Important Terms Related to the Engine
Arrangement of Cylinders
- Horizontal,
- Vertical,
- V type
9/26/2017 4
9/26/2017 5
Cylinder Liner
9/26/2017 7
Cylinder Head
9/26/2017 8
Various clearances
Subassembly Clearance in mm
Cylinder
9/26/2017
liner wear 1.524 9
IndianOil
Various clearances
Sub assembly Clearance in mm
Piston clearance Top Groove 0.300
9/26/2017 10
BASIC INPUTS IN ENGINE
ENGINE
9/26/2017 11
MONITORING OF OUR ENGINE
FUEL
IMPORTANT PARAMETERS- FUEL TEMPERATURE
FUEL
IMPORTANT PARAMETERS- FUEL PRESSURE
9/26/2017 13
MONITORING OF OUR ENGINE
CHARGE AIR
IMPORTANT PARAMETERS- CHARGE AIR PRESSURE
NO ALARM
Indicates the functioning of
Turbocharger
Oil Bath Filter
Engine Fuel System Performance
Leakages in Charge Air Pressure Line
9/26/2017 14
MONITORING OF OUR ENGINE
CHARGE AIR
IMPORTANT PARAMETERS- CHARGE AIR TEMPERATURE
9/26/2017 17
MONITORING OF OUR ENGINE
WATER
IMPORTANT PARAMETERS- JACKET WATER TEMPERATURE
9/26/2017 18
MONITORING OF OUR ENGINE
WATER
IMPORTANT PARAMETERS- JACKET WATER PRESSURE
9/26/2017 19
Air filter
CHARGE AIR/ TURBO-SUPERCHARGING
SYSTEM
Exhaust
chimney
Turbine
Exhaust manifold
After
cooler
Impeller Fixed nozzle ring
Inlet Exhaust
Exhaust manifold
Air
9/26/2017
Piston 20
manifold
Level Gauge
WATER COOLING SYSTEM
Riser Pipe
1 2 3 4 5 6
ENGINE
BLOCK
Water Pump
9/26/2017 21
ENGINE CONTROLS & SAFETY
EQUIPMENTS
9/26/2017 22
ENGINE CONTROLS & SAFETY EQUIPMENTS
9/26/2017 24
ENGINE CONTROLS & SAFETY EQUIPMENTS
9/26/2017 29
TROUBLE SHOOTING (ENGINE DOES NOT START)
Fuel pump cut out lever not in Put fuel lever in run in run
run condition. condition.
9/26/2017 30
ENGINE DOES NOT START
9/26/2017 31
TROUBLE SHOOTING (ENGINE STOPS SUDDENLY)
9/26/2017 32
TROUBLE SHOOTING (ENGINE HUNTS)
9/26/2017 33
TROUBLE SHOOTING (ENGINE HUNTS)
9/26/2017 34
TROUBLE SHOOTING (SMOKY EXHAUST)
PH 7.5 to 9.5
9/26/2017 36
ACTIVITIES FOR 12000 HOURS
MAINTENANCE
1. PRE TEST RUN & RECORDING OF ALL
PARAMETERS. 7.5 to 9.5
2. 250 HOURS SCHEDULE COMPLETED.
3. 1500 HOURS SCHEDULE COMPLETED
4. 3000/4000 HOURS SCHEDULE COMPLETED
5. 6000/8000 HOURS SCHEDULE COMPLETED
9/26/2017 37
ACTIVITIES FOR 12000 HOURS
MAINTENANCE
7.DESCALING OF COMPLETE ENGINE DONE &
WATER JACKETS CLEANED
7.5 to 9.5
8.LINER WITHDRAWN, DESCALED INSPECTED,
COPPER JOINTS & LINER ‘O’ RINGS RENEWED
9.RUNNING CLEARANCES OF CAMSHAFT
CHECKED
10.CRANK PIN DIAMETER MEASURED AND
CHECKED FOR QUALITY
9/26/2017 38
ACTIVITIES FOR 12000 HOURS
MAINTENANCE
11.PUSH ROD & FUEL PUMP ROLLER GUIDE,
SPRINGS & PUSH7.5
ROD ENDS INSPECTED FOR
to 9.5
WEAR AND DEFECTS
12.LUBRICATING OIL PUMP AND DRIVE
STRIPPED, GEAR, SPINDLES AND BEARINGS
INSPECTED
13.WATER PUMP DRIVE STRIPPED AND
INSPECTED
14.CHECK ENGINE BED PLATE JOINT FOR
TIGHTNESS
9/26/2017 39
ACTIVITIES FOR 12000 HOURS MAINTENANCE
15.RELATIVE MOTION OF THE FLYWHEEL & DRIVING
PINION SHAFT OF GEAR BOX CHECKED FOR
ASCERTAINING CONDITION OF COUPLING (BETWEEN
7.5 to 9.5
ENGINE – GEAR BOX)
16.ITCL PUMP OVERHAULED
17.HEAT EXCHANGERS IN FUEL MODULE OPENED
CLEANED & PRESSURE TESTED.
18.GEAR BOX MAINTENANCE.
19.EQUIPMENT ALIGNEMENT.
20.TEST RUN TO ASCERTAIN IMPROVEMENT IN
PERFORMANCE.