Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PRE-ENGINEERED
STEEL BUILDINGS
Contact Us
Cambodia Office:
Add : No.598 St., Borey Vimean PhnomPenh,
Russei Keo, PhnomPenh, Cambodia
Phone : +855 23 666 7898
Thailand Office:
Add : No.350/114 Rama3 St., Chongnosee Yannawa
Bangkok 10120, Thailand
Vietnam Office:
Add : 54 Truong Quoc Dung St., Phu Nhuan Dist.,
Ho Chi Minh City
Phone : +84 8 3990 3777
Email: sales@uni-steelbuildings.com
Website: uni-steelbuildings.com
CONTENT
ABOUT US 4-5
ADVANTAGES 9
READY WHY US ?
TO ACHIEVE
CONSULT & DESIGN 12-13
FABRICATION 14-15
THE PEAKS
QA & QC 16-17
ERECTION 18-19
Lower cost:
Due to the systems approach, there is a significant saving in design, manufacturing and site
erection cost, the structural elements are shaped to follow the stress diagram of the member,
thus reducing weight, cost and load to foundations, the secondary members and cladding
nest together reducing transportation cost, the overall price per square meter may be
reduced as much as 30% lower than conventional steel.
2. CONSULTING
1 2
3. CONTRACTING
5. FABRICATION
8. ERECTION
5 6
7 8
10 I Main Brochure Main Brochure I 11
WHY US ? CODES TEKLA MODEL
ISO 9001:2008
Site Address Scope
Certificate no.: VN.3470197 Version:1 Revision date: 24 July 2015 Certification body address: 66 Prescot Street, London, E1 8HG, United Kingdom
Local Office: Unit 4.4A, 4th Floor, E-town 1 Building, 364 Cong Hoa Street,
Tan Binh District, Ho Chi Minh City, Vietnam Tahir Sharif, Managing Director, Tekla M&C
Further clarifications regarding the scope of this certificate and the applicability of the
Management System requirements may be obtained by consulting the organization.
To check this certificate validity, please call +84-8-3812 2246.
NGUYEN TU HAI
Signed on behalf of BVCH SAS - UK Branch
Certification body address: 66 Prescot Street, London, E1 8HG, United Kingdom
Local Office: Unit 4.4A, 4th Floor, E-town 1 Building, 364 Cong Hoa Street,
Tan Binh District, Ho Chi Minh City, Vietnam
Further clarifications regarding the scope of this certificate and the applicability of the
Management System requirements may be obtained by consulting the organization.
To check this certificate validity, please call +84-8-3812 2246.
Page 2 of 2
Page 1 of 2
1 2
3 4
FABRICATION
1. CUTTING
2. FITTING UP
3. AUTO WELDING
4. MANUAL WELDING
5. FINISHING
6. PAINTING
5 6
14 I Main Brochure Main Brochure I 15
MILL TEST CERTIFICATE
WHY US ? WAKAI & CO., LTD.
!"#$%&'
Product Technical Data Sheet
WVA-00002PTDS
Product
Akis Hex Flange Head Self-Drilling Screw 5.5X25 with EPDM Packing Bonded Washer
Application
Akis Hex Flange Head Self-Drilling Screw 5.5X25 with EPDM Packing Bonded Washer is used
for fixing single skin roof panels at valley to steel purlins.
Drill Capacity
Steel up to 6.0 mm in total thickness
Features
Big Washer For prevention of the damage on the folded plate roof in case of too much fastening
Drill Point For quick drilling without dancing on the sheet metal
Coating Extreme corrosion performance to Salt Spray Test (JIS Z-2371) more than 2000 hours
Installation Steps
1. Use a powered or cordless screw driver with a 2,500 RPM speed.
2. Fit a screw into 5/16 Hex Head Driver Bit and place the screw on the fastening position.
3. Apply consistently firm pressure to the screw driver until the screw has fastened
Mechanical Properties
Material: Carbon Steel SAE 1022
Shaer Strength 750 N/m (
Tensile Strength 1,600 N/ m (
Torsion Strength 13.5 N-m
Pullout Strength Steel Purlin 1.6: 2,770 N | Steel Purlin 2.3:4,200 N | Steel Purlin 3.2: 7,230 N
All values are averages obtained under laboratory conditions and appropriate safety factors should be applies for design purposes.
Pachking
Small Box Qty. 250 pieces
Carton Qty. 3,000 pieces (250 pieces X 12 boxes)
ACTUAL CHECKING
TESTING
QA & QC
UNIVERSAL VIETNAM
KCN VSIP II, BÌNH DƯƠNG
WHY US ?
MATERIALS
MATERIALS OF PHASE 01
ARRANGED GL. BY GL.
Crane 25 tonne Kato 25 ton
MATERIALS OF PHASE 02
ARRANGED GL. BY GL.
MATERIALS OF PHASE 01
ARRANGED GL. BY GL.
MOBILIZE MATERIALS
MATERIALS
TO ASSEMBLING AREA 1
DIRECTION OF ERECTION DIRECTION OF ERECTION
2 1
MATERIALS OF PHASE 02
ARRANGED GL. BY GL.
MATERIALS OF PHASE 01
ARRANGED GL. BY GL.
ASSEMBLING AREA
ASSEMBLING AREA
Kato 25 ton
MOBILIZE MATERIALS TO ASSEMBLING AREA 2
r=1
8m
MATERIALS OF PHASE 02
Crane 25 tonne
MATERIALS OF PHASE 01
Working radius : 18m
32
01
28
07 09
08
40
21
30
ERECTION
ERECTION
1. METHOD STATEMENT
2. ERECTION
1 2
- Setting anchor bolts
- After setting anchor bolts
- Daily safety meeting
- Assembling members
- Erection
3 4 5
TIPS:
Building length
Tips: It is advisable to keep all bay
lengths equal. If this is not possible,
manintain all interior bays equal and
the end bays equal but shorter than
the interior bays.
Buiding Width:
Since the roof purlins are at 1500mm
c/c spacing make the building width a
multiple of 3M.
US Buildings Pre-Engineered Steel
Buildings are designed by our architects
solely with customer requirements in
mind and within the parameters of the
pre-engineered structures. Our basic
architectural measures include:
Building Width is the distance from The Building height forms the eave height, which is the
the outside of eave strut of one side- length from the foot of the main frame column base plate
wall to the outside of eave strut of the to the top outer point of the eave strut and can measure
facing sidewall. up to a height of 30m. In the case of columns that are
Building Length is the distance recessed o elevated from finished floor, the eave height
between the outside flanges of end- is the distance from finished floor to top of the eave
wall columns in facing endwall. strut.
The end Bay Length forms the The roof slopes, of thick any practical ones can be con-
distance from the outside of the outer structed by our architects, is the angle which the roof
flange of endwall columns to the forms with respect to horizontal and are commonly
center line of the first interior frame 0.5/10 and 1/10.
columns. US Buildings has minimum roof live design load of
The Interior Bay Length is measured 0.57kN/m2 and design wind speed of 110km/hr which
as the distance between the center are applicable in keeping with American codes.
lines of two adjacent interior main
frame columns which usually range
from 6m, 7.5m and 9m to 15m.
55 mm
specifications of ASTM A36 Grade 36 or conforms to ASTM A792 Grade 50B. The
protective steel coating shall be aluminum
(3+1) mm
equivalent with minimum yield stress of 345
N/mm2. zinc alloy comprised of 55% Aluminum and - Washer T19 (EPDM)
45% Zinc, weighing 150 grams/m2 spread - 3mm thick
19 mm
O/S
900
41 mm strong profile 41
Fixing Supporter
Self-lock
Step 1
• Fire resistance
• Weight and space saving
Decking 55mm Decking 76mm • Easy cleaning and decoration
• Low maintenance and long long
life
• Fast delivery due to fully
automated manufacturing
process
832 895
295
• Long lengths and wide
208
spanning characteristics means
55 76
rapid and simple site erection
• CFC-HCFC free
• Personnel Doors
• Double personnel Doors
• Sliding Doors
• Roll up Doors
• Window
• Frame Openings
• Fixed Louvers
• Adjustable Louvers
• Roof Curbs
• Translucent Panels
• Ridge Ventilators
• Power Ventilators
• Insulation
• Suspended Ceilings
• Roof Extensions
• Canopies
• Fascias
• Partitions
• Crane and Roof Monitors.
2. Galvanize Truss
3. Hangar
5. Insulation
6. Staircase
3 4
5 6
AZ150
AISI – American Iron & Steel
4 Roof panel Zinc Aluminum Base Fy = 34.5 kN/cm2 Institute – 2001 Edition
ASTM A792 Gr. 50
* CANOPY 15M
* PIPERACK SYSTEM
PROJECT AREA (m2) LOCATION