GENERAL REQUIREMENT,
Posted on March 26, 2013 under Auto changeover scheme

General Requirement

Bus Pt for measuring Bus voltage & checking bus is healthy or unhealthy.
Line Pt for measuring Line voltage & Synchronizing between two sources.
Numerical relays with maximum BI-BO & breaker with maximum aux.
contacts.

If synchronizing is required, then synchronizing function should be available


in numerical relay of bus coupler.
General Schematic Diagram
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 1/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

General Singe Line Diagram

Independent Mode
Closing conditions-I/C-1
 Mode selector switch in independent mode
 Bus PT-1 Unhealthy
 Incomer-2 Off & no fault trip
 Bus coupler Off & no fault trip

Closing For incomer-1 Ind. mode

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 2/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Independent Mode

Mode selector switch in independent mode


Bus PT-2 Unhealthy
Incomer-1 Off & no fault trip
Bus coupler Off & no fault trip

Closing For incomer-2-Ind. mode

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 3/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Independent Mode
Closing conditions-B/C

Mode selector switch in independent mode


Bus PT-1 Unhealthy
Bus PT-2 Unhealthy
Incomer-1 Off & no fault trip
Incomer-2 Off & no fault trip

For Bus Coupler-Ind. mode

Go to Next page…
Go Back…

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 4/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Advertisements

BS7671:2008 BS7671:2008
Software Software
CableCalc 17th edition cable & circuit CableCalc 17th edition cable & circuit
evaulation software evaulation software

castlinesystems.co.uk OPEN castlinesystems.co.uk OPEN

REPORT THIS AD REPORT THIS AD

Leave a comment

INDEPENDENT MODE,MANUAL
MODE,AUTO
MODE,FEEDER REQUIRED
Posted on March 26, 2013 under Auto changeover scheme

In this mode, Two Breakers can close at the same time.


For e.g.:-
INCOMER-1 ON

INCOMER-2 ON

BUSCOUPLER OFF

INCOMER-1 ON

INCOMER-2 OFF
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 5/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

BUSCOUPLER ON

INCOMER-1 OFF
INCOMER-2 ON

BUSCOUPLER ON

Manual Mode
In this mode, When supply is Synchronize, Then Three Breakers can
close at the same time. But after some time delay, one breaker will be
Trip by using Trip Selector Switch.

For e.g.:-

I/C-1 & B/C are ON & if I/C-2 ON than I/C-1 will be trip after some time
delay. (if Trip selector switch is on I/C-1)

Auto Mode
This mode is only for Bus coupler.
If two incomer is On & Bus coupler is Off. If one incomer trip due to
under voltage. At that time B/C is On automatically.

Feeder Required

Incomer-1 with Line Pt-1


Incomer-2 with Line Pt-2
Bus Coupler
Bus Pt-1
Bus Pt-2
Outgoing Feeders
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 6/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Go to Next page…
Go Back…

Leave a comment

AUTO CHANGEOVER SCHEME


Posted on March 26, 2013 under Auto changeover scheme

What is Auto Change Over?

Load can be transfer from one Bus to another Bus by using Auto
Change Over Scheme.
It means, within specific conditions, load can be transferred on another
bus by automatically ON or OFF the breakers, without disturbing any
load.

Different Mode for changeover

Independent Mode
Manual Mode / Synchronizing Mode
Auto Mode
Blackout Condition

 Different Switches for changeover


Mode Selector Switch:-
This switch is on Bus coupler. 
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 7/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

This switch is 3 pole, 3 position switch.

Three positions are, 

“ (1) Auto
(2) Independent
(3) Manual

 Trip Selector Switch:-


This switch is on Bus coupler. 
This switch is 3 pole, 3 position switch.

Three positions are, 

“ (1) Incomer-1 trip


(2) Incomer-2 trip
(3) Bus coupler trip

Go to Next page…

Leave a comment

SWITCHGEAR DESIGN
Posted on March 25, 2013 under Switchgear design

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 8/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

1  Main parts of Switchgears


2  MAIN PARTS OF BREAKER
3  Isolator
4  Voltage Transformer
5  Main Compartments of Panel
6  CIRCUIT BREAKER COMPARTMENT
7  CABLE & CT COMPARTMENT
8  L V Plate and Types of Panel
9  Schematic Diagram of Switchboard
10  Breaker Selection Chart For Normal Design and RE D…
11  Protection Relay
12  PURPOSE OF PROTECTIVE RELAYS
13  Basic Design of Panel

1 Comment

BASIC DESIGN OF PANEL


Posted on March 25, 2013 under Switchgear design

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 9/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

2  

3  
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 10/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

5  

6  
7

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 11/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

8  

9  

Back Page…

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 12/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Leave a comment

PURPOSE OF
PROTECTIVE RELAYS
Posted on March 25, 2013 under Switchgear design

TO DETECT ABNORMALITIES (FAULTS)


TO ELIMINATE SUCH ABNORMALITIES

“ By isolating smallest portion of the system


In a shortest period of time.

TO PREVENT DAMAGE TO EQUIPMENTS


TO PREVENT INJURIES TO PERSONNEL

RELAY OPERATION WHEN A FAULT OCCURS

“ Each relay should protect a specific zone in the system


If fault is inside its zone,relay should operate and isolate the zone
If fault is outside zone,Relay should not operate –Some other relay
should operate and isolate

CONNECTION DIA OF O/C & E/F RELAY

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 13/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

CONNECTION DIA OF O/C & E/F RELAY

Go to Next page…
Back page…

Leave a comment

PROTECTION RELAY
Posted on March 25, 2013 under Switchgear design

A device which sense the fault and give a signal to the circuit breaker for
tripping.

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 14/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

WHAT DO WE MEAN BY PROTECTION?

PROTECTION OF VARIOUS COMPONENTSOF POWER SYSTEM


AGAINST VARIOUSTYPES OF SYSTEM FAULTS

VARIOUS TYPES OF EQUIPMENTS

GENERATORS
TRANSFORMERS
MOTORS
FEEDERS
TRANSMISSION BUS BARS
LINES
CAPACITORS
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 15/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

VARIOUS TYPE OF FALUTS


R-Y-B-G OR R-Y-B(Symmetrical Fault)
R-Y Unsymmetrical Faults
Y-B
B-R
R-Y-G
Y-B-G
B-R-G
R-G
Y-G
B-G

POWER SYSTEM -FAULTS

 Current  Voltage  Power


Over power
Over Load Over Vol. Under power
Over Current Under Vol. Reverse power
Earth Fault Voltage Unb.
Current Unb. Neutral shift
Dir. Over Cur.
Dir. Earth Fault
Computed Frequency Control/Mgmt.
Over fluxing Over Freq. Synchronising
Loss of field Under Freq. Load sharing
Diff. O/C dF/dT Islanding
Restricted E/F Load shedding
Under Imp.
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 16/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Go to Next page…
Back page…

Leave a comment

BREAKER SELECTION CHART FOR


NORMAL DESIGN AND RE DESIGN
Posted on March 25, 2013 under Switchgear design

Breaker Selection Chart For Breaker Slection chart for RE-


Normal Design Design
 #8BK80-12KV-600mm Width-3AH5  #8BK80-12KV-600mm Width-
STC-26.3KA & UPTO 31.5KA 3AH5P
3AH5 is available for 800A & 1250A STC-26.3KA & UPTO 31.5KA
3AH5P is available for 800A &
#8BK80-12KV-800mm Width-3AH3 1250A
STC-31.5KA & UPTO 40/44KA
3AH3 is available for 1250A & #8BK80-12KV-800mm Width-
3150A 3AH5P
STC-UPTO 31.5KA
#8BK88PLUS-12KV-600mm Width- 3AH5P is available for 2000A &
3AH0 2500A
STC-UPTO 26.2KA
3AH0 is available for 800A,1250A & #8BK80-12KV-700mm Width-3AK6
1600A STC-40/44KA
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 17/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

#8BK80-24KV-1000mm Width- Rating Should be <=1250A


3AH3
STC-UPTO 26.3KA #8BK80-12KV-800mm Width-3AK6
3AH3 is available for 1250A & STC-31.5/40/44KA
2000A Rating Should be >1250A

#8BK80-36KV-1100mm Width-
3AH3
STC-UPTO 31.5KA
3AH3 is available for 1250A,2000A
& 2500A

Go to Next page…
Back page…

Leave a comment

SCHEMATIC DIAGRAM
OF SWITCHBOARD
Posted on March 25, 2013 under Switchgear design

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 18/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

 MV Switchboards

 Normal Design  RE-Design


8BK80-12KV(600mm/800mm) 8BK80-
8BK80-24KV-1000mm 12KV(600mm/700mm/800mm)
8BK80-36KV-1100mm
8BK88PLUS-12KV-600mm

For Double Busbar – 8BM80/12KV


Without Isolator -800mm
With Isolator-1000mm
Types of Breaker

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 19/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Types of vacuume contactor

Go to Next page…
Back page…

Leave a comment

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 20/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

L V PLATE AND TYPES OF PANEL


Posted on March 25, 2013 under Switchgear design

LV PLATE

LV DOOR

Types of Panel

Incomer
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 21/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Outgoing feeder
Motor feeder
Transformer feeder
Capacitor feeder
Tie feeder
Bus Coupler
Adapter Panel
Bus PT
Caballing Panel
Incomer Cum Outgoing feeder

Go to Next page…
Back page…

Leave a comment

REPORT THIS

https://electricaltm.wordpress.com/page/9/ 22/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

Older posts

Search … Search

RECENT POSTS

Other Generator Controls and Monitoring Devices


Transformer Rectifier Unit
Constant Speed Drive
Engine Driven AC Generators
Aircraft Electrical Systems

RECENT COMMENTS

Anonymous on Electrical Safety

Jaykumar Trivedi on Example: Parapet Walls

Jaykumar Trivedi on Example: Parapet Walls

Anonymous on Example: Parapet Walls

Anonymous on High Voltage Circuit Brea…

ARCHIVES
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 23/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9
O S

April 2013
March 2013

CATEGORIES

Aircraft Electrical Systems


Auto changeover scheme
Basics of Busbar and Local Breaker Back up
Busbar protection ( Siemens )
Busbar protection Scheme with 7SS60 relay
Calculation of REF Protection
CT VA Burden
Current Transformer (CT) Testing
Diodes And Applications
Electrical Safety
INTELLIGENT PANEL METER
Motor Protection
Power System Configurations
Protection principles
REF PROTECTION
Switchgear design
The Future of Design for Construction Safety
THE PHILOSOPHY OF PROTECTIVE RELAYING
Transformer Differential Protection
Uncategorized
WHAT IS PROTECTIVE RELAYING

META

Register
Log in
Entries RSS
Comments RSS
REPORT THIS

https://electricaltm.wordpress.com/page/9/ 24/25
04/12/2018 electricaltm's Blog | Smile! You’re at the best WordPress.com site ever | Page 9

WordPress.com

Blog at WordPress.com.

https://electricaltm.wordpress.com/page/9/ 25/25

Potrebbero piacerti anche