Sei sulla pagina 1di 69

PRODUCT MANAGEMENT, REV.

FEBRUARY 2018

PVS-100/120-TL
The largest 1000Vdc string inverter in the solar industry
Andrea Genovesi, Gianluca Marri, Marco Trova, Arttu Rantala
ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficiency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 2


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficiency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 3


ABB – PVS-100/ PVS-120
New cost effective high power platform

Application?
– For large commercial/ industrial rooftops and for
ground mounted PV installations

Why?
– Reduced CAPEX—high power density
– Reduced OPEX—fast installation and easy
configuration, thanks to ABB AbilityTM Platform
offering
• Smart communication capabilities, Wi-FI- fast
configuration with any laptop/tablet/smart phone
• Integrated data logging and direct connection to
ABB cloud
– High reliability—via extensive testing and advanced
cooling methods

March 5, 2018 Slide 4


ABB – PVS-100/ PVS-120
Two box construction

Dimensions
• High power density almost 1000W/kg Power module

• Two box structure (Inverter box ~70 kg,


wiring box ~55kg)

• Benefits:
• Two person can manage the mounting of 869 mm
boxes
• Cost saving on logistics
• Wiring box/ inverter box can be stocked
separately
• Future local variants of wiring box 419 mm
possible 1086 mm
Wiring Box

March 5, 2018 Slide 5


ABB – PVS-100/ PVS-120
Complete portfolio

30kW 100kW 1MW 5MW 20MW+

Complete portfolio benefits:


- With higher power inverters further cost effectiveness and savings in balance of system cost
- Use smaller inverter to fill in the corners of the plant

March 5, 2018 Slide 6


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 7


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

Six in ONE

• Power dense

• Installer friendly

“O&M f riendly edit abile”

• Versatile

• All-in-One, combiner-free design


SIX in ONE

• ABB Ability

• O&M friendly

March 5, 2018 Slide 8


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

POWER DENSE
 The larger capacity on the market for a 1000Vdc string
inverter!
 Less inverters are required to complete the optimal
“O&M f riendly edit abile”

power block
SIX in ONE
 Reduced logistic and installation costs

From 3 Boxes
to
a single Box
AC

March 5, 2018 Slide 9


ABB – PVS-100/ PVS-120
DENSE

2,4 MW Power Block Lay-out

COMMON DATA

Installed DC Power [kWp] 2976

Poly

PV module Type 72cells

310Wp

Panels in series 20

Total number of strings 480

• N° 20 x PVS-120: 24 strings for each inverter


or
• N° 40 x 60kVA Inverter: 12 strings for each
inverter (ref. TRIO-60.0-TM)

March 5, 2018 Slide 10


ABB – PVS-100/ PVS-120
DENSE

2,4 MW Power Block Lay-out


60kW Inverter solution PVS-120 inverter solution
AC AC

AC AC

AC AC

AC AC

AC AC

AC AC

AC AC

AC AC

AC AC

AC AC

N° 40 inverter / 120MPPT
AC
• • N° 20 inverter / 120MPPT
• N° 20 AC recombiner box AC Box 60kW PVS-120
Inverter
MV station

March 5, 2018 Slide 11


ABB – PVS-100/ PVS-120
DENSE

2,4 MW Power Block Lay-out


60kW Inverter solution PVS-120 inverter solution
AC AC

Saving:
AC AC

• 50% less inverters


• Reducing cost for logistics and
AC AC

AC AC
installation  up to 50%

AC AC

AC AC

AC AC
Saving:
AC AC
• Avoid cost for AC recombiner box
(up to 0,35 €cent/W saving)
• Avoid cost for logistics and
AC AC

AC AC
installation

N° 40 inverter / 120MPPT
AC
• • N° 20 inverter / 120MPPT
• N° 20 AC recombiner box AC Box 60kW PVS-120
Inverter
MV station

March 5, 2018 Slide 12


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

INSTALLER FRIENDLY
 The easier to install for a product of its category!.
 Same as installing a DC string combiner box. The PV
module’s mounting structure can be used to install the
“O&M f riendly edit abile”

inverters
SIX in ONE
 Saving time and cost on logistics and site preparation
(no heavy trucks and no concrete foundations required)
 Operational costs reduced by quicker installation via
Installation wizard, installer app and wireless access with
any laptop and mobile device

March 5, 2018 Slide 13


ABB – PVS-100/ PVS-120
INSTALLER FRIENDLY

 Mounting Bracket: 3 pieces simple to assemble

March 5, 2018 Slide 14


ABB – PVS-100/ PVS-120
INSTALLER FRIENDLY
 Two Boxes (Wiring Box and Inverter Box):
Easy to install on the bracket

Toggle Clamps on both sides

Click

March 5, 2018 Slide 15


ABB – PVS-100/ PVS-120
Installer and maintenance friendly mechanical design

Fast installation, service friendly

– Fast opening of cover with key Key

– PV quick connectors for fast installations


– Wi-Fi for WebUI access
– Benefits
• Reduced time for cabling, fuse/ SPD check
(AC, Comm wiring)
• Configuration via Wi-Fi without the need to
open covers reduces risk of water leak
inside the inverter
• Reduced time to repair (i.e. consumables
fuses, SPD)
• Repair on site concept—fast and cost
effective repair at site or close to the site

March 5, 2018 Slide 16


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

VERSATILE
 Multi-mppt (6) wide input voltage range platform
 Larger capacity comes without compromising the
inherent flexibility and versatility which is typical of
“O&M f riendly edit abile”

smaller string inverters


SIX in ONE
 Design-friendly inverter, can be easily adapted for
any application in commercial rooftop and free field
ground mount installations

20° 60°

Fixed Tilt Mounting Single-Axis Tracking East-West Mounting

March 5, 2018 Slide 17


ABB – PVS-100/ PVS-120
VERSATILE

Free Field Ground Mount Installation


PVS-100/120
1
2
H H
3
4
5
L
6

L 2 X PORTRAIT DC/DC INVERTER

PVS-100/120
1
H H 2
3
M
M 4
5
L 6

L
3 X LANDSCAPE DC/DC INVERTER

March 5, 2018 Slide 18


ABB – PVS-100/ PVS-120
VERSATILE

Commercial Rooftop Installation


E W

PVS-100/120
1
2
E
3
4
5
W
6

DC/DC INVERTER

24 strings (12 east, 12 west) / 4 each MPPT


20 modules in series, 350Wp
PDC = 168kWp
DC/AC Ratio = 140%

March 5, 2018 Slide 19


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

All-In-One / Combiner-Free Design


 Saving capex and opex costs!
 Integrated string combiner box with DC disconnect and
the AC wiring compartment
“O&M f riendly edit abile”

 Wide space for wiring and ability to receive large


SIX in ONE
Aluminum cable cross section
 Saving the cost of separate DC combiner box and AC 1st
level combiners plus the associated installation costs!
 Two combiner models available:

BASE solution FULL optional


Save costs solution

WB-SX-PVS-100/120-TL WB-SX2-PVS-100/120-TL

March 5, 2018 Slide 20


ABB – PVS-100/ PVS-120
All-In-One / Combiner-Free Design

Typical design with two 60kWp string inverters: What we can do with the
NEW PVS-100/120 ?

LV/MV
AC Trafo

March 5, 2018 Slide 21


ABB – PVS-100/ PVS-120
All-In-One / Combiner-Free Design

 Integrated string combiner box with DC disconnect and


Typical design with two 60kWp string inverters: What we can do with the
the AC wiring compartment
NEW PVS-100/120 ?
 Saving the cost of separate DC combiner box and AC 1st
level combiners plus the associated installation costs!

Up to 24 strings PVS-100/120-TL-POWERMODULE-400 Up to 4x185mmq /


(2x6mmq) 3x185mmq +PE
LV/MV
Trafo

WB-SX2-PVS-100/120-TL

March 5, 2018 Slide 22


ABB – PVS-100/ PVS-120
All-In-One / Combiner-Free Design

What do we mean with AC


AC Side connections &
DC Side connections &
a real “ALL-IN-ONE” combiner?
protections
protections
Control & Monitoring

AC

March 5, 2018 Slide 23


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

ABB Ability
 Improved user experience in large scale installations
(Installer App for plant commissioning, installation
“O&M f riendly edit abile”
wizard,…)

 Self-consistent: advanced logging and control capabilities


SIX in ONE
embedded into the inverter, thus improving reliability.

 Reduced time on site: Life time free remote cloud services


(FW upgrade, asset management, ….)

 Proven technology: for better protecting customer’ s


investment (TCP/IP, Modbus Sunspec certified , IEC 61850
information model,…)

 Future-proof: meet current and future regulatory norms


(like Rule 21- Step 2, EC61850, …)

March 5, 2018 Slide 24


ABB – PVS-100/ PVS-120
ABB Ability
Aurora Vision

Protecting Customer Investment


Plant Viewer
Plant Viewer
for Mobile

Plant Portfolio

Off-the-Shelf TCP/IP components


Manager


Monitoring
Accounts/
Assets FW Upgrade  Standard technology: no need to educate people
management Operations &
(Modbus TCP Sunspec

Maintenance  IP protocol is the only one really suitable for IoT


Ethernet

Modbus TCP Sunspec for zero cost integration


Internet

with third party devices
TCP / IP

Router / Gateway
 Compliant with modern regulatory norms (like
Rule 21 – Step 2, IEC61850,….)
Ethernet
(Modbus TCP Sunspec)

Wi-Fi Wi-Fi
 Multiple data streams and services can run at the
Ethernet same time
RS485
Installer Utility - Remote monitoring
App Closed Loop - Plant control (incl. dynamic feed-in)
VSN800 Control
Weather Station
Meter @ POI
- Remote FW update
- Remote parameter’s setting

March 5, 2018 Slide 25


ABB – PVS-100/ PVS-120
ABB Ability
Aurora Vision
CLOUD
Minimizing Customer Costs
Plant Viewer
Plant Viewer
for Mobile

Plant Portfolio

Switch
 Accessories directly connected to the inverter:
Manager

(VSN800 Weather Station, meter, …)


Installer App for
Plant
Commissioning  Multi inverter commissioning via Installer App
Fiber

Internet
 Integrated Web Server and Wi-Fi channel:
parameter’s setting via any WLAN-enabled device
Ethernet

Switch  Free of charge access to ABB cloud remote


services including:
- Remote access to inverter data
- Remote FW update
- Remote monitoring / Troubleshooting
RS485
- User and asset management
- Reporting and alarming through mobile app and
web portal

WLAN enabled device for accessing


to integrated Web Server

March 5, 2018 Slide 26


ABB – PVS-100/ PVS-120
VALUE PROPOSITION – Six in One

O&M friendly
 Easy and Basic Maintenance during system operating life
 Advanced cooling concept combined with a 2 box design
help in preserving the lifetime and minimizing the O&M
“O&M f riendly edit abile”

costs
SIX in ONE
− Heavy-duty cooling fans, easily removable during
scheduled maintenance cycles
− Power module can be easily replaced without
removing the wiring box.

March 5, 2018 Slide 27


ABB – PVS-100/ PVS-120
O&M friendly

Routine maintenance only includes inspection,


cleaning and checks that can be performed
without any advanced technical skills

External inspections
Wiring box inspections
(PV connectors, AC tightening cable check)

March 5, 2018 Slide 28


ABB – PVS-100/ PVS-120
O&M friendly

O&M friendly
Smart access to all wiring box protection devices
SPD type II

Fuses
Boards

SPD type II

March 5, 2018 Slide 29


ABB – PVS-100/ PVS-120
O&M friendly

Advanced cooling concept


2 independent and separated forced air circuits
• External circuit for power converter:
- Cold air from the sides of the unit
- Hot air exhaust from the rear
• Internal air recirculation circuit:
- cooling of electromechanical components
(inductors, contactors, capacitors, …)
- Internal air temperature equalization

N°2 monitored and replaceable IP54 fans on both sides

N°2 monitored and replaceable internal fans


recirculating air inside wiring box & power converter

March 5, 2018 Slide 30


ABB – PVS-100/ PVS-120
O&M friendly

Advanced cooling concept


2 independent external air circuits:
• Booster on the left side
• Inverter on the right side

Benefits:
• Increased lifetime as temperature of
components is kept under control
• Enables vertical and horizontal mounting
• Fans speed modulation, to reduce self
consumption and preserve fan lifespan
• Wiring box temperature controlled
(minimize thermal stress on fuse and contactor)

March 5, 2018 Slide 31


ABB – PVS-100/ PVS-120
O&M friendly

Power module can be easily replaced without removing the wiring box.

March 5, 2018 Slide 32


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 33


ABB – PVS-100/ PVS-120
Data-sheet
Inverter parameters User Interface
• 6 Independent MPP / 24 strings • Standard LEDs
• One string/MPPT supports 30 A fusing to • Integrated Web User Interface for
allow 5th string per MPP channel managing inverter
• PVS-100 (100kW, 400Vac, 3ph 50/60Hz): • IOS and Android installation app for
• VMPPT = 480 – 850 Vdc multiple inverter commissioning
• PVS-120 (120kW, 480Vac, 3ph 50/60Hz): • Standard level access to Aurora Vision
• VMPPT = 570 – 850 Vdc remote monitoring service

Construction, weight, volume Communication


• IP66 • 2 x Ethernet;
• Forced Air cooling • Wi-Fi Channel
• Two box construction • 1 x RS485;
• Mounting vertically/horizontally IP •

Modbus RTU/TCP (Sunspec compliant);
Integrated datalogger and direct
• High Power density ~1000W/kg connection to Aurora Vision remote portal

Efficiency (PVS-120) In/Out protections


• Max. Efficency: 98,9% • Type 2 Surge arrester (both DC
• EU Efficency: 98,6% and AC)
• CEC Efficency: 98,6% • Insulation monitoring control per
IEC 62109-2

March 5, 2018 Slide 34


ABB – PVS-100/ PVS-120
PVS-100/PVS-120 components

Components

1.1 Power module


1
2.2 Wiring box

3.
3 Mounting bracket
2
It is necessary to order 3 components above. 4
As optionally

4.
4 AC multicore plate for 1+PE cables
(as default single core plate for 4+PE cables)
3

“Unipack” codes with package of above


components to reduce custom duties are
available as well

March 5, 2018 Slide 35


ABB – PVS-100/ PVS-120
Available options—All integrated

SX version—Cost cut SX2 version—Full version


1.1 PVS-120-TL-POWER MODULE or 1.1 PVS-120-TL-POWER MODULE or
PVS-100-TL-POWER MODULE PVS-100-TL-POWER MODULE

2.2 WB-SX-PVS-100-TL or WB-SX-PVS-120-TL 2.2 WB-SX2-PVS-100-TL or WB-SX2-PVS-120-TL

3.3 MOUNTING BRACKET; PVS-100/120 3.3 MOUNTING BRACKET; PVS-100/120

DC input AC output
DC—quick Input Fuses (15A DC disconnect DC SPD AC disconnect AC SPD
Wiring box
connectors monitoring as standard) switch Type II switch Type II

WB-SX-PVS-100-TL / Per Positive


24 ch   – 
WB-SX-PVS-120-TL MPPT (6ch) pole only

WB-SX2-PVS-100-TL / Per individual


24 ch Both poles    
WB-SX2-PVS-120-TL string (24ch)

March 5, 2018 Slide 36


ABB – PVS-100/ PVS-120
Available PN
PN Model designation Class
3P809900000A PVS-100-TL-POWER MODULE PVS

3P209900000A PVS-120-TL-POWER MODULE PVS

3P47000WB06A WB-SX2-PVS-100-TL/24 INPUTS PVS

3P47000WB07A WB-SX-PVS-100-TL/24 INPUTS PVS

3P47000WB08A WB-SX2-PVS-120-TL/24 INPUTS PVS

3P47000WB09A WB-SX-PVS-120-TL/24 INPUTS PVS

3P510000000A MOUNTING BRACKET Accessory

3P51000J000A AC OUTPUT PANEL M63 FOR WIRING BOX Accessory

3P899901000A PVS-100-TL;SX2;FULL Unipack

3P899902000A PVS-100-TL;SX;FULL Unipack

3P909901000A PVS-120-TL;SX2;FULL Unipack

3P909902000A PVS-120-TL;SX;FULL Unipack

3P51000A000A PVS INSTALLATION AND LIFTING KIT* Accessory

March 5, 2018 Slide 37 * At least one PVS installation and lifting kit required per plant
ABB – PVS-100/ PVS-120
Cabling—easy access

DC connection
DC
– 48 PV quick connectors enables fast and
secure connection
– 2 DC switches

AC connection
– Single core1 & multicore2 AC cable panels
185mm2 with M10 lug
– Supports long distances (Direct from field to
AC
LV switchboard at MVC)
– Cu or Al both supported
– 4W or 3W, no neutral required to operate
inverter, savings in cable costs

Comm
– 2 x Ethernet (RJ45) + 1 RS-485 COMM

1 Single core plate as default 4xM40 + M25


March 5, 2018 Slide 38 2 Multi core plate as accessory M63+ M25
ABB – PVS-100/ PVS-120
SX2 wiring box details– DC Side, electrical drawings

DC Switch 1
DC Switch 2
MPPT 1-2-3 (12 PV Quick connectors)
MPPT 4-5-6 (12 PV Quick connectors)

March 5, 2018 Slide 39


ABB – PVS-100/ PVS-120
SX2 wiring box details

Power Supply Board

Optional Pre-Charge Board


or PID Board

SPD Type 2 (DC Side)

Fuses Boards

March 5, 2018 Slide 40


ABB – PVS-100/ PVS-120
SX2 wiring box details – DC Side, electrical drawings

Positive fuse board Negative fuse board DC SPD type 2

March 5, 2018 Slide 41


ABB – PVS-100/ PVS-120
SX2 wiring box details – AC Side, electrical drawings

Monitoring &
AC SPD type 2 Control Board

2 x Ethernet (RJ45)
AC Switch
ACConnections
AC Box cover 1 x RS485
terminals (M10 lug)
AC Contactor Remote OFF
(DSP controller)

March 5, 2018 Slide 42


ABB – PVS-100/ PVS-120
SX2 wiring box details – AC Side, connections

• Supports long distances (Direct from field


to LV switchboard at MVC)
• Cu or Al both supported
• 4W or 3W, no neutral required to operate
inverter, savings in cable costs
M63 M40 • Multi core (M63 + 1xM25 Cable lugs) or Single
core (4xM40 + 1xM25 Cable lugs) AC cable
panels: 185mm2 with M10 lug.

PE Connection

clamping range: min. ÷ max. cable diameter(*) Control & Monitoring connections

M63 25mm 55mm


M40 15mm 28mm
M25 10mm 17mm (*) Preliminary data

March 5, 2018 Slide 43


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 44


ABB – PVS-100/ PVS-120
Best Performance in the Typical DC Operating Range
System design optimization:
Efficiency PVS-120
 Max efficiency available in the middle
99
99 of the input operating voltage range
98.5
 String length can be optimized, while fully
98
98 exploiting the best inverter performance
under typical operating conditions
97.5
PVS-120: Efficiency vs Input Voltage
97
97 99.00 Performance optimization:
570Vdc
η [%]

98.80
720Vdc
96.5
98.60
 System PR is kept unchanged or further
800Vdc increased as compared to single stage
η [%]

96
96 98.40
Eta_Max
inverters;
95.5 98.20 Eta_CEC

 Weighted efficiency >98.2% in the input


Eta_Euro
98.00
95
95 550 600 650 700 750
DC Input Voltage
800 850
range 570 - 800 Vdc!
94.5

94
94
Vin ηMAX ηEuro ηCEC
10 20 30 40 50 60 70 80 90 100
570 98,46 98,22 98,21
P/Pn [%]
720 98,87 98,64 98,58
800 98,67 98,46 98,46

March 5, 2018 Slide 45


22 panels in series / 60cells / 1000W/m2

ABB – PVS-100/ PVS-120


DC Power [kW]

144

120

Inverter architecture that maximize system PR 96

72 Tcell @ 5°C
48

24

0 100 200 300 400 500 600 700 800 900 1000
DC Voltage [V]

DC Power [kW]

Single stage inverter:


144 power loss due to
narrow input range
120

96

72 Tcell @ 75°C
48

24

0 100 200 300 400 500 600 700 800 900 1000
DC Voltage [V]
Single stage
Double stage

Input Voltage [V]


• Similar performance of single stage inverters
Double stage mode Bypass mode
in the same DC operating range thanks to
DC/DC Inverter DC/DC Inverter the bypass function
• No clipping losses at high temperatures,
when Vmpp falls below the minimum
operating limit of single stage inverters!
ȠT = ȠDC/DC x ȠINV ȠT ≈ ȠINV

710V 725V Higher PR

March 5, 2018 Slide 46


ABB – PVS-100/ PVS-120
Output Power derating vs Input Voltage
Conditions / Ratings PVS-100 PVS-120
Rated AC Voltage [Vacr] 400 V 480 V
Secured Energy Yield Full Power MPPT range 480 … 850 V 570 … 850 V
Maximum MPPT current 6 x 36 A
1) MPPT range not depending on AC voltage: Maximum AC current 145 A

 MPPT voltage window not affected


by AC Voltage fluctuation.
Out put Power vs Input Volt age
 String design can be optimized to match P [kW]
PVS-120
peak inverter efficiency without affecting PVS-100

energy harvest at low irradiance and/or 120


PVS-100/ 120

high temperature
100

2) Smooth high DC voltage derating 80


78
 DC power is reduced linearly from 100% 60
at 850Vdc to zero at 1000Vdc
 No risk of shut-down or MPP locking at 40

near-zero power under cold conditions


20
200 400 600 800 1000 Vin [V]
(*) Preliminary data 360 480 570 850

March 5, 2018 Slide 47


ABB – PVS-100/ PVS-120
Output Power derating vs Ambient Temperature

Secured Energy Yield: Conditions / Ratings PVS-100 PVS-120


Rated AC Voltage [Vacr] 400 V 480 V
 Inverter suitable for application in harsh Full Power MPPT range 480 … 850 V 570 … 850 V
environmental conditions.
Maximum AC current 145 A
 Performance unaffected by mounting
position, either vertical or horizontal
Output Power vs Ambient Temperature
P [kW]

PVS-120

120 PVS-100

100

80

60

40

20
(*) Preliminary data 20 30 40 50 60 Tamb [°C]

March 5, 2018 Slide 48


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 49


ABB – PVS-100/ PVS-120
Improve Safety, Availability and Fault Segregation Capabilities of your PV system

IEC 62109-2 requirements for Non-isolated inverter


connected to Ungrounded Array:

1 - Riso (Isolation resistance):


Preventive measure (before grid connection) of the
insulation resistance to the earth of the PV generator.
• Grid connection is only possible if Riso > 33 KOhm.

2 - GFI (ground fault interface):


Real-time monitoring of earth leakage current
(AC + DC component) equivalent to an advanced RCD.
Two protections are needed: Continuous residual current max. Value

a. Disconnect within 0,3s if the continuous residual current PVS-100 1A

exceeds maximum 10 mA per kVA of rated continuous output PVS-120 1,2A

power
Residual current Max. Time to inverter
b. Disconnect from the mains within the time specified if a sudden change disconnection from the mains

sudden increase in the RMS residual current is detected 30mA 0,3s

exceeding the values listed in the table. 60mA 0,15s

150mA 0,04s

March 5, 2018 Slide 50


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 51


ABB – PVS-100/ PVS-120
Distribution Systems

TN-S: MV/LV transformer with star configuration; N and PE are separate conductors
conductor L1
L1
L2
L2
L3 L3
\ N N
PE
PE

MV/LV transformer

Both 3 or 4 Wiring connection are permitted.


Inverter automatically recognize the system.

March 5, 2018 Slide 52


ABB – PVS-100/ PVS-120
Distribution Systems

TN-C: MV/LV transformer with star configuration; N and PE are the same conductor
L1
L1
L2
L2
L3 L3
\ PEN
PEN

MV/LV transformer

TN-C-S: is also permitted


Both 3 or 4 Wiring connection are permitted.
Inverter automatically recognize the system.
TT: MV/LV transformer star configuration; PE (building connection point).
Not compatible with this size of inverters (use of high sensitive RCD)

IT: MV/LV transformer, no earthing


not permitted AC system! (corner ground is not supported either)

March 5, 2018 Slide 53


ABB – PVS-100/ PVS-120
Horizontal and vertical mounting

Mounting bracket

• Same bracket can be used in vertical and


horizontal positions
• Wiring box is installed at first and then
power module
• Power module can be easily replaced
without removing the wiring box

March 5, 2018 Slide 54


ABB – PVS-100/ PVS-120
Minimum & recommended clearances – wall mounting

(*): Increase according to minimum cable’s bending radius

March 5, 2018 Slide 55 PRELIMINARY


ABB – PVS-100/ PVS-120
Minimum & recommended clearances – wall mounting

(*): Increase according to minimum cable’s bending radius

March 5, 2018 Slide 56 PRELIMINARY


ABB – PVS-100/ PVS-120
Minimum & recommended clearances – free field mounting

(*): Recommended clearance to prevent flooding and cable damage during grass trimming. This may
be reduced (> 15cm) if grass trimming and flooding do not represent a risk;
Increase according to minimum cable’s bending radius, if needed

March 5, 2018 Slide 57 PRELIMINARY


ABB – PVS-100/ PVS-120
Minimum & recommended clearances: horizontal and back to back mounting

Horizontal mounting Back to Back mounting

(*): Clearance may be reduced if an air


deflector or decoupling plate is installed

March 5, 2018 Slide 58 PRELIMINARY


ABB – PVS-100/ PVS-120
Maximum tilt angles

A minimum of 5° is recommended for water drainage

March 5, 2018 Slide 59 PRELIMINARY


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 60


ABB – PVS-100/ PVS-120
Overview – New Communication Features!

100/120kVA 1000VDC string inverter

• Wireless and Ethernet field network - Fast,


low cost, industry standard IP
communications.
• Ethernet daisy chain support - Reduces
installation time enabling advanced closed
loop control applications.
• Inverter Installer App – Simplifies the
inverter installation process and reduces
installation time/costs.
• Integrated Web User Interface – with
installation wizard and advanced parameter
settings and diagnostic

March 5, 2018 Slide 61


ABB – PVS-100/ PVS-120
Communication Interfaces

Communication interfaces
Integrated Wi-Fi (IEEE 802.11 b/g/n @ 2.4 GHz)
• 2 radio channels integrated
• Touch-free inverter commissioning
• Wirelessly accessing to the inverter WUI
• Station mode setting for transferring data to cloud

2 x Ethernet ports
• 10/100 Mbit/s (RJ45 plug )
• Configured for daisy chain layout connection
(Linear or ring shape topology)
• Suitable also for radial layout connection
• Remote monitoring and FW update without the
need of installing any additional device

1 x RS485 port
• Master and slave setting
• Recommended for direct connection of accessories
(i.e. meteo station, etc…)

March 5, 2018 Slide 62


ABB – PVS-100/ PVS-120
Ethernet field bus (Daisy Chain, ring shaped or radial layout)

Aurora Vision
Communication over Ethernet

< 100 m
Standard Ethernet cable:
Plant Viewer
Plant Viewer
for Mobile

Plant Portfolio

• Cross-section: min. 2 x 2 x 0.22 mm2


Manager

or min. 2 x 2 x AWG 24
2
• Cable type: 100BaseTx, CAT5 with shielding
S-UTP, F-UTP or higher
Internet
• UV-resistant if used outdoor
1
• Plug type: RJ45

Ethernet
switch Three different topologies:
1. Daisy chain over Ethernet cable
(max 100m inverter to inverter distance)
3 2. Ring shaped layout for improving service
continuity also in case of inverter failure
3. Radial layout
(max 100m inverter to switch distance)

March 5, 2018 Slide 63


ABB – PVS-100/ PVS-120
Agenda

 Introduction

 Value Proposition

 Datasheet, available models & ordering codes

 Efficency, P-Q Capability, Temperature & Voltage Deratings

 Improve Safety, Availability and Fault Segregation Capabilities of your PV System

 Installation Guidelines

 Advanced Communication Capabilities

 «Web User Interface» & «ABB Installer» for Solar Inverters

March 5, 2018 Slide 64


ABB – PVS-100/ PVS-120
Commissioning and inverter setting

Commissioning over Ethernet


Aurora Vision

− Automatic setting up of the communication after


the turning on of all the inverters connected by
Plant Viewer
Plant Viewer
for Mobile

Ethernet cable (with or without DHCP server)


Plant Portfolio
Manager

− Installer App for commissioning the entire plant


(up to 50 inverters over the same LAN)

− Single inverter settings via Wi-Fi / AME by any WLAN


Internet
enabled device

− Network info also available within every single


inverter’s Web User Interface

Ethernet − Accessing to a single inverter’s Web User Interface


switch is also possible from the Ethernet switch
(multicast DNS service needed on the switch)

March 5, 2018 Slide 65


ABB – PVS-100/ PVS-120
‘Installer App’ to reduce plant installation costs

Simple and Quick Plant Installation Solution

Touch-free Inverter Commissioning


 Via Wi-Fi Access Point connection
 App compatible with any Android and IOS
smartphone and mobile device

Multiple Inverter Installation


 Commissioning of the entire plant/cluster
(up to 50 inverters over the same LAN)
 Optionally scan and track shipped inverters
 Smart app manages passcodes to minimize
password issues
 Fast setup of single or multiple inverters: grid
standard, input mode…
Try it!
that’s it you’re on line!

March 5, 2018 Slide 66


ABB – PVS-100/ PVS-120
Web User Interface – easy configuration and maintenance operation

WUI – Easy Analysis and Configuration

Commissioning Wizard and FW Upgrade


 Simple 4-step guided commissioning process
 Local/Remote FW upgrade
Supporting advanced diagnostic
 Dashboard – one-page Inverter information
 Status summary with all internal key operating
parameters
 Detailed analysis for critical operating
parameters (i.e. deratings…)
 Event log with reporting and filtering
Supporting advanced inverter setting
 DC input and AC protection parameters
 Grid Support and Control Functions

March 5, 2018 Slide 67


ABB three phase string inverter—PVS-100/ PVS-120
As of Feb-18

Safety & general certificates availability Grid codes availability

– CE & RCM mark – CEI0-16, CEI0-21 (Italy)

– RED Directive – Turkey HV / Turkey LV

– IEC62116, IEC61727(anti-islanding) – Jordan_IRR-DCC-MV

– IEC60068-2-1/2/14/30/78 (Environmental) – AS4777.2 (Australia)

– IEC/EN61683 (Efficiency) – VDE-AR-N 4105

– VFR_2014 (France) + UTE C15-712-1

– UK59-3

– Coming soon! BDEW, EN50438, Thailand


PEA/MEA, South Korea-60Hz
Brazil-60Hz, Dubai

March 5, 2018 Slide 73 More information will follow, stay tuned

Potrebbero piacerti anche