
Lintel Band (Ground Floor)
Masonary Work Above Lintel Band (Ground Floor)
FormWork for First Floor Slab
Rebar Cutting and Bending for First Floor Slab
Concreting on First Floor Slab 308.0028
Electrical Duct Layout First Floor Slab
Electrical Duct Layout Second Floor Slab
Electrical Duct Layout Third Floor Slab
Ground Floor Internal Plaster 2167.615
Ground Floor Ceiling Plaster
Ground Floor External Plaster 840.1782
Screeding and Punning on Floor (on all Stories) 2606.37
Tile Work on all Floors 833.61
Elevation Tile Work on all Bathroom
Elevation Tile on Kitchen
Marble Works on StairCase 85
Marble Works on KItchen Slab, Entrance Steps and Misc
StairCase Railing 113.32
Paint Works
Parapet Railing
Form Work For Column First Floor
Concreting of Column (First Floor)
Masonary Work upto Sill Level (First Floor)
Fixing Door Window Frame(First Floor)
Masonary Work Above Sill Level upto Lintel Level (First Floor)
Sill Band (First Floor)
Lintel Band (First Floor)
Masonary Work Above Lintel Band (First Floor)
FormWork for Second Floor Slab
Rebar Cutting and Bending for Second Floor Slab
Concreting on Second Floor Slab
First Floor Internal Plaster
First Floor Ceiling Plaster
First Floor External Plaster
Form Work For Column (Second Floor)
Concreting of Column (Second Floor)
Masonary Work upto Sill Level (Second Floor)
Fixing Door Window Frame (Second Floor)
Masonary Work Above Sill Level upto Lintel Level (Second Floor)
Sill Band (Second Floor)
Lintel Band (Second Floor)
Masonary Work Above Lintel Band (Second Floor)
FormWork for Third Floor Slab
Rebar Cutting and Bending for Third Floor Slab
Concreting on Third Floor Slab
Second Floor Internal Plaster
Second Floor Ceiling Plaster
Second Floor External Plaster
Masonry Work for Parapet Wall on applicable floors
Door Panel Fittings
Fixing Window
Window Grill
Plumbing Pipe Fixing Ground Floor
Plumbing Pipe Fixing For First Floor
Plumbing Pipe Fixing For Second Floor
Brick Soling for Water Tank
Brick Work For Water Tank
Brick Soling For Septic Tank
Brick Work For Septic Tank
PCC For Water Tank
PCC for Septic Tank
Concreting for Water Tank Side Wall
Rebar Cutting and Bending for Water Tank
Formwork For Water Tank Side
Formwork For Water Tank Slab
Rebar Cutting, Bending and Placing for Water tank Slab
Concreting for Water Tank Slab
Conrete Works for Septic Tank Slab
Fixing Switches and Boards
Fixing Lighting fixtures
Sanitary Fixtures
Electrical Duct layout and Box Fixing for Ground Floor Wall
Electrical Duct layout and Box Fixing for First Floor Wall
Electrical Duct Layout and Box Fixing for Second Floor
Electrical Cables Fixing for Ground Floor Wall
Electrical Cables Fixing for First Floor Wall
Electrical Cables Fixing for Second Floor
Exterior Boundry Wall
Gate Fixing
Placing Circular Staircase
External Flooring and Fininshing
Cleaning and Handover
Fixing Over Head Water Tank
Water Proofing For Water Tank
Plaster And punning for Water Tank
Plaster and Punning for Septic Tank
Kitchen Counter Slab ( Whichever Floor)
Actual Qty
BUILDING SUMMARY
SN Description Quantity Unit Rate Total Cost Remarks
Site Clearance
1
1,500.00 sq. ft - -
Excavation in medium soil including
carriage upto 3 m height and
2 transportation uptop 30m width
2,963.08 cub. ft - -
1 Layer Proper Brick Soling with properly
3 burnt class B brick
1,451.27 sq. ft 69.29 100,551.82
Sand Filling above Brick Soling of atleast
4 half inch
1,451.27 sq. ft 10.00 14,512.70
5 PCC work of M15 under footing and
under ground surface 470.30 cub. ft 280.95 132,131.74

6 RCC work of M20 for Column, Beam, Slab,


Staircase and Footing 2,409.82 cub. ft 330.00 795,240.77
7 Rebar for RCC 6.93 MT 91,300.00 632,713.85
Masonary Wall construction with Sand
Cement Mortar and first class brick
8
2,293.39 cub. ft 321.70 737,795.03
Plaster in Exterior wall of atleast 12.5 mm
9 thick
2,748.03 sq. ft 12.06 33,149.88
Plaster in Interior wall of atleast 12.5 mm
10 thick
6,003.37 sq. ft 12.06 72,419.43
Plaster in Cieling atleast 12.5 mm thick
11
2,284.97 sq. ft 14.62 33,396.11
Floor Finishing of the Entire Slabs BY
12 Sceeding on Building
2,606.37 sq. ft 44.58 116,189.68
Floor Finishing of the Entire Slabs BY Tile
13 on Open terrace, veranba & Kitchen
558.61 sq. ft 159.15 88,902.50
Floor & wall Finishing of the Entire Toilet
14 BY Tile
275.00 sq. ft 159.15 43,766.11
Marble in staircase and kitchen
15
263.39 sq. ft 350.00 92,186.50
Marble Skirting in staircase
16
85.00 rft 300.00 25,500.00
Exterior 1 coat of white cement and Two
Coat Paint in the Building
17
2,748.03 sq. ft 30.00 82,440.97
Interior 1 coat of white cement and Two
18 Coat Paint in the Building
8,288.34 sq. ft 30.00 248,650.17
Chaukash for Door of Salwood
19
20.82 cub. ft 6,500.00 135,297.50
Plywood panel doors of 18 mm thickness
with all finishing and accessories cost
20
290.50 sq. ft 400.00 116,200.00
Steel Staircase Railing
21
113.32 rft 1,100.00 124,652.00
Parqueting in living room
22
- sq. ft 450.00 -
Door Paint
23
201.85 sq. ft 15.00 3,027.75
Door shutter Paint
24
581.00 sq. ft 125.00 72,625.00
Aluminium windows
25
563.78 sq. ft 1,400.00 789,293.89
Form work
26
- sq. ft 32.05 -

27
Skirting on room 744.28 rft 50.00 37,214.00
28 Tile Skirting 205.67 rft 150.00 30,850.50
29 Iron Grill Work 8.00 sq.ft 200.00 1,600.00
30 Boundary brick wall 549.98 cub. ft 321.70 176,929.64
31 Boundary wall plaster 1,466.60 sq. ft 12.06 17,691.79
32 Boundary wall paint 1,466.60 sq. ft 30.00 43,998.00
33 Boundary wall fence 146.66 sq.ft 200.00 29,332.00
34 Circular Staircase 1.00 no. 40,000.00 40,000.00
35 Main Gate 1.00 no. 350.00 350.00
36 Tile Cladding on outside wall 511.94 sq. ft 225.00 115,186.50
37 Overhead Water Tank 1.00 no. 15,000.00 15,000.00
38 Stone flooring in car park 135.78 sq. ft 200.00 27,156.00
39 Puning work 1,751.43 sq.ft 25.00 43,785.75
A Underground Water tank
Excavation in medium soil including
1 carriage upto 3 m height and
transportation uptop 10m width
814.94 cub. ft - -
1 Layer Proper Brick Soling with properly
2 burnt class B brick
103.13 sq. ft 69.29 7,145.06
Sand Filling above Brick Soling of atleast
3 half inch
103.13 sq. ft 30.00 3,093.75
4 PCC work of M15 under footing and
under ground surface 18.98 cub. ft 280.95 5,331.09
5 RCC work of M15 103.13 cub. ft 0.52 53.63
6 Rebar for RCC 0.65 MT 91,300.00 59,241.15
7 Form work 275.38 sq. ft 31.79 8,755.54
8 chemical Treatment 294.63 sq. ft 25.00 7,365.63
-
B Septic Tank -
1 Septic Tank (10X5X5)ft3 -
2 Earth work (excavation) 462.00 - -
3 Brick Soling 75.90 69.29 5,258.76
Sand Filling above Brick Soling of atleast
half inch
4 75.90 30.00 2,277.00
5 75mm PCC 18.98 280.95 5,331.09
6 Brick Work 61.88 560.00 34,650.00
7 RCC Work for slab 18.98 321.70 6,104.35
8 Reinforcement 0.04 91,300.00 3,826.39
9 Form work 75.90 31.79 2,413.24
Total of Civil Works 5,220,584.23
Total Labor Cost 1,800,000.00
Civil Sub-total 7,020,584.23
Sanitary and Electrical Work (15%) 1,053,087.63
SubTotal 8,073,671.87
Overhead Costs 605,525.39

Grand Total 8,679,197.26


BUILDING SUMMARY
SN Particulars Quantity Unit Wet Quantity Unit Cement OPC (No.)
1 Total RCC work (M20) 2,409.82 cub. ft cub. ft #VALUE!
2 Total PCC work (M15) 470.30 cub. ft 724.26 cub. ft 98.14
Total Plaster work (1:4)
3
2,284.97 sq.ft 146.62 cub. ft
Total Plaster work (1:6)
4
8,751.40 sq.ft 561.55 cub. ft
5 Masonary wall (1:4) 2,293.39 cub. ft
6 Brick Soling 1,451.27 sq. ft
7 Sand filling 1,451.27 sq. ft
8 Rebar 6.93 MT
9 Screeding (1:2:4) 2,606.37 sq. ft 501.73 cub. ft 67.98
10 Tile (1:4) 833.61 sq. ft 53.49 cub. ft 8.70
11 Marble (1:4) 263.39 sq. ft 16.90 cub. ft 2.75
TOTAL SUM #VALUE!

Total Quantity including wastages of 10%


Cement OPC #VALUE! bags
Cement PPC 261.94 bags
Sand (Khasro) #VALUE! cu.ft
Sand (double washed) 1,460.71 cu.ft
Aggregate #VALUE! cu.ft
Brick 33,431.16 No.
Cement PPC (No.) Sand (cuft) Plaster Sand (cuft) Aggregate (cuft) Brick (No.)
#VALUE! #VALUE!
241.42 482.84

23.84 117.30

65.22 481.33
149.07 729.30 25,227.30
5,164.66
60.47

167.24 334.48
42.79
13.52
238.13 #VALUE! 1,327.92 #VALUE! 30,391.96
BUILDING SUMMARY
SN Particulars Quantity Unit Quantity in m3 Unit Cement OPC (No.)
1 Total RCC work (M20) 2,409.82 cub. ft 68.29 cub.m 546.33
2 Total PCC work (M15) 470.30 cub. ft 13.33 cub.m 85.30
Total Plaster work (1:4)
3
2,284.97 sq.ft 212.39 sq.m
Total Plaster work (1:6)
4
8,751.40 sq.ft 813.45 sq.m
5 Masonary wall (1:4) 2,293.39 cub. ft 64.99 cub.m
6 Brick Soling 1,451.27 sq. ft
7 Sand filling 1,451.27 sq. ft
8 Rebar 6.93 MT
9 Screeding (1:2:4) 2,606.37 sq. ft 501.73 cub. ft 67.98
10 Tile (1:4) 833.61 sq. ft 53.49 cub. ft 8.70
11 Marble (1:4) 263.39 sq. ft 16.90 cub. ft 2.75
TOTAL SUM 711.05

Total Quantity including wastages of 10%


Cement OPC 782.16 bags
Cement PPC 236.48 bags
Sand (Khasro) 1,669.23 cu.ft
Sand (double washed) 636.11 cu.ft
Aggregate 3,087.35 cu.ft
Brick 45,715.89 No.
Cement PPC (No.) Sand (cuft) Plaster Sand (cuft) Aggregate (cuft) Brick (No.)
1,024.17 2,072.45
209.28 399.75

22.85 109.42

62.15 450.66
129.98 18.20 36,395.24
5,164.66
60.47

167.24 334.48
42.79
13.52
214.98 1,517.48 578.28 2,806.68 41,559.90