Pre- Commissioning Checklist

Date :
PROJECT NAME: CUSTOMER:

MANUFACTURER: LOCATION:
(CITY, PV PLANT NAME)
TYPE: CONTACT NAME & NO.:

This pre-commissioning report and other documentations about inverter commissioning, are provided to
ensure SUNGROW inverter and accessories pass the commissioning and enter into operation. Please keep
these documentations properly!
Pre-Commissioning report includes all the parameters should be checked during commissioning.

This report can’t displace installation report from plant installer and products’ certifications.

Complete the report and return in to Sungrow (by fax, e-mail, etc.)
Before commissioning, all the installation and connection must be strictly in compliance with the relevant rules
and documentations.

Page 1 of 4
Inverter Container Checkl ist

Container
Type/ Model: Serial No.:
RECORDS
SL ( PHOTO /
ITEM TECHNICAL REQUIREMENTS & COMMENTS RESULT
NO. RECORDED
DOCUMENT )
Containers are installed according to the
relevant documentations. Containers are intact with no visible
1
(installat ion drawings, Installation damage and fixed firmly in proper place.
manual, Installat ion guide)
For DC cables, AC cables and
Container is placed in right place for
2 communication cables entry there shall
cables accessibility
be suitable place.
Air ducts to be installed 4nos of big air
ducts and 2nos of small air ducts per
container as per guide / installat ion
3 Air ducts are installed
manual. Ensure that sealant is applied in
all sides of the air flew and there shall not
be any space to enter rain water.
Connect the AC output to transformer
4 AC output is connected to transformer using cables or busduct, if completed
ensure that there shall be no water entry.
Ensure that container is earthed at both
5 Container Body Earthing is connected ends of the container and earth
resistance should be less than 2Ohms.
Check internal earth bus bar is connected
Internal negative and earthing
6 to dedicated earth pits and earth
connected
resistance should be less than 2Ohms
Check that all cable entries are blocked or
All cables entries filled with Electrical sealed with Electrical foam and sealant
7
foam or sealant and ensure that there shall not be any
space to enter foreign materials / insects
Check all electrical terminations are
8 Electrical terminations at AC output t ightened as per the manual and marked
torque t ightness

Inverter Check List

Inverter
Type: Serial No.:
NO. ITEM TECHNICAL REQUIREMENTS & COMMENTS RESULT RECORDS
Inverters are installed according to the
Inverters are intact with no visible
1 relevant documentations.
damage and fixed firmly in proper place.
(installat ion drawings, Installation

Page 2 of 4
manual, Installat ion guide)
Connections are firm and with clear
2 Fasten screws
marks.
3 DC Connection Check stability of terminal connections.
Check phase sequence and stability of
4 AC Connection
terminal connections.
Check whether lightning proof device
5 Lightning proof device and fuses and fuses are in good and usable
condition. ( SPD ‘s and DC input fuses )
Check that all cables and wires are
7 Cables and wires arrangement properly arranged and fixed without
short circuit to the enclosure.
Ensure that all protection covers are
8 Protection covers and enclosure installed after cable termination. ( DC
and AC Cabinets )
Labels and marks are attached steadily,
9 Warning labels and Marks
clean and easy to read.
Connect all DC Cables (DC Combiner Box
10
to Inverter)
Check Polarity of DC cables at Inverter
11
end and DC combiner box end.
Check all DC & AC cables IR values To ensure inverter operation without any
12 ground fault errors, IR values to be
checked and passed as per standards.
Ensure that grid is available at MV Measure the grid voltage at MV
13
Switchgear and transformers. switchgear and Transformer feeder
Check and record AC Voltage at
Transformer end
i) L1- L2
14 ii) L2- L3
iii) L3- L1
Clockwise phase rotation should be
present
Check the open circuit DC voltages at DC Mention the open circuit DC voltage at
15
combiner box combiner box output
Check the MCCB trip function. Check the MCCB trip fuction by pressing
16 the Emergency switch. (Note : SCB will
be remail off).
17 Ground Resistance value Check the ground resistance value

LV Distribution Cabinet
Serial No.:
NO. ITEM TECHNICAL REQUIREMENTS & COMMENTS RESULT RECORDS

Page 3 of 4
Check all the cables are connected to Check all terminations and properly
1
distribution feeders t ightened
Check all cable entries to be sealed using
2 Check cable entry to be sealed
sealant
Check that all cables and wires are
3 Cables and wires arrangement properly arranged and fixed without
short circuit to the enclosure.
All covers removed for connection have
4 Protection covers and enclosure been replaced. The doors can be opened
and closed smoothly.
Check Communication cables are RS485 / Ethernet cables to be
5
installed and terminated terminated.

Note :
1. All records must be photo graphs and documents verified by client project Manager
2. After visit ing service team to site and more than 2days if grid is not restored all the expenses ( Ex :
Travel, accommodation and engineer charges ) of service engineers team should be borne by the client.

( Signature )

Date : (Project Manager)

Return Address:
Sungrow Power Supply Co., Ltd. Service Department
Address: No.1699 Xiyou Rd., New & High Technology Industrial Development Zone, Hefei, P.R.China.
Zip: 230088
Email: service@sungrow.cn
Telephone: +86 551 532 7834, +86 551 532 7845
Fax: +86 551 6532 3478

Page 4 of 4