3 5 7 3 5 7 NOTE:

2.82 2.82 2.82 2.82 1. Provisions for buffers and any other supporting systems
H Bar 2 H Bar 2 of lift may be given as per the requirements of lift suppliers
A A
150mmc/c 150mmc/c 150mmc/c 150mmc/c

J Bar 1 J Bar 1 2. The depth of lift pit shown from the upper cellar floor level
is based on the assumption of 8 passenger lift with a speed
of 1.5m/sec as per standards. However the actual
Bar 3 Bar 4 Bar 5 Bar 3 Bar 4 Bar 5
dimensions may be arrived in collaboration with lift suppliers

upper cellar 3. Materials used are M20 grade concrete and


Fe500 Grade steel

4. The cover for the reinforcement provided for the


Slab is 20mm and for the beams is 25mm
FFL of lower cellar

3 5 7
H
H J
3
2#12(St) 2#12(St)

2#12(St)

2#12(St)+ 2#12(St)+
1#16(Ex) 1#16(Ex)
2#12(St)
300 300

LONGITUDINAL SECTION OF BAR 1 & BAR 2 LONGITUDINAL SECTION OF BAR 3, BAR 4 & BAR 5

Designed Drawn Checked Approved


Venture : by : by : by by:
CIVIL ENGINEERING DEPARTMENT
SKANDHANSHI TRADE CENTER PSS SAM PSS PSS CHAITANYA BHARATHI INSTITUTE OF
(Double cellar+Ground+Four ) DWG NO: TECHNOLOGY
proposed at Thadipatri, Anantapur CBIT/CED/CONS/SIPK/STC-TP/STR/FSD-BG/1A GANDIPET, HYDERABAD- 500075 (T.S)
By
Revision: Note:
Skandha Infra Projects Pvt.Ltd., Kurnool
No.___
Dt: 22-05-2018 HEAD, CED PRINCIPAL