Project Preparation Feasibility Study

for Gjilan Wastewater Treatment Plant

Project Presentation – July 2013

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Opening Remarks

Qemail Mustafa
Mayor of the Municipality of Gjilan
Kryetari
y i Komunës të Gjilanit
j

Myrvete Hoti
Chief Executive RWC Hidromorava
Drejtor Ekzekutiv KUR Hidromorava

Sohail Hassan
Environment Sector Expert – WYG
WYG-IPF
IPF 1
Ekspert i Sektorit Mjedisor – WYG-IPF 1

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Structure of Presentation
Struktura e Prezantimit
Introduction Hyrje
1. Existingg Situation & 1. Situata ekzistues &
Planning Planifikimi
2. Sewer Network 2. Modelimi i sistemit te
Modelling Kanalizimeve
3. Projekti prioritar i
3. Wastewater Priority Kanalizimeve
Project 4. Vleresimi Mjedisor
4. Environment 5. Vleresimi Financiar
A
Assessment t
5. Financial Appraisal

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
PART 1 EXISTING SITUATION & 
PART 1 – EXISTING SITUATION &
PLANNING
PJESA 1‐ SITUATA EKZISTUES & 
PLANIFIKIMI

Presented by Tim Westmoreland
Prezantuar nga Tim Westmoreland

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sewer discharge to rivers – 1 
Shkarkimi i kanalizimeve ne lum – 1

Sewer
discharge in
Mi h river
Mirusha i

Shkarkimi i
Kanalizimeve
ne lumin e
Mirushes

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sewer discharge to rivers – 2 
Shkarkimi i kanalizimeve ne lum – 2

Sewer
discharge in
Mi h river
Mirusha i

Shkarkimi i
Kanalizimeve
ne lumin e
Mirushes

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sewer discharge to rivers – 3
Shkarkimi i kanalizimeve ne lum – 3

Sewer
discharge in
St i h river
Stanishor i

Shkarkimi i
Kanalizimeve
ne lumin
Stanishor

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Definition of the Project Area
Percaktimi i Zones se Projektit

Includes three Mbulon tre


catchment
t h t pellgje
ll j
areas: ujembledhes:
•Mirusha
Mirusha •Mirusha
Mirusha
•Livoc •Livoc
•Morava •Morava

Villages of Fshatrat e
P l
Perlepnica
i P l
Perlepnices
i
catchment not nuk jane
included perfshire
(Perlepnica, (Perlepnica,
Kmetovc and Kmetovc dhe
Dobercan) Dobercan)`
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Population projection to 2042
Projektimi i popullesise deri me vitin 2042
Population Projected total population
Popullesia Projektimi i popullesise totale
Area / Zonë 2012 2022 2032 2042
Gjilan urban zone 58,322  65,985  73,606  80,952 
Velekince 9,494  11,024  12,584  14,120 
Pasjan area  1,931  2,134  2,331  2,518 
L i + Cernica
Lovice C i 17 083
17,083  19 590
19,590  22 120
22,120  24 593
24,593 
Patesh + villages 7,272  8,036  8,779  9,481 
TOTAL Project Area /
TOTAL Project Area /
Totali i zones se projektit 94,103  106,769  119,421  131,663
GJL ‐ outside project zonë 14,988  16,563  18,094  19,540 
Kamenica+Ranillug 44,531  48,076  51,549  54,896 
Viti+Kllokot 56,710  65,265  73,050  80,021 

TOTAL 210,332  236,673  262,114  286,121 


Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Population connected
Popullesia e lidhur me sistemin
140,000 

120 000
120,000 

100,000 

80,000 

60,000 

40,000 

20 000
20,000 


2010 2015 2020 2025 2030 2035 2040 2045

Projected total population Connected population ‐ WATER

Connected population SEWAGE


Connected population ‐

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Water Demand Assumptions
Vleresimi i Kerkeses per Uje
• Litres per capita per day =  • Sasia e ujit per person ne 
125 l/c/d dite = 125 l/c/d
• NRW reduces from 63% to  • Uji pa te ardhura
45% over 30 years
45% over 30 years zvogelohet nga 63% ne 
63% ne
• Non‐domestic demand  45% ne 30 vjet
follows population growth
follows population growth • Kerkesa per uje
per uje jo familjar
• Large business / industrial  ndjek rritjen e popullesise
grows at a modest rate @ 
t d t t @ • Bizneset
Bi t e medhenj/ rritjet
dh j/ itj t
1% per annum after 2020 e industrise me nje shkalle
modeste @ 1% ne vit
@ 1% ne it pas 
pas
vitit 2020

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Water Supply Balance
Bilanci i furnizimit me uje

300   
l/s
250   

200   

150   

100   

50   


2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042

Water demand at target NRW 60% Water demand at target NRW 45%
Water demand at target NRW 30% Minimum yield
Average yield Maximum yield

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Summary – long term water needs
Permbledhje – Kerkesat afat‐gjate per uje
• Rapid reduction in NRW  • Ulje e shpejte e ujit pa te
from 63% to 45% ardhura nga 63% ne 45%
• Increase in available  • Rritje ne burimet e 
water resources by about  disponueshme te ujit me 
50 l/s for Gjilan rreth 50 l/s per Gjilanin
• Continued take‐over of  • Rritje e vazhdueshme e 
rural water supplies marrjes nen menaxhim i
• Replacement of main  sistemeve rurale te
transmission pipe from  furnizimit me uje
Perlepnica to city • Zevendesimi i tubacioni
kryesor furnizues nga
Perlepnica ne qytet

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Flow to sewers
Prurja qe shkarkon ne sistemin e Kanalizimeve
Dry Weather Flow to sewer
Prurja shkarkuese ne periudhen e thate

(m3/day) 2012  2022 2032 2042 


Gjilan main urban area 7,888  10,634 11,790 12,899 
Velekince 1,288  1,930 2,161 2,386 
Pasjan ‐ 335 363 390 
Lovice+Cernica 951  1,510
, 3,482
, 3,864 
,
Patesh+villages ‐ ‐ 1,223 1,311 
Total Dry Weather Flow
Total Dry Weather Flow
Prurja totale e periudhes se 
thate 10,127  14,409 19,019 20,850

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP Development Options
Opsionet e zhvillimit te Impantit te Trajtimit

OPTION 1

OPTION 2

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP Development Options
Opsionet e zhvillimit te Impantit te Trajtimit
OPTION 1 OPTION 2

OPTION 1 – €0.02 /m3 pumping OPTION 1 – €0.02 /m3 pompimi


OPTION 2 – €0.04 /m3 pumping OPTION 2 – €0.04 /m3 pompimi

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Long term wastewater needs
Kerkesat afat‐gjata per Kanalizimet
• New and replacement sewers 
d l • Linjat e reja dhe
dh zevendesimi
d i
to unify the Gjilan sewer  atyre ekzistuese per te
network unifikuar sistemin e 
e
• Reduce number of discharges  Kanalizimeve te Gjilanit
from 23 to 1.
from 23 to 1.  • Zvogelimi i numrit te
• The development of the  shkarkimeve nga 23 ne 1. 
sewer collector system to 
y • Zhvillimi i kolektoreve kryesore
y
transfer all flows to the  te sistemit te Kanalizimeve per 
WWTP. transferimin e prurjeve ne 
• WWTP – capacity 21,000  I i ti e Trajtimit.
Impiantin T jti it
m3/day DWF – in two phases  • Impianti i Trajtimit – kapacitet
at location as Option 1
at location as Option 1. 21 000 m3/dite prurje e 
21,000 m e
periudhes se thate – ne dy faza
ne pozicionin
p e Opsionit
p 1

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Effluent standard for WWTP
Standartet e shkarkimit per Impiantin e Pastrimit

Classification of Receiving Water/


Non‐sensitive Sensitive
Klasifikimi i Ujit Prites
Jo – i ndjeshem I ndjeshem
UWWTD 92/271/EEC
BOD5 Concentration mg/l 25 25

COD Concentration mg/l 125 125

Total Suspended
p Solids Concentration mg/l
g/ 35 35

Total Nitrogen mg/l ‐ 10 (15)

Total Phosphorus mg/l ‐ 1 (2)1


• Morava River not classified but • Lumi Morava nuk eshte i klasifikuar
may be
b “sensitive”
“ iti ” in
i llong tterm por mund te jete “ii ndjeshem
ndjeshem” ne
periudhen afat-gjate
• Therefore, WWTP needs to be • Keshtu qe, Impianti i Trajtimit nevojitet
sized for Nitrogen and Phosphorus te dimensionohet per heqjen e
removal (BNR) Nit j it dhe
Nitrogjenit dh Fosforitit
F f itit

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Design parameters: 2042 + BNR
Parametrat e projektimit 2042 + BNR

Design Horizon / Periudha e projektimit 2042


Nominal Capacity p.e. 139,050
Hydraulic Capacity, Ave. Daily Flow
Hydraulic Capacity, Ave. Daily Flow , m3/d
QADF, m 16,680
Hydraulic Capacity, Dry Weather Flow QDWF, m3/d 20,850
y p y,
Hydraulic Capacity, Flow Full Treatment  Qmax, m3//h 54,220
,
Wastewater Load and Composition Unit 2042
Ngarkesë ujërave të zeza dhe përbërja
BOD5 60g/h/d kg/d 8,343
TSS, 65 g/h/d kg/d 8,853
Total Nitrogen, 9 g/h/d kg/d 1,125
Total Phosphorus, 1.6 g/h/d kg/d 220

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Process options considered
Opsionet e proceseve te marre ne konsiderate
1. CONVENTIONAL ACTIVATED SLUDGE (CAS)  1. TRAJTIMI ME LLUM TE AKTIVIZUAR KLASIKE
TREATMENT WITH ANAEROBIC SLUDGE (LLAK) ME THARJE AN‐AEROBIKE TE BALTES
DIGESTION 2
2. TRAJTIMI ME LLUM TE AKTIVIZUAR KLASIKE
2. CONVENTIONAL ACTIVATED SLUDGE (CAS)  (LLAK) ME LLUM TE STABILIZUAR ME
WITH LIME STABILISATION OF SLUDGE GELQERE
3
3. SEQUENCING BATCH REACTORS (SBR) 
(SBR) WITH 3
3. TRAJTIM ME REAKTOR TE NJEPASNJESHEM
PRIMARY SETTLEMENT AND ANAEROBIC (SBR) ME DEKANTIM PARESOR DHE ME
SLUDGE DIGESTION THARJE AN‐AEROBIKE TE LLUMIT
4
4. SEQUENCING BATCH REACTORS (SBR) 
(SBR) 4
4. TRAJTIM ME REAKTOR TE NJEPASNJESHEM
WITHOUT PRIMARY SETTLEMENT AND (SBR) PA DEKANTIM PARESOR DHE THARJE
AEROBIC SLUDGE STABILISATION AN‐AEROBIKE TE LLUMIT

5
5. OXIDATION DITCH WITH ANAEROBIC SLUDGE 5
5. PELLGJE OKSIDUES ME THARJE AN‐AEROBIKE
TE LLUMIT
DIGESTION
6. PELLGJE OKSIDUESE QE OPEROJNE NE NJE
6. OXIDATION DITCH OPERATING IN THE
MENYRE TE ZGJERUAR + 
+ HEQJE E UJIT TE
EXTENDED AERATION MODE PLUS SLUDGE
LLUMIT
DEWATERING
7. REZERVUAR AJRIMI ME STABILIZIM AJRUES TE
7. AERATION TANK WITH AEROBIC SLUDGE UMIT
LLUMIT
STABILISATION

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Evaluation of Alternative Processes
Vlerësimi i Proceseve Alternative
P
Process option code
ti d I t t C t EURO th
Investment Costs, EURO thousand
d O ti l C t EURO th
Operational Costs, EURO thousand
d
Chemical 
Total  and Sludge  Total  Average 
Biological 
Bi l i l Sludge 
Sl d EEquipment 
i t I t t
Investment  Maintenance 
M it Staff 
St ff PPower  Di
Disposal  l R i
Running  Incremental
Incremental 
treatment treatment Civil Cost Cost Land Cost  Cost Costs Costs Costs Costs Costs Cost, EURO/m3
PST‐AER ASD          9,243              8,139          148            17,530                    172            68          77                788         1,105                 0.377
PST‐AER
PST AER LME          8,297             7,050         142          15,489                   151           63       300              987        1,501                0.470
PST‐SBR ASD          7,678              8,840          104            16,622                    175            68          57                788         1,088                 0.370
SBR ASS          8,955              8,462          141            17,558                    176            58        340                798         1,372                 0.432
OXD(LR) ASD        10,214              8,427          147            18,788                    182            68        142                738         1,130                 0.387
OXD(EA) DeW        13,402             7,181         214          20,797                   178           53       426              766        1,423                0.452
AER ASS        11,092              7,568          181            18,841                    173            58        377                798         1,406                 0.444
Key
PST – primary settlement tank ASD – anaerobic sludge digestion
AER – aeration tank LME – lime stabilization
SBR – sequential batch reactor ASS – aerobic sludge stabilisation
OXD (LR) – oxidation ditch aeration DeW – sludge dewatering only
OXD (EA) – oxidation ditch extended aeration
Shkurtimet
PST – Basen primar i dekanitimit ASD – tharje an-aerobike e llumit
AER – Rezervuar ajrimi LME – stabilizim me gelqere
SBR – Reaktor te njepasnjeshem ASS – stabilizim i llumit me ajrim
OXD (LR) – Pellgje oksidimi te ajruar DeW – vetem heqje e ujit
OXD (EA) – Pellgje oksidimi te zgjeruar me ajrim

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Selection of WWTP process
Përzgjedhja e procesit ITUZ
Advantages Disadvantages
1. Very flexible process with full control over 1. Batch process requires use of actuated
aeration, anoxic and anaerobic periods to valves/penstocks plus computer programme.
ensure successful nutrient removal
removal. 2 Adjustment of cycle times requires training
2. training.
2. Adjustability to suit changes in influent 3. More skilled maintenance required.
characteristics and flow.
3. Routine operation relatively simple due to
computer control.
4. Small footprint.
5. Relatively low construction cost.
Avantazhet Dizavantazhet
1. Proces shume fleksibel me kontroll mbi 1. Proceset ne grumbuj kerkon perdorimin e
ajrimin, anoksik dhe periudha an-aerobike valvolave/portave+programet kopjuterike.
per te siguruar heqje te suksesshme te 2. Rregullimi i kohes se ciklit kerkon trajnim.
ushqimit 3. Kerkohet me shume miremebajtje
2. Rregullim per te pershtatur ndyshimet ne profesionale.
karakteristikat e ujit hyres dhe prurjeve.
prurjeve
3. Operim rutine relativisht te thjeshte per
shkak te kontrollit komjuterik.
4.
4 Gjurme te vogla.
vogla
5. Relativisht kosto e ulet ndertimi.

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Recommended Process ‐ SBR 
Precesi i Rekomanduar ‐ SBR 

Primary Settlement + SBR +


Anaerobic Sludge Digestion

Dekantim Primar + SBR +


Tharje An
An-aerobike
aerobike te Llumit

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Example WWTP – Cork, Ireland
Shembul Impianti Trajtimi– Cork, Irlandë

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
PART 2 –
PART 2 SEWER NETWORK MODELLING
SEWER NETWORK MODELLING
PJESA 2
2‐ MODELIMI I RREJETIT
I RREJETIT TE 
TE
KANALIZIMIT

Presented by Fahri Maho
Prezantuar nga Fahri Maho

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Topographic survey
Punimet topografike
• No drawings of sewers or  • Nuk jane gjetur projekte
storm water systems  ekzistuese per Kanalizimet e 
available ujrave
j te zeza dhe te shiut
• GPS topographic survey of  • Studimi topografik me GPS 
entire system 110 km plus  ka perfshire te gjithe
4 860 manholes
4,860 manholes sistemin e kanalizimeve
e kanalizimeve per 
per
• 2,900 manholes physically  rreth 110 km plus 4,860 
opened and inspected puseta
• For the first time the Gjilan  • 2,900 puseta
2 900 t jane
j h
hapur
sewer system is mapped in  fizikisht dhe inspektuar
g
digital format on over 300  • Per here te p pare sistemi i
drawings at 1:100 scale. kanalizimeve te Gjilanit
eshte pregatitur ne gjendjen
e tijj reale dhe eshte
pregatitur ne forme digitale
ne mbi 300 formate
vizatime ne shkalle
ne shkalle 1:100.

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Survey photographs – 1
Foto nga studimi topografik– 1

Manhole that
has been
welded
ld d closed
l d

Puseta qe
kane q
qene te
mbyllura me
saldim

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Survey photographs – 2
Foto nga studimi topografik– 2

Manhole that
requires
excavation
ti to
t
open

Pusetat qe
kerkojne
j
germime per
t’u hapur

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Survey photographs – 3
Foto nga studimi topografik – 3

Measuring
manhole
d th
depth

Matjet e
thellesise se
pusetave

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Existing networks
Sistemi ekzistues

Gjilan and Gjilan dhe


Velekince: Velekince:

17 networks 17 sisteme
and dhe
23 discharge 23 pika
points
p shkarkimi

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Hydraulic model
Modeli Hidraulik
• Modelled using  • Modelimi duke perdorur
SewerCAD SewerCAD
• Treated as a combined 
Treated as a combined • Eshte trajtuar si nje
system – only 7 km of  sistem i kombinuar –
storm drainage in Gjilan vetem 7 km i drenimit te
• DWF as calculated from  shirave
hi ne Gjilan
jil
population • DWF sic eshte llogaritur
• WWF added to peak DWF 
WWF added to peak DWF nga popullesia
to give total design flow  • WWF e shtuar tek piku i
in sewers DWF duke dhene prurjen
• Flows distributed spatially  totale llogaritese te
in 20 sub‐catchments. projektuar per 
kanalizimet
• Prurja e shperndare ne 
hapesiren e 20 nen‐
pellgjeve.
ll j
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Urban population zones
Zonat e populluara Urbane
Population, dry Popullsia, Prurja
weather flow e periudhes se
and wet weather thate dhe e
flow divided periudhes se
between 20 lagesht e ndare
zones ndermjet 20
zonave
Zones reflect
arrangement of Zonat reflektojne
existing sewers rregullimet e
and Urban sistemit
Development ekzistues te
Plan kanalizimeve
dhe Planin e
Zhvillimit Urban
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Wet weather flow
Prurja e periudhes se lagesht
Summary of wet weather flow calculation
f h fl l l Gjilan urban
l b
Unit Rural areas Total
Permbledhje e llogaritjeve te prurjeve te Zona urbane 
Njesia Zona rurale Totali
periudhes se lagesht Gjilan
T t l
Total area in planned sewer network 2042
i l d t k 2042
Siperfaqja totale ne planin e sistemit te
Kanalizimeve ne vitin 2042 m2 18,154,137  9,966,212  28,120,349 
Average runoff coefficient
Average runoff coefficient
Koeficienti mesatar i rrjedhjes ‐ 0.16 0.14 0.15
Total storm flow
Prurja totale e shiut
e shiut m3/s 9 08
9.08  4 19
4.19  13 27
13.27 
Flow reaching the sewage system
Prurja qe arrin ne sistemin e kanalizimeve m3/s 2.27  1.05  3.32 
DWF / Prurja
DWF / P j e Periudhes
P i dh se Thate
Th m3/s
3/ 0 18
0.18 0 06
0.06 0 24
0.24 
Peak DWF / Piku i Periudhes se Thate m3/s 0.27 0.10 0.37 
Total peak flow in sewer peak DWF+WWF
Totali i prurjes pik ne Kanalizime DWF+WWF m3/s 2.54 1.15 3.69 
Ratio of peak DWF+WWF to DWF
Raporti i pikut te DWF+WWF me DWF ‐ 14 18 15
Percentage of DWF in peak flow (DWF+WWF)
Perqindja e DWF ne prurjen pik (DWF+WWF) % 7.0% 5.5% 6.5%
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Existing and planned network
Sistemi ekzistues dhe i planifikuar i Kanalizimeve

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
New and replacement pipes
Tubacionet e rinj dhe zevendesues te sistemit

Unified Gjilan Sistemi i


sewer unifikuar
nifik ar i
network Kanalizimeve
te Gjilanit
Replacement
sewers Linjat
zevendesuese
New pipes
Linjat e reja

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
PART 3 –
PART 3 PRIORITY INVESTMENT PROJECT
PRIORITY INVESTMENT PROJECT
PJESA 3‐ PROJEKTI ME PRIORITET PER 
INVESTIM

Presented by Tim Westmoreland
Prezantuar nga Tim Westmoreland

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
The Long Term Investment Cost – 1
Kostot e Investimit Afat ‐ Gjate – 1

Sewer network improvement / Permiresimet e sistemit te
kanalizimeve €

Additional sewers in Gjilan / Linjat shtese te Kanalizimeve ne Gjilan  3,107,000 

Replacement of existing sewers in Gjilan / Zevendesimi i kanalizimeve
1,363,000 
ekzistuese ne Gjilan
Main collector sewers in Gjilan and main collector to WWTP / 
Kolektoret kryesore ne Gjilan dhe Kolektori kryesor per ne Impiantin e  2,036,000 
Trajtimit
Main collector sewers to Velekince and Livoc catchments / Kolektori i
1,842,000 
kanalizimeve per ne pellgjet e Velekinces dhe Livocit

Main collector sewers to outlying villages / Kolektoret kryesore per 


2,161,000 
fshatrat rreth e qark
Total long term cost / Kostot totale Afat‐Gjate 10,509,000
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
The Long Term Investment Cost – 2
Kostot e Investimit Afat ‐ Gjate – 2
PHASE / FAZA DESCRIPTION / PERSHKRIMI €
PHASE 1 – constructed 2018 Base case option  ‐ p.e.  11,381,000
Faza 1 – ndertuar
d ne 2018 92 413
92,413, no BNR
BNR
Opsioni baze ‐ p.e. 92,413, jo
BNR
PHASE 2 – extension constructed later Full design capacity – p.e.  6,573,000
Faza 2 – Zgjerimi i ndertuar me vone 139,048, with BNR
Kapaciteti total i
total i projektit –
p.e. 139,048, me BNR
Replacement of mechanical electrical  Phase 1 M&E equipment  5,940,000
equipment +15 years
equipment +15 years Faza 1 pajisjet
1 pajisjet M&E
Zevendesimi i pajisjeve mekanike
elektrike +15 vjet
Total long‐term cost for WWTP constructed in two phases with 
ll f di h ih 23 89 000
23,894,000
replacement of Phase 1 M&E
Kostot totale afat – gjate per ITUZ ndertuar ne dy faza me 
zevendesimin e Fazes 1 M&E

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
The Long Term Investment Cost – 3
Kostot e Investimit Afat ‐ Gjate – 3
LONG TERM COST / KOSTOT AFAT‐GJATE €
Wastewater treatment plant (including Phase 2 and 23 894 000
23,894,000
M&E replacement after 15 years)
Impianti i Trajtimit te ujrave te perdorura (perfshire
fazen 2 dhe zevendesimin e pajisjeve M&E pas 15
vjetesh)

Sewer improvement and collection network 10,509,000


Permiresimi i kanalizimeve dhe sistemi i mbledhjes se
ujrave te perdorura
TOTAL LONG TERM DEVELOPMENT COSTS 34,143,000
KOSTOT TOTALE AFAT‐GJATE TE ZHVILLIMIT

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Development Options
Opsionet e Zhvillimit
From long‐term planning  Nga planifikimi afat – gjate tre
three development options 
p p opsione
p zhvillimi jjane
selected: zgjedhur:
• Minimum Case – Gjilan + 
j • Opsioni
p minimal – Gjilan + 
j
Phase 1 WWTP Faza 1 ITUZ

• Base Case – Gjilan +  • Opsioni Baze – Gjilan + 


Velekince + Phase 1 WWTP Velekince + Faza 1 ITUZ

• High
High Case –
Case – Gjilan + 
Gjilan + • Opsioni i Larte – Gjilan + 
Gjilan +
Velekince + Livoc + Phase 1  Velekince + Livoc + Faza 1 
WWTP ITUZ

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Minimum Case – sewer network
Opsioni Minimal – Sistemi i Kanalizimeve

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Base Case – sewer network
Opsioni Baze – Sistemi i Kanalizimeve

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
High Case – sewer network
Opsioni i larte – Sistemi i kanalizimeve

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Phase 1 WWTP options
Faza 1 Opsionet e ITUZ
GJILAN WWTP – PHASE 1 DEVELOPMENT  LONG  MIN  BASE  HIGH 
CASES / IMPIANTI I TRAJTIMIT GJILAN – FAZA 1  TERM CASE CASE CASE
OPSIONET E ZHVILLIMIT AFAT‐ OPSIONI OPSIONI OPSIONI I
GJATE MINIMAL BAZE LARTE
Design Horizon / Periudha e projektimit 2042 2032 2032 2032
Nominal Capacity  p.e. 139,050 72,172  92,413  117,921 
Kapaciteti nominal
Dry Weather Flow 
Dry Weather Flow QDWF,  20 850
20,850 10 870
10,870 13 944
13,944 17 800
17,800
Prurja e periudhes se thate m3/day

Flow to Full Treatment 
Flow to Full Treatment Qmax, m3/h 54 220
54,220 28 270
28,270 36 265
36,265 46 270
46,270
Prurja per trajtim te plote

BOD5, 60g/h/d
60g/h/d kg/d 8 343
8,343 4 330
4,330 5 545
5,545 7 075
7,075

BNR included in WWTP design  yes/no Yes no no no


P f hi j e BNR ne projektin
Perfshirja BNR j k i e  po/jo
/j po j
jo j
jo j
jo
Impiantit te Trajtimit
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Investment costs for options
Kostot e investimit per opsionet
MINIMUM CASE Opsioni
i i minimal
i i l €
Urban sewers and main transfer sewer to WWTP Rrjeti urban i kanalizimeve + kolektori i transferimit per ne Impiantin e Trajtimit 4,382,650 
Collector sewers to villages and surburbs Kolektoret e kanalizimeve per ne fshatra dhe zonat sub‐urbane ‐
WWTP @ Uglare Impianti i pastrimit ne Uglare 10,259,700 
TOTAL  TOTAL I 14,642,350 
Plus price escalation Plus  rritjen e cmimeve 1,241,098 
Plus VAT Plus TVSH 2,541,352 
Total investment for minimum case Totali i investimit per opsionin minimal 18,424,799 

BASE CASE Opsioni baze €


Urban sewers and main transfer sewer to WWTP Rrjeti urban i kanalizimeve + kolektori i transferimit per ne Impiantin e Trajtimit 5,878,063 
Collector sewers to villages and surburbs
Collector sewers to villages and surburbs Kolektoret e kanalizimeve
e kanalizimeve per ne fshatra
per ne fshatra dhe zonat sub
sub‐urbane
urbane 929,310
929,310 
WWTP @ Uglare Impianti i pastrimit ne Uglare 12,519,100 
TOTAL TOTALI 19,326,473 
Plus price escalation Plus  rritjen e cmimeve 1,636,503 
Plus VAT
Plus VAT Plus TVSH
Plus TVSH 3 354 076
3,354,076 
Total investment for base case Totali i investimit per opsionin baze 24,317,052 

HIGH CASE Opsioni i larte €


Ub
Urban sewers and main transfer sewer to WWTP
d i t f t WWTP R j ti urban i
Rrjeti b i kanalizimeve
k li i + k l kt i i transferimit
+ kolektori t f i it per ne Impiantin
I i ti e Trajtimit
T jti it 7,212,293 
7 212 293
Collector sewers to villages and surburbs Kolektoret e kanalizimeve per ne fshatra dhe zonat sub‐urbane 2,026,424 
WWTP @ Uglare Impianti i pastrimit ne Uglare 14,251,600 
TOTAL TOTALI 23,490,317 
Plus price escalation Plus  rritjen e cmimeve 1,993,250 
Plus VAT Plus TVSH 4,077,371 
Total investment for high case Totali i investimit per opsionin e larte 29,560,937 
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Investment costs for options
Kostot e investimit per opsionet
PROJECT DESIGN PE OF PERCENTAGE OF INFRASTRUCTURE COST APPROXIMATE
DEVELOPMENT WWTP  PROJECT AREA (WITHOUT VAT) AVERAGE COST € / 
OPTION BENEFITING PE

OPSIONET E PROJEKTIMI PE I PERQINDJA


Q E ZONES KOSTOJA E KOSTOJA E
ZHVILLIMIT TE ITUZ  SE PROJEKTIT QE INFRASTRUKTURES (PA PERAFERT
PROJEKTIT PERFITON TVSH) MESATARE € / PE

Minimum/ 72,172  52% 14,642,350 € 203


Minimum
Base/Baze 92,413  66% 19,326,473 € 209

High/Larte 117,921  84% 23,490,317 € 199

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Recommended Priority Project
Projekti Prioritar i Rekomanduar
The Base Case is selected: Opsioni Baze eshte zgjedhur:

• Covers 66% of the  • Mbulon 66% te popullesise


population in the project 
p p p j ne zonen e projektit
area
• Kostoja per person eshte
per person eshte e 
e
• Cost per capita is  krahasueshme me 
comparable to other 
p opsionet e tjera
options
to te gj
• Eviton gjitha
t a sshkarkimet
a et
• Removes all sewage flows  e ujrave te zeza ne 
in Gjilan rivers
j lumenjte e Gjilanit

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Overview of Priority project
Pamje e pergjithshme e Projektit Prioritar

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Location of Priority project
Pozicioni i Projektit Prioritar

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP location
Zonat e Impiantit te Trajtimit

Proposed
P d
WWTP
location

Pozicioni i
p p
propozuar
i Impiantit
te Trajtimit

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP Phase 1
ITUZ Faza 1

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP Phase 1 & Phase 2
Faza 1 & Faza 2 e ITUZ 

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Capital Investment Cost
Kostot Kapitale te Investimit
CAPITAL COST KOSTOT KAPITALE € X 1000
Sewers – additional and replacement Kanalizimet – Shtese dhe zevendesimet 3,762
Sewers – main collectors Kanalizimet – kolektoret kryesore 2,426
SUB TOTAL – SEWERS NEN TOTAL – KANALIZIMET 6,188
Phase 1 WWTP Faza 1 ITUZ 11,259
Land purchase for WWTP Blerja e tokes per ITUZ 122
SUB TOTAL – PHASE 1 WWTP NEN TOTAL – FAZA 1 ITUZ 11,381
TOTAL – BASE INFRASTRUCTURE COST TOTAL – KOSTOJA BAZE E INFRASTRUKTURES 17,570
Add physical contingency 10% Shtohen rezervat fizike 10% 1,757
Add price escalation Shtohet efekti i rritjes se cmimit 1,636
TOTAL CAPITAL INVESTMENT COST TOTAL KOTOT KAPITALE TE INVESTIMIT 20,963
Plus VAT @ 16% Plus TVSH @ 16% 3,354
TOTAL CAPITAL INVESTMENT COST TOTAL KOSTOJA KAPITALE E INVESTIMIT 24,317

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Affect on operating cost
Efekti i kostove te operimit

2,500,000 

2,000,000 

1,500,000 

1,000,000 

500,000 

WATER TOTAL ‐ BASE CASE  WASTEWATER TOTAL ‐ BASE CASE


TOTAL OPERATING COST RWC

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Wastewater operating costs
Kostot operuese te ujrave te perdorura
Wastewater OPEX
2013 Wastewater OPEX
2032
0% 0%
12% 6% 8%

34% 21%

12%
70%
21%
13%
2%
Electricty consumption
El ti t ti
Material Electricty consumption
Material
Wages & salaries
Wages & salaries
Wages & salaries
Maintenance & repair costs Maintenance & repair costs
Transport/fuel Transport/fuel
Sl d di
Sludge disposal & other direct costs
l & th di t t Sl d di
Sludge disposal & other direct costs
l & h di

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Implementation contracts
Kontratat e zbatimit
CONTRACT CONDITIONS SCOPE OF WORK DOSJA E KUSHTET E AKTIVITETET E PUNEVE
PACKAGE OF CONTRACT KONTRATAVE KONTRATES

Asistence Kushtet Pregatitja e projektit


e projektit
TTechnical 
h i l SStandard 
d d Design
D i
Teknike Standarte te te zbatimit, dosjes se 
Assistance conditions  Drawing preparation perdorura ne INF  tenderit, 
as used by  Tender dossiers per kontratat e  Supervizioni
the IFI for 
S
Supervision
i i k
konsulences
l
consultancy 
contracts
Projektim dhe Projektimi i Projektimi i zbatimit
Design and 
Design and Process 
Process Detailed design
Detailed design ndertim i procesit te te proceseve ne 
construction  Plant  Process, civil,  Fazes 1 ITUZ Trajtimit ne  Impiantin e Trajtimit, 
of the Phase  Design‐Build  mechanical and  Impiant‐Kontrata punimeve civile, 
1 WWTP Contract – electrical plant.
p e ndertimit –
e ndertimit mekanike dhe
FIDIC Yellow  3‐year training period FIDIC Libri i pajisjeve elektrike.
Book Verdhe 3‐vjet periudhe
trajnimi
SSewers ‐ Construction 
C t ti Ci il
Civil engineering 
i i Linjat e reja Kontrata e 
new and  Contract – works dhe ndertimit – FIDIC  Punimet inxhinierike
replacement FIDIC Red  zevendesuese Libri i Kuq Civile
Book te
kanalizimeve
ne Gjilan.
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Implementation schedule
Grafiku i zbatimit

GJILAN WWTP - PRIORITY WASTEWATER PROJECT 2013 2014 2015 2016 2017 2018
PROJECT ACTIVITIES J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D
SERVICE CONTRACT - TECHNICAL ASSISTANCE
Preparation of Technical Assistance tender dossier
Contract forecast and procurement notice
Expression of interest/short-listing
Tender and tender evaluation
Contract award
Consultant mobilisation
Provision of consultancy services

WORKS CONTRACT 1 - WWTP DESIGN & CONSTRUCT


Prepare tender dossier WWTP contract
Contract forecast and procurement notice
Tendering and tender evaluation
Contract award
Mobilisation of contractor
Works implementation and commissioning
Operation, training and hand-over (3-years)
Operation, training period continuing 
Completion of construction period
for 3 years after WWTP completion
WORKS CONTRACT 2 - SEWERs - NEW & REPLACEMENT
Detailed design of new sewers
Prepare
p tender dossier WWTP contract
Contract forecast and procurement notice
Tendering and tender evaluation
Contract award
Mobilisation of contractor
Works implementation and commissioning

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
PART 4 –
PART 4 ENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL ASSESSMENT
PJESA 4 – VLERESIMI AMBIENTAL
PJESA 4  VLERESIMI AMBIENTAL

Presented by Karina Zachodni
Prezantuar nga Karina Zachodni

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Environmental Considerations–
Rëndësia mjedisore

Environmental review – content
• Water quality, health Impact of developments:
• Wastewater Benefits &
• WWTP location  Summary Impact Assessment

Rishikim i mjedisit ‐ përmbajtja


• Cilësia e ujit dhe shëndeti
• Ujërat e zeza
• Lokacionet për IPUZ
• Ndikimi i zhvillimeve:
• Përfitimet
• Pë bl dhj e vlerësimit
Përmbledhja l ë i it të ndikimit
diki it

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Existing Situation
Situata ekzistuese

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
HIGH WATER RELATED ILLNESS
SEMUNDJET NGJITËSE QË PËRHAPEN ME UJË

Yearly Total Cases
Gjilan: 2006 2007 2008 2009 2010 2011 2012
Varicella 663 789 700 578 690 685 1,371
Meningitis inf. 21 10 6 1 0 0
High and rising
Enterocolitis 3,478 3,991 5,300 4,410 5,668 7,504 8,214
enterocolitis cases
Infectiones intest. vir.
Leptospirosis
WHY?
Mononucleosis inf.
Hepatitis virosa A 29 98 36 36 7 3 4
Hepatitis virosa B 5 1 7 5
Parotitis epid. 5 20 4 159 1 0 3
Gjilan: Salmonelosis 39 12 26 57 16 53 21
Intoxication aliment.bact. 2 5 5 22 0 0 59
Shkallë e lartë dhe
në rritje të rasteve Most likely reasons: Aresyet e mundshme:
enterocolitis
t liti •Sanitacioni i dobët
•Poor sanitation
•Ujërat e ndotura nëntokësore
•Polluted groundwater •Klorim joadekuat
PSE? •Inadequate chlorination

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
NOT ENOUGH CHLORINE …
KLOR TË PAMJAFTUESHËM...
100%

90%

80%
 % of Samples that Fail for Cl
% of saamples failng forr Residual Cl

70% residual in Gjiljan

60%
 % of Samples that Fail for Cl
50% residual in Kamenice

40%
% of Samples that Fail for Cl
30%
residual in Viti

20%

10%

0%
Apr‐11

Oct‐11

Apr‐12

Oct‐12
Jan‐11

Mar‐11

Jun‐11
Jul‐11
Aug‐11

Jan‐12

Mar‐12

Jun‐12
Jul‐12
Aug‐12
Feb‐11

May‐11

Sep‐11

Nov‐11
Dec‐11

Feb‐12

May‐12

Sep‐12

Nov‐12
Dec‐12
M

M
M

M
N

N
A

A
Almost half of water samples have Pothuajse gjysma e mostrave të ujit
insufficient residual Chlorine for kanë klor rezidual të pamjaftueshëm për
effective disinfection dezinfektim efektiv

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
… SO BACTERIA CAN THRIVE
… PRA, BAKTERIET MUND TË ZHVILLOHEN
35% 350%

Gjiljan, Kamenice and Viti

Yearly 
mples

30% 300%
d Total Bacterria Count Sam

ases as % of Y
% of Samples that Fail for
25% 250% Total  bacteria count in 1
ml H2O at 37oC
20% 200%

Average
nterocolitis Ca
15% 150%
% of Failed

Monthly En
10% 100%

Enterocolitis (Diarrhoea et
5% 50% g. causa inf. sus.), Average
of cases/y/100k
0% 0%
Jan‐11
Feb‐11
Mar‐11
Apr‐11

Jul‐11
Aug‐11
Sep‐11

Nov‐11

Jan‐12
Feb‐12
Mar‐12
Apr‐12

Jul‐12
Aug‐12
Sep‐12

Nov‐12
May‐11
Jun‐11

Oct‐11

Dec‐11

May‐12
Jun‐12

Oct‐12

Dec‐12
Seasonal peaks in bacteria count Sezonant kur numri I bakterieve
failures match enterocolitis eshte ne maksimum p pershtaten me
outbreaks epidemitë e enterocolitis-it

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
CORRECTIVE ACTIONS
VEPRIMET KORREKTUESE

1. Increase chlorine dosing to 1. Të rritet doza e klorit që të


ensure adequate residuals sigurohet mbetja e
(>0.35 mg/l in distribution përshtatshme (>0.35 mg/l në
2. Add redundancy to ensure shpërndarje)
chlorination is continuous 2. Të lejohet
j klorinim i
(dual cylinders with automatic vazhdueshëm (cilindra të
switching on empty) dyfishtë me kyçje automatike
3 Reduce network leaks to
3. kur janë të zbrazët)
eliminate: 3. Të zvogëlohen rrjedhjet në rrjet
• Seasonal water që të eliminohen:
shortages • Mungesat e ujërave
• Contamination of the sezonal
network from influent • Ndotja e rrjetit nga ujërat
groundwater
d t nëntokësor
ë t kë
4. Monitor water quality and health 4. Të monitorohet cilësia e ujit dhe
statistics statistikat shëndetësore

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Wastewater ‐ Ujërat e zeza

– Only 60% of municipality is  – Rreth 60% të komunës janë të kyqur


sewered, 89% in Gjilan urban  në kanalizim, 89% të zonës urbane 
area të Gjilanit.
– Percolating septic tanks in use – Gropat septike të depërtushme janë
– Discharges to run –off canals,  në përdorim
M
Morava and its tributaries
di ib i – Shkarkime
Shk ki të ujërave
jë të zeza nëë
– Industrial discharges  Moravë dhe degët e saj
– Treatment 
Treatment –none – Shkarkime të ujërave industriale
– Trajtim – nuk ka

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Wastewater Treatment Plant Locations
Lokacionet për IPUZ

2 WWTP sites identified
Option 2
2 lokacione të identifikuara 
për IPUZ

Option 1

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP Location 1
Lokacioni 1 për IPUZ

Option 1 
Option 1
Alternativa 1 
• needs an access 
•Ka nevojë për një
road rrugë
ë aksesi
k i

• no
no buildings 
buildings •Nuk ka ndërtesa
ka ndërtesa
within 500m of  500m brenda
perimeter perimetrit

• Sludge tankers 
g •Çisterna të llumit 
cross town k l
kalojnë nëpër 
qytet

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
WWTP Location 2 – Lokacioni 2 për IPUZ

Option 2 
p
• next to existing  Alternativa 2 
road •Afër rrugës 
ekzistuese
• no buildings 
within 500m of  •Nuk ka ndërtesa 
perimeter 500m brenda 
perimetrit
i t it
• needs pumping
K jë ë
•Ka nevojë për 
pompim

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Wastewater collection & discharge arrangements
Grumbullimi dhe shkarkimi i ujerave te zeza

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Benefits of the Project
Përfitimet nga Projekti

– More reliable drinking water supply
– Removes groundwater pollution risk
– Removes wastewater discharges 
to surface water
– Reduces  health risks

• Furnizimit më të besueshëm me ujë


të pijshëm
• Largohet rreziku për ndotjen e ujërave
nëntokësore
• Largohen shkarkimet e ujërave të
zeza në ujërat sipërfaqësore
• Zvogëlohen rreziqet shëndetësore

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Summary of impacts – PIP
Pembledhje e ndikimit - PIP

PIP components  Minimum Base Maximum PIP components 


C  O C O C O
Gjilan Wastewater Collection and Kolektimi dhe Trajtimi i Ujërave të
Treatment Zeza në Gjilan
Phase 1 WWTP 2032 (pe) 72,172 ‐ o 92,413 ‐ +++ 117,921 ‐‐ +++ Faza 1 WWTP 2032 (pe)
Gravity sewers Kanalizimi me gravitet
Gjilan urban sewer interceptors and Kolektorët kryesor urban dhe
improvements 19.1 - ++ 30.5 - ++ 42.5 - ++ përmirësimet
Main collector - Gjilan to WWTP @
Uglare 4.8 - ++ 4.8 - ++ 4.8 - ++ Kolektori kryesor - Gjilan - Uglarë
M i collector
Main ll t - V Velekince
l ki MH tto
WWTP @ Uglare 2.3 - ++ 2.3 Kolektori kryesor - Velekincë - Uglarë
Main collector - Livoc to Velekince Kolektori kryesor - Livoq Velekincë
MH 6.8 MH
Sludge Disposal Asgjësimi i llumit
To landfill or Y ‐‐ ‐‐ Y ‐‐ ‐‐ Y ‐ ‐‐ Në deponi apo
N
Non-agricultural
i lt l use off sludge
l d ffor soilil Pë d i i jjo-bujqësor
Përdorimi b j ë i llllumit
it për
ë
conditioning and fertilisation Y ‐‐ +++ Y ‐‐ +++ Y ‐ +++ fertilizim të tokës

Risk of impact Reziku nga impakti 


High adverse --- I pafavorshem i larte ---
Moderate adverse -- Moderuar negativ --
Minor adverse - Minor negativ -
Negligible o Parendesishem o
Perfitim minore +
Minor beneficial +
Perfitim i moderuar ++
Moderate beneficial ++
Perfitim i larte +++
High beneficial +++
C – ndertim i perkohshem
C – temporary construction
O – afatgjate/ operativ
O – long
l t
term/operational
/ ti l

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Conclusions ‐ Përfundimet

– Significant beneficial impact 
– No potential risks to public health
– Good design and construction practice = no unacceptable 
environmental impact

• Ndikim pozitiv signifikant


• Pa rrezik potencial për shendetin
publik
• Praktikë e mirë e dizajnit dhe
ndërtimit = nuk ka ndikim të
papranueshëm
hë mjedisor
j di

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sludge Management Strategic Approach
Qasja Strategjike në Menaxhimin e Llumit
 Best Practicable Environmental  Opsioni më i praktikueshëm
Option – integrated evaluation of mjedisor – Vlerësimi i integruar i
sludge treatment and use / disposal trajtimit të llumit dhe përdorimi /
options
opsionet e asgjësimit
 Priority is to identify sludge outlets
that:
 Prioritet është që të identifikohen
 Recycle nutrients and organic matter
kanalet dalëse që:
on land (agriculture, forestry, land  Riciklojnë materiet ushqyese
reclamation)) dhe lëndët organike në tokë
 Recover energy (incineration, co- (bujqësi, pylltari, bonifikimin e
combustion)
tokave)
 Landfill disposal
p is the option
p of last
resort  Rigjenerojnë
Ri j j ë energjiji (djegie,
(dj i
bashkë djegie)
 Shkarrkimi në deponi p është
opsion i fundit

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sludge Use in Agriculture
Përdorimi i Llumit në Bujqësi
 Sludge production for WWTP  Prodhimi i llumit për skenarin
Base Scenario: 2000 t ds/y bazë: 2000 t ditë/vit
 250 ha/y required (at 8 t ds/ha)  250 ha/vit nevojiten (me 8 t
 4% of land actually cultivated ditë/ha)
 Most farms very small  4% e tokës së kultituar
 Sufficient large farms where  Shumica e farmave janë të
mechanical spreading is feasible vogla
 Marketinggp programme
g crucial  Mjaft farma të mëdha ku
 Storage necessary (6 months) shpërndarje mekanike është
 Uncertainty over soil quality e realizueshme
 Programi
P i i promovimit
i it është
ë htë
thelbësor
 Magazinim
g të nevojshëm
j ((6
muaj)
 Pasiguria mbi cilësinë e tokës

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sludge Use in Land Reclamation
Përdorimi i Llumit në Bonifikimin e Tokave
 Large potential opportunities at  Mundësitë potenciale të mëdha në
KEK, Trepca, and Ferronickeli KEK, Trepça dhe Ferronikeli, por
but depends on project finance varet nga financimi i projektit
 Current project to recultivate KEK  Projekti aktual për rikultivim të hirit
ash and overburden areas të KEK-ut dhe sipërfaqeve të
 KEK mine extension 40 years mbingarkuara
 Long transport for sludge but  Jetëgjatësia e minierës së KEK-ut
mine could provide storage është 40 vite
 Other periodic opportunities but  Distancë e gjatë transportuese për
depend on finance llumin por miniera mund të ofrojë
h ë ië
hapësirë.
 Mundësi tjera por të varura nga
financimi

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Energy Recovery from Sludge
Përfitim të Energjisë nga Llumi
 Sludge similar combustion value  Llumi i ngjajshëm me linjitin
to lignite për nga kaloritë
 Major
M j users off energy – KEK,
KEK
Sharrcem, Ferronickeli  Përdorues të mëdhenj të
 Sharrcem p policy
y to use alternative energjisë – KEK, Sharrcem,
fuels F
Ferronickeli
i k li
 Long transport distance (55 km)  Politika Sharrcem-it për
and gate fee përdorin
ë d i të lëndëve
lë dë djegëse
dj ë
 But provides continuous disposal alternative
of sludge at known cost
 Distancë të gjatë transporti
(55 km) dhe pagesa në portë
 Por parashikon largimin e
vazhdueshëm të llumit me
kosto të njohur

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Sludge Disposal
Asgjësimi i Llumit
 Regional sanitary landfill  Deponia rajonale sanitare
‘Velekinca’ close to proposed “Velekinca” është afër
WWTP site
vendndodhjes të propozuar
 Gate fee only €6/t, assuming
KLMC will accept sludge
për IPUZ.
 Current landfill management  Pagesa
P për
ë hyrje
h j është
ë h ë €6/t,
€6/
unsuitable for sludge disposal duke supozuar KKMD do të
 Composting facility may be pranojë llumin
installed in the future
 Deponia aktuale është e
papërshtatshme për
asgjësimin e llumit
 Objekti
j për kompostim
p p mund
të instalohet në të ardhmen

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Evaluation of Sludge Outlets in Gjilan
Vlerësimi i Përdorimit të Llumit në Gjilan

Outlet Practicability Capacity Overall Feasibility Sludge Quality


Përdorimet Zbatueshmeri Kapacitet Fizibilitet te pergjithshem CIlësitë të llumit
Agriculture Moderate Large Moderate Stabilised dry
Stabilised,
Bujqësi Mesatar I madh Mesatar Stabilizuar i thatë
Land reclamation High Large High Stabilised, cake
Rekuperim i tokësI larte I madh I larte Stabilizuar, gjysëm i thatë
Forestry Moderate Small Low Stabilised, dry
Pylltari Mesatar I vogel I ulët Stabilizuar i thatë
E
Energy recovery High
Hi h L
Large Hi h
High St bili d d
Stabilised, dry
Përfitim në energj I larte I madh I larte Stabilizuar i thatë
Landfill Moderate High Moderate Stabilised, >35% ds
D
Deponi
i M
Mesatar
t I larte
l Mesatar Stabilizuar, >35%

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Priorities for Sludge Strategy Development
Prioritetet për Zhvillimin e Strategjisë së Llumit

 Maximise use in agriculture by  Te promovohet perdorimi i


marketing to large farms llumit në fermat e medha
 Negotiate with Sharrcem and  Të negociohet me Sharrcem
KEK to supply sludge long-term dhe KEK për furnizim me
 Exploit local opportunities in land ll
llum nëë periudhë
i dhë afatgjatë
f j ë
recultivation and forestry
 Avoid disposal to landfill
 Hulumtohen mundësitë
l k l në
lokale ë rekultivim
k lti i të tokës
t kë
dhe pylltari
 Të shmanget asgjësimi në
deponi

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
PART 5 
PART 5 – FINANCIAL APPRAISAL OF 
FINANCIAL APPRAISAL OF
PROPOSED DEVELOPMENT PROJECT
PJESA 5 – VLERËSIMI FINANCIAR I 
PJESA 5  VLERËSIMI FINANCIAR I
PROJEKTIT TË PROPOZUAR ZHVILLIMOR 
Sohail Hassan
Environment Sector Expert – WYG‐IPF
Ek
Ekspert i Sektorit Mjedisor –
t i S kt it Mj di WYG IPF
WYG‐IPF
Gëzim Tosuni
Gëzim Tosuni
Financial Analyst – WYG‐IPF
Analist Financiar – WYG
Analist Financiar  WYG‐IPF
IPF
Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands
RWC Hidromorava - Gjilan
Existing Financial Situation
Situata Ekzistuese Financiare
EUR € 2010 2011 2012 •For the past three years, RWC Hidromorava tariffs
Income 1,719,340 1,715,692 1,881,688 have not been sufficient to cover operating
expenditures and depreciation.
Të hyrat
•Në tri vitet e shkuara, tarifat e KRU Hidromorava nuk
Expenditure
di 2,105,411 2,068,280 1,914,837 kanë qenë të mjaftueshme për ti mbuluar shpenzimet
Shpenzimet operative dhe amortizimin.
•Operating losses incurred each year since 2010.
Loss 386,071 352,588 33,149
•Humbjet janë paraqitur çdo vit prej 201
H
Humbja
bj

•RWC Hidromorava is not able to finance CAPEX, under


such conditions
Fixed Assets 8,832,121 8,306,347 8,783,314
•KRU Hidromorava nuk do të mund të financojë
Mjetet Fikse
shpenzimet kapitale në këto kushte siq është.
Current Assets 2,313,714 2,509,946 2,876,286
j
Mjetet •Future operating
p g environment needs to improve
p to
Qarkulluese cover OPEX, as well as to finance CAPEX maintenance
Current 916,927 923,200 988,267 and urgently needed investments in water and
Liabilities wastewater services.
Mjedisi operues në të ardhmen duhet të përmirësohet
Detyrimet
në mënyrë që të mbulohen shpenzimet operative
operative, si
afatshkurtëra
dhe të financohen shpenzimet kapitale dhe
Long-term - - - mirëmbajtjen si dhe investimet që urgjentisht nevojiten
Liabilities
në shërbimet e ujësjellësit dhe ujërave të zeza.
Detyrimet
afatgjata

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Tariff Levels
Tarifat
Year
Tariffs as approved by WWRO Unit Viti
Tarifat e aprovuara nga ZRRUM Njësia
2012 2013 2014
Households/Ekonomitë familjare

Water supply fixed monthly charge €/month


1 1 1
Furnizimi me ujë sipas tarifës fikse €/muaj
Water supply volume charge 3
€/m 0.32 0.3168 0.3256
Furnizimi me ujë sipas vëllimit
Wastewater charge (based on volume of water
3
consumed) €/m 0.08 0.0799 0.0855
Kanalizimi (sipas vëllimit të ujit të konsumuar)
Commercial and Institutional/Ndërmarrjet dhe Institucionet
Water supply fixed monthly charge €/month
3.00 3.00 3.00
Furnizimi me ujë sipas tarifës fikse €/muaj
Water supply volume charge 3
€/m 0.71 0.6335 0.5861
Furnizimi me ujë sipas vëllimit
Wastewater charge (based on volume of water
3
consumed) €/m 0.19 0.1999 0.2137
Kanalizimi (sipas vëllimit të ujit të konsumuar)

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Revenues 
Të hyrat
Summary Income Table
Tabela e të hyrave

€ 2010 2011 2012

Water supply
pp y – Uji
j 1,209,556
, , 1,225,620
, , 1,345,806
, ,

Wastewater – Ujërat e zeza 189,520 189,541 249,603

Sub-total
b l – Nën
ë totall 1 399 076
1,399,076 1 415 161
1,415,161 1 595 410
1,595,410

Change – Ndryshimi 1.1% 12.7%


Other Operating revenues – Të
160,949 142,469 272,542
hyrat tjera operative

Other revenues – Të hyrat tjera 320,264 158,062 13,736

Total revenues – Gjithsej të 1,719,340 1,715,692 1,881,688


hyra
-0.2% 9.6%
Change – Ndryshimi

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Summary of Operating Costs
Përmbledhje e shpenzimeve operative
• Staff cost represents a significant company
Operating Costs € 2010 2011 2012 expense and accounts for around 34% of total
Shpenz. Operative € operating costs.
• Personeli paraqet një shpenzim të dukshëm
Materials (Chemicals) 35 716
35,716 26 542
26,542 22 164
22,164 dh llllogaritet
dhe it t për
ë rreth
th 34% të shpenzimeve
h i
Materialet (Kemikalet) operative.
• Bad debts make up for around 21% of total
Electricity 121,126 129,407 176,772 operating costs.
Rryma Elektrike • Borgjet e kqija paraqesin rreth 21% të
shpenzimeve operative.
Staff Cost 612,065 714,878 758,691
Shpenzi. e personelit • Electricity costs comparatively low at around
7% of operating costs
Maintenance Cost 74,585 72,923 73,693 • Shpenzimet e rrymës elektrike relativisht të
Shpenzi. e Mirëmbajtjes ulëta, rreth 7% të shpenzimeve operative.

Bad Debt 405,731 280,511 180,054


Borgjet e këqia • Maintenance costs are almost constant at
about 5% of total operating costs
Other operating costs* 172,012 169,664 189,246 • Shpenzimet e mirëmbajtjes gati konstante në
Shpenz. tjera 5% të shpenzimeve operative
operative*
Total / Gjithsej 1,421,235 1,393,925 1,400,620 • Other operating
p g costs are also significant
g at
Increase / Rritja around 13% of the operating costs
-1.9% 0.5% • Shpenzimet tjera operative luajnë rrol të
* Fuel; Contracted Services; Recreation & sports; Maintenance Costs; rëndësishëm dhe janë rreth 13% të
Financial costs; Etc. shpenzimeve operative.
* Karburantet;
K b t t Shërbimet
Shë bi t e jashtme
j ht k t kt
kontraktuese; R k
Rekreacioni
i i dhe
dh
sport; Mirëmbajtja; Të dalurat financiare; Etj.

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Alternative Priority Investment Programmes
Programet alternative investuese sipas prioriteteve

• Investment Costs: • Investimet:


• Prices
P i i l di
including VAT and
d local
l l • Çmimet
Ç i t duke
d k përfshirë
ë f hi ë TVSH dhe
dh
inflation inflacionin lokal
Min Base High Min Bazë Max
€ 000 € 000 € 000 € 000 € 000 € 000
18,123 23,925 29,102 18,123 23,925 29,102

• Financing Plan: • Plani i financimit:


Min Base High Min Bazë Max
Loan 24% 28% 32% Kredi 24% 28% 32%
Grant 76% 72% 68% Donacion 76% 72% 68%

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Assumed EBRD Loan Terms and Conditions
Kushtet e supozuara kredituese sipas EBRD

Conditions Kushtet
• 15 Loan maturity period • Afati i maturimit 15 vite
• 5 years grace period • Periudha “grace” 5 vite
• 3.5 % interest rate • 3.5 % norma e interesit
• 1.0 % upfront
p fee • 1.0 % upfront
p fee
• 0.5 % commitment fee • 0.5 % commitment fee

Min Case: Loan 4.382 € m Opsioni Minimal: Kredi 4.382 € m


Grant 13.740 € m Donacion 13.740n € m

Base Case: Loan 6.807 € m Opsioni Bazë: Kredi 6.807 € m


Grant 17.118 € m Donacion 17.118 € m

High Case: Loan 9.238 € m Opsioni Maksimal: Kredi 9,238 € m


Grant 19.863 € m Donacion 19.863 € m

• Met from RWC Revenues • Mbulohen nga g të hyrat


y e RWC
• Debt Service Coverage Ratio of • Koeficienti i mbulueshmërisë për
over 1.5 servisimin e borxhit mbi 1.5

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Debt Service Implications for RWC
Implikimet e servisimit të borxhit për RWC

Annual Repayments in € m Pagesat vjetore në €

Min Case - Max 0.591 in 2019 Opsioni Minimal - Max 0.591 në 2019

Base Case - Max 0.918 in 2019 Opsioni


p Bazë - Max 0.918 në 2019

High Case - Max 1.182 in 2019 Opsioni Maksimal - Max 1.182 në 2019

1,000,000 
900,000 
800,000 
700,000 
600,000 
500,000 
400,000 
300,000 
200,000 
100,000 

Loan repayment Interest Total financial fees

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Summary of Financial Projections for RWC – Base
Përmbledhja e projeksioneve financiare për RWC ‐ Bazë

2,500,000

2,000,000

1,500,000

1,000,000

500,000

-
2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028
-500,000
500 000

Operating cash Total including fees, interest and principal


Discretionary Capex Cash after Discretionary Capex

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Future Tariff Levels
Nivelet tarifore në të ardhmen
5,000,000 
4,500,000 
4,000,000 
Base Case Project 3,500,000 
Euro /m3 3,000,000 
Water Wastewater Combined 2,500,000 
2,000,000 
2012 1 500 000
1,500,000 
Domestic / Ekonomitë familjare 0.31 0.07 0.38 1,000,000 
Commercial / Komerciale 0.71 0.19 0.90 500,000 
Institutional / Institucionet 0.71 0.19 0.90 ‐

2012

2014

2016

2018

2020

2022

2024

2026

2028
2

2
2017
Electricity costs Material
Domestic / Ekonomitë familjare 0.42 0.13 0.55 Wages & salaries Social tax and contribution
Commercial / Komerciale 0.92 0.29 1.21 Maintenance & repairs Support production units
Institutional / Institucionet 0.92 0.29 1.21 Other direct costs
1.00 
1.00
2022 0.90 
Domestic / Ekonomitë familjare 0.57 0.20 0.77 0.80 
Commercial / Komerciale 1.20 0.42 1.62 0.70 
Institutional / Institucionet 1.20 0.42 1.62 0.60 
0.50 
2027 0.40 
0.30 
Domestic / Ekonomitë familjare 0.66 0.24 0.90
0.20 
Commercial / Komerciale 1.39 0.49 1.88
0.10 
Institutional / Institucionet 1.39 0.49 1.88 ‐

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Affordability for Households
Aftësia e pagesës nga amvisëritë

• Affordability Criteria: 3% to 4% • Kriteri i aftësisë së pagesës: 3%


of average
g household income for deri 4% të të hyrave
y mesatare të
water and sewerage amvisërive për ujë dhe kanalizim
• Current tariffs: account for • Tarifat aktuale: rreth 1.0% e të
about 1.0% of averageg hyrave
y mesatare të ekonomive
household income familjare
• Projected tariffs: • Tarifat e projektuara :
• Base Case would be 1.1%
1 1% of • 1 1% e të
Opsioni minimal: 1.1%
household income in 2017 hyrave të ekonomive familjare në
vitin 2017.
• Reducing to 0.9% of household
income in 2027 • Zvogëlimi në 0.9%
0 9% të të hyrave të
ekonomive familjare në vitin
2027.

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands


RWC Hidromorava - Gjilan
Financial Analysis – Key Findings and Issues 
Analiza Financiare – Përfundimet e nxjerrura

• Real and inflation linked tariff • Janë të nevojshme tarifa të


increases are needed and lidhura me inflacionin real q

services remain affordable shërbimet të mbeten të
përballueshme
• KUR është financiarisht e
• RWC is financially sustainable
sustainable,
qëndrueshme, i mbulon të gjitha
contributing to meeting all debt
nevojat për servisim të borxhit
financing needs and operating
dhe shpenzimet operative.
costs
• Çështje financuese –burime
financuese lokale dhe
• Funding issues – availability of ndërkombëtare, dhe grante në
significant local and dispozicion
dispozicion.
international grant financing

Infrastructure Projects Facility in the Western Balkans – Implemented by WYG creative minds safe hands