Contrato: NO TIENE MI EXPEDIENTE ESTE PUNTO

Obra: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO – PROVINCIA DE UTCUBAMBA - AMAZONAS”
Cliente: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA
Contratista: NO TIENE MI EXPEDIENTE ESTE PUNTO
Supervision: ING. MANUEL HUGO PUICAN CARREÑO
Sist. Contra: SUMA ALZADA
Lugar: Utcubamba – Bagua Grande - Amazonas

VALORIZACION N° 01 INFR-P-16-FA / Rev.00 ( 28/12/15 )

Nombre del Proyecto: "CONSTRUCCION DE PISTAS Y VEREDAS BARRIO - SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS" PRESUPUESTO ORIGINAL USD ó S/. S/.3´191,339.55

Fecha : 30 de Junio del 2015 Nº de Contrato. (Orden de Compra LAP): Modalidad del Contrato: ORDENES DE CAMBIO USD ó S/.
Periodo : 120 DIAS CALENDARIOS Contratista : NO TIENE MI EXPEDIENTE ESTE PUNTO POR CONTRARA PRESUPUESTO ACTUAL USD ó S/. S/. 1,311,360.88
30 de Junio al 29 Julio del 2015
CONTRATO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO ACTUAL
ITEM
DESCRIPCION TOTAL MONTO MONTO MONTO MONTO
U.M CANT P.U CANT % CANT % CANT % CANT %
USD ó S/. USD ó S/. USD ó S/. USD ó S/. USD ó S/.
01 OBRAS PROVISIONALES 4,271.95
01.01 Cartel de indentificación de Obra de 3.60 x 8.50 m. u 1.00 1,871.95 1,871.95 - 0% 1.00 100% 1,871.95 1.00 100.00% 1,871.95 - 0.00% 0.00
01.02 Alquiler de Almacén y Oficina mes 4.00 600.00 2,400.00 - 0% 4.00 100% 2,400.00 4.00 100.00% 2,400.00 - 0.00% 0.00
02 PAVIMENTOS 1,290,423.89
02.01 TRABAJOS PRELIMINARES 35,803.93
02.01.01 Limpieza de Terreno Manual m2 6,007.37 4.99 29,976.78 - 0% 6,007.37 100% 29,976.78 6,007.37 100.00% 29,976.78 - 0.00% 0.00
02.01.02 Trazo, Nivel y Replanteo m2 6,007.37 0.97 5,827.15 - 0% 6,007.37 100% 5,827.15 6,007.37 100.00% 5,827.15 - 0.00% 0.00
02.02 MOVIMIENTO DE TIERRAS 189,028.65
Corte con Maquinaria en terreno natural hasta H=1.00 m
02.02.01 m3 7,282.14 4.60 33,497.84 - 0% 7,282.14 100% 33,497.84 7,282.14 100.00% 33,497.84 - 0.00% 0.00
02.02.02 Perfilado, Nivelación y compactación de la subrasante en zonas de corte m2 6,007.37 4.94 29,676.41 - 0% 6,007.37 100% 29,676.41 6,007.37 100.00% 29,676.41 - 0.00% 0.00
02.02.03 Mejoramiento de subrasante con over menor a 4" e=20cm m2 6,007.37 13.75 82,601.34 - 0% 6,007.37 100% 82,601.34 6,007.37 100.00% 82,601.34 - 0.00% 0.00
02.02.04 Base Granular e=20cm m2 6,007.37 7.20 43,253.06 - 0% 6,007.37 100% 43,253.06 6,007.37 100.00% 43,253.06 - 0.00% 0.00
02.03 CONCRETO SIMPLE 754,307.80
02.03.01 Losa de Rodadura, Mortero f'c = 210 Kg/cm2, e=0.20 m. m2 6,007.37 82.31 494,466.62 - 0% 6,007.37 100% 494,466.62 6,007.37 100.00% 494,466.62 - 0.00% 0.00
02.03.02 Concreto en Uñas para Pavimento Rígido, Mortero f'c = 210 Kg/cm2 m3 263.26 268.37 70,651.09 - 0% 263.26 100% 70,651.09 263.26 100.00% 70,651.09 - 0.00% 0.00
02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2 3,504.61 51.59 180,802.83 - 0% 3,504.61 100% 180,802.83 3,504.61 100.00% 180,802.83 - 0.00% 0.00
02.03.04 Levantamiento de Buzones Existentes a nivel de rasante u 14.00 599.09 8,387.26 - 0% 14.00 100% 8,387.26 14.00 100.00% 8,387.26 - 0.00% 0.00
02.04 CURADO 20,965.72
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m2 6,007.37 3.49 20,965.72 - 0% - 0% 0.00 - 0.00% - 6,007.37 100.00% 20965.72
02.05 JUNTAS 58,838.19
02.05.01 Juntas de contracción e=6mm m 2,292.49 1.75 4,011.86 - 0% - 0% 0.00 - 0.00% - 2,292.49 100.00% 4011.86
02.05.02 Juntas de contrucción de 3/4" c/ pasajuntas m 254.40 34.07 8,667.41 - 0% - 0% 0.00 - 0.00% - 254.40 100.00% 8667.41
02.05.03 Juntas de contrucción de 3/4" sin pasajuntas en la intersección de calles m 418.62 16.01 6,702.11 - 0% - 0% 0.00 - 0.00% - 418.62 100.00% 6702.11
02.05.04 Juntas asfálticas en pavimentos h=20 cm, e=1" m 1,902.45 20.74 39,456.81 - 0% - 0% 0.00 - 0.00% - 1,902.45 100.00% 39456.81
02.06 ACERO LISO 30,190.68
02.06.01 Dowels transversales con acero liso de 3/4" m 1,372.80 18.16 24,930.05 - 0% - 0% 0.00 - 0.00% - 1,372.80 100.00% 24930.05
02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m 919.69 5.72 5,260.63 - 0% - 0% 0.00 - 0.00% - 919.69 100.00% 5260.63
02.07 SEÑALIZACION 4,124.87
02.07.01 SEÑAILZACION HORIZONTALES 3,026.63
02.07.01.01 Pintado de Franjas en Pavimento - Señalizacion m2 441.20 6.86 3,026.63 - 0% - 0% 0.00 - 0.00% - 441.20 100.00% 3026.63
02.07.02 SEÑALIZACION VERTICAL 1,098.24 - -
02.07.02.01 Señalización Preventiva de lado 0.60 x 0.60 u 16.00 68.64 1,098.24 - 0% - 0% 0.00 - 0.00% - 16.00 100.00% 1098.24
02.08 ELIMINACION
Eliminación deDE MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento 197,164.05
02.08.01 c/volquete m3 9,102.68 21.66 197,164.05 - 0% 9,102.68 100% 197,164.05 9,102.68 100.00% 197,164.05 - 0.00% 0.00
03 VEREDAS 369,722.57
03.01 TRABAJOS PRELIMINARES 33,079.24
03.01.01 Limpieza de Terreno Manual m2 2,741.67 4.99 13,680.93 - 0% 2,741.67 100% 13,680.93 2,741.67 100.00% 13,680.93 - 0.00% 0.00
03.01.02 Trazo, Nivel y Replanteo m2 2,741.67 0.97 2,659.42 - 0% 2,741.67 100% 2,659.42 2,741.67 100.00% 2,659.42 - 0.00% 0.00
03.01.03 Demolición de Vereda existente de mortero simple m2 945.16 15.50 14,649.98 - 0% 945.16 100% 14,649.98 945.16 100.00% 14,649.98 - 0.00% 0.00
03.01.04 Demolición de Vereda existente de mortero simple H=1.00m m2 62.90 33.21 2,088.91 - 0% 62.90 100% 2,088.91 62.90 100.00% 2,088.91 - 0.00% 0.00
03.02 MOVIMIENTO DE TIERRAS 71,770.86
03.02.01 Corte manual
Nivelacion de terreno
Reglado en Veredas
y Apisonado en Vereda m3 1,100.78 26.60 29,280.75 - 0% 1,100.78 100% 29,280.75 1,100.78 100.00% 29,280.75 - 0.00% 0.00
03.02.02 c/volquete m2 2,751.95 6.23 17,144.65 - 0% 2,751.95 100% 17,144.65 2,751.95 100.00% 17,144.65 - 0.00% 0.00
03.02.03 Relleno Compactado c/Material de prestamo (Afirmado) para base de vered m2 2,751.95 9.21 25,345.46 - 0% 2,751.95 100% 25,345.46 2,751.95 100.00% 25,345.46 - 0.00% 0.00
03.03 CONCRETO SIMPLE 186,679.60
Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. bruña
03.03.01 m2 2,562.10 54.99 140,889.88 - 0% - 0% 0.00 - 0.00% - 2,562.10 100.00% 140889.88
03.03.02 Concreto f 'c=175 kg/cm2 en Rampas m2 189.85 58.24 11,056.86 - 0% - 0% 0.00 - 0.00% - 189.85 100.00% 11056.86
Encofrado, descencofrado de Vereda
03.03.03 m2 1,970.10 17.63 34,732.86 - 0% - 0% 0.00 - 0.00% - 1,970.10 100.00% 34732.86
03.04 JUNTAS Y BRUÑADO 36,823.51
Junta de dilatación 1" x 4" de mortero asfáltico a 3.0 m
03.04.01 m 625.20 10.49 6,558.35 - 0% - 0% 0.00 - 0.00% - 625.20 100.00% 6558.35
03.04.02 Bruñado De Veredas m 5,503.00 4.66 25,643.98 - 0% - 0% 0.00 - 0.00% - 5,503.00 100.00% 25643.98
03.04.03 Bruñado De Rampas m 890.40 5.19 4,621.18 - 0% - 0% 0.00 - 0.00% - 890.40 100.00% 4621.18
03.05 CURADO 10,484.93
03.05.01 Curado de vereda con material de prèstamo, durante 7 dias - 4 veces x día m2 2,751.95 3.81 10,484.93 - 0% - 0% 0.00 - 0.00% - 2,751.95 100.00% 10484.93
03.06 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE 8,531.74
03.06.01 Suministro y Colocacion encimado de Cajas Para Agua u 149.00 23.63 3,520.87 - 0% 149.00 100% 3,520.87 149.00 100.00% 3,520.87 - 0.00% 0.00
03.06.02 Suministro y Colocacion encimado de Cajas Para Desague u 149.00 33.63 5,010.87 - 0% 149.00 100% 5,010.87 149.00 100.00% 5,010.87 - 0.00% 0.00
03.07 ELIMINACION
Eliminación deDE MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento 22,352.69
03.07.01 c/volquete m3 1,031.98 21.66 22,352.69 - 0% 1,031.98 100% 22,352.69 1,031.98 100.00% 22,352.69 - 0.00% 0.00
CONTRATO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO ACTUAL
ITEM
DESCRIPCION TOTAL MONTO MONTO MONTO MONTO
U.M CANT P.U CANT % CANT % CANT % CANT %
USD ó S/. USD ó S/. USD ó S/. USD ó S/. USD ó S/.
04 SARDINLES 216,918.06
04.01 TRABAJOS PRELIMINARES 2,321.43
04.01.01 Limpieza de Terreno Manual m2 389.50 4.99 1,943.61 - 0% 389.50 100% 1,943.61 389.50 100.00% 1,943.61 - 0.00% 0.00
04.01.02 Trazo, Nivel y Replanteo m2 389.50 0.97 377.82 - 0% 389.50 100% 377.82 389.50 100.00% 377.82 - 0.00% 0.00
04.02 MOVIMIENTO DE TIERRAS 6,216.42 -
04.02.01 Excavacion de sardineles hasta h=60 cm m3 233.70 26.60 6,216.42 - 0% 233.70 100% 6,216.42 233.70 100.00% 6,216.42 - 0.00% 0.00
04.03 CONCRETO SIMPLE 202,052.89
04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3 194.75 342.66 66,733.04 - 0% - 0% 0.00 - 0.00% - 194.75 100.00% 66733.04
04.03.02 Encofrado y Desencofrado m2 2,025.37 41.69 84,437.68 - 0% - 0% 0.00 - 0.00% - 2,025.37 100.00% 84437.68
04.03.03 Acero Corrugado fy=4200 kg/cm2 ,Grado 60 kg 6,006.39 4.71 28,290.10 - 0% - 0% 0.00 - 0.00% - 6,006.39 100.00% 28290.10
04.03.04 Relleno de Juntas de Dilatación con mortero asfaltico 1"x2" m en sardine m 130.25 7.99 1,040.70 - 0% - 0% 0.00 - 0.00% - 130.25 100.00% 1040.70
04.03.05 Tarrajeo pulido en sardineles m2 467.39 40.99 19,158.32 - 0% - 0% 0.00 - 0.00% - 467.39 100.00% 19158.32
04.03.06 Curado de sardinel con material de prèstamo, durante 7 dias - 4 veces x día m2 623.19 3.84 2,393.05 - 0% - 0% 0.00 - 0.00% - 623.19 100.00% 2393.05
04.04 ELIMINACION DEde
Eliminación MATERIAL EXCEDENTE
Material Excedente a una Distancia = 5 Km + 25% esponjamiento 6,327.32
04.04.01 c/volquete m3 292.12 21.66 6,327.32 - 0% 292.12 100% 6,327.32 292.12 100.00% 6,327.32 - 0.00% 0.00
05 CUNETAS RECTANGULARES 335,241.41
05.01 TRABAJOS PRELIMINARES 6,074.14
05.01.01 Limpieza de Terreno Manual m2 1,019.15 4.99 5,085.56 - 0% 1,019.15 100% 5,085.56 1,019.15 100.00% 5,085.56 - 0.00% 0.00
05.01.02 Trazo, Nivel y Replanteo m2 1,019.15 0.97 988.58 - 0% 1,019.15 100% 988.58 1,019.15 100.00% 988.58 - 0.00% 0.00
05.02 MOVIMIENTO DE TIERRAS
Excavacion de canaletas hasta h=60 cm
05.03 m3 509.57 24.32 12,392.74 - 0% 509.57 100% 12,392.74 509.57 100.00% 12,392.74 - 0.00% 0.00
05.04 CONCRETO SIMPLE 302,977.76
05.04.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3 212.32 342.66 72,753.57 - 0% - 0% 0.00 - 0.00% - 212.32 100.00% 72753.57
05.04.02 Acero Corrugado fy=4200 kg/cm2 ,Grado 60 kg 4,871.44 4.71 22,944.48 - 0% - 0% 0.00 - 0.00% - 4,871.44 100.00% 22944.48
05.04.03 Encofrado y Desencofrado m2 2,038.30 41.69 84,976.73 - 0% - 0% 0.00 - 0.00% - 2,038.30 100.00% 84976.73
05.04.04 Tarrajeo pulido en Cunetas m2 2,123.23 40.99 87,031.20 - 0% - 0% 0.00 - 0.00% - 2,123.23 100.00% 87031.20
05.04.05 Curado de sardinel y cuneta con material de prèstamo, durante 7 dias - m2 2,972.52 3.81 11,325.30 - 0% - 0% 0.00 - 0.00% - 2,972.52 100.00% 11325.30
Tapas de concreto para canaletas
05.04.06 m3 41.62 575.36 23,946.48 - 0% - 0% 0.00 - 0.00% - 41.62 100.00% 23946.48
05.05 ELIMINACION
Eliminación deDE MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento 13,796.77
05.05.01 c/volquete m3 636.97 21.66 13,796.77 - 0% 636.97 100% 13,796.77 636.97 100.00% 13,796.77 - 0.00% 0.00
06 MURO DE CONTENCION 21,934.59
06.01 TRABAJOS PRELIMINARES 539.27
06.01.01 Limpieza de Terreno Manual m2 90.48 4.99 451.50 - 0% 90.48 100% 451.50 90.48 100.00% 451.50 - 0.00% 0.00
06.01.02 Trazo, Nivel y Replanteo m2 90.48 0.97 87.77 - 0% 90.48 100% 87.77 90.48 100.00% 87.77 - 0.00% 0.00
06.02 MOVIMIENTO DE TIERRAS 1,324.13
06.02.01 Corte de Terreno Manual para Muro de Contención m3 25.44 31.00 788.64 - 0% 25.44 100% 788.64 25.44 100.00% 788.64 - 0.00% 0.00
06.02.02 Relleno con material de préstamo en Muro de Contención m3 9.05 59.17 535.49 - 0% 9.05 100% 535.49 9.05 100.00% 535.49 - 0.00% 0.00
06.03 CONCRETO SIMPLE 1,205.19
Solado 1:10; C:A e = 4"
06.03.01 m2 45.24 26.64 1,205.19 - 0% - 0% 0.00 - 0.00% - 45.24 100.00% 1205.19
06.04 CONCRETO ARMADO PARA MUROS DE CONTENCION 18,197.96
06.04.01 Encofrado y Desencofrado de Muro de contención m2 56.55 47.53 2,687.82 - 0% - 0% 0.00 - 0.00% - 56.55 100.00% 2687.82
06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg 1,097.91 4.60 5,050.39 - 0% - 0% 0.00 - 0.00% - 1,097.91 100.00% 5050.39
06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contención m3 20.36 513.74 10,459.75 - 0% - 0% 0.00 - 0.00% - 20.36 100.00% 10459.75
06.05 JUNTAS 195.85
06.05.01 Juntas de Dilatación en Muro y Losa Inferior con water stop 6" cada 9.00 m. m 5.00 39.17 195.85 - 0% - 0% 0.00 - 0.00% - 5.00 100.00% 195.85
06.06 ELIMINACION
Eliminación deDE MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento 472.19
06.06.01 c/volquete m3 21.80 21.66 472.19 - 0% 21.80 100% 472.19 21.80 100.00% 472.19 - 0.00% 0.00
07 AREAS VERDES 103,956.34
Corte superficial para jardineras hasta 0.20 m
07.01 m2 2,504.15 5.71 14,298.70 - 0% - 0% 0.00 - 0.00% - 2,504.15 100.00% 14298.70
Acarreo de material excedente dp <=50 m
07.02 m3 500.83 25.34 12,691.03 - 0% - 0% 0.00 - 0.00% - 500.83 100.00% 12691.03
07.03 Suministro y Colocacion de Tierra Agricola m2 2,504.15 13.59 34,031.40 - 0% - 0% 0.00 - 0.00% - 2,504.15 100.00% 34031.40
07.04 Sembria De Gras m2 2,504.15 9.40 23,539.01 - 0% - 0% 0.00 - 0.00% - 2,504.15 100.00% 23539.01
07.05 Arborizacion Con
Eliminación de Plantones
Material Excedente a una Distancia = 5 Km + 25% esponjamiento u 227.00 25.71 5,836.17 - 0% - 0% 0.00 - 0.00% - 227.00 100.00% 5836.17
07.06 c/volquete m3 626.04 21.66 13,560.03 - 0% - 0% 0.00 - 0.00% - 626.04 100.00% 13560.03
08 VARIOS 9,292.09
08.01 Limpieza FInal de Obra m2 12,226.44 0.76 9,292.09 - 0% - 0% 0.00 - 0.00% - 12,226.44 100.00% 9292.09
COSTO DIRECTO S/. 2,351,760.90 1,365,775.29 1,365,775.29 S/. 985,985.61
GASTOS GENERALES 10.00% S/. 235,176.09 136,577.53 136,577.53 98,598.56
UTILIDAD 5.00% S/. 117,588.05 68,288.76 68,288.76 49,299.28
=========== =========== =========== ===========
SUB TOTAL S/. 2,704,525.04 S/. 1,570,641.58 S/. 1,570,641.58 S/. 1,133,883.46
IGV (Impuestos) 18.00% S/. 423,316.96 245,839.55 245,839.55 177,477.41
FACTOR DE RELACION = 1 =========== =========== =========== ===========
PRESUPUESTO DE OBRA A CONTRATAR S/. 3,127,842.01 S/. 1,816,481.14 S/. 1,816,481.14 S/. 1,311,360.88
AVANCE % 9.09% 9.09% 6.56%
MONTO ENTREGADO POR ADELANTO 20% 3,127,842.01 625,568.40 0% 58% 1,816,481.14 58% 42%
CONTRATISTA PROJECT MANAGER (A) TOTAL 0.00 + 1,816,481.14 = 1,816,481.14 = 1,311,360.88

(B) MENOS: ADELANTOS 0.00 + (363,296.23) = (363,296.23) = 363,296.23

(C) SUBTOTAL (A+B) 0.00 + 1,453,184.91 = 1,453,184.91 = 1,674,657.11

FECHA: FECHA: (D) IGV [18% of (C)] 0.00 + 261,573.28 = 261,573.28 = 301,438.28

CONTROL DE PROYECTOS GERENTE DE INFRAESTRUCTURA (E) TOTAL (C+D) 0.00 + 1,714,758.19 = 1,714,758.19 = 1,976,095.39
(F) OTRAS DEDUCCIONES (*) 0.00 + 0.00 = 0.00 = 0.00

(G) RETENCION (6%) 0.00 + (102,885.49) = (102,885.49) = (118,565.72)

FECHA: FECHA: (H) MONTO A PAGAR (E+F+G) 0.00 + 1,611,872.70 = 1,611,872.70 = 1,857,529.67
Contrato: NO TIENE MI EXPEDIENTE ESTE PUNTO
Obra: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO – PROVINCIA DE
Cliente: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA
Contratista: NO TIENE MI EXPEDIENTE ESTE PUNTO
Supervision: ING. MANUEL HUGO PUICAN CARREÑO
Sist. Contra: SUMA ALZADA
Lugar: Utcubamba – Bagua Grande - Amazonas

VALORIZACION N° 02

Nombre del Proyecto: "CONSTRUCCION DE PISTAS Y VEREDAS BARRIO - SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AM

Fecha : 28 de Noviembre del 2015 Nº de Contrato. (Orden de Compra LAP):


Periodo : 520 DIAS
120 DIAS
CALENDARIOS
CALENDARIOS Contratista NO TIENE MI EXPEDIENTE ESTE

CONTRATO
ITEM DESCRIPCION
U.M CANT

01 OBRAS PROVISIONALES
01.01 Cartel de indentificación de Obra de 3.60 x 8.50 m. u 1.00
01.02 Alquiler de Almacén y Oficina mes 4.00
02 PAVIMENTOS
02.01 TRABAJOS PRELIMINARES
02.01.01 Limpieza de Terreno Manual m2 6,007.37
02.01.02 Trazo, Nivel y Replanteo m2 6,007.37
02.02 MOVIMIENTO DE TIERRAS
Corte con Maquinaria en terreno natural hasta H=1.00 m
02.02.01 m3 7,282.14
02.02.02 Perfilado, Nivelación y compactación de la subrasante en zonas de corte m2 6,007.37
02.02.03 Mejoramiento de subrasante con over menor a 4" e=20cm m2 6,007.37
02.02.04 Base Granular e=20cm m2 6,007.37
02.03 CONCRETO SIMPLE
02.03.01 Losa de Rodadura, Mortero f'c = 210 Kg/cm2, e=0.20 m. m2 6,007.37
02.03.02 Concreto en Uñas para Pavimento Rígido, Mortero f'c = 210 Kg/cm2 m3 263.26
02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2 3,504.61
02.03.04 Levantamiento de Buzones Existentes a nivel de rasante u 14.00
02.04 CURADO
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m2 6,007.37
02.05 JUNTAS
02.05.01 Juntas de contracción e=6mm m 2,292.49
02.05.02 Juntas de contrucción de 3/4" c/ pasajuntas m 254.40
02.05.03 Juntas de contrucción de 3/4" sin pasajuntas en la intersección de calles m 418.62
02.05.04 Juntas asfálticas en pavimentos h=20 cm, e=1" m 1,902.45
02.06 ACERO LISO
02.06.01 Dowels transversales con acero liso de 3/4" m 1,372.80
02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m 919.69
02.07 SEÑALIZACION
02.07.01 SEÑAILZACION HORIZONTALES
02.07.01.01 Pintado de Franjas en Pavimento - Señalizacion m2 441.20
02.07.02 SEÑALIZACION VERTICAL
02.07.02.01 Señalización Preventiva de lado 0.60 x 0.60 u 16.00
02.08 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
02.08.01 c/volquete m3 9,102.68
03 VEREDAS
03.01 TRABAJOS PRELIMINARES
03.01.01 Limpieza de Terreno Manual m2 2,741.67
03.01.02 Trazo, Nivel y Replanteo m2 2,741.67
03.01.03 Demolición de Vereda existente de mortero simple m2 945.16
03.01.04 Demolición de Vereda existente de mortero simple H=1.00m m2 62.90
03.02 MOVIMIENTO DE TIERRAS
03.02.01 Corte manual
Nivelacion de terreno
Reglado en Veredas
y Apisonado en Vereda m3 1,100.78
03.02.02 c/volquete m2 2,751.95
03.02.03 Relleno Compactado c/Material de prestamo (Afirmado) para base de vereda m2 2,751.95
03.03 CONCRETO SIMPLE
Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. bruña
03.03.01 m2 2,562.10
03.03.02 Concreto f 'c=175 kg/cm2 en Rampas m2 189.85
Encofrado, descencofrado de Vereda
03.03.03 m2 1,970.10
03.04 JUNTAS Y BRUÑADO
Junta de dilatación 1" x 4" de mortero asfáltico a 3.0 m
03.04.01 m 625.20
03.04.02 Bruñado De Veredas m 5,503.00
03.04.03 Bruñado De Rampas m 890.40
03.05 CURADO
03.05.01 Curado de vereda con material de prèstamo, durante 7 dias - 4 veces x día m2 2,751.95
03.06 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE
03.06.01 Suministro y Colocacion encimado de Cajas Para Agua u 149.00
03.06.02 Suministro y Colocacion encimado de Cajas Para Desague u 149.00
03.07 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
03.07.01 c/volquete m3 1,031.98
04 SARDINLES
04.01 TRABAJOS PRELIMINARES
04.01.01 Limpieza de Terreno Manual m2 389.50
04.01.02 Trazo, Nivel y Replanteo m2 389.50
04.02 MOVIMIENTO DE TIERRAS
04.02.01 Excavacion de sardineles hasta h=60 cm m3 233.70
04.03 CONCRETO SIMPLE
04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3 194.75
04.03.02 Encofrado y Desencofrado m2 2,025.37
04.03.03 Acero Corrugado fy=4200 kg/cm2 ,Grado 60 kg 6,006.39
04.03.04 Relleno de Juntas de Dilatación con mortero asfaltico 1"x2" m en sardinel m 130.25
04.03.05 Tarrajeo pulido en sardineles m2 467.39
04.03.06 Curado de sardinel con material de prèstamo, durante 7 dias - 4 veces x día m2 623.19
04.04 ELIMINACION DEde
Eliminación MATERIAL EXCEDENTE
Material Excedente a una Distancia = 5 Km + 25% esponjamiento
04.04.01 c/volquete m3 292.12
05 CUNETAS RECTANGULARES
05.01 TRABAJOS PRELIMINARES
05.01.01 Limpieza de Terreno Manual m2 1,019.15
05.01.02 Trazo, Nivel y Replanteo m2 1,019.15
05.02 MOVIMIENTO DE TIERRAS
Excavacion de canaletas hasta h=60 cm
05.03 m3 509.57
05.04 CONCRETO SIMPLE
05.04.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3 212.32
05.04.02 Acero Corrugado fy=4200 kg/cm2 ,Grado 60 kg 4,871.44
05.04.03 Encofrado y Desencofrado m2 2,038.30
05.04.04 Tarrajeo pulido en Cunetas m2 2,123.23
05.04.05 Curado de sardinel y cuneta con material de prèstamo, durante 7 dias - 4 m2 2,972.52
Tapas de concreto para canaletas
05.04.06 m3 41.62
05.05 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
05.05.01 c/volquete m3 636.97
06 MURO DE CONTENCION
06.01 TRABAJOS PRELIMINARES
06.01.01 Limpieza de Terreno Manual m2 90.48
06.01.02 Trazo, Nivel y Replanteo m2 90.48
06.02 MOVIMIENTO DE TIERRAS
06.02.01 Corte de Terreno Manual para Muro de Contención m3 25.44
06.02.02 Relleno con material de préstamo en Muro de Contención m3 9.05
06.03 CONCRETO SIMPLE
Solado 1:10; C:A e = 4"
06.03.01 m2 45.24
06.04 CONCRETO ARMADO PARA MUROS DE CONTENCION
06.04.01 Encofrado y Desencofrado de Muro de contención m2 56.55
06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg 1,097.91
06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contención m3 20.36
06.05 JUNTAS
06.05.01 Juntas de Dilatación en Muro y Losa Inferior con water stop 6" cada 9.00 m. m 5.00
06.06 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
06.06.01 c/volquete m3 21.80
07 AREAS VERDES
Corte superficial para jardineras hasta 0.20 m
07.01 m2 2,504.15
Acarreo de material excedente dp <=50 m
07.02 m3 500.83
07.03 Suministro y Colocacion de Tierra Agricola m2 2,504.15
07.04 Sembria De Gras m2 2,504.15
07.05 Arborizacion Con
Eliminación de Plantones
Material Excedente a una Distancia = 5 Km + 25% esponjamiento u 227.00
07.06 c/volquete m3 626.04
08 VARIOS
08.01 Limpieza FInal de Obra m2 12,226.44
COSTO DIRECTO
GASTOS GENERALES 10.00%
UTILIDAD 5.00%

SUB TOTAL
IGV (Impuestos) 18.00%
FACTOR DE RELACION = 1
PRESUPUESTO DE OBRA A CONTRATAR
AVANCE %
MONTO ENTREGADO POR ADELANTO 20%
CONTRATISTA PROJECT MANAGER

FECHA: FECHA:

CONTROL DE PROYECTOS GERENTE DE INFRAESTRUCTURA


FECHA: FECHA:
ARTIN ALTO – PROVINCIA DE UTCUBAMBA - AMAZONAS”

VALORIZACION N° 02

- PROVINCIA DE UTCUBAMBA - AMAZONAS"

to. (Orden de Compra LAP): Modalidad del Contrato:


NO TIENE MI EXPEDIENTE ESTE PUNTO POR CONTRARA
30 de Julio al 29 Agosto de
CONTRATO ANTERIOR ACTUAL
TOTAL MONTO MONTO
P.U CANT % CANT %
USD ó S/. USD ó S/. USD ó S/.
4,271.95
1,871.95 1,871.95 1.00 100% 1,871.95 - 0% 0.00
600.00 2,400.00 4.00 100% 2,400.00 - 0% 0.00
1,290,423.89
35,803.93
4.99 29,976.78 6,007.37 100% 29,976.78 - 0% 0.00
0.97 5,827.15 6,007.37 100% 5,827.15 - 0% 0.00
189,028.65
4.60 33,497.84 7,282.14 100% 33,497.84 - 0% 0.00
4.94 29,676.41 6,007.37 100% 29,676.41 - 0% 0.00
13.75 82,601.34 6,007.37 100% 82,601.34 - 0% 0.00
7.20 43,253.06 6,007.37 100% 43,253.06 - 0% 0.00
754,307.80
82.31 494,466.62 6,007.37 100% 494,466.62 - 0% 0.00
268.37 70,651.09 263.26 100% 70,651.09 - 0% 0.00
51.59 180,802.83 3,504.61 100% 180,802.83 - 0% 0.00
599.09 8,387.26 14.00 100% 8,387.26 - 0% 0.00
20,965.72
3.49 20,965.72 - 0% - 6,007.37 100% 20,965.72
58,838.19
1.75 4,011.86 - 0% - - 0% 0.00
34.07 8,667.41 - 0% - - 0% 0.00
16.01 6,702.11 - 0% - - 0% 0.00
20.74 39,456.81 - 0% - - 0% 0.00
30,190.68
18.16 24,930.05 - 0% - 1,372.80 100% 24,930.05
5.72 5,260.63 - 0% - 919.69 100% 5,260.63
4,124.87
3,026.63
6.86 3,026.63 - 0% - - 0% 0.00
1,098.24 - - -
68.64 1,098.24 - 0% - - 0% 0.00
197,164.05
21.66 197,164.05 9,102.68 100% 197,164.05 - 0% 0.00
369,722.57
33,079.24
4.99 13,680.93 2,741.67 100% 13,680.93 - 0% 0.00
0.97 2,659.42 2,741.67 100% 2,659.42 - 0% 0.00
15.50 14,649.98 945.16 100% 14,649.98 - 0% 0.00
33.21 2,088.91 62.90 100% 2,088.91 - 0% 0.00
71,770.86
26.60 29,280.75 1,100.78 100% 29,280.75 - 0% 0.00
6.23 17,144.65 2,751.95 100% 17,144.65 - 0% 0.00
9.21 25,345.46 2,751.95 100% 25,345.46 - 0% 0.00
186,679.60
54.99 140,889.88 - 0% - 2,562.10 100% 140,889.88
58.24 11,056.86 - 0% - 189.85 100% 11,056.86
17.63 34,732.86 - 0% - 1,970.10 100% 34,732.86
36,823.51
10.49 6,558.35 - 0% - - 0% 0.00
4.66 25,643.98 - 0% - - 0% 0.00
5.19 4,621.18 - 0% - - 0% 0.00
10,484.93
3.81 10,484.93 - 0% - - 0% 0.00
8,531.74
23.63 3,520.87 149.00 100% 3,520.87 - 0% 0.00
33.63 5,010.87 149.00 100% 5,010.87 - 0% 0.00
22,352.69
21.66 22,352.69 1,031.98 100% 22,352.69 - 0% 0.00
216,918.06
2,321.43
4.99 1,943.61 389.50 100% 1,943.61 - 0% 0.00
0.97 377.82 389.50 100% 377.82 - 0% 0.00
6,216.42 -
26.60 6,216.42 233.70 100% 6,216.42 - 0% 0.00
202,052.89
342.66 66,733.04 - 0% - 194.75 100% 66,733.04
41.69 84,437.68 - 0% - 2,025.37 100% 84,437.68
4.71 28,290.10 - 0% - 6,006.39 100% 28,290.10
7.99 1,040.70 - 0% - 130.25 100% 1,040.70
40.99 19,158.32 - 0% - 467.39 100% 19,158.32
3.84 2,393.05 - 0% - 623.19 100% 2,393.05
6,327.32
21.66 6,327.32 292.12 100% 6,327.32 - 0% 0.00
335,241.41
6,074.14
4.99 5,085.56 1,019.15 100% 5,085.56 - 0% 0.00
0.97 988.58 1,019.15 100% 988.58 - 0% 0.00

24.32 12,392.74 509.57 100% 12,392.74 - 0% 0.00


302,977.76
342.66 72,753.57 - 0% - 212.32 100% 72,753.57
4.71 22,944.48 - 0% - 4,871.44 100% 22,944.48
41.69 84,976.73 - 0% - 2,038.30 100% 84,976.73
40.99 87,031.20 - 0% - 2,123.23 100% 87,031.20
3.81 11,325.30 - 0% - 2,972.52 100% 11,325.30
575.36 23,946.48 - 0% - 41.62 100% 23,946.48
13,796.77
21.66 13,796.77 636.97 100% 13,796.77 - 0% 0.00
21,934.59
539.27
4.99 451.50 90.48 100% 451.50 - 0% 0.00
0.97 87.77 90.48 100% 87.77 - 0% 0.00
1,324.13
31.00 788.64 25.44 100% 788.64 - 0% 0.00
59.17 535.49 9.05 100% 535.49 - 0% 0.00
1,205.19
26.64 1,205.19 - 0% - 45.24 100% 1,205.19
18,197.96
47.53 2,687.82 - 0% - 56.55 100% 2,687.82
4.60 5,050.39 - 0% - 1,097.91 100% 5,050.39
513.74 10,459.75 - 0% - 20.36 100% 10,459.75
195.85
39.17 195.85 - 0% - - 0% 0.00
472.19
21.66 472.19 21.80 100% 472.19 - 0% 0.00
103,956.34
5.71 14,298.70 - 0% - - 0% 0.00
25.34 12,691.03 - 0% - - 0% 0.00
13.59 34,031.40 - 0% - - 0% 0.00
9.40 23,539.01 - 0% - - 0% 0.00
25.71 5,836.17 - 0% - - 0% 0.00
21.66 13,560.03 - 0% - - 0% 0.00
9,292.09
0.76 9,292.09 - 0% - - 0% 0.00
S/. 2,351,760.90 762,269.78
S/. 235,176.09 76,226.98
S/. 117,588.05 38,113.49
=========== ===========
S/. 2,704,525.04 S/. 876,610.25
S/. 423,316.96 137,208.56
=========== ===========
S/. 3,127,842.01 S/. 1,013,818.82
AVANCE % 5.07%
3,127,842.01 625,568.40 0% 32% 1,013,818.82
(A) TOTAL 0.00 + 1,013,818.82

(B) MENOS: ADELANTOS 0.00 + (202,763.76)

(C) SUBTOTAL (A+B) 0.00 + 811,055.06

FECHA: (D) IGV [18% of (C)] 0.00 + 145,989.91

(E) TOTAL (C+D) 0.00 + 957,044.97

(F) OTRAS DEDUCCIONES (*) 0.00 + 0.00


(G) RETENCION (6%) 0.00 + (57,422.70)
FECHA: (H) MONTO A PAGAR (E+F+G) 0.00 + 899,622.27
INFR-P-16-FA / Rev.02 ( 29/01/16 )

PRESUPUESTO ORIGINAL USD ó S/. S/.3´191,339.55

ORDENES DE CAMBIO USD ó S/.


PRESUPUESTO ACTUAL USD ó S/. S/. 297,542.07
e Julio al 29 Agosto del 2015
ACUMULADO ACTUAL SALDO ACTUAL
MONTO MONTO
CANT % CANT %
USD ó S/. USD ó S/.

1.00 100.00% 1,871.95 - 100.00% 0.00


4.00 100.00% 2,400.00 - 100.00% 0.00

6,007.37 100.00% 29,976.78 - 100.00% 0.00


6,007.37 100.00% 5,827.15 - 100.00% 0.00

7,282.14 100.00% 33,497.84 - 100.00% 0.00


6,007.37 100.00% 29,676.41 - 100.00% 0.00
6,007.37 100.00% 82,601.34 - 100.00% 0.00
6,007.37 100.00% 43,253.06 - 100.00% 0.00

6,007.37 100.00% 494,466.62 - 100.00% 0.00


263.26 100.00% 70,651.09 - 100.00% 0.00
3,504.61 100.00% 180,802.83 - 100.00% 0.00
14.00 100.00% 8,387.26 - 100.00% 0.00

6,007.37 100.00% 20,965.72 - 0.00% 0.00

- 0.00% - 2,292.49 100.00% 4011.86


- 0.00% - 254.40 100.00% 8667.41
- 0.00% - 418.62 100.00% 6702.11
- 0.00% - 1,902.45 100.00% 39456.81

1,372.80 100.00% 24,930.05 - 0.00% 0.00


919.69 100.00% 5,260.63 - 0.00% 0.00
- 0.00% - 441.20 100.00% 3026.63

- 0.00% - 16.00 100.00% 1098.24

9,102.68 100.00% 197,164.05 - 100.00% 0.00

2,741.67 100.00% 13,680.93 - 100.00% 0.00


2,741.67 100.00% 2,659.42 - 100.00% 0.00
945.16 100.00% 14,649.98 - 100.00% 0.00
62.90 100.00% 2,088.91 - 100.00% 0.00

1,100.78 100.00% 29,280.75 - 100.00% 0.00


2,751.95 100.00% 17,144.65 - 100.00% 0.00
2,751.95 100.00% 25,345.46 - 100.00% 0.00

2,562.10 100.00% 140,889.88 - 0.00% 0.00


189.85 100.00% 11,056.86 - 0.00% 0.00
1,970.10 100.00% 34,732.86 - 0.00% 0.00

- 0.00% - 625.20 100.00% 6558.35


- 0.00% - 5,503.00 100.00% 25643.98
- 0.00% - 890.40 100.00% 4621.18

- 0.00% - 2,751.95 100.00% 10484.93

149.00 100.00% 3,520.87 - 100.00% 0.00


149.00 100.00% 5,010.87 - 100.00% 0.00

1,031.98 100.00% 22,352.69 - 100.00% 0.00

389.50 100.00% 1,943.61 - 100.00% 0.00


389.50 100.00% 377.82 - 100.00% 0.00

233.70 100.00% 6,216.42 - 100.00% 0.00

194.75 100.00% 66,733.04 - 0.00% 0.00


2,025.37 100.00% 84,437.68 - 0.00% 0.00
6,006.39 100.00% 28,290.10 - 0.00% 0.00
130.25 100.00% 1,040.70 - 0.00% 0.00
467.39 100.00% 19,158.32 - 0.00% 0.00
623.19 100.00% 2,393.05 - 0.00% 0.00

292.12 100.00% 6,327.32 - 100.00% 0.00

1,019.15 100.00% 5,085.56 - 100.00% 0.00


1,019.15 100.00% 988.58 - 100.00% 0.00

509.57 100.00% 12,392.74 - 100.00% 0.00

212.32 100.00% 72,753.57 - 0.00% 0.00


4,871.44 100.00% 22,944.48 - 0.00% 0.00
2,038.30 100.00% 84,976.73 - 0.00% 0.00
2,123.23 100.00% 87,031.20 - 0.00% 0.00
2,972.52 100.00% 11,325.30 - 0.00% 0.00
41.62 100.00% 23,946.48 - 0.00% 0.00

636.97 100.00% 13,796.77 - 100.00% 0.00

90.48 100.00% 451.50 - 100.00% 0.00


90.48 100.00% 87.77 - 100.00% 0.00

25.44 100.00% 788.64 - 100.00% 0.00


9.05 100.00% 535.49 - 100.00% 0.00

45.24 100.00% 1,205.19 - 0.00% 0.00

56.55 100.00% 2,687.82 - 0.00% 0.00


1,097.91 100.00% 5,050.39 - 0.00% 0.00
20.36 100.00% 10,459.75 - 0.00% 0.00

- 0.00% - 5.00 100.00% 195.85

21.80 100.00% 472.19 - 100.00% 0.00

- 0.00% - 2,504.15 100.00% 14298.70


- 0.00% - 500.83 100.00% 12691.03
- 0.00% - 2,504.15 100.00% 34031.40
- 0.00% - 2,504.15 100.00% 23539.01
- 0.00% - 227.00 100.00% 5836.17
- 0.00% - 626.04 100.00% 13560.03

- 0.00% - 12,226.44 100.00% 9292.09


2,128,045.07 S/. 223,715.83
212,804.51 22,371.58
106,402.25 11,185.79
=========== ===========
S/. 2,447,251.83 S/. 257,273.21
383,048.11 40,268.85
=========== ===========
S/. 2,830,299.95 S/. 297,542.07
14.16% 1.49%
32% 68%
= 1,013,818.82 = 297,542.07

= (202,763.76) = 202,763.76

= 811,055.06 = 500,305.83

= 145,989.91 = 90,055.05

= 957,044.97 = 590,360.88

= 0.00 = 0.00

= (57,422.70) = (35,421.65)
= 899,622.27 = 554,939.23
Contrato: NO TIENE MI EXPEDIENTE ESTE PUNTO
Obra: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO – PROVINCIA DE
Cliente: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA
Contratista: NO TIENE MI EXPEDIENTE ESTE PUNTO
Supervision: ING. MANUEL HUGO PUICAN CARREÑO
Sist. Contra: SUMA ALZADA
Lugar: Utcubamba – Bagua Grande - Amazonas

VALORIZACION N° 03

Nombre del Proyecto: "CONSTRUCCION DE PISTAS Y VEREDAS BARRIO - SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AM

Fecha : 28 de Noviembre del 2015 Nº de Contrato. (Orden de Compra LAP):


Periodo : 520 DIAS
120 DIAS
CALENDARIOS
CALENDARIOS Contratista NO TIENE MI EXPEDIENTE ESTE

CONTRATO
ITEM DESCRIPCION
U.M CANT

01 OBRAS PROVISIONALES
01.01 Cartel de indentificación de Obra de 3.60 x 8.50 m. u 1.00
01.02 Alquiler de Almacén y Oficina mes 4.00
02 PAVIMENTOS
02.01 TRABAJOS PRELIMINARES
02.01.01 Limpieza de Terreno Manual m2 6,007.37
02.01.02 Trazo, Nivel y Replanteo m2 6,007.37
02.02 MOVIMIENTO DE TIERRAS
Corte con Maquinaria en terreno natural hasta H=1.00 m
02.02.01 m3 7,282.14
02.02.02 Perfilado, Nivelación y compactación de la subrasante en zonas de corte m2 6,007.37
02.02.03 Mejoramiento de subrasante con over menor a 4" e=20cm m2 6,007.37
02.02.04 Base Granular e=20cm m2 6,007.37
02.03 CONCRETO SIMPLE
02.03.01 Losa de Rodadura, Mortero f'c = 210 Kg/cm2, e=0.20 m. m2 6,007.37
02.03.02 Concreto en Uñas para Pavimento Rígido, Mortero f'c = 210 Kg/cm2 m3 263.26
02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2 3,504.61
02.03.04 Levantamiento de Buzones Existentes a nivel de rasante u 14.00
02.04 CURADO
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m2 6,007.37
02.05 JUNTAS
02.05.01 Juntas de contracción e=6mm m 2,292.49
02.05.02 Juntas de contrucción de 3/4" c/ pasajuntas m 254.40
02.05.03 Juntas de contrucción de 3/4" sin pasajuntas en la intersección de calles m 418.62
02.05.04 Juntas asfálticas en pavimentos h=20 cm, e=1" m 1,902.45
02.06 ACERO LISO
02.06.01 Dowels transversales con acero liso de 3/4" m 1,372.80
02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m 919.69
02.07 SEÑALIZACION
02.07.01 SEÑAILZACION HORIZONTALES
02.07.01.01 Pintado de Franjas en Pavimento - Señalizacion m2 441.20
02.07.02 SEÑALIZACION VERTICAL
02.07.02.01 Señalización Preventiva de lado 0.60 x 0.60 u 16.00
02.08 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
02.08.01 c/volquete m3 9,102.68
03 VEREDAS
03.01 TRABAJOS PRELIMINARES
03.01.01 Limpieza de Terreno Manual m2 2,741.67
03.01.02 Trazo, Nivel y Replanteo m2 2,741.67
03.01.03 Demolición de Vereda existente de mortero simple m2 945.16
03.01.04 Demolición de Vereda existente de mortero simple H=1.00m m2 62.90
03.02 MOVIMIENTO DE TIERRAS
03.02.01 Corte manual
Nivelacion de terreno
Reglado en Veredas
y Apisonado en Vereda m3 1,100.78
03.02.02 c/volquete m2 2,751.95
03.02.03 Relleno Compactado c/Material de prestamo (Afirmado) para base de vereda m2 2,751.95
03.03 CONCRETO SIMPLE
Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. bruña
03.03.01 m2 2,562.10
03.03.02 Concreto f 'c=175 kg/cm2 en Rampas m2 189.85
Encofrado, descencofrado de Vereda
03.03.03 m2 1,970.10
03.04 JUNTAS Y BRUÑADO
Junta de dilatación 1" x 4" de mortero asfáltico a 3.0 m
03.04.01 m 625.20
03.04.02 Bruñado De Veredas m 5,503.00
03.04.03 Bruñado De Rampas m 890.40
03.05 CURADO
03.05.01 Curado de vereda con material de prèstamo, durante 7 dias - 4 veces x día m2 2,751.95
03.06 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE
03.06.01 Suministro y Colocacion encimado de Cajas Para Agua u 149.00
03.06.02 Suministro y Colocacion encimado de Cajas Para Desague u 149.00
03.07 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
03.07.01 c/volquete m3 1,031.98
04 SARDINLES
04.01 TRABAJOS PRELIMINARES
04.01.01 Limpieza de Terreno Manual m2 389.50
04.01.02 Trazo, Nivel y Replanteo m2 389.50
04.02 MOVIMIENTO DE TIERRAS
04.02.01 Excavacion de sardineles hasta h=60 cm m3 233.70
04.03 CONCRETO SIMPLE
04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3 194.75
04.03.02 Encofrado y Desencofrado m2 2,025.37
04.03.03 Acero Corrugado fy=4200 kg/cm2 ,Grado 60 kg 6,006.39
04.03.04 Relleno de Juntas de Dilatación con mortero asfaltico 1"x2" m en sardinel m 130.25
04.03.05 Tarrajeo pulido en sardineles m2 467.39
04.03.06 Curado de sardinel con material de prèstamo, durante 7 dias - 4 veces x día m2 623.19
04.04 ELIMINACION DEde
Eliminación MATERIAL EXCEDENTE
Material Excedente a una Distancia = 5 Km + 25% esponjamiento
04.04.01 c/volquete m3 292.12
05 CUNETAS RECTANGULARES
05.01 TRABAJOS PRELIMINARES
05.01.01 Limpieza de Terreno Manual m2 1,019.15
05.01.02 Trazo, Nivel y Replanteo m2 1,019.15
05.02 MOVIMIENTO DE TIERRAS
Excavacion de canaletas hasta h=60 cm
05.03 m3 509.57
05.04 CONCRETO SIMPLE
05.04.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3 212.32
05.04.02 Acero Corrugado fy=4200 kg/cm2 ,Grado 60 kg 4,871.44
05.04.03 Encofrado y Desencofrado m2 2,038.30
05.04.04 Tarrajeo pulido en Cunetas m2 2,123.23
05.04.05 Curado de sardinel y cuneta con material de prèstamo, durante 7 dias - 4 m2 2,972.52
Tapas de concreto para canaletas
05.04.06 m3 41.62
05.05 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
05.05.01 c/volquete m3 636.97
06 MURO DE CONTENCION
06.01 TRABAJOS PRELIMINARES
06.01.01 Limpieza de Terreno Manual m2 90.48
06.01.02 Trazo, Nivel y Replanteo m2 90.48
06.02 MOVIMIENTO DE TIERRAS
06.02.01 Corte de Terreno Manual para Muro de Contención m3 25.44
06.02.02 Relleno con material de préstamo en Muro de Contención m3 9.05
06.03 CONCRETO SIMPLE
Solado 1:10; C:A e = 4"
06.03.01 m2 45.24
06.04 CONCRETO ARMADO PARA MUROS DE CONTENCION
06.04.01 Encofrado y Desencofrado de Muro de contención m2 56.55
06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg 1,097.91
06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contención m3 20.36
06.05 JUNTAS
06.05.01 Juntas de Dilatación en Muro y Losa Inferior con water stop 6" cada 9.00 m. m 5.00
06.06 ELIMINACION DE
Eliminación de MATERIAL
Material EXCEDENTE
Excedente a una Distancia = 5 Km + 25% esponjamiento
06.06.01 c/volquete m3 21.80
07 AREAS VERDES
Corte superficial para jardineras hasta 0.20 m
07.01 m2 2,504.15
Acarreo de material excedente dp <=50 m
07.02 m3 500.83
07.03 Suministro y Colocacion de Tierra Agricola m2 2,504.15
07.04 Sembria De Gras m2 2,504.15
07.05 Arborizacion Con
Eliminación de Plantones
Material Excedente a una Distancia = 5 Km + 25% esponjamiento u 227.00
07.06 c/volquete m3 626.04
08 VARIOS
08.01 Limpieza FInal de Obra m2 12,226.44
COSTO DIRECTO
GASTOS GENERALES 10.00%
UTILIDAD 5.00%

SUB TOTAL
IGV (Impuestos) 18.00%
FACTOR DE RELACION = 1
PRESUPUESTO DE OBRA A CONTRATAR
AVANCE %
MONTO ENTREGADO POR ADELANTO 20%
CONTRATISTA PROJECT MANAGER

FECHA: FECHA:

CONTROL DE PROYECTOS GERENTE DE INFRAESTRUCTURA


FECHA: FECHA:
ARTIN ALTO – PROVINCIA DE UTCUBAMBA - AMAZONAS”

VALORIZACION N° 03

- PROVINCIA DE UTCUBAMBA - AMAZONAS"

to. (Orden de Compra LAP): Modalidad del Contrato:


NO TIENE MI EXPEDIENTE ESTE PUNTO POR CONTRARA
30 de Agosto al 29 Setiembre
CONTRATO ANTERIOR ACTUAL
TOTAL MONTO MONTO
P.U CANT % CANT %
USD ó S/. USD ó S/. USD ó S/.
4,271.95
1,871.95 1,871.95 1.00 100% 1,871.95 - 0% 0.00
600.00 2,400.00 4.00 100% 2,400.00 - 0% 0.00
1,290,423.89
35,803.93
4.99 29,976.78 6,007.37 100% 29,976.78 - 0% 0.00
0.97 5,827.15 6,007.37 100% 5,827.15 - 0% 0.00
189,028.65
4.60 33,497.84 7,282.14 100% 33,497.84 - 0% 0.00
4.94 29,676.41 6,007.37 100% 29,676.41 - 0% 0.00
13.75 82,601.34 6,007.37 100% 82,601.34 - 0% 0.00
7.20 43,253.06 6,007.37 100% 43,253.06 - 0% 0.00
754,307.80
82.31 494,466.62 6,007.37 100% 494,466.62 - 0% 0.00
268.37 70,651.09 263.26 100% 70,651.09 - 0% 0.00
51.59 180,802.83 3,504.61 100% 180,802.83 - 0% 0.00
599.09 8,387.26 14.00 100% 8,387.26 - 0% 0.00
20,965.72
3.49 20,965.72 6,007.37 100% 20,965.72 - 0% 0.00
58,838.19
1.75 4,011.86 - 0% - 2,292.49 100% 4,011.86
34.07 8,667.41 - 0% - 254.40 100% 8,667.41
16.01 6,702.11 - 0% - 418.62 100% 6,702.11
20.74 39,456.81 - 0% - 1,902.45 100% 39,456.81
30,190.68
18.16 24,930.05 1,372.80 100% 24,930.05 - 0% 0.00
5.72 5,260.63 919.69 100% 5,260.63 - 0% 0.00
4,124.87
3,026.63
6.86 3,026.63 - 0% - 441.20 100% 3,026.63
1,098.24 - -
68.64 1,098.24 - 0% - 16.00 100% 1,098.24
197,164.05
21.66 197,164.05 9,102.68 100% 197,164.05 - 0% 0.00
369,722.57
33,079.24
4.99 13,680.93 2,741.67 100% 13,680.93 - 0% 0.00
0.97 2,659.42 2,741.67 100% 2,659.42 - 0% 0.00
15.50 14,649.98 945.16 100% 14,649.98 - 0% 0.00
33.21 2,088.91 62.90 100% 2,088.91 - 0% 0.00
71,770.86
26.60 29,280.75 1,100.78 100% 29,280.75 - 0% 0.00
6.23 17,144.65 2,751.95 100% 17,144.65 - 0% 0.00
9.21 25,345.46 2,751.95 100% 25,345.46 - 0% 0.00
186,679.60
54.99 140,889.88 2,562.10 100% 140,889.88 - 0% 0.00
58.24 11,056.86 189.85 100% 11,056.86 - 0% 0.00
17.63 34,732.86 1,970.10 100% 34,732.86 - 0% 0.00
36,823.51
10.49 6,558.35 - 0% - 625.20 100% 6,558.35
4.66 25,643.98 - 0% - 5,503.00 100% 25,643.98
5.19 4,621.18 - 0% - 890.40 100% 4,621.18
10,484.93
3.81 10,484.93 - 0% - 2,751.95 100% 10,484.93
8,531.74
23.63 3,520.87 149.00 100% 3,520.87 - 0% 0.00
33.63 5,010.87 149.00 100% 5,010.87 - 0% 0.00
22,352.69
21.66 22,352.69 1,031.98 100% 22,352.69 - 0% 0.00
216,918.06
2,321.43
4.99 1,943.61 389.50 100% 1,943.61 - 0% 0.00
0.97 377.82 389.50 100% 377.82 - 0% 0.00
6,216.42 -
26.60 6,216.42 233.70 100% 6,216.42 - 0% 0.00
202,052.89
342.66 66,733.04 194.75 100% 66,733.04 - 0% 0.00
41.69 84,437.68 2,025.37 100% 84,437.68 - 0% 0.00
4.71 28,290.10 6,006.39 100% 28,290.10 - 0% 0.00
7.99 1,040.70 130.25 100% 1,040.70 - 0% 0.00
40.99 19,158.32 467.39 100% 19,158.32 - 0% 0.00
3.84 2,393.05 623.19 100% 2,393.05 - 0% 0.00
6,327.32
21.66 6,327.32 292.12 100% 6,327.32 - 0% 0.00
335,241.41
6,074.14
4.99 5,085.56 1,019.15 100% 5,085.56 - 0% 0.00
0.97 988.58 1,019.15 100% 988.58 - 0% 0.00

24.32 12,392.74 509.57 100% 12,392.74 - 0% 0.00


302,977.76
342.66 72,753.57 212.32 100% 72,753.57 - 0% 0.00
4.71 22,944.48 4,871.44 100% 22,944.48 - 0% 0.00
41.69 84,976.73 2,038.30 100% 84,976.73 - 0% 0.00
40.99 87,031.20 2,123.23 100% 87,031.20 - 0% 0.00
3.81 11,325.30 2,972.52 100% 11,325.30 - 0% 0.00
575.36 23,946.48 41.62 100% 23,946.48 - 0% 0.00
13,796.77
21.66 13,796.77 636.97 100% 13,796.77 - 0% 0.00
21,934.59
539.27
4.99 451.50 90.48 100% 451.50 - 0% 0.00
0.97 87.77 90.48 100% 87.77 - 0% 0.00
1,324.13
31.00 788.64 25.44 100% 788.64 - 0% 0.00
59.17 535.49 9.05 100% 535.49 - 0% 0.00
1,205.19
26.64 1,205.19 45.24 100% 1,205.19 - 0% 0.00
18,197.96
47.53 2,687.82 56.55 100% 2,687.82 - 0% 0.00
4.60 5,050.39 1,097.91 100% 5,050.39 - 0% 0.00
513.74 10,459.75 20.36 100% 10,459.75 - 0% 0.00
195.85
39.17 195.85 - 0% - 5.00 100% 195.85
472.19
21.66 472.19 21.80 100% 472.19 - 0% 0.00
103,956.34
5.71 14,298.70 - 0% - 2,504.15 100% 14,298.70
25.34 12,691.03 - 0% - 500.83 100% 12,691.03
13.59 34,031.40 - 0% - 2,504.15 100% 34,031.40
9.40 23,539.01 - 0% - 2,504.15 100% 23,539.01
25.71 5,836.17 - 0% - 227.00 100% 5,836.17
21.66 13,560.03 - 0% - 626.04 100% 13,560.03
9,292.09
0.76 9,292.09 - 0% - 12,226.44 100% 9,292.09
S/. 2,351,760.90 223,715.77
S/. 235,176.09 22,371.58
S/. 117,588.05 11,185.79
=========== ===========
S/. 2,704,525.04 S/. 257,273.13
S/. 423,316.96 40,268.84
=========== ===========
S/. 3,127,842.01 S/. 297,541.98
AVANCE % 1.49%
3,127,842.01 625,568.40 0% 10% 297,541.98
(A) TOTAL 0.00 + 297,541.98

(B) MENOS: ADELANTOS 0.00 + (59,508.40)

(C) SUBTOTAL (A+B) 0.00 + 238,033.58

FECHA: (D) IGV [18% of (C)] 0.00 + 42,846.04

(E) TOTAL (C+D) 0.00 + 280,879.62

(F) OTRAS DEDUCCIONES (*) 0.00 + 0.00


(G) RETENCION (6%) 0.00 + (16,852.78)
FECHA: (H) MONTO A PAGAR (E+F+G) 0.00 + 264,026.84
INFR-P-16-FA / Rev.02 ( 29/02/16 )

PRESUPUESTO ORIGINAL USD ó S/. S/.3´191,339.55

ORDENES DE CAMBIO USD ó S/.


PRESUPUESTO ACTUAL USD ó S/. S/. 0.09
gosto al 29 Setiembre del 2015
ACUMULADO ACTUAL SALDO ACTUAL
MONTO MONTO
CANT % CANT %
USD ó S/. USD ó S/.

1.00 100.00% 1,871.95 - 100.00% 0.00


4.00 100.00% 2,400.00 - 100.00% 0.00

6,007.37 100.00% 29,976.78 - 100.00% 0.00


6,007.37 100.00% 5,827.15 - 100.00% 0.00

7,282.14 100.00% 33,497.84 - 100.00% 0.00


6,007.37 100.00% 29,676.41 - 100.00% 0.00
6,007.37 100.00% 82,601.34 - 100.00% 0.00
6,007.37 100.00% 43,253.06 - 100.00% 0.00

6,007.37 100.00% 494,466.62 - 100.00% 0.00


263.26 100.00% 70,651.09 - 100.00% 0.00
3,504.61 100.00% 180,802.83 - 100.00% 0.00
14.00 100.00% 8,387.26 - 100.00% 0.00

6,007.37 100.00% 20,965.72 - 100.00% 0.00

2,292.49 100.00% 4,011.86 - 0.00% 0.00


254.40 100.00% 8,667.41 - 0.00% 0.00
418.62 100.00% 6,702.11 - 0.00% 0.00
1,902.45 100.00% 39,456.81 - 0.00% 0.00

1,372.80 100.00% 24,930.05 - 100.00% 0.00


919.69 100.00% 5,260.63 - 100.00% 0.00
441.20 100.00% 3,026.63 - 0.00% 0.00

16.00 100.00% 1,098.24 - 0.00% 0.00

9,102.68 100.00% 197,164.05 - 100.00% 0.00

2,741.67 100.00% 13,680.93 - 100.00% 0.00


2,741.67 100.00% 2,659.42 - 100.00% 0.00
945.16 100.00% 14,649.98 - 100.00% 0.00
62.90 100.00% 2,088.91 - 100.00% 0.00

1,100.78 100.00% 29,280.75 - 100.00% 0.00


2,751.95 100.00% 17,144.65 - 100.00% 0.00
2,751.95 100.00% 25,345.46 - 100.00% 0.00

2,562.10 100.00% 140,889.88 - 100.00% 0.00


189.85 100.00% 11,056.86 - 100.00% 0.00
1,970.10 100.00% 34,732.86 - 100.00% 0.00

625.20 100.00% 6,558.35 - 0.00% 0.00


5,503.00 100.00% 25,643.98 - 0.00% 0.00
890.40 100.00% 4,621.18 - 0.00% 0.00

2,751.95 100.00% 10,484.93 - 0.00% 0.00

149.00 100.00% 3,520.87 - 100.00% 0.00


149.00 100.00% 5,010.87 - 100.00% 0.00

1,031.98 100.00% 22,352.69 - 100.00% 0.00

389.50 100.00% 1,943.61 - 100.00% 0.00


389.50 100.00% 377.82 - 100.00% 0.00

233.70 100.00% 6,216.42 - 100.00% 0.00

194.75 100.00% 66,733.04 - 100.00% 0.00


2,025.37 100.00% 84,437.68 - 100.00% 0.00
6,006.39 100.00% 28,290.10 - 100.00% 0.00
130.25 100.00% 1,040.70 - 100.00% 0.00
467.39 100.00% 19,158.32 - 100.00% 0.00
623.19 100.00% 2,393.05 - 100.00% 0.00

292.12 100.00% 6,327.32 - 100.00% 0.00

1,019.15 100.00% 5,085.56 - 100.00% 0.00


1,019.15 100.00% 988.58 - 100.00% 0.00

509.57 100.00% 12,392.74 - 100.00% 0.00

212.32 100.00% 72,753.57 - 100.00% 0.00


4,871.44 100.00% 22,944.48 - 100.00% 0.00
2,038.30 100.00% 84,976.73 - 100.00% 0.00
2,123.23 100.00% 87,031.20 - 100.00% 0.00
2,972.52 100.00% 11,325.30 - 100.00% 0.00
41.62 100.00% 23,946.48 - 100.00% 0.00

636.97 100.00% 13,796.77 - 100.00% 0.00

90.48 100.00% 451.50 - 100.00% 0.00


90.48 100.00% 87.77 - 100.00% 0.00

25.44 100.00% 788.64 - 100.00% 0.00


9.05 100.00% 535.49 - 100.00% 0.00

45.24 100.00% 1,205.19 - 100.00% 0.00

56.55 100.00% 2,687.82 - 100.00% 0.00


1,097.91 100.00% 5,050.39 - 100.00% 0.00
20.36 100.00% 10,459.75 - 100.00% 0.00

5.00 100.00% 195.85 - 0.00% 0.00

21.80 100.00% 472.19 - 100.00% 0.00

2,504.15 100.00% 14,298.70 - 0.00% 0.00


500.83 100.00% 12,691.03 - 0.00% 0.00
2,504.15 100.00% 34,031.40 - 0.00% 0.00
2,504.15 100.00% 23,539.01 - 0.00% 0.00
227.00 100.00% 5,836.17 - 0.00% 0.00
626.04 100.00% 13,560.03 - 0.00% 0.00

12,226.44 100.00% 9,292.09 - 0.00% 0.00


2,351,760.84 S/. 0.06
235,176.08 0.01
117,588.04 0.00
=========== ===========
S/. 2,704,524.96 S/. 0.07
423,316.95 0.01
=========== ===========
S/. 3,127,841.92 S/. 0.09
15.65% 0.00%
10% 90%
= 297,541.98 = 0.09

= (59,508.40) = 59,508.40

= 238,033.58 = 59,508.49

= 42,846.04 = 10,711.53

= 280,879.62 = 70,220.02

= 0.00 = 0.00

= (16,852.78) = (4,213.20)
= 264,026.84 = 66,006.82