TAKEOFF SHEETS #01 Blo

Project
Mixed:-Use Apartement Building

Item No L×W×H Qty Units

1 31.23
21.42
668.95 m2

1 18.73
16.31
305.49 m2
974.43 m2

16 5.00
3.20
1.00
256.00 m3

47 5.00
3.20
1.00 752.00 m3

1 2.50
2.50
3.45
21.56 m3

1 2.50
2.50
2.68
16.75 m3
1 2.50
2.50
2.71
16.94 m3

1 2.50
2.50
2.74
17.13 m3

1 2.50
2.50
2.26
14.13 m3

1 3.10
3.10
2.17
20.85 m3

1.00 2.80
2.80
2.31
18.11 m3
125.46

Prepared By

Name

Signature

Mixed Use TAKEOFF SHEETS #01 Bl


Apartement
Project :- Building

Item No L×W×H Qty Units

1 2.5
2.50
2.22
13.88 m3

1 2.80
2.80
2.03
15.92 m3

1 2.50
2.50
2.80
17.50 m3

1 2.80
2.80
2.77
21.72 m3

1 2.50
2.50
2.56
15.97 m3

1.00 2.50
2.50
0.79
4.94 m3

1 3.35
3.35
0.52
5.84 m3

1 2.80
2.80
1.39
10.86 m3

1.00 2.5
2.5
0.90
5.63 m3
1 2.50
2.50
0.81
5.06 m3

1.00 2.50
2.50
0.59
3.66 m3

1 2.50
2.50
0.65
4.06 m3

1 2.50
2.50
0.78
4.88 m3

1 2.50
2.50
2.80
17.50 m3

1 2.80
2.80
2.77
21.72 m3
1 2.80
2.80
2.56
20.03 m3
189.14
474.36 m3

Prepared By Checked by

Name

Signature
TAKEOFF SHEETS #01
Mixed Use
Apartement
Project :- Building

Item No L×W×H Qty Units

4 2.00
2.00
16.00 m2

4 2.30
2.30
21.16 m2

2 2.00
2.00
8.00 m2

6 2.00
2.00
24.00 m2

2 2.00
2.00
8.00 m2

4 2.30
2.30
21.16 m2

2 2.00
2.00
8.00 m2
106.32

1 2.6
2.60
6.76 m2
3 2.85
2.85
24.37 m2

6 2.00
2.00
24.00 m2

1 5.25
2.50
13.13 m2
1 3.80
2.40
9.12 m2
77.37
183.69 m2

Prepared By Checked by

Name

Signature

TAKEOFF SHEETS #01

Project
Mixed:-Use Apartement Building

Item No L×W×H Qty Units

1 54.35
2.00
108.70 m2

1 6.50
2.00
13.00 m2
1 1.85
0.50
0.93 m2
1 1.20
0.40
0.48 m2

1 2.20
2.10
4.62
127.73 m2

1 2.50
1.35
3.38 m2

1 2.50
1.35
3.38 m2

1 2.50
1.35
3.38 m2

Prepared By Checked by
Name

Signature
TAKEOFF SHEETS #01 Block F
D

Client:-
W/ro Aberash Nugussie Consultant:-OADUS

Description Item No L×W×H Qty Units


01 SITE WORK
EXCAVATION & EARTH WORK 1 2.50
ORDINARY SOIL EXCAVATION 2.50
ON BLOCK F 2.47
Clearing of site up to a depth of 20 cm 15.44 m3

Area 1 On Axis B/n 1--4 & A--K 1 2.50


2.50
1.71
10.66 m3
Area 2 On Axis B/n 5--7 & B--J

Total Clearance Work 1 3.35


02 BULK EXCAVATION 3.35
bulk excavtion to reduce the level to a 1.87
required depth level from ground floor 20.99 m3
not exceeding 1.5m.
1 2.80
NB Selected Material 2.80
1.91
Total Bulk Excavation 14.94 m3
Cartway Oridnery Soil

Total Cartway Oridnery Soil


Pit Excavation
On axis 1 (A) 1 2.50
2.50
2.08
13.00 m3

On axis 2 (A) 1 2.50


2.50
1.17
7.31 m3
On axis 3 (A) 1 3.35
3.35
1.31
14.70 m3

On axis 4 (A) 1 2.80


2.80
2.05
16.07 m3

On axis 1(B) 1 2.50


2.50
1.83
11.44 m3

On axis 2(B) 1 2.50


2.50
2.55
15.94 m3

On axis 3 (B) 1 2.80


2.80
2.46
19.29 m3
159.76
Sub Total Pit Excavation 1

Checked By

Name Name

Signature Signature

TAKEOFF SHEETS #01 Block F W/ro


Aberash D
Client:- Nugussie Consultant:-OADUS

Description Item No L×W×H Qty Units


On axis 7(G)

1 2.50
2.50
0.05
On axis 6(G) 0.31 m3

1 3.35
3.35
0.19
On axis 7 (I) 2.13 m3

1 2.50
2.50
0.30
On axis 6 (I) 1.88 m3

1.00 2.50
2.50
0.55
3.44 m3

On axis 5 (I) 1 3.35


3.35
0.98
11.00 m3

On axis 1 (J) 1 2.80


2.80
0.11
0.82 m3

On axis 2 (J) 1.00 2.5


2.5
0.59
3.69 m3

On axis 3 (J) 1 2.50


2.50
0.69
4.31 m3

On axis 4 (J) 1.00 2.50


2.50
0.91
5.69 m3
On axis 1 (K) 1 2.50
2.50
0.85
5.31 m3

On axis 2 (K) 1 2.50


2.50
0.92
5.75 m3
44.33
On axis 3 (K)

On axis 4 (K)

On axis 7 (C)

On axis 6 (C)

On axis 5 (C)

Sub Total Pit Excavation 3


Total Pit Excavation

Checked By

Name Name

Signature Signature
TAKEOFF SHEETS #01 Block F
W/ro
Aberash D
Client:- Nugussie Consultant:-OADUS

Description Item No L×W×H Qty Units


50mm03. CONCRETE
thick WORK
lean concrete in C-5 with
LEAN CONCRETE
minimum cement content of 150kg/m3 of
concrete under:
Under Footings
On axis 7 (C…I)
3 4.00 2.85
0.75
On axis 6 (C…I) 25.65

1 4 2.60
0.65
On axis 5 (C…I) 6.76

4 4.00 2.30
0.55
On axis 4 (A…K) 20.24

6 4 2.00
0.45
On axis 3 (A…K) 21.60
74.25

On axis 3 (A…K)

On axis 2 (A…K)

Sub Total Lean Concrete 1


On axis 2 (A…K)

On axis 2 (A…K)
On axis 1 (A…K)

Lift Shaft Shear Wall Footing Pad


LEAN CONCRETE

Sub Total Lean Concrete 2


Total Lean Concrete
Checked By

Name Name

Signature Signature

TAKEOFF SHEETS #01 Block F


D
Client:-
W/ro Aberash Nugussie Consultant:-OADUS

Description Item No L×W×H Qty Units


External Gating Fence
Type 1
Equluptes & EGA Sheet

Water Pump House


Equluptes & EGA Sheet

Equluptes & EGA Sheet


Equluptes & EGA Sheet
Roofing for Water Pump House

Total Equluptes & EGA Sheet


Hard Core
For water pump

Total Hard Core


Mass Concrete
For water pump
to the depth 15cm thick

Total Mass Concrete


Cement Screed
For water pump
to the depth 5cm thick

Total Cement Screed

Checked By
Name Name

Signature Signature
page 01
Date :-16/11/2016

Consultant:-OADUS Consulting PLC

Description
On axis 4 (B)

On axis 1 (D)

On axis 2 (D)

On axis 3 (D)

On axis 4 (D)

On axis 1(F)

On axis 2(F)
On axis 3(F)

On axis 4(F)

On axis 7(E)

On axis 6(E)

Sub Total Pit Excavation 2

Aproved By

Signature

page 02
Date :-16/11/2016
Consultant:-OADUS Consulting PLC

Description
Hard Rock Excavation
On axis 1(F)
On axis 2(F)

On axis 4(F)

On axis 1 (J)

On axis 2 (J)

On axis 3 (J)

On axis 4 (J)

On axis 1 (K)

On axis 2 (K)

On axis 3 (K)
On axis 4 (K)

Total Hard Rock


Excavation

Aproved By

Signature
page 03
Date :-16/11/2016
Consultant:-OADUS Consulting PLC

Description
04 FORM WORK
SUBcut
Provide, STRUCTURE
and fix in position
swan zigba wood formwork to:-
a) For footing
Footing Type 1

Footing Type 2

Footing Type 3

Footing Type 4

Total Footing Formwork


b) Foundation column
Aproved By

Signature

page 03
Date :-16/11/2016
Consultant:-OADUS Consulting PLC

Description
Aproved By
Signature