Sei sulla pagina 1di 1

Form # TTC-07 (00) 14/12/06

MONTHLY PROGRESS REPORT Technical


FOR GRADUATE TRAINEE ENGINEERS & EQUIVALENT Training Center

Name: Hasnain Ali P. # 01816 Report #: 2 / 12

Discipline: Mechanical Date of Joining: 13-9-2018

Report for the Month of: October Section / Unit Project Engineering Unit

THEORETICAL TRAINING COMPLETED (Topics with brief description):


 Study of Two Risk Based Elements of PSM including Emergency Response Plan and Pre-Start Up
Safety Review(PSSR)
 Understanding of “Work to Permit Procedures” that are followed for different types of jobs to
ensure that all work is being carried out in a safest possible manner.
 Weight calculations of an Economizer with given dimensions including its tubes and supports and
preparation of its BOM
 Study of ASME B36.10M (Welded and Seamless pipes)
 Overview of Friedrich Uhde Specifications for Piping of NP, CN, CAN and HNO 3 Plants
 Calculation of minimum required thickness of Boiler Tubes (up to and including 5” O.D), Piping,
Drums and Headers according to ASME BPVC-Section-I
 Fundamental Design aspects of ASME BPVC-Section VIII Division-1 and learned:
o Calculating the minimum required thickness of thin and thick shell under Internal Pressure

o Thickness Calculation of Hemi-Spherical, Elliptical, Torispherical and Toriconical using Dish


Head Formulas
o Joint Efficiency and its values for Full and Spot Radiographic Testing

o Reinforcement wall thickness calculation


PRACTICAL TRAINING COMPLETED (Topics with brief description):
 Attended the IPP Training on “Types of Fire and Methods of Suppression”
 Active Participation in D-Level Safety Talks of the Unit
 Participated in 2 Days HR-Based Training on “Driving for Results”
Learned how to make SMART Goals, to increase the productivity of our work by scheduling, knowing
the personality traits and personal values.
 Attended the HORC Meeting of PH & S for the month of October
 Sub-HSE (M) of Ammonia Export Line
 Field visit of AN Plant and assisted in modifying the Isometric Drawings according to built in Rental
Boiler Connections
 Field Visit of NH3 Plant of extension of Air Vent at Steam Drum 101-F

ROUTE PREPARED BY REVIEWED BY APPROVED BY ASSESSED BY


Name Hasnain Ali Sarfraz Ali Sadik Bashir
Date 5-Nov-18
Desig./Sign. SH / UM Dept. Manager Mngr. Training

/conversion/tmp/scratch/406238910.doc

Potrebbero piacerti anche