Sei sulla pagina 1di 1

B

UP

TOILE
T UP

UP
0
TOILE
T GREEN lvl.+ 135
ROOM
FEMALE
GREEN M.
lvl.+ 600 UP
18 SQ.
ROOM lvl.+ 900
MALE UP
.M.
18 SQ 0
lvl.+ 135
AHU
M.
12 SQ.
STORE

UP

TOILET (F)
PARAPET LVL.+7550MM

TERRACE LVL.+6450MM

LINTEL LVL.+5650MM

BED ROOM

LIVING ROOM SILL LVL.+4350MM

BACK STAGE

80 SQ.M.

lvl.+1200

lvl.+ 600
lvl.+1200

lvl.+ 2400
lvl.+ 1350
FIRST FLOOR LVL.+3450MM

STAGE
LINTEL LVL.+2650MM
A A'
studio/hall BED ROOM

LIVING ROOM SILL LVL.+1350MM

PLINTH LVL.+450MM
GROUND LVL.+00MM

TOILET (M)
gurukul
lvl.+
1200

CUT OUT SLAB ABOVE


E N T R A N C E
SECTION AA
ELECT
RIC
ROOM AL
12 SQ
.M.

F O Y E R
lvl.+

UP
1350

lvl.+ 450
UP
VIP /
AR
LOUN TIST
lvl.+ 60 lvl.+
GUE 0 900
+450MM
UP

UP
+00MM
36 SQ
.M.
TOILE
T
FRONT ELEVATION
lvl.+
600

UP
UP
UP
lvl.+ 00

B'

GROUND FLOOR PLAN

AUDITORIUM

UP
W

GREEN ROOM FEMALE


12 sq.m.

50 sq.m.
BACK STAGE

+900MM

STAGE
+900MM
+00MM

30 sq.m.

+450MM

+450MM

+450MM

+00MM
+900MM
UP
A A'

UP
+900MM

+2250MM
+1350MM

+1800MM

+2700MM

+3150MM

+3600MM
THEATRE
GREEN ROOM MALE
THEATRE
12 sq.m.
FRONT ELEVATION
W
SIDE ELEVATION

UP
W

THEATRE
FLOOR PLAN

girls hostel boys hostel


boys hostel
side elevation SIDE ELEVATION
FRONT ELEVATION

guest house
guest house
FRONT ELEVATION
SIDE ELEVATION

girls hostel
front elevation

Potrebbero piacerti anche