Equipment Code Yamato 300A jac102372 Location Practical Work Area/Shielded Metal Operation Procedure: 1. Check primary circuit. Confirm that the power switch is off. Check insulation. Check for any loose joints. Check for any casement grounds. 2. Check secondary circuit Check for any loose joints. Check insulations. Check clamp and cables. Check for the wiring connections. Insert the electrode in the correct angle. 3. Prepare the ammeter Turn the dial to adjust the optimum position. Turn on the welding machine switch. Turn the adjusting handle to adjust the pointer correctly to the scale. Make a short circuit (arc) between the welding rod and the base metal. Check the optimum current using the ammeter. Turn-off the welding machine switch.