Sei sulla pagina 1di 8

Temporary work design

Applicable for grid R to S / 40 to 43


Form work Material used : "TITAN BEAMS AND PROPS"
Assumptions
1. Assumed that the Prop load of 2730 kN is given for one Panel
( 8.00 m. x 8.00 m ) of slab and is including all type of Dead, REMARKS
imposed and Factor of safety.

Per sq. m. Load on the slab = SW 2730 = 42.65625 kN


64
Using Titan Main beams 1.70 m. @ 13.8 kg.
M.R. of the beam 6.90 kNm Ref. Titan beam data
B.M. max. = wl2 / 8 wx 1.70 x 1.70
8
or w = 6.90 x 8 = 19.1003 kN
2.89

Now as the Beam length is fixed, Loading is also fixed, the only
thing which can be changed is the w per m. run on the beam
which depands on b the loading strip
b

1.70

Width of load strip = b = w / SW 0.4477737 m.


The arrangement is shown in the drawing

Prop load = SW x Span x spacing 30.81914 kN


Use Titan # 3

Applicable for slabs outside grid R to S / 40 to 43 Strengthening of adjoining slabs for Traffic

We consider that demolition work is being carried out by a machine of gross weight of 20 kN

CASE -1 = KOMATSU PC 16 -R2


Operating weight = 1570 kg
Assumed gross weight 2000 kg

Loading condition 1 : Excavater is directly on beam (one track only) in the mid of beam

1.20 m

1.70 m Plan

Max. B.M. = W / B x ( x2 - a2 ) / 2 10 1 0.0625


1.2 2

B.M.max = 8.333333 0.46875 = 3.90625 kNm < 6.90 O.K.


Hence TITAN main beam of 1.70 span can be safely used

Condition 2 : Two Excavaters sitting directly on beam. tracks perp. to the beam span (one track one excavater ) in the mid of beam

3.54 3.54 3.54

0.77 m 0.50 m
Exc. 1 Exc2
1.70 m

1.70 m
Loading of one track = Beam spacing /2 x track width x Load per m2

Load per m. on track area 10 = 36.231884 kN/m2


0.23 1.2

Point load on beam due to one track 36.23188 x 0.425 x 0.23 = 3.54 kN

Max. moment 3.541667 x 0.85 + 3.54 x 0.35 4.25 kNm > 6.90
Check O.K.

5 kN
Use TITAN MAIN BEAMS of 1.70 span in both directions
20 kn 20 kn
Reaction on props

5 kN
Ra horz. + Rb horz. + Ra vert. + Rb vert. 50 kN

Use TITAN # 4
Temporary work design
Applicable for grid R to S / 40 to 43
Form work Material used : "MKII SOLDIERS AND DU-AL ALUMINIUM BEAMS"
Load calculation
Self weight of the Slab 0.45 1 1 25
Imposed load

1. Assume two breaker of 20 kn each standing side by side ,


beam spanning 1.80 m and 1.80 m c/c both grids

Total load per m2


Factor of safety as 2 x due to impact and other factors
Using Titan Main beams 1.80 m. long
M.R. of the beam
B.M. max. = wl2 / 8 wx 1.80 x 1.80
8
or w = (B.M. is replaced by M.R.) 38.00 x 8 = 93.8272
3.24
Now as the Beam length is fixed, Loading is also fixed, the only
thing which can be changed is the w per m. run on the beam
which depands on b the loading strip
20 kN
br

20 kN
br

1.80
1.80
0

Width of load strip = b = w / SW 2.09


The arrangement is shown in the drawing
Hence MKII SOLDIERS @ 1.80 M. on both axis can be used

Prop load = SW x Span x spacing 145.3 kN (When all four panels arou
Hence GASS 140 kN capacity aluminium shoring system can be used as the capacity is marginally lower than require

Applicable for slabs outside grid R to S / 40 to 43 Strengthening of adjoining slabs for Traffic

We consider that demolition work is being carried out by a machine of gross weight of 20 kN
CASE -1 = KOMATSU PC 16 -R2
Operating weight = 1570 kg
Assumed gross weight 2000 kg

Loading condition 1 : Excavater is directly on beam (one track only) in the mid of beam

1.20 m

1.80 m

Max. B.M. = W / B x ( x2 - a2 ) / 2 10 1 0.0625


1.2 2

B.M.max = 8.333333 0.46875 = 3.90625


Hence use S150 DU-AL beam of SWL bending = 6.80 kNm

Condition 2 : Two Excavaters sitting directly on beam. tracks perp. to the beam span (one track one excavater ) in the
3.54 3.54 3.54

0.77 m 0.50 m

1.80 m

Loading of one track = Beam spacing /2 x track width x Load per m2

Load per m. on track area 10 = 36.231884


0.23 1.2

Point load on beam due to one track 36.23188 x 0.425 x 0.23 =

Max. moment 3.541667 x 0.85 + 3.54 x 0.35

5 kN
Use TITAN MAIN BEAMS of 1.70 span in both directions
20 kn 20 kn
Reaction on props

5 kN
Ra horz. + Rb horz. + Ra vert. + Rb vert. 50 kN

Hence SGB cuplock support @ 74 kN leg capacity can be used


11.25 kN/m2
5 kN/m2

6.17284 kN/m2 REMARKS

22.42284
44.84568 kN /m2

38.00 kNm Ref. Titan beam data

kN

m.

(When all four panels around vert. support are occupied by breakers)
ginally lower than required
Plan

kNm < 6.80 O.K.

ack one excavater ) in the mid of beam


Exc. 1 Exc2

1.70 m

kN/m2

3.54 kN

4.25 kNm > 6.80


Check O.K.