Sei sulla pagina 1di 22

1.

0 MATERIAL REQUISITION
No Task Remarks
1.0 Remaining Items to Purchase
1.1 Fastener
1.2 Pallet for Packing
1.3 Grating for Stairs Already purchase. Not Arrived yet
Commence Date Due Date Status
2.0 FABRICATION (FIT UP AND WELDING)
No Task Remarks
1.0 Remaining Items on Fabrication
1.1 Tier 6 ( 8 pcs) Still pending on Beam

1.2 Handrail Still sandblasting

1.3 Support Platform (2pcs) 2 items are missing. Not fabricated yet

Still Waiting for bending, required to


1.4 Hollow 253MA weld
1.5 Chequred Plates Currently on surface preparation

2.0 Shipping Frame


2.1 Girder Plate
2.2 Support Column & wind Fence
2.3 Tier 1
2.4 Tier 2
2.5 Tier 3
2.6 Tier 4
2.7 Tier 5
2.8 Tier 6

3.0 Bending, Machining and Rolling


2.1 Bending Hollow (6pcs) Still not finish yet
Commence Date Due Date Status

6/8/2018
3.0 TRIAL FIT UP
No Task Remarks
Remaining Item to be sent for Trial Fit
1.0 Up
1.1 Platform Items DO to UCE has been prepared
Still waiting on fabrication (Pending on
Tier 6
1.2 Beam)
1.3 Chequred Plates DO to UCE has been prepared

2.0 Current Trial Fit Up Status


2.1 Tier 1 Required Modification on angle
2.2 Tier 2 Finish. Ready to assemble to Tier 2
2.3 Tier 3 Finish. Ready for painting
Finish. Ready to assemble into next
2.4 Tier 4 erection
2.5 Tier 5
2.6 Tier 6
2.7 Ladder (2 pcs)
2.8 Platfrom

3.0 Other
3.1 Stainless steel required to be cleaned
before proceed to paint
Commence Date Due Date Status

6/8/2018 6/8/2018
4.0 PAINTING/GALVANIZING
No Task Remarks
1.0 Item to be galvanized
Still at factory. DO has been
Wind Fence Column (16 pcs)
1.1 prepared
1.2 Support Column (8 pcs) Not collect yet
1.3 Special Washer (64 pcs) Not collect yet
1.4 Girder Plate (4 pcs) waiting to be drilled
1.5 Stair Support (3pcs)
1.6
1.7
1.8
1.9
1.10

2.0 Item to be painted


2.1 Tier 1
2.2 Tier 2
2.3 Tier 3 DO to UCE has been prepared
2.4 Tier 4
2.5 Tier 5
2.6 Tier 6

Handrail need to be painted after


2.7 Handrail galvanizing
Commence Date Due Date Status
5.0 PACKING
No Task
1.0 Shipping Frame
1.1 Purchase Fastener
Purchase Yellow paint for temporary
1.2 Support

2.0 Pallet
Purchase Pallet for Handrail,
2.1 Ladder,Platform, Stair and Fastener

3.0 Packing

3.1 Prepare Packing List and Shipping Mark


for Girder Plate, Support Column, Wind
Fence Column (1st Delivery)

3.2 Prepare Packing List and Shipping Mark


for Tier 1 and Tier 2 (2nd Delivery)
3.3 Item Required
- Shipping Mark
- Packing List
- Tag (Stainless Steel)
- Shipping Mark Plastic Sheet
- Rubber Mat
Commence Date Due Date Status
6.0 DELIVERY
No Task Commence Date Due Date Status

Potrebbero piacerti anche