Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Printed in France
UNCONTROLLED COPY: The master of this document is stored on an electronic database and is “write protected”;
it may be altered only by authorized persons. While copies may be printed, it is not recommended. Viewing of the
master electronically ensures access to the current issue. Any hardcopies taken must be regarded as uncontrolled
copies.
ALCATEL-LUCENT CONFIDENTIAL: The information contained in this document is the property of Alcatel-Lucent.
Except as expressly authorized in writing by Alcatel-Lucent, the holder shall keep all information contained herein
confidential, shall disclose the information only to its employees with a need to know, and shall protect the
information from disclosure and dissemination to third parties. Except as expressly authorized in writing by Alcatel-
Lucent, the holder is granted no rights to use the information contained herein. If you have received this document
in error, please notify the sender and destroy it immediately.
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization
TABLE OF CONTENTS
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization
BSR-GW
Basic
External
Herve Maillard
V1ed0 5th of July Hervé Maillard link redundancy related requirements added
1 June 16th Hervé Maillard Creation of FRS
2011
Draft2 June 20th Hervé Maillard Update with Mark comment
2011
Feature Patch/Prop/S
Release Comments
# ource
122287 BCR 4.0
2 FEATURE INFORMATION
The limited stock of IPC product is planed to be exhausted before the market demand for IuoATM
is finished. Therefore a replacement solution has to be developed. The feature deals with
integrating most of the current IPC functionalities in the BSR-GW product. ATM over PDH
interface will nevertheless not be supported on the BSR-GW; the 7750 SR-7 of the small cell GW
will be used for that purposed.
Consequently the feature also contains the validation, including O&M aspects, of an IPC
replacement solution relying on both BSR-GW and 7750 SR-7 products. This feature do not
include the capability for a customer to use his/her own router for ATM connectivity. The SR must
be used.
This feature will able to address markets where IuoATM is still required after current IPC product
stock exhaustion (currently planed mid 2012).
The feature will remove the risks associated with the refurbishing process (obsolescence of
components, lack of support on HW etc)
This solution based on integration of IPC functions in the BSR-GW and 7750 SR will reduce the
footprint of the cluster.
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization
APAC
o China Unicom, Taiwan has not plan to migrate (might sill need IPC in 2 Y time frame)
2.4.2 Technology
3G small cell
3 DEVELOPMENT REQUIREMENTS
Require-
General Requirements
ment #
The current IPC telecom functions shall be fully supported by the ATCA based BSR-GW together
R1 with the 7750-SR of the small cell gateway cluster,. with the exception of redundancy aspects which
are treated in separated requirements
The solution shall accommodate Iuflex at the same functional level, in particular, each Iu interface
R2
instance shall be selectable to be either IP or ATM
Each single cluster of an ATCA configuration can be independently configured with or without the
R3 IPC function activated. The 7750 SR shall be able to support, at the same time, cluster with and
without the IPC function activated
The physical & logical interfaces exposed to IuoATM CN nodes shall remained unchanged with the
R4
replacement solution
The redundancy scheme of the replacement IPC solution shall be such that the failover duration of
R5
the BSR-GW or of the 7750 shall be similar with and without IPC function activated
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization
GICC (network interface board) on the IPC supports 1+1 active hot standby redundancy at port
R6 level with APS/MSP 1+1 protection. The 7750 shall support equivalent level of link redundancy for
ATM/SDH ports.
The redundancy scheme of the replacement IPC solution shall be such that the outage of the
R7 service, from end user perspective, upon failure of BSR-GW or 7750, is similar with and without
IPC function activated
Require-
Performance / Capacity / Reliability Requirements
ment #
R8 The BCR 3.0 capacity of the BSR-GW shall be sustained when the IPC function is activated
The capacity of the IPC function shall be such that it covers the need of the BSR-GW product
supporting this IPC function
R9
For instance, let’s consider a 6 cluster ATCA shelf with a 7750 SR-7. The IPC function supported by
this hardware shall provide the IPC capacity for 6 clusters
The IPC function shall scale the same way than the gateway function. Despite the design is let
R10
implementation, it is expected that each ATCA bono blade supports both GW and IPC functions
In BCR 4.0, the ATCA BSR-GW shall also be able to interwork with a “legacy IPC”, (i.e an external
R11 IPC on cPSB HW). Whether the BSR-GW uses the internal or external IPC function (or no IPC
function at all) shall be configurable at the cluster level.
3.3.1 General
Require-
General Requirements
ment #
The current IPC O&M functions shall be fully supported by the SCMS (small cell management
R12
system and 7750-SR O&M
R13 It shall be possible to enable/disable the internal IPC function, per cluster, from the CSMS
3.3.2 Counter Requirements
Require-
Counter Requirements
ment #
R14 None
3.3.3 Fault Management and Alarm Requirements
Require-
Fault Management and Alarm Requirements
ment #
R15
3.3.4 Configuration Management and Parameter Requirements
Require-
Configuration Management and Parameter Requirements
ment #
R16
R17
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization
Require-
Billing Requirements
ment #
R18 None
3.3.6 Serviceability Requirements
Require-
Serviceability Requirements
ment #
R19
3.3.7 Specific Documentation Requirements
Require-
Specific Documentation Requirements
ment #
R20 None
3.3.8 Software Optional Control
# Description of Restriction/Limitation/Clarification
1 This feature is not supported for SUN based BSR-GW
2
3
5 DEPENDENCIES
Optional or
# Feature # Feature Title
Required
1 Required 116361 Small cell GW on ATCA
# Hardware Dependencies
1 ATCA GW and 7750 SR-7
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization
# Software Dependencies
1 None
# Interworking Dependencies
1 None
# Device Dependencies
1 None
# Engineering Impacts
1 None
6 STANDARDS
none
Acronym Definition
Passing on or copying of this document, use and communication of its contents not permitted without Alcatel·Lucent written authorization