Sei sulla pagina 1di 1

1 2 3 4 5

+1.000 ±0.000 +1.000 +1.000 +1.000

C
±0.000 -1.100
d=600
C.J. C.J. C.J. C.J. C.J.

+1.000

+1.000
-1.100 -1.100 -1.100 -1.100 -1.100
d=600 d=600 d=600 d=600 d=600

B
±0.000 ±0.000 ±0.000 ±0.000
d=200 d=200 d=200 d=200

C.J
±0.000 CONTRUCTION JOINT

+0.100

+0.100

C.J. C.J. C.J. C.J. C.J.

TYP. CONSTRUCTION JOINT DETAIL

A
-1.100
d=600 General Fill Acceptance Criteria
+1.000 +0.100 ±0.000 +1.000 ±0.000 +1.000 +1.000 +0.100 +1.000
NO Property Acceptable Limits In Accordance with

1 Percentage passing through 125 mm sieve, % = 100 ASTM D422

2 Percentage passing through 63 microns sieve, % ≤ 15 ASTM D422

3 LiquiLiquid Limit % ≤ 60 ASTM D4318


FOUNDATION REINFORCEMENT DETAILS 1/50 4 Plasticity Index % ≤ 35 ASTM D4318

Maximum Dry Unit Weight, kg/m3


5 ≥ 1,450 ASTM D698
(Standard or Modified Proctor)

NOTE: SEE ARCHITECTURAL DRAWINGS FOR THE ISOLATION DETAILS.

MIN. LAP LENGTH INFORMATION


FOUNDATION TOP BAR = Ø55
BOTTOM BAR = Ø55
WALL = Ø50
COLUMN BAR = Ø55
+1.000

SOIL INFORMATION
SITE CLASS = D
ALLOWABLE BEARING CAPACITY = 200 kPa
GROUNDACCELATION = 0.2

+0.100
±0.000 GENERAL NOTES
1-MENTIONED ALL DIMENSIONS ARE IN "mm." ALL ELEVATIONS ARE IN "m."
2-ALL DIMENSION AND LEVELS WILL BE CHECKED AT SITE BEFORE APPLICATION
3-NEED TO MAKE CHANGES TO THE PROJECT SIZE. ENGINEER MUST APPROVE THE PROJECT

COVER OF REINFORCEMENT
FOUNDATION = 75 mm
-1.100 -1.100 -1.100 COLUMN-WALL = 40 mm
BEAM = 40 mm
SLAB = 25 mm

-1.700 -1.700 -1.700


METERIAL
CONCRETE = C25/30 (fck:250 kg/cm2)
SECTION 1-1 1/25
REINFORCEMENT = S420 (fyk:4200 kg/cm2)
STRUCTURAL STEEL = St37-2 (S235JR) , St44-2 (S275JR) , St52 (S355JR)
TYPICAL WALL DETAILS 1/25
TYPICAL WALL DETAILS 1/25
TYPICAL WALL DETAILS 1/25
( FOR TOP LEVEL ±1.00 ) ( FOR TOP LEVEL ±0.00 ) ( FOR TOP LEVEL ±0.00 )
REFERENCE DRAWINGS
END-Q-A50-0130001
END-Q-A50-0130003
-0.350 END-Q-A50-0130004
END-R-A00-0130001 : GENERAL LAYOUT
END-Q-A00-1260001 : TECHNICAL SPECIFICATION FOR CONCRETE WORKS
END-Q-A00-1260002 : TECHNICAL SPECIFICATION FOR SITE PREPARATION and EARTHWORKS
SCHEDULE1 VOLUME 2A - RFP TECHNICAL SPECIFICATION
1 1 160524-MASTER GUINEA-RFP TECH SCHEDULE
-1.100

PERSPECTIVE
0 05.10.2018 ISSUED FOR CONSTRUCTION Mahmut METE Onur TOPÖNDER Akif UZ
Rev. No. DATE DESCRIPTION DESIGNED CHECKED APPROVED
-1.700

STAND DETAIL P1 PIER DETAILS


1/50 1/25
( 15 REQ'D )

50 MW HFO POWER STATION, CONAKRY, GUINEA

ADMINISTARATION BUILDING
FOUNDATION REINFORCEMENT DETAILS

±0,00=40.20 SCALE SIZE DRAWING NUMBER: SHEET REV.


1/50 A0 END-Q-A50-0140002 1/1 0