Sei sulla pagina 1di 1

Ladder 2

DRAWING No
SHOP DRAWING

SET BACK LINE (20M)


Up
STAIRCASE-2

Up
MATERIAL STORAGE
DUST COLLECTOR
SCALE

MACHINE WASTE MATERIAL STORAGE AC MACHINE RM


DATE

STAIRCASE-1
by STEEL PIT
2
PIT
950

FL-950
Up
FUJITA CORPORATION
CHECKER

3
(FL-500)

CHILLER RM
LARGE MOLDING CENTRAL INSPECTION SMALL MOLDING MOLD WAREHOUSE
RAMP
Up
(FL-500)

PROJECT MANAGER
CONTRACTOR
GUTTER W/ROOF (FL-500)

COOLING TOWER
KYOCERA Document Technology Vietnam Company Limited Factory B Project

WATER TANK 138M3


WC(M)-2
APPROVED

LARGE MOLDING CENTRAL INSPECTION SMALL MOLDING


WC(F)-2
VSIP IZ - HAI PHONG, VIET NAM

MOLD WAREHOUSE MOLD WAREHOUSE


1.1
TECHNOLOGY VIETNAM co., ltd

1
KYOCERA DOCUMENT

CRANE 3T
REST RM
PUMP RM
Y18
2
A B
Point 2
Point 1
LARGE MOLDING CENTRAL INSPECTION SMALL MOLDING
STORAGE
PIT
REVISION AND COMPLETION DATE

Line Panel at 2nd Floor


Y17
PIT
EXHAUST MACHINE
4

MOLD WAREHOUSE MOLD WAREHOUSE


WC(M)-1
DRIVER TOILET
Y16
LARGE MOLDING CENTRAL INSPECTION SMALL MOLDING
1

3
DRIVER REST RM
OFFICE
WC(F)-1
FL-1.00 FL-1.00
TEST CHAMBER-1
Y15
PANTRY-2
Point 12
Point 3 PIT
MOLD WAREHOUSE MOLD WAREHOUSE
Point 5
LARGE MOLDING CENTRAL INSPECTION SMALL MOLDING
Point 4
PIT
Y14
TRANSFORMER
PIT
Line Panel at 2nd Floor
Point 7 CRANE 7T
PIT
Point 6
Angle steel V50x50x4
Make hole d6 @2000
Y13 Finshing by blue gray
Sealant, 20x20mm
ELETRICAL RM PE. W=20mm RAMP
Point 8 Point 11
FL+5.0
MOLD WAREHOUSE MOLD WAREHOUSE
LARGE MOLDING CENTRAL INSPECTION SMALL MOLDING
1.2
PANTRY-1
SMOCKING AREA W/ROOF
GENERATOR TEST CHAMBER-2
EXPANSION JOINT DETAIL
Point 9
Y12Y12 Point 10
OIL TANK W/COVER

STAIRCASE-3
1.2X1.9X1.5 Up
X1-7 X1-8 X1-8 X1-9 X1-9
BUFFER INFRONT MOLDING
5
SMOCKING AREA W/ROOF WAREHOUSE AREA WAREHOUSE AREA
Bolt M8
Steel plate t=8
Sika
FL
Add steel plate 50x50x5, hole D9
Bolt M8 (BA-870, Sanko bolt)
Line Panel at 2nd Floor
Steel plate t=3 for adjust
Steel plate Lx50x6 (L check site)
Steel plate 2810x157x8
PIT
Sealant
Aluminium L20x20
Steel []50x50
Steel []50x50
MANAGEMENT
6
PIT RECEVING STORAGE
Up
BUFFER RM
CORRIDOR
STAIRCASE-6

Up
WAREHOUSE AREA WAREHOUSE AREA WAREHOUSE AREA
INSPECTION RM
PIT
PIT
WAREHOUSE AREA WAREHOUSE AREA WAREHOUSE AREA
Line Panel at 2nd Floor
PIT
WC(M)-3
7
WC(F)-3
Ladder 1
WAREHOUSE AREA WAREHOUSE AREA WAREHOUSE AREA

STAIRCASE-5
Up
RAMP

STAIRCASE-4
Up
EV
Line Panel at 2nd Floor
X1 X2 X3 X4 X5 X6 X7 X8 X9

Steel Beam
Steel Beam

Potrebbero piacerti anche