OBJECTIVE

To Promote participation of Corporate & PSUs


(Sponsoring Entity) for:

Execution of environmental sustainability works.


Cleanliness-creating awareness through innovative
communicating strategies.
Innovative infrastructure & sanitation Solutions
including behavior change.
Passenger amenities at Station.
WORK IDENTIFIED FOR
CSR
IN
MUMBAI DIVISION (WR)
WORKS THAT CAN BE DONE UNDER CSR
Total cost
Identified possible Total
(in Rs Location/station names
works nos
Cores)
Water conservation works Bardoli, Amalner, Saphale, Dahanu road, Vapi, Navsari,
Rain water Harvesting 20 03 Vyara, Billimora, Valsad, Surat, Dondaicha, Nandurbar, Ukai 15
Lakh per pit Songhad, Navapur & Dharangaon
Matunga road colony, Bandra (E) & (W) colony, Khar colony,
Sewage Treatment plant - 85 Andheri station & colony, Jogeshwari (AT), Borivali,
11.90 14
Lakh each Dahisar, Vasai road, Nandurbar, Amalner, Vapi, Valsad, Surat
& Udhna
Bhayander (E) & (W), Nallsaopara (E) & (W), Virar quarry,
Afforestration including 7.35
Virar carshed, Jogeshwai (AT). Panju Island
development of green area - 39.40 Lakh
(Between Bhayander - Naigaon), Suburban = 35000 sqm
Rs. 400 per sqm sqm
along track Virar - Surat 300 Km, Udhna - Jalgaon 400 Km.
Badhwar park, Churchgate, Mumbai Central, Parel
workshop, Dadar Terminal, Bandra Pali Hill, Andheri,
Water Efficient fixtures - 10
2.40 Kandivali, Borivali, Vasai road, Virar Carshed, Dahisar, 24
Lakhs per station/colony
Dahanu road, Vapi, Valsad, Billimora, Navsari, Udhna, Surat,
Vyara, Navapur, Nandurbar, Amalner & Dondaicha.
Construction renovation of Churchgate to Virar = 40 nos, Virar-Surat = 20 nos, Udhna -
7.80 65
toilet - 12 Lakhs per toilet Jalgaon = 05 nos
WORKS THAT CAN BE DONE UNDER CSR
(contd.)
Total cost
Total
Identified possible works (in Rs Location/station names
nos
Cores)

Drinking water facilities (Water Churchgate to Virar = 28 nos, Virar-Surat = 10 nos,


0.54 43
Cooler) - 1.25 Lakhs each station Udhna - Jalgaon = 05 nos

Mumbai Central Yard, Parel workshop, Bandra


Water recycling plant - 3.5 crore
21 Terminus yard, Grant road (laundary), Khar colony, 06
each station
Valsad, Surat.

Mumbai cnetral, Lower parel, Dadar, Bandra Terminus,


Khar road, Santacruz, Vile Parle, Andheri, Jogeshwari,
Lift (20 passengers capacity) Goregaon, Malad, Kandivali, Borivali, Dahisar,
32 32
(engg + elect) - 1 crore Bhayander, Mira road, Naigaon, Vasai road,
Nallasopara, Virar, Palghar, Dahanu road, Vapi, Valsad,
Navsari, Bilimora, Udhna * Surat.

Escalators (One set up + down) All stations from Mumbai Central to Virar, Surat,
42 28
(Engg + elect) - 1.5 crores Udhna, Valsad & Vapi.
Mumbai Central, Bandra Terminus, Andheri, Borivali,
Battery Operated Car - 3.0 lakh 0.24 08
Vapi, Surat, Valsad, Udhna.
WORKS THAT CAN BE DONE UNDER CSR
(contd.)
Solar Panel equipped Parking Lots with illumination and charging facilities – BCT,
ST and other stations.

Green-wall suburban train corridors at Mumbai Central Division.

Design and Installation of Murals / Paintings/ Art Decos / Tribal/ Ethnic art at Railway
Stations and offices of Mumbai Central Division.

Installation (including transport), restoration and maintenance of heritage rolling


stock along-with associated art-work and green-landscape at important Stations,
installation and offices of Mumbai Central Division.

Standalone solar lighting systems for yards, coaching depots, running / rooms and
sheds for general illumination and pit-lines of Mumbai Central Divisions.

Solar based LED destination indicator systems on long-distance trains of Mumbai


Central Division.

Solar-based water efficient systems for filtered watering at stations and coaching
depots and cleaning of coaches at stations and depots.
WORKS THAT CAN BE DONE UNDER CSR
(contd.)
Solar-based water efficient systems for filtered watering at stations and coaching depots and
cleaning of coaches at stations and depots.

Eco-friendly packaging of linen using packets made by prison inmates/ under-privileged/ etc.
Social focus.

Garbage compaction based dustbins on coaches and garbage compaction systems at


stations.

Eco-friendly Toilets / Vacuum Based Toilets at Railway stations, Offices and depots.

Cleanliness and Bio-toilet usage awareness campaign for trains and stations of Mumbai
Central Division.

Rain-water harvesting at Car-sheds, Coaching depots and Loco Sheds of Mumbai Central
Division.

Training and soft-skill development for Security and frontline personnel attending to women
and children in distress on Railway stations.

Campaigns to ameliorate harassment / distress of women and children, against anti-social


activities like drugging of passengers, trespassing etc. on Stations, offices and depots of
Mumbai Central Division.
WORK DONE THROUGH
CSR
IN
MUMBAI DIVISION (WR)
SOLAR PANELS & STATION UPGRADATION – MATUNGA ROAD
(M/s ASSET RECONSTRUCTION COMPANY INDIA LTD)

M/s ARCIL has following CSR initiatives at Matunga Road Station:


Solar panels above the platform shed.

Replacement of lightings with LED fittings.

Refurbishment of station name boards & Signages.

Landscape garden alongside tracks.

Renovation of toilet blocks (north & south end).

Installation of RO water purifier and stainless steel dustbins.

Approximate Cost of Project: Rs 33 Lakhs


SOLAR PANELS & STATION UPGRADATION – MATUNGA ROAD
(M/S ASSET RECONSTRUCTION COMPANY INDIA LTD)
LED SCREENS AT CHURCHGATE STATION
(K C LAW COLLEGE)

KC Law College installed two LED


Screens at Churchgate Station.
The LED screens display:
different laws and rights of
Indian constitution.
Provisions and action passenger
centric sections of Indian
Railways Act.

Approximate Cost of Project: Rs 2 Lakhs


CONSTRUCTION OF TOILET BLOCK
(ROTARY CLUB OF BOMBAY KANDIVALI)

Renovation of 11 toilet blocks undertaken by Rotary Club of


Kandivali. The work of 08 toilet blocks has been completed so far at
following station:
Marine Lines Elphinstone Road
Charni Road Dadar
Grant Road Mahim
Lower Parel Vasai Road

*Renovation work of 03 toilet blocks under progress.

Approximate Cost of Project: Rs 60 Lakhs


RENOVATION OF TOILET BLOCK
(ROTARY CLUB OF BOMBAY KANDIVALI)
RENOVATION OF BANDRA RAILWAY STATION
(UNION BANK OF INDIA)

Union bank of India has undertaken following CSR activities at


Bandra Station :
Renovation of toilet Block on heritage theme (Completed).

Fencing and beautification of west circulating area (Under


progress).

Provision of Heritage style benches (Under Progress).

Development of Garden in west side (Under Progress)

Approximate Cost of Project: Rs 90.64 Lakhs


RENOVATION OF BANDRA RAILWAY STATION
(UNION BANK OF INDIA)
FEEEDBACK OF TOILET CLEANLINESS
(GAIA)

Gaia Smart Cities (Gaia), an award-winning urban


technology firm did an exclusive tie up to provide
Smart Feedback system to monitor the cleanliness
of toilets across 17 suburban stations in an effort to
improve cleanliness and hygiene conditions:
Churchgate Bandra
Marine lines Goregaon
Charni Road Andheri
Grant Road Kandivali
Lower Parel Borivali
Elphinstone Road Dahisar
Dadar Bhayander
Matunga Road Vasai Road
Mahim
NAMMA TOILET – APNA TOILET
(IRCTC)

IRCTC installed Namma Toilet at KHAR & BDTS under CSR


Scheme.

The toilets are portable in nature, making them easy to fix


anywhere with minimum use of space.

The block has eight units, comprising two Gents module, one
Ladies module, one Divyang module and four urinals.

The advantage of these toilets is that they can be installed in


areas where drainage system is not available.

Approximate Cost of Project: Rs 32 Lakhs


NAMMA TOILET – APNA TOILET
(IRCTC)
STATION BEAUTIFICATION
(Mumbai First and Making A Difference (M.A.D.) Foundation)

ELPHINSTONE ROAD

CHURCHGATE CHURCHGATE

Under the "Hamara Station - Hamari Shaan" beautification project, 21 stations viz
Churchgate, Marine Lines, Charni Road, Grant Road, Mumbai Central, Mahalaxmi,
Lower Parel, Elphinstone Road, Dadar, Mahim, Bandra, Khar Road, Santacruz, Vile
Parle, Andheri, Jogeshwari, Goregaon, Malad, Kandivali, Borivali & Dahisar were
beautified by volunteers of Mumbai First and Making A Difference ( MAD) Foundation
STATION BEAUTIFICATION
(Mumbai First and Making A Difference (M.A.D.) Foundation)

Artistic painting of Staircases, FOBs, Booking Office areas,


Entrance / Exits and platforms beautified on theme based designs
by approximately 15,000 volunteers under this project.

Another initiative has been named History Wall, under which one
of the unusual elements being tried out to provide a basic history
plate of the railway station at each of the stations.

The initiative has been acknowledged across India and


appreciated widely including by Hon'ble Prime Minister of India
and Hon'ble Minister of Railways.

PROJECT UNDER CSR AND VOLUNTARY


PARTICIPATION
STATION BEAUTIFICATION
(Mumbai First and Making A Difference (M.A.D.) Foundation)
STATION BEAUTIFICATION
(Mumbai First and Making A Difference (M.A.D.) Foundation)
STATION BEAUTIFICATION – DAHANU ROAD
(ROSHANI FOUNDATION)

Dahanu Road Station beautification with Warli Art as


a "Youth Empowerment Project" has been done by
Roshni Foundation and Charitable Trust.

World-famous tribal art named "Warli art" originated


from Warli tribe who originate from Dahanu Road.
STATION BEAUTIFICATION – DAHANU ROAD
(ROSHANI FOUNDATION)
STATION BEAUTIFICATION – SURAT
(M/S. SARIN TECHNOLOGIES INDIA PVT. LTD)

A mega-beautification drive has been done at Surat railway


station by the Israel-based leading diamond machine
manufacturer, Sarin Techonlogies India Limited as part of their
CSR activity.

Each of the four platforms, walkways, bridges and entrance on


both the sides of the station were cleaned, painted and beautified
with murals and artwork.

Around 60 spots at the railway station including ramps, walls,


pillars, walkways, etc, have been painted with beautiful theme-
based paintings depicting the rich history of Surat and vibrancy
of the city's textile and diamond industries.
STATION BEAUTIFICATION – SURAT
(M/s. SARIN TECHNOLOGIES INDIA PVT. LTD)
STATION BEAUTIFICATION – BARDOLI & NANDURBAR

Bardoli station beautified on Swaraj Theme under CSR


initiatives by roping NGOs.

Nandurbar Station beautified on Warli Art theme under CSR


initiatives by roping NGOs.

Approximate Cost of Project: Rs 2.50 Lakhs


STATION BEAUTIFICATION – BARDOLI & NANDURBAR
STATION BEAUTIFICATION – MATUNGA ROAD
(ROTARY CLUB OF BOMBAY QUEEN)

Mumbai Division in collaboration with Rotary Club of Bombay


Queen has completed the beautification of Matunga Road station.

The theme based painting work depicting the diversified role and
emergence of women in the Society has been done across the
Booking offices, SS office and Foot over Bridges of the station.

Approximate Cost of Project: Rs 1.50 Lakhs


STATION BEAUTIFICATION – MATUNGA ROAD
(ROTARY CLUB OF BOMBAY QUEEN)
STATION BEAUTIFICATION - CHURCHGATE
(ASIAN PAINTS)

Asian paints and St+ Art foundation in association with Mumbai


Division, completed painting of 81ft x 54ft iconic Mural of Mahatma
Gandhi on exterior facade of Churchgate Station Building by
Legendary Brazilian street artist Eduardo Kobra under CSR initiative.

The mural is an adaption of a photograph of ‘Mahatma Gandhi at the


Railway station, early 1940s’ by Kulwant Roy, which is owned by
Aditya Arya Archive and India Photo Archive.

The mural of Mahatma Gandhi at Churchgate station aims to use the


power of public art to create a dialogue and join people under a
positive message of peace.

Approximate Cost of Project: Rs 25 Lakhs


STATION BEAUTIFICATION - CHURCHGATE
(ASIAN PAINTS)

Asian paints and St+ Art foundation in association with Mumbai Division, completed
painting of 81ft x 54ft iconic Mural of Mahatma Gandhi on exterior facade of Churchgate
Station Building by Legendary Brazilian street artist Eduardo Kobra under CSR initiative.
Escalators at Stations
(Western Coalfields Limited)

Western Coalfields Limited (WCL), one of the eight Subsidiary


Companies of Coal India Limited (CIL) and under aegis control of
Ministry of Coal has funded the project of installation of 05 escalators
at following stations which is under process:

Khar Road (01)


Dahisar (01)
Mira Road (01)
Virar (02).

Approximate Cost of Project: Rs 5.41 Crores


Escalators at Stations
(Power Grid Corporation of India Ltd)

Power Grid Corporation of India Limited (POWERGRID), an Indian


state-owned electric utility company has funded the project of
installation of 02 escalators at following stations which is under
process:

Lower Parel (01)


Santacruz (01)

Approximate Cost of Project: Rs 2.51 Crores


Escalators at Stations
LED LIGHTINGS – MUMBAI CENTRAL STATION
(SYSKA LED)

Syska LED, a leading lighting solutions company has replaced all


conventional light fittings with LED fittings at Mumbai Central (Main)
Station.

Approximate Cost of Project: Rs 55 Lakhs


WATER FILTRATION PLANTs- 48 Stations
(Yes Bank)

Yes Bank installed Water Filtration plants with RO purification at 48


Stations of Mumbai Division under CSR initiative.

Approximate Cost of Project: Rs 1.30 Crores


BRAILLE INDICATORS - BORIVALI STATION
(Anuprayaas and Cox & Kings Foundation)

Anuprayas Solutions and Cox & king Foundation installed braille indicators
(for blind) at passenger interface areas of Borivali station (Platforms, Foot
over Bridges (FOBs), subways, Entry & Exit, Booking office, Escalators and
Lifts) for guidance to blind Passengers.

Approximate Cost of Project: Rs 20 Lakhs


BENEFITS FOR SPONSORING PARTY

No D&G and supervision charges.

MOU will be signed between Railway and sponsoring


party.(approved by DRM)

Water and electricity required as per norm for


provision/installation and O&M of amenities/facilities shall
be supplied free of cost by Railway.

Maintenance of assets can be done by sponsoring party if


they are willing, else railway will take it over.
DISPLAY OF NAME

Policy says Railway may allow putting up a board/plaque


of reasonable size containing name of sponsoring
party/parties if the cost of infrastructure created is Rs 50
lakhs or above.

The facility created can have small display mentioning the


name of sponsoring party.

Size and content of board/plaque will be approved by DRM


and DRM’s decision on this will be final.
POINTS TO REMEMBER

Work should be completed within 2 years from the date of


approval.

Sponsoring party will not have any right on assets so


created.

No right for commercial exploitation of assets.

No right for commercial publicity.

Technical documents related to installation if any shall be


handed over to railways.
PROCESS TO FOLLOW…

1. Give proposal/application addressing to DRM (of the


division) or SR DCM.

2. In principal approval by DRM.

3. Permission letter will be issued.

4. Submit details of work and action plan for execution


along with draft MOU.

5. For display of name submit content and size of board.