WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 4-Nov-16 SUPERVISED BY :
TIME : 10.30-12.00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 0.4 0.6 1.0 0.6 0.4
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 1.9 2.1 4.2
2 1.8 2.1 4.3
3 1.9 2.2 4.4
4 1.9 2.2 4.4
5 1.9 2.3 4.3
6 1.8 2.2 Waterlost
7 1.8 2.1
8 1.9 2.0
9 1.7 2.0
10 1.9 2.1
Q 1.85 2.13 2.16 0.00 0.00
( l / min )
Q 0.37 0.43 0.43 0.00 0.00
(l/min/m)
Q 30.83 35.50 36.00 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 0.40 0.150 0.300 0.0000 0.850 0.37 30.83 4.35 5.99E-05
2 0.60 0.150 0.300 0.0000 1.050 0.43 35.50 4.06 5.58E-05
3 1.00 0.150 0.300 0.0000 1.450 0.43 36.00 2.98 4.10E-05
4 0.60 0.150 0.300 0.0000 1.050 0.00 0.00 0.00 0.00E+00
5 0.40 0.150 0.300 0.0000 0.850 0.00 0.00 0.00 0.00E+00
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 2.28 3.13E-05
essure (kg/cm2)

G W
pump G ra p
10 x Q Total pressure V
Lu 
10 x Q Total pressure V
Lu 

Total Pres
H1 P xL 10
Ground Surface
9
Concrete 8
Q
K x LN L/r 7
H2 2 x (3.14) x LH 6
GWL 5
H 2 ( none GWL )
D (depth) 4
3

L 2
2
3
1
0
d
0 0.1

Q l/

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 1/4
56 mm
1.0 kg/cm2
1.50 m
HOLE NO PCA-18
0.50 m STAGE
0.0 m
FROM

TO 5.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure 628318.5
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete) 314159.3

H2= Diff. head (Surface to GWL or to center of test 500


section) 3.14 178.5714
H3 = Head loss 2.8
24.6176 20.31067

LUGEON GRAPHIC
Dilation
G ra p h O f 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )

Increase 1

Number of Test
Poins

3
2
3 1; 1.450
2 4
1
0 0.1 0.2 0.3 0.4 0.5

Q l/min/m
5

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
3.011146

8.0 9.0
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 11-Oct-16 SUPERVISED BY :
TIME : 11:00 - 12:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 0.8 1.2 2.0 1.2 0.8
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 7 8.0 11.0 8.0 5.0
2 6.5 2.1 11.0 8.0 5.0
3 6.5 7.0 11.0 7.0 6.0
4 7.5 8.0 11.0 7.0 5.0
5 7.5 8.0 11.0 8.0 5.0
6 8.6 8.0 12.0 8.0 5.0
7 7.1 8.0 11.0 8.0 6.0
8 8.3 8.0 11.0 7.0 5.0
9 8 8.0 11.0 8.0 5.0
10 7 7.0 11.0 8.0 5.0
Q 7.40 7.21 11.10 7.70 5.20
( l / min )
Q 1.48 1.44 2.22 1.54 1.04
(l/min/m)
Q 123.33 120.17 185.00 128.33 86.67
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 0.80 0.210 0.800 0.0000 1.810 1.48 123.33 8.18 1.13E-04
2 1.20 0.210 0.800 0.0000 2.210 1.44 120.17 6.52 8.98E-05
3 2.00 0.210 0.800 0.0000 3.010 2.22 185.00 7.38 1.01E-04
4 1.20 0.210 0.800 0.0000 2.210 1.54 128.33 6.97 9.59E-05
5 0.80 0.210 0.800 0.0000 1.810 1.04 86.67 5.75 7.91E-05
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 6.96 9.57E-05
es s ure (k g/cm2)

G W
pump G ra
10 x Q Total pressure
Lu 
10 x Q Total pressure
Lu 

Total Pres
H1 P xL 10
Ground Surface
9
Concrete 8
Q
K x LN L/r 7
H2 2 x (3.14) x LH 6
GWL 5
H 2 ( none GWL )
D (depth) 4
3
3 2 1;
L 2 23
1 1
0
d
0 1 2 3 4

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
2 kg/cm2
2.10 m
HOLE NO PCA-18
0.50 m STAGE
5.0 m
FROM

TO 10.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
3
2 1; 3.010
23
4
1

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
8.0 9.0
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 11-Oct-16 SUPERVISED BY :
TIME : 14.10 - 12:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.2 1.6 3.0 1.6 1.2
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 9 8.0 16.0 9.0 8.0
2 8 9.0 15.0 19.0 18.0
3 9 9.0 16.0 10.0 8.0
4 8 9.0 15.0 9.0 7.0
5 8 9.0 16.0 9.0 8.0
6 8 8.0 14.0 8.0 7.0
7 8 9.0 15.0 8.0 9.0
8 8 9.0 14.0 9.0 8.0
9 8 9.0 15.0 8.0 8.0
10 9 11.0 14.0 9.0 7.0
Q 8.30 9.00 15.00 9.80 8.80
( l / min )
Q 1.66 1.80 3.00 1.96 1.76
(l/min/m)
Q 138.33 150.00 250.00 163.33 146.67
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 1.20 0.210 0.800 0.0000 2.210 1.66 138.33 7.51 1.03E-04
2 1.60 0.210 0.800 0.0000 2.610 1.80 150.00 6.90 9.49E-05
3 3.00 0.210 0.800 0.0000 4.010 3.00 250.00 7.48 1.03E-04
4 1.60 0.210 0.800 0.0000 2.610 1.96 163.33 7.51 1.03E-04
5 1.20 0.210 0.800 0.0000 2.210 1.76 146.67 7.96 1.10E-04
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 7.47 1.03E-04
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5
3
GWL 4
H 2 ( none GWL ) 2
D (depth)
23
3
2
1
L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
2 kg/cm2
2.10 m
HOLE NO PCA-18
0.50 m STAGE
5.0 m
FROM

TO 10.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
6.2 6.4 6.6 6.8 7.0 7.2 7.4 7.6 7.8 8.0 8.2
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3 3
1; 4.010
2
23
1 4

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
8.0 8.2
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 14-Nov-16 SUPERVISED BY :
TIME : 9:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.2 1.8 3.0 1.8 1.2
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 0.6 0.6 1.0 0.7 0.6
2 0.6 0.7 1.0 0.7 0.6
3 0.5 0.7 1.0 0.7 0.6
4 0.7 0.7 0.9 0.8 0.5
5 0.6 0.6 1.0 0.7 0.4
6 0.6 0.7 1.9 0.5 0.6
7 0.6 0.7 1.0 0.7 0.6
8 0.6 0.7 1.0 0.7 0.8
9 0.6 0.7 1.0 0.7 0.6
10 0.6 0.7 1.0 0.7 0.6
Q 0.60 0.68 1.08 0.69 0.59
( l / min )
Q 0.12 0.14 0.22 0.14 0.12
(l/min/m)
Q 10.00 11.33 18.00 11.50 9.83
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 1.20 0.100 1.300 0.0000 2.600 0.12 10.00 0.46 6.35E-06
2 1.80 0.100 1.300 0.0000 3.200 0.14 11.33 0.43 5.85E-06
3 3.00 0.100 1.300 0.0000 4.400 0.22 18.00 0.49 6.76E-06
4 1.80 0.100 1.300 0.0000 3.200 0.14 11.50 0.43 5.93E-06
5 1.20 0.100 1.300 0.0000 2.600 0.12 9.83 0.45 6.25E-06
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.45 6.23E-06
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5 3
GWL 1; 4.400
4 2
H 2 ( none GWL ) 3
D (depth) 32
2 1
L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
3.5 kg/cm2
1.00 m
HOLE NO PCA-18
0.50 m STAGE
10.0 m
FROM

TO 15.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.4 0.4 0.4 0.4 0.5 0.5 0.5
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
3
1; 4.400
2
23
1 4

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
5 0.5
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 14-Nov-16 SUPERVISED BY :
TIME : 9:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.5 2.0 3.5 2.0 1.5
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 0.8 0.9 1.2 0.9 0.8
2 0.9 1.0 1.2 0.9 0.8
3 0.8 0.9 1.1 1.0 0.8
4 0.7 0.9 1.2 1.0 0.8
5 0.8 1.0 1.2 1.0 0.8
6 0.9 0.9 1.2 0.9 0.6
7 0.9 0.9 1.2 1.0 0.8
8 0.8 0.9 1.2 0.9 0.7
9 0.9 1.0 1.3 0.9 0.8
10 0.9 0.9 1.2 0.9 0.8
Q 0.84 0.93 1.20 0.94 0.77
( l / min )
Q 0.17 0.19 0.24 0.19 0.15
(l/min/m)
Q 14.00 15.50 20.00 15.67 12.83
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 1.50 0.100 1.300 0.0000 2.900 0.17 14.00 0.58 7.97E-06
2 2.00 0.100 1.300 0.0000 3.400 0.19 15.50 0.55 7.53E-06
3 3.50 0.100 1.300 0.0000 4.900 0.24 20.00 0.49 6.74E-06
4 2.00 0.100 1.300 0.0000 3.400 0.19 15.67 0.55 7.61E-06
5 1.50 0.100 1.300 0.0000 2.900 0.15 12.83 0.53 7.31E-06
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.54 7.43E-06
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
3
H2 5 1; 4.900
GWL 42
D (depth)
H 2 ( none GWL ) 23
3
2 1
L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
3.5 kg/cm2
1.00 m
HOLE NO PCA-18
0.50 m STAGE
10.0 m
FROM

TO 15.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.4 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
1; 4.900 3
2
23
1
4

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.6 0.6
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : 2.50 meter TESTED BY :
DATE : 5-Dec-16 SUPERVISED BY :
TIME : 18:00 - 18:50 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.5 2.0 3.5 2.0 1.5
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 0.8 0.9 1.1 0.9 0.9
2 0.9 1.0 1.2 0.9 0.9
3 0.8 0.9 1.1 1.0 0.8
4 0.8 0.9 1.1 1.0 0.9
5 0.9 0.9 1.2 0.9 0.9
6 1 1.0 1.1 0.9 1.0
7 0.8 0.9 1.2 0.9 1.0
8 0.9 1.0 1.2 0.9 0.8
9 0.9 0.0 1.0 1.0 0.8
10 0.9 0.9 1.2 0.9 0.8
Q 0.87 0.84 1.14 0.93 0.88
( l / min )
Q 0.17 0.17 0.23 0.19 0.18
(l/min/m)
Q 14.50 14.00 19.00 15.50 14.67
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 1.50 0.050 1.800 0.0000 3.350 0.17 14.50 0.52 7.15E-06
2 2.00 0.050 1.800 0.0000 3.850 0.17 14.00 0.44 6.00E-06
3 3.50 0.050 1.800 0.0000 5.350 0.23 19.00 0.43 5.86E-06
4 2.00 0.050 1.800 0.0000 3.850 0.19 15.50 0.48 6.65E-06
5 1.50 0.050 1.800 0.0000 3.350 0.18 14.67 0.53 7.23E-06
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.48 6.58E-06
es s ure (k g/cm2)

G W
pump G ra
10 x Q Total pressure
Lu 
10 x Q Total pressure
Lu 

Total Pres
H1 P xL 10
Ground Surface
9
Concrete 8
Q
K x LN L/r 7
H2 2 x (3.14) x LH 6 3
1; 5.350
GWL 5
H 2 ( none GWL ) 2
D (depth) 42 3
3
1
L 2
1
0
d
0 1 2 3 4

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
3.5 kg/cm2
0.50 m
HOLE NO PCA-18
0.50 m STAGE
15.0 m
FROM

TO 20.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.1 0.2 0.3 0.4 0.5 0.6
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
1; 5.350
2 3
23
1
4

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
5 0.6
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 11-Oct-16 SUPERVISED BY :
TIME : 14.10 - 12:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.2 1.6 3.0 1.6 1.2
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 9 8.0 16.0 9.0 8.0
2 8 9.0 15.0 19.0 18.0
3 9 9.0 16.0 10.0 8.0
4 8 9.0 15.0 9.0 7.0
5 8 9.0 16.0 9.0 8.0
6 8 8.0 14.0 8.0 7.0
7 8 9.0 15.0 8.0 9.0
8 8 9.0 14.0 9.0 8.0
9 8 9.0 15.0 8.0 8.0
10 9 11.0 14.0 9.0 7.0
Q 8.30 9.00 15.00 9.80 8.80
( l / min )
Q 1.66 1.80 3.00 1.96 1.76
(l/min/m)
Q 138.33 150.00 250.00 163.33 146.67
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1 1.20 0.210 0.800 0.0000 2.210 1.66 138.33 0.75 1.03E-04
2 1.60 0.210 0.800 0.0000 2.610 1.80 150.00 0.69 9.49E-05
3 3.00 0.210 0.800 0.0000 4.010 3.00 250.00 0.75 1.03E-04
4 1.60 0.210 0.800 0.0000 2.610 1.96 163.33 0.75 1.03E-04
5 1.20 0.210 0.800 0.0000 2.210 1.76 146.67 0.80 1.10E-04
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.75 1.03E-04
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5
3
GWL 4
H 2 ( none GWL ) 2
D (depth)
23
3
2
1
L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
2 kg/cm2
2.10 m
HOLE NO PCA-18
0.50 m STAGE
5.0 m
FROM

TO 10.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.8
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3 3
1; 4.010
2
23
1 4

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.8 0.8
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 9-Dec-16 SUPERVISED BY :
TIME : 15:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.0
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 1.5
2 1.5
3 1.5
4 1.5
5 1.5
6 1.5
7 1.5
8 1.5
9 1.5
10 1.5
Q 1.50
( l / min )
Q 0.00 0.00 0.30 0.00 0.00
(l/min/m)
Q 0.00 0.00 25.00 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1
2
3 1.00 0.050 0.300 0.0000 1.350 0.30 25.00 0.22 3.06E-05
4
5
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.22 3.06E-05
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5
GWL 4
H 2 ( none GWL )
D (depth) 3
2 3
1; 1.350
L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
1 kg/cm2
0.50 m
HOLE NO cb-17
0.50 m STAGE
0.0 m
FROM

TO 5.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.1 0.1 0.2 0.2 0.3
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
4
1; 1.350

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.3
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 8-Dec-16 SUPERVISED BY :
TIME : 15:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 2.0
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 6.0
2 6.0
3 6.0
4 6.0
5 5.0
6 6.0
7 6.0
8 7.0
9 6.0
10 6.0
Q 6.00
( l / min )
Q 0.00 0.00 1.20 0.00 0.00
(l/min/m)
Q 0.00 0.00 100.00 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1
2
3 2.00 0.100 1.300 0.0000 3.400 1.20 100.00 0.35 4.86E-05
4
5
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.35 4.86E-05
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5
GWL 4 3
H 2 ( none GWL ) 1; 3.4
D (depth) 3
2

L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
2 kg/cm2
1.00 m
HOLE NO cb-17
0.50 m STAGE
10.0 m
FROM

TO 15.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
3
1; 3.400

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.4 0.4
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 9-Dec-16 SUPERVISED BY :
TIME : 15:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 3.0
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 2.0
2 3.0
3 2.0
4 2.0
5 1.0
6 2.0
7 2.0
8 2.0
9 2.0
10 2.0
Q 2.00
( l / min )
Q 0.00 0.00 0.40 0.00 0.00
(l/min/m)
Q 0.00 0.00 33.33 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1
2
3 3.00 0.050 1.300 0.0000 4.350 0.40 33.33 0.09 1.27E-05
4
5
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.09 1.27E-05
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5 3
GWL 4
1; 4.350
H 2 ( none GWL )
D (depth) 3
2

L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
3 kg/cm2
0.50 m
HOLE NO cb-17
0.50 m STAGE
10.0 m
FROM

TO 15.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
3
1; 4.350

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.1 0.1
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 9-Dec-16 SUPERVISED BY :
TIME : 15:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 1.0
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 1.5
2 1.5
3 1.5
4 Water lost
5
6
7
8
9
10
Q 0.45
( l / min )
Q 0.00 0.00 0.09 0.00 0.00
(l/min/m)
Q 0.00 0.00 7.50 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1
2
3 1.00 0.050 0.300 0.0000 1.350 0.09 7.50 0.07 9.17E-06
4
5
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.07 9.17E-06
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5
GWL 4
H 2 ( none GWL )
D (depth) 3
2 3
1; 1.350
L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
1 kg/cm2
0.50 m
HOLE NO cb-17
0.50 m STAGE
0.0 m
FROM

TO 5.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
4
1; 1.350

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.1 0.1
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 8-Dec-16 SUPERVISED BY :
TIME : 15:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 2.0
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 1.0
2 0.9
3 1.0
4 0.9
5 1.0
6 1.0
7 0.9
8 1.0
9 1.0
10 0.9
Q 0.96
( l / min )
Q 0.00 0.00 0.19 0.00 0.00
(l/min/m)
Q 0.00 0.00 16.00 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1
2
3 2.00 0.150 1.300 0.0000 3.450 0.19 16.00 0.06 7.66E-06
4
5
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.06 7.66E-06
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5
GWL 4 3
H 2 ( none GWL ) 1; 3.450
D (depth) 3
2

L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
2 kg/cm2
1.50 m
HOLE NO cb-17
0.50 m STAGE
10.0 m
FROM

TO 15.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.0 0.0 0.0 0.0 0.1 0.1
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
3
1; 3.450

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
1 0.1
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CIMANUK-CISANGGARUNG
SNVT PEMBANGUNAN BENDUNGAN
Jalan Pemuda No. 40 Cirebon, Telp (0231) 205876 – Fax (0231) 205875

WATER TEST MASS CONCRETE REPORT


PROJECT : KUNINGAN DAM ANGLE FROM VERTICAL :
LOCATION : BLOK 5 DIAMETER OF HOLE (d) :
FEATURE : PILOT HOLE HEIGHT OF PRESSURE :
AREA DESIGNATION : Mass Concrete As Dam ( Block 5) GAUGE from SURFACE :
GROUND ELEVATION : - m.s.l CONCRETE THICKNESS :
DEPTH OF GWL : - meter TESTED BY :
DATE : 9-Dec-16 SUPERVISED BY :
TIME : 15:00 CALCULATED BY :

WATER INJECTED INTO HOLE IN TESTING PERIOD (READ FROM WATER METE
PRESSURE
ELAPSED P1 P2 P3 P4 P5 P6 P7 P8 P9
TIME 3.0
(max)
min (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
1 0.7
2 0.8
3 0.7
4 0.7
5 0.8
6 0.8
7 0.7
8 0.7
9 0.7
10 0.8
Q 0.74
( l / min )
Q 0.00 0.00 0.15 0.00 0.00
(l/min/m)
Q 0.00 0.00 12.33 0.00 0.00
(cm /sec)
3

PRESSURE DISCHARGE (Q) LUGEON


k
NO P0 (gauge) H1 H2 H3 P total VALUE
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) kg/cm2 l/min/m (cm3/sec) ( L U ) (cm/sec)
1
2
3 3.00 0.100 1.300 0.0000 4.400 0.15 12.33 0.03 4.63E-06
4
5
6
7
8
9
10 0.00 0.00
11 0.00 0.00
AVERAGE 0.03 4.63E-06
es s ure (k g/cm2)

G W G ra
10 x Q Total pressure
pump Lu 
10 x Q Total pressure
pump Lu 

Total Pres
P xL 10
H1 9
Ground Surface
8
Concrete Q
K x LN L/r 7

2 x (3.14) x LH 6
H2 5 3
GWL 1; 4.400
4
H 2 ( none GWL )
D (depth) 3
2

L 1
0
0 1 2 3 4
d
Q

SEEN BY CHECKED BY PREP


OWNER CONSULTANT

Date Sign Date Sign Date

Name
Name
DONY FATUROCHMAN DJUWARI
T

5875
WIKA -BRANTAS, KSO`

PORT
0 deg.
SHEET 4/2
56 mm
3 kg/cm2
1.00 m
HOLE NO cb-17
0.50 m STAGE
10.0 m
FROM

TO 15.0 m

WATER METERS IN LITERS)

P10 P11
Remarks

(kg/cm2) (kg/cm2)

REMARKS

P= P0 + C (H1 + H2 - H3)
(kgf/cm2)
Po= Gauge pressure
C= Constant (0.1 kgf/cm2)
H1= Diff. head (gauge to surface + concrete)

H2= Diff. head (Surface to GWL or to center of test


section)
H3 = Head loss

LUGEON GRAPHIC
Dilation
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G ra ph O f
Total pressure Vs Lugeon ( Lu )
Total pressure Vs Lugeon ( Lu )
1

Number of Test
Increase
Poins

3
3
1; 4.400

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5
Q l/min/m

PREPARED AND SUBMITTED BY


CONTRACTOR

Date Sign

Name
AGUS BASUKI
0.0 0.0

Potrebbero piacerti anche