Sei sulla pagina 1di 1

PTW FLOW CHART

POWER ON WORK PERMIT


Power on permit request raised by section head Section head/Engineer raises the permit to work in
before the activity and approved by the issuing live/energized area & gives it to the task supervisor. He
authority (Testing & Commissioning In- ensures all resources are in place including any LOTO
charge) requirements.

ETA HSE Dept receives the Power on permit


Task supervisor prepares the location as per the
Notification, verify the supporting documents,
permit conditions mentioned and takes the permit to HSE
sign and log the permit in the log book.
dept for logging & tagging. The permit is logged only after
verifying all the signatories endorsed.

Main contractor MEP Dept receives the power The safety dept verifies all the control measures
on notification, verify the supporting documents mentioned the permit is fulfilled. Watch man is posted to
and approve the permit to power on ensure only authorized person enters the live area by
maintaining a log book.

Work authorization received by the competent


person: Work In-Charge/task supervisor. Task supervisor conducts job briefing & tool box talk
Work In-charge fulfills all safety measures and to the operatives. Location is safe to carry out the
conduct briefing, TBT and establish exclusion work
zone.

Work commences/Area /Equipment engerzied:


Task supervisor & Area HSE officer monitors the
condition:

Safe System of Unsafe system of


works in place works

Work is allowed to Work is temporarily


continue suspended ‘till corrective
measures are taken