Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
2
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
3
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
4
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
5
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
(Safe)
At the long edge, the diameter of the bar must follow the requirements
1.3 M1/V + L0 ≥ Ld
Ast at support = 1000 x 50.27/216 = 232.4 mm2
M1 = 5.58 X 106 N-mm
V = 16193 N
Assume Support Width = 170 mm with cover of 20 mm
L0 = 65 mm
Hence = 513 mm > 450 mm (O.K), code requirement is satisfied.
Check for Shear & Development Length in Long Span
S.F. at Short Edge = 1/3 wlx = 12800 N/m
Nominal Shear Stress = 12800/1000 x 112 = 0.114 N/m2 (Safe)
Ast = 1000 x 50.27/200 = 251.35 mm2
M1 = 251.35 X 230 X 0.87 X 112 = 5.60 X 106 N-mm
V = 12800 N
L0 = ls/2-x’ = 80 mm
At the short edge, the diameter of the bar must follow the requirements
1.3 M1/V + L0 ≥ Ld
Hence = 649 mm > 450 mm (O.K), code requirement is satisfied.
Torsional Reinforcement at Corners
Size of torsional mesh = lx/5 = 1.0 Meter
Area of mesh reinforcement = ¾ (Ast)x= 544.4 mm2
Using 10 mm Ф bar @ 140 mm c/c in short direction an 8 mm Ф bar @ 140 mm c/c in long
direction. This reinforcement is to be provided at both face of slab at each corner.
The details of reinforcement are shown in drawings.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
6
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
7
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
8
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
9
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
6. Reinforcing Bars
Ast = 2018 mm2, providing 20 mm Ф Bars 7 Nos., place 4 bars at bottom tier and 3
bars at top tier, keeping a clear cover of 20 mm between the two tiers.
Asc = 1158 mm2, providing 20 mm Ф Bars 4 Nos., place 4 bars at Top, in one tier,
Keeping a clear cover of 25 mm.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
10
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
7. Curtailment of Reinforcement
The bending at any point x meter from the centre of the span is
X= (2(M1 – M)/ 1000 W)0.5
X = 3.2 Meter
Hence at x = 3.2 M from the centre, compressive reinforcement is no longer required and
it may, therefore, be curtailed. So curtail 2 bars and continue 2 bars up to the support, to
hold the shear stirrups, at this section bending moment is equal to M1 = 56.37 X 106 N-
mm, Ast1 = 557 mm2, which will need 4 Bars, only so curtail 3 bars from upper tier at this
point and continue rest of the bars to support.
8. Shear Reinforcement
Near the support, where the S.F. is maximum. The section is singly reinforced.
Vc = 49507.5 N, Vs = 55752.5 N
Sv = 311 mm
Provide 10 mm Ф ring bar @ 200 mm c/c near support and increase to 250 mm c/c up to
mid span.
The diameter of the bar must follow the requirements = 1.3 M1/V + L0 ≥ Ld
Here, M1 = 159.0 X 106 N-mm
V = 105260 N
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
11
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
2 Nos. Triangular Load of Slab S-1 + Self-Load of Beam + 2 Nos. Point Load MB-1
24166.67 + 6000 + 210520 = 30166.67 N/m (U.D.L.) + 210520 N (Point Load)
6. Reinforcing Bars
Ast = 6205 mm2, providing 25 mm Ф Bars 12 Nos., place 6 bars at bottom tier and 6
bars at top tier, keeping a clear cover of 25 mm between the two tiers.
Asc = 1712 mm2, providing 20 mm Ф Bars 6 Nos., place 4 bars at Top, in one tier,
and 2 Nos. at Second Tier Keeping a clear cover of 25 mm.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
12
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
7. Curtailment of Reinforcement
The bending at any point x meter from the centre of the span is
X= (2(M1 – M)/ 1000 W)0.5
X = 5.4 Meter
Hence at x = 5.4 M from the centre, compressive reinforcement is no longer required and
it may, therefore, be curtailed. So curtail 2 bars and continue 4 bars up to the support, to
hold the shear stirrups, at this section bending moment is equal to M1 = 106.23 X 106 N-
mm, Ast1 = 764 mm2, which will need 6 Bars, only so curtail 6 bars from upper tier at this
point and continue rest of the bars to support.
8. Shear Reinforcement
Near the support, where the S.F. is maximum. The section is singly reinforced.
Vc = 101660.0 N, Vs = 154433.35 N
Sv = 154 mm
Provide 10 mm Ф ring bar @ 150 mm c/c near support and increase to 200 mm c/c up to
mid span.
The diameter of the bar must follow the requirements = 1.3 M1/V + L0 ≥ Ld
Here, M1 = 409.45 X 106 N-mm
V = 256093.35 N
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
13
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
1 Nos. Triangular Load of Slab S-1 + Self-Load of Beam +1 Nos. Point Load MB-1
12083.33 + 3750 + 105260 = 15833.33 N/m (U.D.L.) + 105260 N (Point Load)
6. Reinforcing Bars
Ast = 4080 mm2, providing 25 mm Ф Bars 8 Nos., place 4 bars at bottom tier and 4
bars at top tier, keeping a clear cover of 25 mm between the two tiers.
Asc = 1616.6 mm2, providing 20 mm Ф Bars 6 Nos., place 3 bars at Top, in one tier,
and 3 Nos. at Second Tier Keeping a clear cover of 25 mm.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
14
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
7. Curtailment of Reinforcement
The bending at any point x meter from the centre of the span is
X= (2(M1 – M)/ 1000 W)0.5
X = 5.4 Meter
Hence at x = 5.4 M from the centre, compressive reinforcement is no longer required and
it may, therefore, be curtailed. So curtail 2 bars and continue 4 bars up to the support, to
hold the shear stirrups, at this section bending moment is equal to M1 = 106.23 X 106 N-
mm, Ast1 = 764 mm2, which will need 4 Bars, only so curtail 4 bars from upper tier at this
point and continue rest of the bars to support.
8. Shear Reinforcement
Near the support, where the S.F. is maximum. The section is singly reinforced.
Vc = 64155.0 N, Vs = 67641.65 N
Sv = 290 mm
Provide 10 mm Ф ring bar @ 200 mm c/c near support and increase to 250 mm c/c up to
mid span.
The diameter of the bar must follow the requirements = 1.3 M1/V + L0 ≥ Ld
Here, M1 = 219.22 X 106 N-mm
V = 131796.65 N
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
15
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
6. Reinforcing Bars
Ast = 628 mm2, providing 12 mm Ф Bars 6 Nos., place 4 bars at bottom tier and 2
bars at top tier, keeping a clear cover of 12 mm between the two tiers.
Asc = 178 mm2, providing 12 mm Ф Bars 3 Nos., place 3 bars at Top, in one tier,
Tier Keeping a clear cover of 25 mm.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
16
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
7. Curtailment of Reinforcement
The bending at any point x meter from the centre of the span is
X= (2(M1 – M)/ 1000 W)0.5
X = 1.5 Meter
Hence at x = 1.5 M from the centre, compressive reinforcement is no longer required and
it may, therefore, be continue 3 bars up to the support, to hold the shear stirrups, at this
section bending moment is equal to M1 = 29.0 X 106 N-mm, Ast1 = 328 mm2, which will
need 4 Bars, only so curtail 2 bars from upper tier at this point and continue rest of the
bars to support.
8. Shear Reinforcement
Near the support, where the S.F. is maximum. The section is singly reinforced.
Vc = 23430.0 N, Vs = 26142.60 N
Sv = 375 mm
Provide 8 mm Ф ring bar @ 200 mm c/c near support and increase to 250 mm c/c up to
mid span.
The diameter of the bar must follow the requirements = 1.3 M1/V + L0 ≥ Ld
Here, M1 = 30.27 X 106 N-mm
V = 49572.60 N
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
17
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
2 Nos. Triangular Load of Slab S-3 + Self-Load of Beam + 2 Nos. Point Load of MB-1
18850 + 3375 + 210520 = 22225 N/m (U.D.L.) + 210520 N (Point Load)
6. Reinforcing Bars
Ast = 4080 mm2, providing 25 mm Ф Bars 8 Nos., place 4 bars at bottom tier and 4
bars at top tier, keeping a clear cover of 25 mm between the two tiers.
Asc = 1616.6 mm2, providing 20 mm Ф Bars 6 Nos., place 3 bars at Top, in one tier,
and 3 Nos. at Second Tier Keeping a clear cover of 25 mm.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
18
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
7. Curtailment of Reinforcement
The bending at any point x meter from the centre of the span is
X= (2(M1 – M)/ 1000 W)0.5
X = 5.4 Meter
Hence at x = 5.4 M from the centre, compressive reinforcement is no longer required and
it may, therefore, be curtailed. So curtail 2 bars and continue 4 bars up to the support, to
hold the shear stirrups, at this section bending moment is equal to M1 = 106.23 X 106 N-
mm, Ast1 = 764 mm2, which will need 4 Bars, only so curtail 4 bars from upper tier at this
point and continue rest of the bars to support.
8. Shear Reinforcement
Near the support, where the S.F. is maximum. The section is singly reinforced.
Vc = 64155.0 N, Vs = 67641.65 N
Sv = 290 mm
Provide 10 mm Ф ring bar @ 200 mm c/c near support and increase to 250 mm c/c up to
mid span.
The diameter of the bar must follow the requirements = 1.3 M1/V + L0 ≥ Ld
Here, M1 = 219.22 X 106 N-mm
V = 131796.65 N
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
19
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
DESIGN OF COLUMNS
1. Loading
(2 X Load from Beam MB-1 + Load from Beam MB-2 + Self Load) X 3 Story
(2 X 105260 + 256093.35 + 18812.5) X 3
= 1456.27 kN
2. Effective Length
Both end Fixed = 0.65 X 4.3 Meter = 2.8 Meter
3. Design of Section
Load carrying capacity of column takin p = 1 % = 0.01
P = σcc (Ag – pAg ) + σsc pAg
Ag = 128494.41 mm2
Providing B = 350 mm and D = 500 mm
Total Ag = 175000 mm2
4. Longitudinal Reinforcement
Asc = 0.01 X 175000 = 1750 mm2
Provide 16 mm Ф 08 Nos. with a nominal cover 40 mm.
5. Design of Ties
Diameter of ties should be ¼ the diameter using 10 mm Ф bar
Spacing
a) 16 X dia of main bar = 256 mm
b) 48 X dia of ties = 480 mm
Provide 10 mm Ф bars @ 200 mm c/c at mid span, and 150 mm c/c near support.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
20
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
(2 X Load from Beam MB-1 + 2 X Load from Beam MB-2 + Self Load) X 3 Story
(2 X 105260 + 2 X 256093.35 + 21500) X 3
= 2232.6 kN
2. Effective Length
Both end Fixed = 0.65 X 4.3 Meter = 2.8 Meter
3. Design of Section
Load carrying capacity of column takin p = 1 % = 0.01
P = σcc (Ag – pAg ) + σsc pAg
Ag = 176490.11 mm2
Providing B = 400 mm and D = 500 mm
Total Ag = 200000 mm2
4. Longitudinal Reinforcement
Asc = 0.01 X 176490.11 = 1764.90 mm2
Provide 16 mm Ф 10 Nos. with a nominal cover 40 mm.
5. Design of Ties
Diameter of ties should be ¼ the diameter using 10 mm Ф bar
Spacing
c) 16 X dia of main bar = 256 mm
d) 48 X dia of ties = 480 mm
Provide 10 mm Ф bars @ 200 mm c/c at mid span, and 180 mm c/c near support.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
21
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
(2 X Load from Beam MB-5 + Load from Beam MB-4 + Self Load) X 3 Story
(2 X 191937.5 + 49572.60 + 12900) X 3
= 1339.0kN
2. Effective Length
Both end Fixed = 0.65 X 4.3 Meter = 2.8 Meter
3. Design of Section
Load carrying capacity of column takin p = 1 % = 0.01
P = σcc (Ag – pAg ) + σsc pAg
Ag = 118147 mm2
Providing B = 300 mm and D = 400 mm
Total Ag = 120000 mm2
4. Longitudinal Reinforcement
Asc = 0.01 X 118147 = 1181.47 mm2
Provide 16 mm Ф 6 Nos. with a nominal cover 40 mm.
5. Design of Ties
Diameter of ties should be ¼ the diameter using 10 mm Ф bar
Spacing
e) 16 X dia of main bar = 256 mm
f) 48 X dia of ties = 480 mm
Provide 10 mm Ф bars @ 200 mm c/c at mid span, and 180 mm c/c near support.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
22
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
1. Loading
(2 X Load from Beam MB-4 + Self Load)
(2 X 49572.60 + 1767.14)
= 1009.12
2. Effective Length
Both end Fixed = 0.65 X 4.3 Meter = 2.8 Meter
3. Design of Section
Load carrying capacity of column takin p = 1 % = 0.01
P = σcc (Ag – pAg ) + σsc pAg
Ag = 89040 mm2
Providing Dia D = 350 mm
Total Ag = 96211.27 mm2
4. Longitudinal Reinforcement
Asc = 0.01 X 89040 = 890.4 mm2
Provide 12 mm Ф 8 Nos. with a nominal cover 40 mm.
5. Design of Ties
Diameter of ties should be ¼ the diameter using 8 mm Ф bar
Spacing
g) 16 X dia of main bar = 192 mm
h) 48 X dia of ties = 384 mm
Provide 8 mm Ф bars @ 180 mm c/c at mid span, and 180 mm c/c near support.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
23
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
DESIGN OF FOOTINGS
1. Size of Footing
2. Design of Section
Maximum B.M. occurs at distance b/4 from the centre of the wall, and its magnitude
is M = p0 B/8 X (B-b)2 X 106 N-mm
M = 343.14 X 106 N-mm
d = 376.5 mm
Let total D = 400 mm
3. Check for Shear
V = 384.44 N
ꞎc = 0.34 N/mm2
4. Design of Reinforcement
Ast = 2689.18 mm2
Ast one face = 1344.6 mm2
Provide 10 mm Ф @ 250 mm c/c both ways at top and bottom.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)
24
Multi-Purpose Commercial Building Structure Design at Kanera, Sagar (M.P.)
5. Size of Footing
6. Design of Section
Maximum B.M. occurs at distance b/4 from the centre of the wall, and its magnitude
is M = p0 (B-b) (B-b/4) X 106 N-mm
M = 752 X 106 N-mm
d = 442.6 mm
Let total D = 500 mm
7. Check for Shear
V = 2009 N
ꞎc = 1.37 N/mm2
8. Design of Reinforcement
Ast = 5419.6 mm2
Ast one face = 2709.8 mm2
Provide 10 mm Ф @ 230 mm c/c both ways at top and bottom.
AATVIK CONSULTANCY & INFRASTRUCTRE (Structure Design and Project Management Consultancy)