Sei sulla pagina 1di 5

LAND USE

USE OF LAND
THE USE OF LAND CAN BROADLY BE CLASSIFIED AS PROFIT MAKING USE OF LAND AND
NON PROFIT MAKING USE OF LAND

PROFIT MAKING USE OF LAND`

THE LAND WHICH IS DEVELOPED WITH PROFIT MAKING MOTIVE IS SAID TO BE USED FOR
PROFIT MAKING USE OF LAND AND THE SITE USED FOR PROFIT MAKING AND THE SITES
DEVELOPED FOR

OFFICES

RESIDENCE

INDUSTRIES.

NON PROFIT MAKING USE OF LAND`

THE LAND WHICH IS DEVELOPED WITHOUT ANY MOTIVE OF PROFIT IS SAID TO BE NON
PROFIT MAKING USE OF LAND

ROADS

PARKS

PLAYGROUNDS

EDUCATIONAL BUILDING,GOVERNMENT OFFICE.

TRIPLICANE | URBAN REPORT | 2014-2019 1


ANALYSIS

THE PREDOMINANT LANDUSE IS TOWARDS THE RESIDENTIAL SECTOR SHOWING THAT THE
HOUSING UNITS ARE DENSLEY POPULATED TO THE POINT OF OVER POPULATION WHEN
COMPARED TO OTHERS

AREAS IN CHENNAI.

THIS HAS LED TO ENCROACHMENTS, WALL TO WALL CONSTRUCTION AND NARROW PLOTS
WITH VERTICAL DEVELOPMENT.

THE TRUE ESSENCE OF THE AREA THE RELIGIOUS CENTRE ,IS NOT GIVEN ITS DUE VISUALS
IMPORTANCE

BECAUSE OF THE IMPOSING HEIGHTS OF THE STRUCTURES AROUND IT AND IS HENCE


IGNORED.

MORE IMPORTANCE IS GIVEN TO FURTHER RESIDENTIAL DEVELOPMENT RATHER THAN


CONSERVING

AND MAINTAINING THE ARCHITECTURAL HERITAGE ON SITE.

VERY HIGH BUILT FROM TOOPEN SPACE RATIO .THUS THERE IS NO PROPER OPEN SPACE
FOR RECREATIONAL ACTIVITIES OR SOCIAL HERITAGE

TRIPLICANE | URBAN REPORT | 2014-2019 2


ANALYSIS : MRTS

The Chennai Mass Rapid Transit System, a state-owned subsidiary of Indian Railways, is a
metropolitan elevated Railway line operated by Southern Railways.

IN 1960s surveys by the Madras Area Transportation Study Unit (MATSU).

which was set up by the Planning Commission during 1968–1970 and the Metropolitan
Transport Project (MTP), which was established by Indian Railways in July 1971

The surveys and studies identified eight important transport corridors along
the Buckingham Canal.

Ministry of Railways in 1983–84 at an estimated cost of ₹ 534.6 million

It took nearly a decade for the first phase to construct and begin operation.

Construction began in earnest in 1991.

After many delays, the first phase was operational from Beach up to Chepauk in 1995
as the

first elevated railway line in the country.

Built at a cost of ₹ 11,710 million.

First phase: From Beach to Tirumailai (Mylapore) - 8.55 km -19 October 1997-₹ 2,690
million.

Second phase: From Tirumailai – Velachery - 11.376 km - 19 November 2007

Second phase: From Velachery to St. Thomas Mount- 5 km -March 2018

TRIPLICANE | URBAN REPORT | 2014-2019 3


AS PER LAND USE MAP THE MAXIMUM BUILTUP AREA FALLS UNDER RESIDENTIAL BUILTUP
AREA.AND IT CONSIST OF WALL TO WALL CONSTRUCTION.AND THE BUILT UP AREAS NOT
AS PER RULE .

RESIDENTIAL - 51% -2.24sqkm

COMMERCIAL AREA MAXIMUM FALLS ON ZAMBAZZAR .

COMMERCIAL - 22%- 0.97sqkm

INSTITUTION- 5%- 0.21sqkm

GOVERMENT- 4%- 0.18sqkm

ROAD NETWORK - 8.5%-0.37sqkm

OPEN SPACE - 5.5%-0.23sqkm

WATERBODY-2%-0.12sqkm

LANDSCAPE- 2%-0.12sqkm

TRIPLICANE | URBAN REPORT | 2014-2019 4


TRIPLICANE | URBAN REPORT | 2014-2019 5

Potrebbero piacerti anche