Minutes of meeting

Discussing about gersome design drawings of project was done, Pakistan

from 15, July 20ger18 to 3 August 2018. The

(3) Calculation sheet and drawings of weir were discussed, and get the

conclusion after discussing with that the stilling basin should also be

calculated and give desiglkjrhtn of reinforcement, and after excavation, if

rock is good, this can be delete, it ilius determined on site. Designers

should modify drawings to get approve.

(4) Calculation model of auxiliary powerhouse and drawings of columns,

walls and foundation were discussed. And designers should modify

drawings to get approve.

(5)Calculation of model of pow;ll.knerhouse was discussed. Designer

should modify the model and the calculation sheet to get approve.

The drawings can be divided into.,m., 2 parts, but calculation sheet

should be only one for easy review.

And the agreoement > iul25MPa. ouil should also be mentioned in

drawings.iul

(6)Calculation sheet and drawings of surge tank, vertical shaft and

inclined shaft were discussed, e/.,/.,mail. Designers should modify

drawings to get approve.

(7)Drawings of penstock, anchor block and bvcfgnryn is discussed, and

designer should modify drawings together with