Sei sulla pagina 1di 2

CONFIDENTIAL

ASSIGNMENT 3
GROUPING
SEPT/OCT SEMESTER 2018

BACHELOR OF CIVIL ENGINEERING

CONSTRUCTION PROJECT MANAGEMENT


(CIVE4406)

Group members name and Id Numbers:

1
2
3
4
5

GENERAL INSTRUCTIONS

1. This question booklet consists of 2 printed pages including this page.

Total marks Marks Score

Total

CONFIDENTIAL
1
QUESTION

Please review the journal title “The development of public and private
construction procurement systems in the Malaysian construction industry” with
the question given below.

1. Review of the Historical scenario in Malaysia – 6 marks


2. Review the significant changes on different economic phases which influence
the routes of procurement systems Malaysia’s construction industry – 6 marks
3. Objective of the case study – 1 marks
4. Any six full citation with the statement – 6 marks
i.e Even Ibrahim, (2010) agrees that the traditional procurement is still the major
approach of construction; however, he suggests that the local construction industry
needs to experience a visible advancement from the old construction practices, as the
traditional ways of performing and managing construction processes face unpredictable
challenges.
Ibrahim, A.R., Roy, M.H., Ahmed, Z., and Imtiaz, G. (2010), An Investigation of the
Status of the Malaysian Construction Industry, Benchmarking: An International
Journal, 17(2): 294-308

5. Review the Procurement system in Malaysia – 6 marks


6. State the selected respondent involved in the research – 4 marks
7. Review the discussion of the finding – 10 marks
8. Review the conclusion of the research – 6 marks
[CLO2-PLO5:C5](Total Mark: 45 marks)

END OF QUESTION

Assignment Format and criteria:


a) Use double space and 12-point of Times New Roman font.
b) Plagiarism is not acceptable and will be given zero (0) mark for each group.
c) Penalty will be given to the late submission.
d) Stapler on the upper left side ONLY.
e) Please include together this page in your report.
f) The assignment maximum pages can reach between 13 to 15 pages only.
g) Due DATE = 8st February 2019
2

Potrebbero piacerti anche