COMMENTS RESOLUTION SHEET LAMPUNUT DEVELOPMENT PLAN

Date : 16/11/2018

Comment refer to calculation rev.A_06.09.18


Doc/Page
No Company Comments Clarifications / Response Remarks
Ref.
Please follow heat loss
1 5 Noted and updated accordingly
calculation
For the subject seem we have mistaken put
numbering actually item no 4 should be
2 6&7 Item No 3 need to show
become item no 3, then numbering no 4 is
replaced
Yes, we have consider into the formula as
follow:

Qc=Vfa*ρ*(hfa-hsa)/3600+Qs/1000,

Where
External Heat caused
by Fresh air need to
3 6 &7 Qc: Total heat load
calculate
Vfa: Fresh air volume
ρ: Density
hfa= Fresh air enthalpy
hsa: AC supply enthalpy
Qs: sensible heat load

Flow shall be Cubic


4 6&7 Yes. Noted and updated accordingly
meter/Hour?
Qc=Vfa*ρ*(hfa-hsa)/3600+Qs/1000,

Where

Qc: Total heat load


Vfa: Fresh air volume
ρ: Density
Please Determine all hfa= Fresh air enthalpy
vallue source hsa: AC supply enthalpy
5 6&7
Qs: sensible heat load

Qc=122*1,2*(147,76-
31,4)/3600+7717/1000=12,5 kW

Qc=515,4*1,2*(147,7631,4)/3600+30431/10
00=50,4kW

6 5 Updated heat loss Noted and and updated accordingly


COMMENTS RESOLUTION SHEET LAMPUNUT DEVELOPMENT PLAN

Date : 16/11/2018

Comment refer to calculation rev.C_11.11.18


Doc/Page
No Company Comments Contractor Response Remarks
Ref.
Noted, yes will provide Temperature
display sensor in the room since related
control already build in into the
A separate room units(indoor + outdoor), then no PLC is
temperature required
sensoe(ie,RTD) shall be
provide to allow for
connection to local PLC
to allow monitoring of the
switch gear room for
1 6
internal temperature.
The sensor position shall
be near the highest point
within the switch room
away from direct airflow
from either Air
condioning or
pressurization units

Noted , yes correct for the one is


calculataion related for pressurization ,
however to ensure positive pressure 25
PA, is required pressurization fan, since
as per equipment selection the external
static pressure max ;180 Pa

we assumed that this


calculation related to
room Pressurization.
2 6 please ensure to have
positive pressure 25kPA.
STP to ensure function
by FAT and test report

however the external pressure required


as per calculation are 292 Pa (calculation
is attached )
Document Number: Rev. :
D
LAMPUNUT DEVELOPMENT PLANT LDP-AC-CAL-001

Date: 15-11-2018

REVISION DESCRIPTION SHEET

REV DATE REVISION DESCRIPTION

A 06-09-2018 ISSUED FOR REVIEW AND COMMENT

B 26-09-2018 RE-ISSUED FOR REVIEW AND COMMENT

C 11-11-2018 ISSUED FOR CONSTRUCTION

D 15-11-2018 RE-ISSUED FOR CONSTRUCTION

PREP. BY : BW.
PT.STARINDO TUNGGAL PRATAMA
Head Office :"
Batu Merah Industrial komplek
AIR COND. CALCULATION CHK. BY :
No. 4 Batu SHY.
Ampar, Batam – Indonesia 29432"
Phone / Fax : 62 778 412392 / 62 778
412390 Email : shanty@starindotp.com
Client Doc No:
/ stp.batam@gmail.com
COVER SHEET
LDP-30291-EH-16
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 2 of 10

TABLE OF CONTENTS

1. INTRODUCTION

1.1 General -------------------------------- 3


1.2 Abbreviations -------------------------------- 3

2. DESIGN INPUT

2.1 Design Condition -------------------------------- 4


2.2 Room Design Condition -------------------------------- 4
2.3 Equivalent Temperature -------------------------------- 4
2.4 Total Heat Transfer Coefficient -------------------------------- 5
2.5 Total Heat Dissipation -------------------------------- 5

3. HEAT LOAD CALCULATION FOR AIR CONDITION

3.1 Swithgear Room ------------------------------- 6


3.2 Control Room ------------------------------- 7
3.3 Summary ------------------------------- 8

4. CATALOGUE ------------------------------- 9
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 3 of 10

1. INTRODUCTION
1.1 General

The purpose of this document is to calculate the ventilation air flow, cooling
load, heating load, humidifying load and fresh air rate for rooms/spaces at
Lampunut Development Plant. HVAC system will serves the utility building.
Following shows the served area.

• Control Room
• Switchgear Room

1.2 Abbreviations
EQT : Equivalent Temperature
DB : Dry Bulb Temperature
WB : Wet Bulb Temperature
RH : Relative Humidity
K-value : Heat Transfer Coefficient
SA : Supply Air
EA : Exhaust Air
RA : Return Air
hfa : Fresh Air Enthalpy
hma : Mixed Air Enthalpy
hra : Room Air Enthalpy
hsa : AC Supply Air Enthalpy
ρ : Density
dfa : Fresh Air Humidity Ratio
dma : Mixed Air Humidity Ratio
dra : Room Air Humidity Ratio
dsa : AC Supply Air Humidity Ratio
Q : Heat
Vfa : : Fresh Airflow volume
V : Airflow volume
dT/ T : Temperature difference
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 4 of 10

2. DESIGN INPUT
2.1 Design Condition

Design Input
TEMPERATURE
DESCRIPTION (DB) RH ENTHALPY
OUTSIDE CONDITION 40 ºC 86% 147,76 kJ/kg
ROOM CONDITION 23,0 ºC 55% 47,62 kJ/kg
RETURN AIR CONDITION 24,0 ºC 51.8% 48,65 kJ/kg
MIXED AIR CONDITION (10%) 25,6 ºC 58,56 kJ/kg
MIXED AIR CONDITION (15%) 26,5 ºC 63,91 kJ/kg
MIXED AIR CONDITION (20%) 27,2 ºC 68,67 kJ/kg
*SUPPLY AIR CONDITION 12,0 ºC 93% 32,60 kJ/kg
SUPPLY AIR DEW POINT 11,3 ºC 95% 31,40 kJ/kg
OUTSIDE CONDITION (WINTER) 15,0 ºC 100% 34,16 kJ/kg
CEILING HEIGHT 3,4 m
SPECIFIC VOLUME 0,82 m³/kg
FRESH AIR PER PERSON 35 CMH

Notes:
Supply air condition only for calculation reference. Design performance shall refer to
equipment/product data sheet.

2.2 Room Design Condition

Room Design Temperature and Pressure


Temperature (DB) RH Pressure
No Service Area o
C % Pa
1 Switchgear Room 23 ± 5 55 +20
2 Control Room 23 ± 5 55 +20

2.3 Equivalent Temperature

Temperature Condition
Temperature
No Description (DB)
o
C
1 Ambient Air 40,0
2 Roof exposed 56,0
3 Wall exposed 52,0
4 Air Conditioning Space 23,0
5 Internal passage/corridor 25,0
6 No Air condition Space 40,0
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 5 of 10

2.4 Total Heat Transfer Coefficient


Table 2.4– Total Heat Transfer Coefficient
Heat Transfer
No Surfaces Coefficient
W/(m².k)
1 Roof 0,44
2 Wall 0,44
3 Floor 0,44

2.5 Total Heat Dissipation load


Table 2.5– Total Heat Dissipation load
Heat Loss
No Service Area
Watt
1 Switchgear Room 16090
2 Control Room 2900
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 6 of 10

3. HEAT LOAD CALCULATION FOR MAIN AC SYSTEM

3.1 Switchgear Room

Project Name ------ Lampunut Development Plant


Room Name ------ SWITCH GEAR ROOM
Outside Condition ------ 40 ºC 86% 147,76 kJ/kg
Room Condition ------ 23 ºC 55% 47,62 kJ/kg

Calculation of Heat Gains and Losses

U-value
Length

Height
Width

Area
Leakage
Room Descrition No. Heat Load
(according to ASHREA HANDBOOK - APPLICATION)

m m m m² dT Q(Sens) Q(Lat) Area Ratio Pressure Difference Leak air flow rate
Room Dimension W/m²ºC
16,5 4,5 3,4 74,3 ºC Watts Watts Pa m³/h
1. Walls & Deck Heat Transfer (Q1)
North Exposed 16,5 3,4 56,1 0,44 29 716 1,70E-04 20 128,82
South Exposed 16,5 3,4 56,1 0,44 29 716 1,70E-04 20 128,82
East Unexposed 4,5 3,4 15,3 0,44 0 0 1,70E-04 0 0,00
West Exposed 4,5 3,4 15,3 0,44 29 195 1,70E-04 20 35,13
Roof Exposed 16,5 4,5 74,3 0,44 33 1.078 1,70E-04 20 170,50
Floor Unexposed 16,5 4,5 74,3 0,44 17 555 5,20E-05 20 52,15
Sub-Total: 3.260
2. Solar Heat Gain(Q2)
Window 0
Heat Gain From Persons(Q3)
Sensible(W) 75 150
Person 2
Latent(W) 55 110
3. Heat Gain From Lighting and Other Sources(Q4)
Lighting 15 W/m² 74,3 1.114
Equipment 16090 W 1 16.090
Sub-Total: 17.204
Total internal heat gain : ΣQ 20.614 110
Total with 10% Margin : 22.797 Watts

Fresh Airflow Calculation


Base on the required fresh air per occupants Supply airflow 35 m³/h Person 70 m³/h
Extract air change requirement 6 T/day 63,1 m³/h
Total Leakage 515,4 m³/h
Total Fresh Air Flow 515 m³/h

Total Heat Load Calculation


Qc=Vfa*ρ*(hfa-hsa)/3600+Qs/1000 ρ: 1,2 kg/m³ 42,79 kw
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 7 of 10

3.2 Control Room

Project Name ------ Lampunut Development Plant


Room Name ------ Control Room
Outside Condition ------ 40 ºC 86% 147,76 kJ/kg
Room Condition ------ 23 ºC 55% 47,62 kJ/kg

Calculation of Heat Gains and Losses

U-value
Length

Height
Width

Area Leakage

No.
Room Descrition Heat Load
(according to ASHREA HANDBOOK - APPLICATION)

m m m m² dT Q(Sens) Q(Lat) Area Ratio Pressure Difference Leak air flow rate
Room Dimension W/m²ºC
3 4,5 3,4 13,5 ºC Watts Watts Pa CMH
1. Walls & Deck Heat Transfer (Q1)
North Exposed 3 3,4 10,2 0,44 29 130 1,70E-04 20 23,42
South Exposed 3 3,4 10,2 0,44 29 130 1,70E-04 20 23,42
East Unexposed 4,5 3,4 15,3 0,44 0 0 1,70E-04 0 0,00
West Exposed 4,5 3,4 15,3 0,44 29 195 1,70E-04 20 35,13
Roof Exposed 3 4,5 13,5 0,44 33 196 1,70E-04 20 31,00
Floor Unexposed 3 4,5 13,5 0,44 17 101 5,20E-05 20 9,48
Sub-Total: 753
2. Solar Heat Gain(Q2)
Window 0 0
Heat Gain From Persons(Q3)
Sensible(W) 75 150
Person 2
Latent(W) 55 110
3. Heat Gain From Lighting and Other Sources(Q4)
Lighting 15 W/m² 13,5 203
Equipment 2900 W 2 5.800
Sub-Total: 6.003
Total internal heat gain : ΣQ 6.905 110
Total with 10% Margin : 7.717 Watts

Fresh Airflow Calculation


Base on the required fresh air per occupants Supply airflow 35 m³/h Person 70 m³/h
Extract air change requirement 6 T/day 11,5 m³/h
Pressurization Leakage 122,5 m³/h
Total Fresh Air Flow 122 m³/h

Total Heat Load Calculation


Qc=Vfa*ρ*(hfa-hsa)/3600+Qs/1000 ρ: 1,2 kg/m³ 12,47 kw
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 8 of 10

3.3 Summary

Summary of Heat Load Calculations and Airflow Balance for Equipment


Calculation of the HVAC System
a. Split Unit Capacity
INTERNAL HEAT TOTAL HEAT *MIN COOLING
FRESH AIR FLOW
LOAD LOAD CAPACITY
SERVICE AREA REMARKS
kW kW CMH CFM kW

SWITCH GEAR ROOM 22,80 42,79 515 303 14,26 4 X 50% (3-duty & 1-standby)
CONTROL ROOM 7,72 12,47 122 72 12,47 2 X 100% (1-duty & 1-standby)

Notes : Supply air flow and cooling capacity shall according to spilt unit package performance at 26 ºC DB / 55 % RH return air and 35ºC outdoor condition
Document No : LDP-AC-CAL-001
Date : 15-11-2018
AIR COND. CALCULATION Rev. D Status: Issued for Approval
Project Doc. No. : LDP-30291-EH-16 Page : 9 of 10

4. CATALOGUE (Refer to the next sheet)


AIR COOLED PACKAGED
AIR CONDITIONERS

l e f or
u i t a b es
S ctori
fa
Page 5
Page 11

Page 5
Page 12

Page 15,16

Page 6
Page 13,14

Page 15,16

1
Nice,
cool air in the factory
or in the cafeteria

2
AIR COOLED PACKAGED AIR CONDITIONERS

FLOOR STANDING TYPE


DIRECT AIR BLOW TYPE Enhanced varieties of factory
modification and optional
accesories Standard model
Factory modification
Contact sales for more infomation
Floor Standing Type
Direct Duct Duct Type
Connection
Air Blow Type
Auto restart
Modify wiring for central control
adapter kit (DAT107A55) installation
Change fan motor and pulley – –
Discharge grill plenum chamber –

Side discharge grillon discharge plenum chamber –

FVGR10NV1
RUR10NY1 Factory Modificaion Lower drain pan – –
Front suction high efficiency filter chamber – –

Front suction base flange for front suction


– –
high efficiency filter chamber
Suction grill for front suction
– –
DUCT CONNECTION TYPE high efficiency filter chamber

Fresh air inlet –

Rear suction –

Drain pump –
Remote sensor(Thermistor for suction air) –

All fresh air application


Low outdoor temp.15ºC application
and long pipe 70m application
Central control adaptor kit
DAT107A55
(external terminal for ON/OFF , abnormal)1
LCD remote controller2 BRC1C62
intelligent Touch Controller2 DCS601C51
Option

Central remote controller2 DCS302CA61


Unified ON/OFF controller3 DCS301B61
RUR10NY1
FVPGR10NY1 Schedule timer3 DST301BA61
Remote sensor (thermistor for suction air)3 KRCS01-1
Remote controller – BRC1NU64
Note:
1
Wiring modification is needed on floor stand model to connect with central control ADP kit.
2
Need to use central control adapter kit for option connection.

DUCT TYPE 3
Central control adapter kit and LCD remote controller is necessary for option connection.

Quiet Operation
Equipped with scroll compressor for
RUR10NY1 quiet operation
FDR10NY1
Smooth running, low
vibration, low operating
sound.

Sound level
Outdoor unit
380V 415V

RUR05NY1 59 dB 60 dB
RUR06NY1 59 dB 60 dB

3
Easy operation
Digital remote control comes standard Refrigerant pre charged for up to 7.5 metres
with indoor unit. Allowable refrigerant pipe length and level difference

Temperature setting is possible by button operation. The set Pre-charged 1 Max. length Max. level
difference
temperature is conveniently displayed on the LED. 50 m
RUR05NY1-20NY1 7.5 m (Equivalent length 70 m) 30 m

1
Floor standing type (Standard accessory) Note: Additional refrigerant charging is required if the refrigerant pipe is longer than the
indicated length.

9 8 Note.1 3

6 4-direction piping affords more freedom


7
of layout (Applies to RUR05N/06N)
5 1
2
Piping can be run from the front, bottom, right or rear surface
according to how the unit is installed.
4
Note.1
In case of RUR08–20N, piping can be drawn out in two
directions-front, and under side.
1 On/Off button 4 Temp. setting down 7 Compressor operation lamp.
2 Fan button 5 Mode button 8 Fan operation lamp.
3 Temp. setting up 6 LED display 9 Cool operation lamp.

Note.1 It cannot be used for FVPGR10–20NY1


Durability
Duct type (optional accessory) Heat exchange fins provided with
9 8 7 6 anti-corrosion treatment (Applies to all outdoor units)
To achieve increased durability by improved resistance to salt
corrosion and atmospheric pollution, coated PE fins (with
special acryl pretreatment) are used for the heat exchanger of
the outdoor unit.

10 2 3 5 4 1

Space savings
1 Power 5 Next setting 9 Compressor 1 indicator lamp
2 Temperature scale 6 Fan indicator lamp 10 Temperature sensor Installation space is saved thanks to a more
3 Temperature setting 7 Cool indicator lamp compact outdoor unit. This also makes it
4 Mode setting 8 Compressor 2 indicator lamp
easier to install.
Previous 20HP outdoor unit
NEW 53%
RUR20NY1 space saved
RUG10AUY1 X 2
Design flexibility (20HP) compared to
previous model

Designed for long refrigerant piping.


50 m maximum length and 30 m maximum level difference
to cover medium- and large-scale building needs. 690
mm 765
2,560mm 1,240mm mm
Outdoor unit roof
installation possible
for plenty of leeway.

Max. length

Max. level difference

4
X X X X X X X X X X

X X X X X X

X X X X X X X X

X X X X X X

5
Control Room Switchgear Room

X X X X X X X X X X

X X X X X X

X X X X X X

X X X X

6
Fan Performance

7
8
Wiring and Piping

9
DIMENSIONS

10
DIMENSIONS

11
12
DIMENSIONS

13
14
DIMENSIONS

15
16
When there is an
obstruction only
on the inlet side

When there are


obstructions on
both sides

An obstruction
in the overhead space
When there are
obstructions on
both sides

An obstruction
in the overhead space

When there is an
obstruction on the
inlet side
An obstruction
in the overhead space

When there are obstructions


on the inlet side and
both lateral sides

An obstruction
in the overhead space

When there are obstructions


on the inlet side and
both lateral
sides

An obstruction
in the overhead space

17
or more or more

or more or more or more or more or more or more


or more or more

or more or more

or more or more or more or more or more or more


or more or more

or more or more

or more or more
or more or more

or more or more

or more or more or more or more or more or more


or more or more

or more
or more or more or more
or more
or more or more or more

or more or more

or more or more or more or more or more or more


or more or more

or more or more or more


or more or more
or more or more or more
mm

mm

18