0 valutazioniIl 0% ha trovato utile questo documento (0 voti)
13 visualizzazioni1 pagina
This document provides details of regression testing done on an embassy integration module. It lists the module, project manager, transport number, incident number, transport code, start and end dates, and testing done by a functional consultant to change scheduling for breakdowns. The document also notes that regression testing was conducted according to test scenarios and scripts provided by the functional consultant.
Descrizione originale:
Breakdown
Titolo originale
Embassy_Integration & Regression Testing_Breakdown Scheduling
This document provides details of regression testing done on an embassy integration module. It lists the module, project manager, transport number, incident number, transport code, start and end dates, and testing done by a functional consultant to change scheduling for breakdowns. The document also notes that regression testing was conducted according to test scenarios and scripts provided by the functional consultant.
This document provides details of regression testing done on an embassy integration module. It lists the module, project manager, transport number, incident number, transport code, start and end dates, and testing done by a functional consultant to change scheduling for breakdowns. The document also notes that regression testing was conducted according to test scenarios and scripts provided by the functional consultant.