Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Part of the Greater London Authority We are moving ahead with many of
family led by Mayor of London Sadiq London’s most significant infrastructure
Contents
Khan, we are the integrated transport projects, using transport to unlock growth.
authority responsible for delivering the We are working with partners on major
Mayor’s aims for transport. projects like Crossrail 2 and the Bakerloo
line extension that will deliver the new
We have a key role in shaping what homes and jobs London and the UK need.
life is like in London, helping to realise We are in the final phases of completing
the Mayor’s vision for a ‘City for All the Elizabeth line which, when it opens, will 4 Foreword
Londoners’. We are committed to add 10 per cent to London’s rail capacity.
creating a fairer, greener, healthier and
more prosperous city. The Mayor’s Supporting the delivery of high-density, 8 Chapter 1 – Cycling’s role in
Transport Strategy sets a target for 80 mixed-use developments that are London’s success
per cent of all journeys to be made on planned around active and sustainable
foot, by cycle or using public transport travel will ensure that London’s growth is
by 2041. To make this a reality, we good growth. We also use our own land 16 Chapter 2 – The vision for cycling
prioritise health and the quality of to provide thousands of new affordable in London
people’s experience in everything we do. homes and our own supply chain
creates tens of thousands of jobs and
We manage the city’s red route apprenticeships across the country. 20 Chapter 3 – Understanding cycling
strategic roads and, through in London
collaboration with the London boroughs, We are committed to being an employer
can help shape the character of all that is fully representative of the 36 Chapter 4 – A clear approach to cycling
London’s streets. These are the places community we serve, where everyone
where Londoners travel, work, shop and can realise their potential. Our aim is to
socialise. Making them places for people be a fully inclusive employer, valuing and 48 Chapter 5 – Streets that enable cycling
to walk, cycle and spend time will reduce celebrating the diversity of our workforce
car dependency and improve air quality, to improve services for all Londoners.
revitalise town centres, boost businesses 72 Chapter 6 – Making it easy to get
and connect communities. We are constantly working to improve around by cycle
the city for everyone. This means
We run most of London’s public freezing TfL fares so everyone can afford
transport services, including the to use public transport, using data and 82 Chapter 7 – Promoting cycling for
London Underground, London Buses, technology to make services intuitive and all Londoners
the Docklands Light Railway, London easy to use, and doing all we can to make
Overground, TfL Rail, London Trams, streets and transport services accessible
London River Services, London Dial-a- to all. We reinvest every penny of our 94 Chapter 8 – Delivering the plan
Ride, Victoria Coach Station, Santander income to continually improve transport
Cycles and the Emirates Air Line. The networks for the people who use them
98 Appendix I – Cycling delivery plan, 2019-2024
quality and accessibility of these services every day.
is fundamental to Londoners’ quality
of life. By improving and expanding None of this would be possible without
public transport, we can make people’s the support of boroughs, communities
lives easier and increase the appeal of and other partners who we work with to
sustainable travel over private car use. improve our services. We all need to pull
together to deliver the Mayor’s Transport
Strategy; by doing so we can create a
better city as London grows.
4 Foreword
DRAFT
Cycling action plan 5
Foreword
Look to our European neighbours and In Waltham Forest, where bold choices That is why we are publishing this
you’ll find countless towns and cities are being made to redesign streets in Cycling Action Plan, setting out our
where children cycle on their own to favour of people, not cars, the borough comprehensive plan for making London’s
school, where older people ride to has quickly become a haven for active the world’s best big city for cycling.
the shops on cycles, where cargo bike travel. The latest monitoring shows that But this is not just a plan for City Hall
deliveries keep the economy moving and residents are cycling more, and they are and TfL to deliver. Delivering it will
where cycling is a genuine option for also walking more. The borough now require with the support, hard work and
most people. tops the outer London league table creativity of boroughs, communities,
for residents cycling regularly, and has businesses and everyone who is
For too long we’ve heard that people jumped from 11th to 6th place London- passionate about making London a
cycle more in countries such as Denmark wide. better place.
and the Netherlands because it’s part
of their culture, or because it’s flat, or In central London, where we are Cycling is a means to an end, not an
because the cities there are compact. building cycle tracks on main roads and end in itself. More people cycling frees
But none of those are the reason why redesigning dangerous junctions, we are up space on overcrowded buses and
cycling is more popular in these places. seeing significant growth– often over trains. It makes our air cleaner. It gives
In truth, these cities see more cycling 50 per cent, and more than double in everyone the opportunity to get
because their streets have been designed some places - in the numbers of people around London quickly and affordably.
to prioritise people, not cars. choosing to cycle where it has been It improves our mental and physical
made safer and more attractive to do so. health. It makes our high streets and
It’s easy to forget that in the early 1970s, public places more vibrant. Making it
Amsterdam was much like London But London’s streets, for the most part, easier to cycle makes our city better to
today: choked with traffic, filled with remain too hostile for the vast majority live, to work, to invest in, to raise
parked cars and with only a fraction of people to feel comfortable choosing children in. That is why we must Will Norman
of people cycling to get around. How to cycle, despite fewer Londoners now continue this journey and enable more Walking and Cycling Commissioner
the city works now is the result of the owning cars. Cycling’s share of the people to choose cycling.
previous generation’s political choices. transport mix remains stubbornly low,
especially in outer London areas which
Cycle around London today and you will have seen little investment in making
start to see glimpses of what happens cycling easier. Too many people are killed
when streets are designed to enable and hurt in crashes with vehicles, despite
everyone to cycle: mums with babies cycling getting safer. Looking again to
cycling through Vauxhall. Businessmen our European neighbours we know that
in suits gliding through Bank Junction on real change takes time and sustained
the way to meetings. Children pedalling investment, not just over political terms
over Blackfriars Bridge. but over decades.
6 Foreword
DRAFT
Cycling action plan 7
Foreword
The Mayor’s Transport Strategy makes We have significantly improved our
clear that a new type of thinking is understanding of cycling, and the way
required to increase active, efficient and we gather data about it, over the last
sustainable travel. This will help achieve few years, and this means that we are
the Mayor’s vision for London – a fairer, able to take an evidence-led approach to
greener, healthier and more prosperous planning for cycling. We can now bring in
city. The Healthy Streets Approach, new routes that are based on data about
set out in the Strategy, provides the cycling potential, and other initiatives
framework for achieving this by putting shaped directly by what Londoners are
people’s health at the heart of our telling us is stopping them from cycling.
decision-making.
We can only deliver this Plan by
Cycling is a fundamental element of working closely with the huge range of
delivering the Healthy Streets Approach. organisations, businesses and people
The barriers to cycling are numerous who shape what it feels like to be on our
and inter-linked, and consequently this streets - and encouraging them to take
Cycling action plan is not a collection of action. This means businesses installing
isolated projects dotted across the city. new cycle racks, people driving at slower
It is instead the most ambitious plan speeds and giving enough space when
that we have ever developed for cycling, overtaking those cycling, and residents
and demonstrates a step-change in our supporting changes to their streets
approach to this mode of travel. that make them safer and attractive to
people walking and cycling.
Londoners tell us that they want to cycle Mike Brown MVO
for some trips, but that the dominance This Cycling action plan is fundamental Transport Commissioner
of motorised traffic makes them feel to achieving the Mayor’s vision for
scared to do so. We can and will address London. And along with our partners
this. Improving how people experience in London’s local authorities, we will
our streets is not just about delivering be taking the decisions that make
protected space for cycling on busy London’s streets more welcoming,
roads – although we will, of course, be accessible, safer and healthy. Thank you
doing this – but is also a much broader for your support.
programme of activity to support
people to take up cycling and to build it
seamlessly into their daily routine.
8
DRAFT
Cycling action plan 9
31%
of adult Londoners report
having walked or cycled for
two 10-minute periods on the
previous day
20%
of young Londoners achieve
the 60 minutes of physical
activity each day required to
support their healthy growth
£9.3bn
build physical activity into their daily to road danger.⁴ Through this we will
routines. However, just 31 per cent of help address safety, both actual and
people report having walked or cycled for perceived, and create streets where 1 Travel in London report 11, TfL, November 2018
two 10-minute periods on the previous people can travel without fear of injury. 2 Transport and Health in London – the main Estimated cost of congestion
day.¹ Encouraging more active travel impacts of London road transport on health, to London’s economy by
would make a huge contribution to public Making efficient use of our streets GLA, 2014
2030 without a shift towards
health in the Capital: if every Londoner London’s streets are some of the 3 Attitudes to Cycling survey, TfL, autumn 2017 sustainable, active and
walked or cycled for 20 minutes each most congested in the world, which 4 Vision Zero action plan, TfL, July 2018 efficient modes of transport
day, it would contribute at least 60,000 affects everyone and undermines 5 Understanding and Managing Congestion, ITP
additional years of healthy life.² London’s success. By 2030, it is for TfL on behalf of GLA, November 2017, p2
12 Chapter 1 – Cycling’s role in London’s success
DRAFT
Cycling action plan 13
Improving air quality and New homes and jobs For instance, 85 per cent of London’s
the environment By 2041, there will be more than Business Improvement Districts (BIDs)
Poor air quality affects the health of all
Londoners, and imposes an economic
two million more people living in
London and an estimated six million
say that cycling is important for business
performance in their area. This is
£1.4bn-£3.7bn
Estimated yearly cost of
cost of between £1.4bn and £3.7bn extra journeys made every day.8 Both because people want to spend time in
poor air quality to London’s
every year.6 As a non-polluting mode of population and employment growth places where they can walk and cycle:
economy
transport, cycling is part of the solution offer enormous potential for London’s BIDs report that good environments for
to London’s poor air quality. Cycle continued success, and cycling can walking and cycling can not only bring
schemes do not generate motorised help ensure this growth works for in more customers, but can also help
80,000
traffic and encourage mode shift away all Londoners. The draft London attract and retain staff.9
from the private car, which will lead to Plan embeds cycling and the Healthy
reduced emissions and less noise. Streets Approach at the heart of new However, we need to ensure that the
developments and growth areas. This economic benefits of cycling can be
cycle trips are made every
A good public transport experience will ensure that our road and public enjoyed by all Londoners, and that we
day in London to reach public
Our ambition is for public transport in transport networks continue to function are supporting all types of business.
transport, or continue a public
London to become more connected, efficiently as London grows, and that Inner and outer London are home
transport journey
less crowded and more reliable. London’s future population is active to almost 65 per cent of London’s
Enabling more Londoners to cycle and healthy. employment, and it is the Capital’s
will help achieve this by creating extra many small and medium-sized
6m
capacity for trips made using public A city that succeeds for everyone enterprises (SMEs) and local businesses
transport and improving bus reliability In the face of many challenges, it is that provide the majority of private
by taking more cars off the road. Making vital that London remains an appealing sector jobs in London.10
it easier to cycle also means that more place for major global businesses, and
people can access public transport: that the city is able to maintain the Cycling can benefit these businesses and The number of extra journeys
every day, 80,000 cycle trips are made to strong talent pool required to sustain help restore vitality to local high streets in London that will be made
or from public transport stations7 and its place as a world-leading economic and town centres across Greater London: every day in 2041 – many of
this number will increase as the cycle and cultural destination. Cycling can high street walking and cycling projects these can be cycled
network grows. help keep the city moving for business, have been shown to increase retail sales
improve the motivation and productivity by up to 30 per cent.11 Perception surveys
85%
of employees, and boost London’s all- from Waltham Forest show that business
round quality of life. owners can overestimate how many
customers travel by car by a margin of
up to 40 per cent.12 This highlights that
parking spaces are not as essential to of London’s Business
6 Mayor's Transport Strategy Supportive Evidence: Challenges and Opportunities for London's Transport business performance as they may seem Improvement Districts say
Network to 2041, TfL, July 2017 that cycling is important for
to some, and that repurposing this space
7 London Travel Demand Survey (LTDS), 2014/15-2016/17 the business performance
for walking and cycling can contribute to
8 Mayor's Transport Strategy, GLA, March 2018 thriving high streets. of their area
9 Healthy Streets: A Business View, University of Westminster for TfL, November 2018
10 Economic Evidence Base for London, GLA, 2016
11 The Pedestrian Pound, Living Streets, 2013
12 London Borough of Waltham Forest, 2015
14 Chapter 1 – Cycling’s role in London’s success
DRAFT
Cycling action plan 15
Focus box 1
London offers something unique for As the world’s best big city for cycling,
everyone who comes here to live, London will lead the way in using cycling
work and visit. It is one of the world’s to address the great urban challenges
best big cities. Our vision is for London facing all large cities today. As a result,
now to become the world’s best big city London will become a greener, healthier,
for cycling. fairer, more affordable and more
successful city for everyone.
This means that London’s streets will
reflect the transport needs of a modern
world city, with a comprehensive cycle
network that everyone can use.
18 Chapter 2 – The vision for cycling in London
DRAFT 19
Chapter 3 – Understanding
cycling in London
All of the actions in this Plan are based on clear evidence
and insight into cycling in London. This chapter sets out
what this evidence base tells us about cycling in London.
TfL has conducted a considerable This chapter sets out our overall
amount of customer research, analysis understanding of cycling, including how
and monitoring related to cycling in cycling has grown in recent years, who is
recent years. This has played a vital role cycling, what stops people from cycling,
in helping develop effective schemes and the overall potential for more
that address the most pressing barriers cycling in London.
to cycling.
Figure 1: Daily cycling journeys in London, 2000-2017 Figure 2: Risk of being killed or seriously injured while cycling in London, 2000-2017
(indexed to year 2000)
800,000 1.2
700,000
1.0
600,000
0.8
500,000
400,000 0.6
300,000
0.4
200,000
0.2
100,000
0 0.0
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
800,000 1.2
700,000
1.0
600,000
0.8
500,000
400,000 0.6
300,000
0.4
200,000
0.2
100,000
0 0.0
2010 2011 2012 2013 2014 2015 2016 2017 2010 2011 2012 2013 2014 2015 2016 2017
26 Chapter 3 – Understanding cycling in London
DRAFT 27
Figure 2: The areas of London with the highest levels of current cycling Figure 3: Gender and ethnicity of people
who cycle in London
37%
Gender
63%
▀ Men ▀ Women
36%
Ethnicity
64%
▀ White ▀ BAME
Key
46%
of all Londoners are put
off cycling due to fear of
collisions
22%
of Londoners who don’t cycle
say that they feel too old or
unfit to do so
However, for many people switching In fact, 55 per cent of all ‘switchable’ of Londoners are able to ride a bicycle, many it is not a genuine opportunity.
from the car will not be an easy task, journeys take place entirely within including 76 per cent of disabled By breaking down the barriers to cycling
and to achieve these benefits cycling in outer London. A further 24 per cent people.36 Adapted cycles, e-bikes set out in the previous section, we aim
London will need to become significantly take place in inner London and 12 per and cargo bikes can allow an even to enable more Londoners to cycle,
more appealing. cent are made to, from, or in central wider range of people to cycle. Most and through this see an increase in
London (the remaining journeys are Londoners therefore have the potential the diversity and range of Londoners
Where is the potential for between these London regions). to cycle for their daily journeys, but for enjoying the benefits of cycling.
more cycling?
Figure 4 overleaf shows the routes that Who has the potential to cycle more?
these eight million ‘switchable’ journeys More than half of ‘switchable’ journeys
would take. Compared to Figure 2, the are made by women, and 38 per cent are
map shows that there are journeys that made by BAME people.35
could be cycled in all parts of London, 33 Analysis of Cycling Potential 2016, TfL, March 2017
even in areas that currently have relatively This highlights that the opportunity 34 Health impacts of cars in London, GLA, 2015
little cycling, such as outer London. to cycle is not limited to any particular
35 Analysis of Cycling Potential 2016, TfL, March 2017
group in society. Eighty-one per cent
36 Attitudes to Cycling survey, TfL, autumn 2017
36 Chapter 3 – Understanding cycling in London
DRAFT
Cycling action plan 37
Figure 4: The areas of London with the highest levels of cycling potential Figure 5: Gender and ethnicity of people
making switchable cycling journeys
55%
Gender
45%
▀ Men ▀ Women
38%
Ethnicity
62%
▀ White ▀ BAME
Key
Top 5% potential
Top 10% potential
Top 15% potential
Top 20% potential
38
DRAFT
Cycling action plan 39
Chapter 4 – An evidence-
driven approach to cycling
The Cycling action plan marks an important milestone in
London’s cycling journey, with ambitious targets and an
evidence-led approach.
An evidence-led approach The future growth of London’s cycle Figure 6: Priority connections for a London-wide cycle network for 2041
network will be based on the Strategic
to planning cycling Cycling Analysis (SCA), published by
infrastructure TfL in June 2017.40 The SCA identifies
the priority areas for a London-wide
The approach to planning for cycling cycle network (Figure 6), comprising
in London has reached a watershed new cycle routes based on areas of
moment. Over the past five years, TfL greatest current and potential demand,
and the boroughs have invested in a taking into account future housing and
range of cycling measures, including jobs growth, and targeting areas where
new infrastructure and behaviour safety concerns and other barriers are
change initiatives. preventing people from enjoying cycling.
As we have rolled out these projects, we The actions set out in Chapter 5 of this
have also monitored their impacts and Plan will build towards this long-term
gathered evidence to help understand network, focusing on new high-quality
how effective they have been in helping routes with the greatest potential for
people overcome the barriers to cycling. enabling more people to cycle. TfL and
the boroughs will target investment
As well as monitoring cycling to help local communities enjoy the
levels on new routes, we have also benefits of cycling by providing well-
conducted research into the innovative planned cycling routes and networks to
new infrastructure that has been local places such as schools, shops and
delivered on London's streets, allowing leisure outlets.
us to hone our approach to design.39
This research has also helped inform Our data-led approach will be used
profound new tools for planning cycling to influence more than just future
projects, including the world's largest routes. For example, our new Cycling
and most advanced cycle network Infrastructure Database (see Action 5)
model, Cynemon. tells us where there is limited cycle
parking. This data will feed into the new
These new tools and learnings Cycle Parking Strategy (see Action 6),
have allowed us to fully embrace an which will use this data to target safe
evidence-led approach to cycling. We and secure parking where it will most
are now using data and customer insights help Londoners to cycle.
to inform and plan all of our cycling
measures, to maximise their contribution Key
to growing cycling in London. Top potential connections
High potential connections
Medium potential connections
39 https://tfl.gov.uk/corporate/publications-and-reports/cycling
Existing and planned cycle routes (June 2017)
40 Strategic Cycling Analysis, TfL, June 2017
44 Chapter 4 – A clear approach to cycling
DRAFT 45
A ‘people-focused’
approach, drawing on
our customer insights
A ‘people-focused’ approach means
continually seeking to learn how well
our cycling initiatives and overall
approach to enabling cycling is working
for Londoners. It involves adapting and
evolving our approach based on evidence
of what people are telling us and what
works for those who want to cycle on
our streets.
Focus box 2
Addressing the barriers Delivering these actions as a package is Our action plan The Cycling action plan also
vital in ensuring that cycling in London includes proposals for the continued
to cycling is inclusive. Every action in this plan
for cycling development of bike sharing in London,
is an action in support of accessible including Santander Cycles, and the
To make cycling a real choice for more and inclusive cycling, and therefore an Our action plan is set out in the delivery of more cycle parking.
Londoners, we need to overcome the accessible and inclusive London. For following chapters, based on three
barriers that stop people cycling. Each example, many disabled Londoners ‘groups’ of actions: Promoting cycling for all
action in this plan has been developed rely on cycling for the mobility and Londoners (Chapter 7)
to break down specific, evidence-based accessibility they need to enjoy the Streets that enable cycling Appealing cycling environments
barriers to cycling. The actions fall within benefits that London can offer. (Chapter 5) are required to encourage new people
three ‘groups’ (see Table 1), and the Plan To encourage cycling, Londoners need to cycle, but removing other barriers
will address the fundamental issues that New infrastructure will open up safe, accessible routes that are not and changing perceptions will be
stop people from cycling in London. London’s streets for more people to dominated by motorised traffic. equally important.
cycle comfortably; improved journey
Seen in this way, the Plan is a package planning will enable people to tailor Improving street environments and To complement the growing cycle
of coherent, inter-linked actions that, routes that meet their specific needs; building new routes to grow the London- network, and break down all barriers
when delivered jointly, will enable more and initiatives such as our community wide cycle network will be vital to to cycling, the Cycling action plan sets
Londoners to cycle. grants will give more Londoners the enabling more people to cycle. The out a raft of initiatives including cycle
support and confidence to start cycling. Cycling action plan includes proposals training, community grants and events
for new routes, Safer Junctions and to celebrate cycling.
borough-led projects to expand the
cycle network across London. Wider action through the
Table 1: How the seven barriers to cycling are addressed by the action groups Mayor's Transport Strategy
Making it easy to get around Achieving the outcomes of the
by cycle (Chapter 6) Cycling action plan will rely not only
Groups of actions Making a cycle journey in London should on the actions set out in the remainder
be as convenient as any other mode. of this Plan, but also on the wider
Streets that Making it easy to Promoting cycling delivery of the proposals set out in the
Barriers to cycling enable cycling get around by cycle for all Londoners Increasing numbers of people use apps Mayor’s Transport Strategy. Adopting
1 Fear and vulnerability ✔ ✔ to plan their journeys, and the Cycling Vision Zero for road danger will make
action plan proposes a step-change it safer and more attractive to cycle.
2 Worried about fitness ✔ in the accuracy and quality of digital Traffic reduction, both through the
3 Not confident ✔ ✔ ✔ journey planning for cycling in London. next generation of pan-London road
This step-change will be powered by the pricing, and locally via boroughs’ traffic
4 Cycling not seen as convenient ✔ ✔
world’s largest Cycling Infrastructure reduction strategies, will be fundamental
5 Not identifying as a 'cyclist' ✔ Database, a comprehensive digital record to creating the conditions where cycling
of all cycling facilities on the streets of becomes a real option for everyone.
6 Not having access to a cycle ✔ ✔
the Capital.
7 Lack of cycling infrastructure ✔ ✔
50
DRAFT
Cycling action plan 51
We know London’s streets can be The Cycling action plan sets out
off-putting and frightening for continued investment in new
cycling: 46 per cent of all Londoners infrastructure, including:
are put off cycling because of streets
with too much traffic, and 25 per cent • Building a London-wide cycle network,
are discouraged because of poor road with major new routes opening across
conditions.41 This is felt more acutely the Capital
by under-represented groups in cycling,
including women42 and BAME people.43 • Investment in local routes and
neighbourhood schemes
Cycling infrastructure plays a critical role
in addressing these barriers. Following • Updated design guidance and
the construction of protected cycle new quality criteria for cycling
lanes on Lower Thames Street, there infrastructure
was a 200 per cent increase in people
counted cycling there when compared • A collaborative and smart approach
to 2014.44 Eighty-four per cent of people to route construction
using the route told us that they felt safe
during some or all of their journey.45
New routes to grow the unified network on an incremental basis, In January 2018, the Mayor announced Beyond this, the pipeline has
London-wide cycle network and we will also work with boroughs to the first six routes to be progressed flexibility, allowing us to begin working
Over the next five years, we will work identify other existing routes that can be from this pipeline. We have been with boroughs and engaging local
with boroughs to deliver more than brought into the cycle network. working with boroughs to develop communities early in the design
450km of new, high-quality cycle detailed plans for these routes. Work process, while adjusting to changing
routes across Greater London. As is the We know that the ambition and on many of the routes is well advanced local circumstances and ambitions. This
case in the world’s best cycling cities, determination of boroughs is vital to and we will begin bringing plans means we can better harness the energy
these routes will draw from a range of realising the level of quality that we are forward for public input from early and determination of boroughs, and
different design approaches:46 some seeking on new cycle routes, and we will 2019 (see Focus box 4). This will include their unparalleled knowledge of local
sections of routes will be segregated, work collaboratively to support every consultations on routes between: neighbourhoods, to develop proposals
and some sections will be along less local authority that is committed to for ambitious new cycle routes.
traffic-heavy streets, where walking transforming the experience of cycling • Camden and Tottenham Hale –
and cycling are prioritised. All of the on its streets. consultation planned 2019 For example, using this approach we have
routes described in this section will be been working in close collaboration with
signed using the new, unified identity for However, we are equally clear that we • Hackney and the Isle of Dogs - Greenwich and Lambeth boroughs to
London’s cycle network. will not support – or provide funding consultation planned 2019 develop plans for new routes connecting
for – schemes that do not address Greenwich and Woolwich, and Oval,
Cycle routes are principally intended the fundamental reasons why people • Dalston and Lea Bridge Road - Brixton and Streatham respectively. The
to make it easier for people to choose don’t currently cycle, or that are not consultation planned 2019 proposals that we are developing with
to cycle for their daily journeys, rather underwritten with genuine political these boroughs will begin construction
than drive. Our ambition is for all new commitment for cycling. • Rotherhithe and Peckham - during the life of this action plan, subject
routes to offer a consistently attractive consultation planned 2019 to consultation.
and inclusive environment for cycling, We have therefore adopted a new,
irrespective of infrastructure used. pipeline approach to the development • Ilford and Barking Riverside –
To help TfL and boroughs meet this and delivery of cycle routes in consultation on first section
aspiration, new TfL-funded routes will London. Working with boroughs, we planned 2019
now be designed and delivered in line have developed a pipeline of 25 new
with new quality criteria (Focus box 6). cycle routes with the top potential to • Wembley and Willesden –
contribute to the growth of cycling in consultation on first section
Since 2010, TfL’s investment in Cycle London, informed by TfL’s Strategic planned by 2021
Superhighways and Quietways has Cycling Analysis.47 These routes are
created a step change in improving the targeted towards potential cycling as
experience of cycling in London. These well as current demand, and include
routes have succeeded in growing uptake both orbital and radial corridors. They
of cycling by creating better conditions focus on connecting town centres and
that help break down the barriers faced communities in inner and outer London,
by Londoners. These well-used strategic where the majority of people live, work
routes will be incorporated into the new and travel.
46 http://content.tfl.gov.uk/international-cycling-infrastructure-best-practice-study.pdf
47 Strategic Cycling Analysis, TfL, June 2017
56 Chapter 5 – Streets that enable cycling
DRAFT
Cycling action plan 57
Focus box 4
Enfield
The route between Camden and Tottenham Hale will link together
CS1
communities and businesses in north London, including improving
access to the major transport interchange at Finsbury Park. It will tackle
the barriers to cycling along this corridor, including the intimidating and
traffic-dominated Seven Sisters Road and Nag's Head Gyratory.
Camden Hackney
The route between Hackney and the Isle of Dogs will be London’s
first major orbital cycle route. As well as providing a much-needed Islington
connection between Cycle Superhighway 2 and Cycle Superhighway 3, Camden
Town
it will link communities along the route with employment hubs, town
centres, parks and waterways. Newham
CS2
Construction on these routes is planned to begin in late 2019,
following a full consultation, with significant sections to be open Tower
Mile End
by May 2020. The full routes are scheduled to be open by 2022, and Hamlets
will be joined by ongoing investment in the growing cycle network City of City of CS3
across Greater London. Westminster London
Key
Island
Proposed new cycle routes Gardens
Alternate alignments
Southwark
Other existing and planned cycle routes
Proposed river crossing (indicative alignment)
58
DRAFT
Cycling action plan 59
We are also committed to completing We also remain committed to delivering between Rotherhithe and Canary Wharf,
delivery of the high-quality routes much-needed improvements to the and in 2019/2020 plan to submit an
currently under development by TfL route between Swiss Cottage and the application for the powers to build and
and the boroughs, including routes West End. We were disappointed that operate this crossing.
conceived as part of the former plans to start construction of this
Cycle Superhighway and Quietway route in summer 2018 were not able to Reducing road danger at junctions
programmes. These routes will be proceed, and we are now considering In London, 73 per cent of collisions
delivered under the new, unified cycle how best to progress with the scheme. resulting in a vulnerable road user
network branding and the quality (a person walking, cycling or using a
criteria will also apply to them. Beyond this, we will work with the motorcycle) being killed or seriously
Where necessary, we will work with boroughs to further expand the injured take place at junctions.49 The
boroughs to improve the designs for London-wide cycle network. In the Safer Junctions programme has therefore
these routes and bring them in line long term, this will include completing been established to radically reduce road
with the new criteria. the pipeline of 25 top potential danger at the most dangerous junctions
routes and moving onto the high- and on TfL’s roads.
Major new sections of the cycle network medium-potential routes identified
that will be delivered over the life of this in the Strategic Cycling Analysis,48 TfL's analysis has identified 73 junctions
plan include routes connecting: working closely with boroughs to most in need of improvement. As well
ensure that the evolving pipeline fully as significant investment in schemes to
• Greenwich, Deptford and Tower reflects local ambitions and priorities. tackle specific junctions, we are reducing
Bridge – construction planned to start We will also support the boroughs to road danger at these junctions by
summer 2019, subject to consultation plan and deliver more of these routes investing in new cycle routes and other
through programmes such as Liveable projects. We have already completed
• Brentford, Chiswick and Neighbourhoods, Local Implementation improvements to 27 junctions, and we
Hammersmith – construction Plans and other funding opportunities. plan to start construction at another
planned to start summer 2019, 20 locations by 2020. The remaining
subject to consultation Overcoming severance for cycling junctions will all be at the design or
As well as investing in new routes, we construction stage by 2020, including
• Wood Lane and Notting Hill Gate – will expand the reach of the London- Waterloo Roundabout and Lambeth
consultation planned early 2019 and, wide cycle network by addressing major Bridge (construction on each will begin in
subject to the outcome, construction sources of severance. 2020, subject to consultation).
could start in 2021
For instance, the lack of river crossings We are also tackling other major
• Clerkenwell Road and Old Street – for people walking and cycling in east intimidating junctions across the cycle
consultation planned for 2019 London means that many journeys network, including Stoke Newington
simply cannot be made by active travel. Gyratory (consultation launched October
• Blackfriars Road to Thamesmead – To address this, we are pressing ahead 2018) and Old Street Roundabout
currently under construction with proposals for a new river crossing (construction started December 2018).
Supporting local Ambitious plans led by boroughs To grow the cycle network to
Boroughs will play a vital role in the extent required by the Mayor’s
cycle journeys growing the high-quality cycle network, Transport Strategy, we will need to
including creating local routes serving explore new methods of funding cycling
As well as strategic routes between communities and town centres, and infrastructure, including making better
different boroughs, local networks expanding neighbourhood cycle use of contributions from developers
serving neighbourhoods and town networks. In support of the Cycling and other private sector bodies.
centres will be an important part action plan, we will look for boroughs
of the London-wide cycle network. to develop ambitious plans through Boroughs are already leading the
a number of channels, including: way here, with innovative approaches
Where boroughs show real ambition such as the Croydon Growth Zone.
and appetite to deliver local • The Liveable Neighbourhoods This involves future business rates
improvements for cycling, TfL will programme: seven Liveable being leveraged to provide vital
provide funding and support to help Neighbourhood schemes are well new infrastructure, including £15.6m
achieve these. This includes programmes under way, and the next tranche for cycling improvements. These
such as Liveable Neighbourhoods and of projects will be announced in include enhanced cycle routes on the
Local Implementation Plans (LIPs). February 2019. Beyond this, new Brighton Road, Roman Way and the
rounds of bidding for boroughs will A232, improving connections between
Some London boroughs are no open annually Croydon town centre, Purley, Mitcham
strangers to delivering high-quality and Bromley.
cycling infrastructure, and there are • Completing the three Mini-Holland
examples of successful and well-used programmes in Kingston, Enfield Better streets across London
borough-led cycling projects across the and Waltham Forest. These ambitious Taken together, investment in the
Capital. We will work with boroughs to projects have already made a positive London-wide network and local
identify the best existing routes to be change in their local areas (see Focus cycling improvements will create a
signed as part of the London-wide cycle box 5) and will be fully complete cycle network that serves all types
network and to upgrade other existing in 2021 of journeys in the Capital. Figure 7 on
routes to the same high standard. page 62 shows the latest map of these
• Delivery of high-quality borough- improvements, together with a timeline
led projects for cycling, such as the of delivery milestones.
Action 2
ambitious schemes at Stratford
Provide funding and support Gyratory (led by Newham) and Beam
for boroughs to deliver local Park (led by Havering)
and neighbourhood improvements
for cycling. • Proposals for local cycle networks
and other improvements through
LIP funding. The LIP Guidance asks
boroughs to set out how they will
contribute to growing the London-
wide cycle network through their LIPs
62 Chapter 5 – Streets that enable cycling
DRAFT
Cycling action plan 63
Focus box 5
Ambitious boroughs
achieving great results
London’s boroughs own 95 per cent of the Capital’s roads and maintain deep
links with their local communities, and thus play a leading role in improving
London's streets for cycling. There is growing evidence highlighting what
ambitious boroughs are able to achieve through improvements to local
walking and cycling networks.
For example, studies show that the delivery of the Mini-Holland schemes in
Enfield, Kingston and Waltham Forest has led to increased levels of walking
and cycling. Residents increased their levels of cycling by 18 per cent and
levels of walking by 12 per cent.50 In Waltham Forest, research has found that
children living in the borough will live an average of six weeks longer because
of improved air quality and lower traffic volumes delivered by the Mini-
Holland programme.51
We will continue to work with every London borough that shows ambition
and commitment to realise these benefits across the Capital. Borough
leadership, and the continued efforts of their officers, will be vital to
achieving the vision set out in this Plan.
Majority of Safer
Junctions complete
Continued investment
Key in Liveable Neighbourhoods,
including delivery of
Cycle network (existing & planned routes) transformative schemes and
Cycle network (alignment TBC) new rounds of bidding
Mini-Hollands
New sections of the Liveable Neighbourhoods
cycle network will open
across the Capital, including Safer Junctions
*reflects schemes funded in segregated routes on busy A full cycling delivery plan,
Other Healthy Streets schemes
the current TfL Business Plan. roads and traffic filtering on setting out milestones for all of
Subject to feasibility and Proposed river crossing these projects, can be found in
residential streets (indicative alignment)
consultation Appendix 1
66
DRAFT
Cycling action plan 67
52 https://tfl.gov.uk/corporate/about-tfl/how-we-work/planning-for-the-future/healthy-streets
53 https://tfl.gov.uk/corporate/publications-and-reports/cycling
68 Chapter 5 – Streets that enable cycling
DRAFT
Cycling action plan 69
Focus box 6
Innovative techniques We will work to ensure that Not all disruptions to London's
construction and other roadworks on streets are planned, and we are also
for effective delivery London's streets do not hinder people taking action to protect people cycling in
cycling. This approach will apply not just the case of unexpected disruptions. TfL’s
Actions 1 and 2 of this Plan highlight the to TfL's own schemes, but to everyone Network Management Control Centre
huge amount of new cycling and walking planning, designing and operating has adopted a new decision-making
infrastructure that will be delivered over temporary traffic management on framework that focuses on focuses
the coming years. Our aim is to deliver the highway, including developers and on the 4Ps – Protection, Pedestrians,
this infrastructure using efficient and utilities companies. Pedal cycles, and Passengers. With this
effective construction techniques. new framework, the decisions made in
Through TfL's Temporary Traffic response to disruptions on London’s
We have learnt from the construction Management Handbook, we will provide streets will seek to minimise the
of cycling infrastructure on London’s guidance to the industry to ensure that impact on people cycling. This includes,
streets, and now have a better safe and inclusive access is maintained wherever possible, granting access to
understanding of how to manage and for people walking and cycling people cycling to continue their journeys
coordinate construction of cycling throughout the duration of roadworks. safely and efficiently without the need
infrastructure at scale. Building on for long or disruptive diversion routes.
these lessons, we are delivering new We will also continue working closely
routes in a way that minimises disruption with contractors, developers, user Action 4
for people walking, cycling and using groups and other partners to offer
public transport. monthly road safety patrols to identify Work with London boroughs, local
improvements that can be made to businesses, utilities companies,
To do so, we are using techniques construction sites to improve conditions contractors and other partners to:
such as more night-time construction for cycling and walking.
away from residential areas, and • Construct new cycling
working with boroughs and other We also provide advice on major infrastructure as efficiently as
partners to pioneer a joined-up construction works and events to people possible, ensuring that disruption
approach to planning roadworks (see cycling and walking to communicate is minimised for everyone using
Focus box 7). This approach will result the impact of the works, including London's streets
in shorter construction times and travel guidance. Where the opportunity
smoother delivery of schemes. presents itself, such as in locations • Minimise the effect on people
with high-quality cycling infrastructure, cycling caused by planned and
we now encourage drivers to consider unplanned disruptions on London's
walking and cycling to help minimise streets
disruption due to planned works.
72 Chapter 5 – Streets that enable cycling
DRAFT
Cycling action plan 73
Focus box 7
Smart construction to
minimise disruption
Innovative joint working was used on Phase 2 of Cycle
Superhighway 6 to minimise potential disruption due to the
construction of the route.
Chapter 7 – Promoting
cycling for all Londoners
Every Londoner should be able to enjoy the freedom
that cycling can bring, and we will work with schools
and communities to give more people the opportunity
to cycle.
Alongside the delivery of new This section sets out the actions that
infrastructure and digital wayfinding, we will take to make cycling inclusive
we are working with partners across and appealing to a wider range of
London to break down barriers to cycling Londoners, including
in local communities and promote
cycling to more Londoners, especially Providing community grants to
those who may not realise that they encourage Londoners from all
enjoy cycling – or may not even realise communities to walk and cycle
that they can cycle at all.
• Expanding cycle training for adults,
To achieve this, we are investing a total children and families, and increasing
of £5m every year in a new Healthy the number of schools participating in
Streets Activation Programme. We will cycle training
target new initiatives where there is
most potential for more cycling, with • Celebrating cycling and inspiring
a particular focus on supporting those Londoners with new events and
who experience the greatest barriers promotions, including car-free days
to cycling, including currently under-
represented groups such as women, • Implementing Vision Zero, with better
BAME people and families. The funding enforcement and safer vehicles to
will also be used to boost the level of help improve safety, and perceptions
resource provided to boroughs to deliver of safety, for people cycling
these activities, helping them reach as
many Londoners as possible.
86 Chapter 7 – Promoting cycling for all Londoners
DRAFT 87
Focus box 10
Celebrating cycling and Cycling events and other car-free days Figure 9: Example of the ‘Walk, Cycle, Discover’ campaign
inspiring Londoners can help more Londoners experience the
Our research tells us that many joy of cycling, and encourage them and
Londoners recognise the benefits their families to cycle.
of cycling, and think that it is an appealing
way to travel.58 However, these positive The most iconic of these events is
attitudes are rarely enough to make Prudential RideLondon, the world’s
people actually start cycling. We need
them to go beyond agreeing that cycling
largest festival of cycling. In 2017, more
than 70,000 Londoners enjoyed cycling
A new route
is a good idea to actively wanting to do it. on eight miles of traffic-free streets in
central London during the FreeCycle A new London
To help build the desire for cycling, we event. This event is about giving more
have launched a new communications Londoners the opportunity to try WALK CYCLE DISCOVER
campaign, ‘Walk, Cycle, Discover’, cycling, and our monitoring shows Search TfL Active Travel
showcasing the pleasures and experiences that more than 30,000 Londoners have
that can be enjoyed when you cycle or continued to cycle after participating in
walk instead of taking the car. This will be RideLondon.
supplemented with further initiatives
targeted at newly launched cycle routes Smaller events can also have a big
and other street changes. For instance, impact on encouraging more Londoners
the launch of Cycle Superhighway 6 in to walk and cycle. As set out in the
September 2018 was supported by local Walking action plan, we will work with
promotion and activities involving boroughs to encourage more local and
schools and communities. community events.
Action 12 Action 13
Deliver annual promotional Give more people the opportunity to
activity, including: experience cycling by holding car-free
events, including:
• London-wide campaigns to
promote active travel, including the • Hosting the Prudential RideLondon
'Walk, Cycle, Discover' campaign festival of cycling each year
Chapter 8 – Delivering
the plan
To achieve the vision and targets of this Plan, commitment,
ambition and action will be required from TfL, boroughs
and partners across the Capital.
Delivering the Cycling action plan By delivering this Plan, we will not
The actions in this plan will create only be helping increased numbers
better streets for cycling across London, of Londoners to enjoy the benefits
with more and improved routes as of cycling, but will also be laying the
part of a growing London-wide cycle foundations for London’s future success.
network. They will enable a marked
change in the level of information we While our long-term vision is for
can provide about cycling on London’s 2041, the time to press ahead with
streets, allowing thousands more people action on cycling is now, and the
to easily plan cycling journeys. And they Cycling action plan marks an ambitious
will help to break through social and change in the planning and delivery
cultural barriers to cycling, enabling all of cycling initiatives.
Londoners to experience and celebrate
the joy of cycling.
Vauxhall to Waterloo ✔ ✔
Wandsworth to Teddington ✔ ✔
Bermondsey to Catford ✔ ✔
Ealing to Greenford ✔ ✔
Greenwich to Bexleyheath ✔ ✔
Blackfriars to Waterloo ✔ ✔
Olympia to Brentford ✔ ✔
Whitechapel to Stepney ✔ ✔
Angel to Barbican ✔ ✔
Greenwich to Woolwich ✔ ✔
Hammersmith to Twickenham ✔ ✔
Brentford to Hounslow ✔ ✔
Rotherhithe to Peckham ✔ ✔
Wembley to Willesden ✔ ✔
106 Appendix 1 – Cycling delivery plan, 2019-2024
DRAFT
Cycling action plan 107
Whitechapel to Shoreditch ✔ ✔
Brentford to Twickenham ✔ ✔
Chelsea to Knightsbridge ✔ ✔
Hounslow to Richmond ✔ ✔
Oval to Streatham ✔ ✔
Canonbury to Highgate ✔ ✔
Borough-led projects
Forest Road ✔ ✔
Markhouse Village ✔ ✔
Walthamstow town centre and gyratory ✔
Ewell Road ✔ ✔
Kingston Station ✔ ✔
Kingston to Surbiton ✔ ✔
Ealing ✔ ✔
Greenwich ✔ ✔
Hackney ✔ ✔
Haringey ✔ ✔
Havering ✔ ✔
Lewisham ✔ ✔
Waltham Forest ✔ ✔
Future tranches of Liveable Neighbourhoods ✔ ✔ ✔ ✔
112 Appendix 1 – Cycling delivery plan, 2019-2024
DRAFT
Cycling action plan 113
Highbury Corner ✔ ✔
Rotherhithe Roundabout ✔ ✔
Waterloo Roundabout ✔ ✔
Stratford Gyratory ✔ ✔
Beddington Gateways ✔ ✔
Beam Parkway ✔ ✔
Vaxuhall Cross ✔ ✔