DATE: 05.04.2016
CHARACTERISTIC:-
1) Plint Dimension = 0.65m(W) x 0.65(L) x 1.35(H)
2) Tie Beam 1 = 0.3m(W) x 1.35m(L) x 0.6m(H)
3) Tie Beam 2 & 3 = 0.3m(W) x 1.85m(L) x 0.6m(H)
4) JKR Probe Blow = 47
5) Concrete Density = 24 KN/m³
Calculation:
JKR Probe Blow for 1.35m depth from SI report is 47 blow, so from the Graph of Allowable Bearing
Capacity vs JKR Dynamic Cone Penetrometer Value, the Allowable Bearing Capacity is 130 KN/m²
Service Load:-
1) Self weight Plint = 24 x 0.65 x 0.65 x 1.35 = 13.69 KN
2)Tie Beam 1 = 24 x 0.3 x 1.35 x 0.6 = 5.83 KN
3)Tie Beam 2 & 3 = 24 x 0.3 x 1.85 x 0.6 = 7.99 KN
4)Load from SA equipment = 3.35 KN
5)Load from CSE equipment = 5.12 KN