Now as the Beam length is fixed, Loading is also fixed, the only
thing which can be changed is the w per m. run on the beam
which depands on b the loading strip
b
1.70
Applicable for slabs outside grid R to S / 40 to 43 Strengthening of adjoining slabs for Traffic
We consider that demolition work is being carried out by a machine of gross weight of 20 kN
Loading condition 1 : Excavater is directly on beam (one track only) in the mid of beam
1.20 m
1.70 m Plan
Condition 2 : Two Excavaters sitting directly on beam. tracks perp. to the beam span (one track one excavater ) in the mid of beam
0.77 m 0.50 m
Exc. 1 Exc2
1.70 m
1.70 m
Loading of one track = Beam spacing /2 x track width x Load per m2
Point load on beam due to one track 36.23188 x 0.425 x 0.23 = 3.54 kN
Max. moment 3.541667 x 0.85 + 3.54 x 0.35 4.25 kNm > 6.90
Check O.K.
5 kN
Use TITAN MAIN BEAMS of 1.70 span in both directions
20 kn 20 kn
Reaction on props
5 kN
Ra horz. + Rb horz. + Ra vert. + Rb vert. 50 kN
Use TITAN # 4
Temporary work design
Applicable for grid R to S / 40 to 43
Form work Material used : "MKII SOLDIERS AND DU-AL ALUMINIUM BEAMS"
Load calculation
Self weight of the Slab 0.45 1 1 25
Imposed load
20 kN
br
1.80
1.80
0
Prop load = SW x Span x spacing 145.3 kN (When all four panels arou
Hence GASS 140 kN capacity aluminium shoring system can be used as the capacity is marginally lower than require
Applicable for slabs outside grid R to S / 40 to 43 Strengthening of adjoining slabs for Traffic
We consider that demolition work is being carried out by a machine of gross weight of 20 kN
CASE -1 = KOMATSU PC 16 -R2
Operating weight = 1570 kg
Assumed gross weight 2000 kg
Loading condition 1 : Excavater is directly on beam (one track only) in the mid of beam
1.20 m
1.80 m
Condition 2 : Two Excavaters sitting directly on beam. tracks perp. to the beam span (one track one excavater ) in the
3.54 3.54 3.54
0.77 m 0.50 m
1.80 m
5 kN
Use TITAN MAIN BEAMS of 1.70 span in both directions
20 kn 20 kn
Reaction on props
5 kN
Ra horz. + Rb horz. + Ra vert. + Rb vert. 50 kN
22.42284
44.84568 kN /m2
kN
m.
(When all four panels around vert. support are occupied by breakers)
ginally lower than required