KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation

Wait for Riser spool inspection . M


Current Operation at 24:00:

Take fine measurements and fine


Begin to weld 21 1/4"X 2K casing
Welding is ongoing.
Meanwhile continue to mix KCL m
Operations last 24 hours(00:00 to 24:00)

Totco
Totco

Last Survey m MD

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEO
Interval m. MD

(m)

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Seepage Beds 802
B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 406.5

Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Akram Maqsud


Wellsite Geologist Kovan waleed
Wellsite Geologist Twana alias
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date 19/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation

ait for Riser spool inspection . Meanwhile continue to mixing KCL mud

ke fine measurements and fine cut of 20" casing 1.87 cm below surface .
gin to weld 21 1/4"X 2K casing head housing to the 20" casing .
elding is ongoing.
anwhile continue to mix KCL mud.

Inc 0.5 Azi


Inc 0 Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) 17'' Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEOLOGICAL SUMMARY
Lithology Descriptions

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth Actual Difference


Depth TVDss Thickness
M m +/-

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


06:00 UPDATE
Depth (mTVD RT) 406.5 Current Activity
Wait for Riser spool inspection

Wellhead preparation.Drill out cement

Team Crew
Days on Ranjdar Ahmed
Days on Ahmed Adnan
Days on Hemn salih

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 10
ROP m/h

CL mud

ow surface .
g.

Csg Depth (m) 406m


Csg Depth (m)
Csg Depth (m)
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Wait for Riser spool inspection

Ranjdar Ahmed Days Off


Ahmed Adnan Days Off
Hemn salih Days Off