Sei sulla pagina 1di 6

9To,

Human Resource Department,


SUBJECT: APPLICATION FOR THE POST OF QA-QC ENGINEER OR MECHANICAL
ENGINEER.

Dear Sir / Madam,

With reference to the above-mentioned vacancy, I am keen to be considered.

Presently working as a QA-QC Engineer with MMP (Mott MacDonald Pakistan) at New
Islamabad International Airport.

I have more than 24 years of experience with different organizations, mostly in QA/QC
Department, Building Construction, Execution of Fabrication & Manufacturing of Piping,
Steel Structure, Fuel-Tanks, Heavy equipment & vessel, Boiler, Cross-country pipeline,
Erection, Installation in Civil, Mechanical, Electrical projects. I have sound grip on
International Standards and Codes used to make sure the procedures policies & quality in
Oil & Gas Sector projects.

I believe that my diverse and well-rounded experience with Multinational Exposure could be
the most beneficial / suitable to your requirements.

If you have any further query please feel free to contact me. Please find my attached
resume.

Looking forward to your positive response.

Thanks & Best Regards.

Tahir Javed Jafri


QA/QC Engineer.

Cell No, +923009847326


+923129847326

1
TAHIR JAVED JAFRI
S/o Faqir Hussain, Haider
Street, Fatima Town,Near
Nehar stop Taxila District
Rawalpindi 47050, Pakistan
tj51214110@gmail.com
Ph: (92-300) 9847326

Technical Qualification:
I. DAE Mechanical from GCT Faisalabad 1994.

Professional Certification:
I. RT Level-II (ASNT) Lonestar Technical & Industrial Services L.L.C Abu Dhabi U.A.E
II. PT Level-II (ASNT) Lonestar Technical & Industrial Services L.L.C. Abu Dhabi U.A.E

Name of
Name of
Post / Starting Ending
Employer Details of Responsibilities / Job Description
Position Date Date
/ City
held
1- Working as Project Management Consultant at
Package # 4 Baggage Handling System; Quality
related activities of Civil, Mechanical, Electrical.

2- Activities: Documents reviewed, Client Specification,


BOQ, IPCs, QIP, ITPs, WPS, PQR, WQT, MIRs, IRs
and DPT Reports as per QCPs of Civil, Mechanical,
Electrical

I have inspected of incoming material as per BOQ. Routine


Inspection of Civil, Mechanical, Electrical works, such as
Foundation & Anchor-grouting of Building Baggage
Mott Mac Reconciliation, Control Room, Compressor, Generator & LT
Donald (PMC) Rooms, Leveling Alignment of foundation for steel structures
Columns, Fabrication, Welding and Installation works of Oct ,
New Islamabad QC Engineer Steel-Structure, Monkey Ladder, Stair-Case, Hand-Railing,
To date
2016
International Catwalk Grating platform, Hanger, Crossover, Total Weight
Airport 9000 Tons approximately for conveyor

Installation work of Transport Conveyor, Curve 90º , 45º,


Photocell, Reflector, Take Away, Fire Security-shutters,
Check-in, ATR, Vertical Diverter, Horizontal Diverter, X- RAY
Machine, Muffs, Belts, CCTV Cameras, Reclaim Carousel,
Makeup Carousel, Electrical Cable Trays, Electrical Panels,
Motors

I have witnessed Acceptance Test and verify During SAT


Static, Dynamic and Function the results of Emergency
Functional Checklist, Line Trunk Functionality, Bag
Transportation, Bag Separation, Bag Queuing, Bag Jam,
Photocell Fault,, Check-in Functions, Check-in Operation,

2
Load Test, ATR Functional Check-List, Vertical Diverter,
Horizontal Diverter, Tracking Functional Checklist, Tracking
Flow Checklist, Bag Size Checklist, Bag Timing Checklist,
Fall Back Checklist, Bag Rating Checklist, ATR performance
checklist, NIIAP -SAT-edx-001 to 006.

Sand Blasting and Painting as per required Standard &


Specification.

1- Worked on 3rd Party Inspection of Fabrication of 40


MMSCFD Three Phase Skid Mounted Separators (6
Units 42mm, Thickness) 40 MMSCFD Three Phase
Skid Mounted Separators ( 4 Units 94mm, Thickness
and 20 MMSCFD Three Phase Skid Mounted
Separators (9 Units 42mm, Thickness.
Also Fabrication and installation of piping, Skid Steel
Structure, Hand Railing, Grating, Pipe Supports Code B-31.3,
ASMI Section VIII Division 1 and API 12J (API Specification
for Oil & Gas Separators).
Quality related activities Document reviewed ITPs, WPS,
PQR, WQT, MIR, IR, RT and DPT Reports as per QCPs And
interpretation of RT films.
I have inspected of incoming material as per BOQ.
I have witnessed of Hydro Test as per Design Pressure1350,
Design Temperature 180°F.
FYI Vessels are U Stamped by the authorized ASMI
Inspector.
Sand Blasting and Painting according the required standard &
Specification. Billing & Receiving complete in all respect. At
Petrosin Ravi Industries Limited, Kala Shah Kaku.

2- Worked on Benazir Bhutto International Airport


TUV Austria Islamabad Static, Dynamic and Function Acceptance
Beauru of Test and verify the results of FAT after test / March July
QC Engineer Inspection of Equipment related to Sewage
Inspection & 2013 2016
Certification. Treatment Plant: I have also inspected of incoming
material as per BOQ.

 Submersible Pump ABS Sweden inspected


Static & Dynamic Test at KSB Hasanabdaal on
bench
 Secondary Clarifier with Scraper Assembly
Arges Aritma Makina Ltd Turkey.
 Sludge Thickener with Scraper Assembly Arges
Aritma Makina Ltd Turkey.
 Rotating Bar Screen Arges Aritma Makina Ltd
Turkey.
 Longitudinal Travelling Bridge Arges Aritma
Makina Ltd. Turkey.
 Grit Washer Unit Arges Aritma Makina Ltd
Turkey.
 Low Speed Surface Aerator Landustries Sneek
BV Netherland.
 PD Air Blower Pedrogil – Spain.
 Filter Nozzle CADRA Ltd. UK.

3- Worked on Manufacturing, Fabrication Erection and


Installation of 140 TPH Boiler including Steam &

3
water Drums, Air Pre-Heater, Water Walls (Furnace
Walls), Super heaters, Economizers, Deaerators
Tanks & Fuel & Ash Handling Systems having total
weight 3000 Tons. Also installation of external piping
& pipe racks, water Treatment plant including all
equipment’s, Tanks, Firefighting system, overhead
Crane of 80 tons, Cooling Tower, Turbine &
supporting equipment’s and Compressor.
Quality related activities Document reviewed ITPs,
WPS, PQR, WQT, MIR, IR, QIP and DPT Reports as
per QCPs And interpretation of RT films.
I have inspected of incoming material as per BOQ.
Sand Blasting and Painting according the required
standard & Specification. Billing & Receiving
complete in all respect.

1- Worked on ICI Soda Ash C.F.B Project Fabrication &


Installation of 2 Boilers 45 Ton Capacity of Headers,
water wall for Furnace, Economizer, Super Heater,
Ducting, Deaerator Tanks & Fuel & Ash Handling
System
.
2- Worked on Ibraheem Fiber Phase III as a Area
Engineer look after fabrication and erection of piping
2.5 Lac Dia inch, Fabrication, Welding and
Installation works of Steel structure Platform, Pipe Nov 2011 To
EKL Site Engr.
Rack, Monkey Ladder, Stare Cass, Hand Railing, March 2013
Mech.
Grating, Hanger, Crossover, Total Weight 3450 Tons
proximately and heavy equipment Erection.

3- Worked on Dakhni Gas Field OGDCL as a I/C


Equipment Erection look after Fabrication, Welding
and Installation works of Steel structure Platform,
Monkey Ladder, Stare Cass, Hand Railing, Grating,
Hanger, Crossover, Weight 2645 Tons proximately ,
Piping and heavy equipment of Sulfur Recovery Unit.

1- Worked on Enar Petroch Refinery Mango Per as


QA/QC Manager for managing and supervise all the
Quality Control staff. all the Quality related activities
Document Reviewed ITPs, WPS, PQR. WQT,
DPT.RT Inspection Reports, and interpretation of RT
films.
Sand Blasting and Painting according the required
standard & Specification.
11 Aug Nov
AL TARIQ QC Manager Billing & Receiving complete in all respect
2009. 2011.
2- Worked on Qadir Pur gas field as a QA/QC Manager
for managing all the Quality related activities
Document reviewed ITPs, WPS, PQR, WQT, MIR, IR
and DPT Reports as per QCPs
And interpretation of RT films.
Sand Blasting and Painting according the required
standard & Specification.
Billing & Receiving complete in all respect
1- Replacement Of Phase – 3 Boiler Tubes of Side Wall
Babcock Borsig Bottom, Floor Furnace, 1st & 2nd Pass (Right & Left), 12 Feb-
Service Kingdom Boiler In Dividing Wall Tubes from inlet bottom header. 2009 06 July
Of Saudi Arabia Charge Economizer inlet to outlet headers bank tubes , Shut 2009
nd
AL Khobar Supporting tubes (Right & Left),, Roof 2 Pass Down
(Right & Left), Main Steam Pipe line Repair of the

4
deformed main steam line on level 16 m Down
Comer Tubes and Soot Blower Boiler No 5,6,7,8 13,
at SALINE WATER CONVERSION CORPORATION
JEDDAH DESALINATION AND POWER PLANTS

2- Replacement Of D Arch Panels at Steam Boiler No 4

3- Replacement Of None Returnable Valve Dia 30” at


Steam Boiler No 6 Saudi Electricity Company,
Rabigh Power Plant

1- Erection and Fabrication of Product Cooler Top Gas


Scrubber Reduction Fern’s Cooling Gas Scriber.
H M C / AL-Tariq Sand blasting, Apace Painting according the required
Site Engineer March- Feb-
Tuwairqi Steel Mill standard & Specification. Billing & Receiving
Mechanical 2008 2009
Bin Qasim Karachi complete in all respect.
Also Erection and Fabrication of Pipe, Miter, Reducer
from plate.
1- Erection and Fabrication of Steel Structure for Filling
Gantry HSD, Super, Fire Water Tanks and Piping Net
Work, 500 Mtr Pipe Line For HSD Oil from Parco TS-
4 to TPPL. Sand blasting, Painting according the
required standard & Specification.
Billing & Receiving, Punch List, and ISO Metric as
Build complete in all respect.
Petrocon Private Site Engineer Nov, Feb-
Limited Mechanical 2006 2008
2- Installation and Alignment of 3 units Gas Turbines for
136 MW. Complete in all Respects.
Erection and Fabrication of Steel Structure for Tanks
and Pipe Racks, P.C.M. Buildings and Stacks.
Sandblasting, Painting according the required
standard & specification. Billing & Receiving, Punch
List, and ISO Metric As Build complete in all respect.
1- Worked as a Supervisor Lying of Air, Water and
Gas Pipelines, Fabrication, Welding and
Installation works of Steel structure Platform,
BESTWAY Technical July,
Monkey Ladder, Stare Cass, Hand Railing, Oct,
Cement Factory – Officer Utility 2004
Grating, Weight 5875 Tons proximately. Sand 2006
Chakwal System
Blasting Painting and Bitumen Coating
according the required standard & specification.
Supervision of Plumbing Team.
1- Worked as a Third Party Inspector
Documentation and Coordination with Client
Inspection and Supervision of Pipe Yard,
Moody Stringing, Fit up, Welding Radiography, DPT,
International (Third Party) Joint Coating & Wrapping, Heat Shrink
12 July
White Oil Pipe Line Inspector Pipe sleeve Trenching, Pinhole Testing, Lowering July 2003
2004
Bin - Qasim to line and Backfilling Carbon Steel Pipeline for
Sawen Crude Oil, Gathering Flow line of 26” dia.
Hydro Testing and preparation of the punch
list as well.

1- Worked as a QC Inspector Inspection and


Marathon
Supervision of Cross Country Pipeline Pipe Yard,
Construction.
Stringing, Fit up, Welding, Radiography, DPT, 01
Bhit Gas Field QC Inspector 31 July
Joint Coating & Wrapping, Heat Shrink sleeve January
Sawen & Bengali Pipe line 2003
Trenching, Pinhole Testing, Lowering and 2002
Dhurnal Gas Field
Backfilling 4”, 10”, 24” dia Carbon Steel Pipeline
Dultala
for Gas Gathering Flow line.

5
1- Worked as a QC Inspector Piping Documentation
& Coordination with Client. I have Inspected of
Fabrication, Welding and Installation works of
EKL – Ibrahim Steel structure Platform, Monkey Ladder, Stare
QC Inspector 15 Jan, Dec,
Fiber Shahkot Cass, Hand Railing, Pipe Supports. Weight 7625
(Piping) 2000 2001
Road Faisalabad. Tons proximately.
Hydro Testing and preparation of the punch list
as well.

1- Worked as a QC Inspector Documentation &


Coordination with Client.
I have Inspected of Process Piping’s Fabrication,
Welding Installation activities and Installation
Siemens Pak. works of Steel structure Platform, Monkey
Engineering Co. Ladder, Stare Cass, Hand Railing, Grating, 08
QC Inspector 04 Aug
Ltd. Hanger, Crossover, Pipe Supports Weight 4680 Nov,
1998
Parco Mid Country Tons proximately. 1999
Refinery Project Hydro Testing and preparation of the punch list
as well.

1- Worked as a Area Supervisor Mechanical ,


Fabrication, Welding and Installation works of Piping,
Petrosin (Pvt.) Ltd.
Supervisor Steel structure Platform, Pipe Rack, Monkey Ladder,
UCH Gas Field 03 Dec 17 July
(Piping Stare Cass, Pipe Supports, Total Weight 9275 Tons
Sohbat Pur Dera 1997 1998
(Mechanical) proximately and heavy equipment Erection. Sand
Murad Jamali
Blasting, Painting and Insulation. Preparing Punch
Lists.
1- I have Inspected and Supervision of Cross Country
Pipeline.
Techno
I have Inspected of Incoming Material at Pipe Yard,
Engineering
Stringing, Fit up, Welding, Radiography, DPT, Joint
Services (Pvt.) Ltd.
QC Inspector Coating & Wrapping, Heat Shrink sleeve Trenching, 13 Feb 25 Nov
Islamabad
Pipe line Pinhole Testing, Lowering and Backfilling 4”, 8”, 10” 1997 1997
UCH Gas Field
12”dia Carbon Steel Pipeline for Gas Gathering Flow
Deara Murad
line according to the required standard &
Jamali
specifications.

1- Worked as a Supervisor of Fabrication of Steel


Structure of Best Way Cement Factory and Bajlane
Heavy Mechanical Sugar Mills Sindh. Conveyer System, Silos, Air
Fabrication 10 Jan Feb
Complex (Pvt.) Filters, and Ducting & Erection of Bucket elevator &
Supervisor 1995 1997
Ltd. Taxila Structure supports Air slide with plate form.
Sand Blasting and Painting according the required
standard & specification

Personal Data:

Parentage: Faqir Hussain.


Date of Birth: Aug. 08, 1972.
Passport No.: BE8677832
Marital Status: Married.

Potrebbero piacerti anche