Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
dated : Date :
RISK Controls
Risk Controls
ACTIVITY : do lathing
Analyzed by : Last updated : Date :
CONTRACTOR: APPROVED BY: PERMIT TO WORK REQUIREMENT: YES □
1a. Setting up the equipment and 1a. sharp surfaces 1a. Graze
materials to be used 2a. Iron 2a. Injured
3a. tool Kit
2a. Turning a source of electrical 1a. electric current 1a. electric shock
current (power supply) machine
3a. Replacing the material on the 1a. material objects 1a. Injured
machine 2a. sharp surfaces 2a. Bloody
Date :
O WORK REQUIREMENT: YES □ NO □
control