Sei sulla pagina 1di 139

Name : Name of Applicant: ….

Araby Abdel Hamed Sadek


License No License No: 2862
License Issue date Issue Date :11/7/2007
License Expiry date Expiry date:10/7/2019
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/1/2018 PW 4158 TASK 72-00-31-020-001 72-00-31-020-001 Step(1)


E.S.N: 724027 Remove Compressor Inlet Cone Using Marking Pen (P05-045), or
equivalent, mark the inlet cone front
segment,
2/1/2018 72-00-31-020-00 Step(2)
Remove six bolts and washers
securing compressor inlet cone front
segment to compressor inlet cone
(rear) segment assembly and remove
front segment.

2/1/2018 72-00-31-020-00 Step(3)


Remove 19 bolts and washers
securing compressor inlet cone (rear)
segment assembly to front
compressor hub assembly.

2/1/2018 72-00-31-020-00 Step(4)


Install PWA 86122 Puller to the inner
side of inlet cone. Precaution must be
used not to install puller on inlet cone
nut plates.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

3/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

4/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/1/2018 PW 4158 TASK 72-00-31-020-001 71-00-00-480-001 Step(5)


E.S.N: 724027 Remove Compressor Inlet Cone Remove compressor inlet cone (rear)
segment assembly and place on pallet
or workbench

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

5/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

6/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/4/2018 PW 4158 TASK 72-00-53-020-002 72-00-54-020-003


E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust
Case With Shaft
Remove The External Parts.

2/4/2018 72-00-53-020-002 Step(1)


Position and adjust PWA 102727
Support to engage and hold the fan
inlet case at Flange "A" at the 6 o'clock
location.
2/4/2018 72-00-53-020-002 Step(2)
Install the PWA 85062 Saddle to the
PWA 87359, PWA 26157, or PWA
107565 Pedestal. Secure the saddle to
the pedestal with one or two ball?lock
pins as
2/4/2018 72-00-53-020-002 Step(3)
Position saddle and pedestal under
diffuser case at 6 o'clock location just
forward of Flange M.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

7/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/4/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(4)


E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Attach PWA 28657 Sling, two PWA
Case With Shaft 76154 Adapters and hoist to PWA
29243 Brackets on exhaust case at 3
and 9 o'clock.

2/4/2018 72-00-53-020-002 Step(5)


Adjust pedestal at diffuser case, 6
o'clock location, to support engine.

2/4/2018 72-00-53-020-002 Step(6)


Raise rear of engine and remove two
pedestals from exhaust case location;
then lower engine to level position,
resting on pedestal at diffuser case.

2/4/2018 72-00-53-020-002 Step(7)


(Post SB PW4ENG 79?76) Remove No.
4 bearing (oil) pressure tube.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

8/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/4/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(8)


E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Remove bolts (304/6) securing No. 4
Case With Shaft bearing shield (304/5) to turbine
exhaust case (rear inner flange)
(304/1). Remove shield. Remove No. 4
bearing he

2/4/2018 72-00-53-020-002 Step(9)


Remove No. 4 bearing cover (304/3).

2/4/2018 72-00-53-020-002 Step(10)


Remove the No. 4 bearing (oil) nozzle
and No. 4 bearing packing transfer
tube from boss in the exhaust case
(No. 4 bearing compartment) at 1:30
o'clock position.

2/4/2018 72-00-53-020-002 Step(11)


Remove the No. 4 bearing (oil) nozzle
and front No. 4 bearing nozzle.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

9/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

10/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/5/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(12)


E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Remove the No. 4 bearing oil scavenge
Case With Shaft (inner) tube.

2/5/2018 72-00-53-020-002 Step(13)


Remove eight bolts and tab washers
(308/1) securing bearing retaining plate
in rear of front compressor drive
turbine shaft (308/2).
2/5/2018 72-00-53-020-002 Step(14)

Install PWA 86437 Fixture or PWA


86325 Fixture to attach the low
pressure turbine shaft to the turbine
exhaust case.

2/5/2018 72-00-53-020-002 Step(15)

Install PWA 88222 Fixture or PWA


86437 Fixture to attach the low
pressure turbine shaft to the turbine
exhaust case.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

11/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


2/5/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(16)
E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Remove key washer retaining ring
Case With Shaft (310/1) and retaining nut key washer
(310/2) securing turbine shaft
plug(310/3) at front of coupling.

2/5/2018 72-00-53-020-002 Step(17)


Remove retaining ring (310/5) and key
washer (310/6) securing turbine shaft
nut to LPT shaft.

2/5/2018 72-00-53-020-002 Step(18)


For operators that use the mechanical
wrench, install the turbine shaft nut

2/5/2018 72-00-53-020-002 Step(20)


Remove Flange N lockwire, bolts, nuts
and brackets. Refer to 72?00?53,
Removal?20 (Task 72?00?53?020?
020).

12/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

13/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/6/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(21)


E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Install PWA 85769 Fixture
Case With Shaft (Install/Remove) into front end of low
pressure turbine shaft.

2/6/2018 72-00-53-020-002 Step(22)

Install jackscrews into threaded holes


in Flange N.

2/6/2018 72-00-53-020-002 Step(23)


Apply hydraulic pressure to separate
turbine shaft from LPC/LPT coupling
and tightening jackscrews to break fit
between turbine cases.

2/6/2018 72-00-53-020-002 Step(24)


Using dowel pin (313/2) retract locking
pin into housing.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

14/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709


2/6/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(25)
E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Remove jackscrews from turbine case
Case With Shaft Flange N.

2/6/2018 72-00-53-020-002 Step(26)


Thread the puck end of PWA 88204
Guide into the front end of the turbine
shaft.

2/6/2018 72-00-53-020-002 Step(27)


Install the adapter in the ID of the fan
nut. Use the detail clamps to attach the
adapter to the coupling lugs.

2/6/2018 72-00-53-020-002 Step(30)

Move turbine assembly rearward


approximately 12 inches (304.80 mm).

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

15/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


2/7/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(31)
E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Align the center hole in PWA 85996
Case With Shaft Front Retainer or PWA 85456 Front
Retainer (316/3) with the dowel pin
hole in the turbine case.

2/7/2018 72-00-53-020-002 Step(32)


Use a second hoist and install a nylon
sling around the turbine shaft. Take up
the slack in the sling.
2/7/2018 72-00-53-020-002 Step(33)
Move the nylon sling as required and
move the assembly rearward. Remove
the turbine and exhaust case from the
engine.

2/7/2018 72-00-53-020-002 Step(34)


Remove the V?seal gasket located
between the outer flanges of the cases,
if applicable.

16/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

17/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/7/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(35)


E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Remove the PWA 85785 Adapter or
Case With Shaft PWA 86210 Adapter as applicable.

2/7/2018 72-00-53-020-002 Step(36)

Remove the guide from the turbine


shaft.

2/7/2018 72-00-53-020-002 Step(37)


Install PWA 85562 Support Sleeve into
the shaft support cradles of PWA
25096 Stand or PWA 76270 Stand or
PWA 87347 Support Sleeve into the
shaft suppo

2/7/2018 72-00-53-020-002 Step(38)


Install PWA 102389 Support Posts or
PWA 102393 Adjustable Support Posts
onto PWA 87330 Stand.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Signature :............................ Date:.......................

Manager Technical Authorization Name : Signature :............................ Date:.......................

18/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709


2/8/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(39)
E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Place turbine and turbine exhaust case
Case With Shaft in the stand so that the PWA 29243
Support Brackets align with the
support posts.

2/8/2018 72-00-53-020-002 Step(40)


Remove hoist, sling, adapters and
brackets from turbine exhaust case.

2/8/2018 72-00-53-020-002 Step(41)


Remove nylon sling and hoist from
turbine shaft.

2/8/2018 72-00-53-020-002 Step(42)


Remove turbine shaft (classified)
spacer using PWA 85298 Puller.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

19/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


2/8/2018 PW 4158 TASK 72-00-53-020-002 72-00-53-020-002 Step(43)
E.S.N: 724027 Remove Low Pressure Turbine And Turbine Exhaust Lubricate the spline area at the front
Case With Shaft end of the turbine shaft with Engine Oil
P03?001.

20/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

21/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/11/2018 PW 4158 Task 72-00-52-020-001 72-00-52-020-001 Step(1)


E.S.N: 724027 Remove The High Pressure Turbine Install the PWA 101268 Fan Case
Horizontal Support to the fan case

2/11/2018 72-00-52-020-001 Step(2)


Remove the retaining ring lock which
attaches the No. 3 bearing nut lock to
the No. 3 bearing retaining nut.

2/11/2018 72-00-52-020-001 Step(3)


Remove the No. 3 bearing nut lock.

2/11/2018 72-00-52-020-001 Step(4)


Remove the remaining retaining ring
lock from the No. 3 bearing retaining
nut.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

22/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

23/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/11/2018 PW 4158 Task 72-00-52-020-001 72-00-52-020-001 Step(5)


E.S.N: 724027 Remove The High Pressure Turbine Horizontal If necessary, remove the 2nd stage
HPT locks from the slots on the 2nd
stage turbine disk.

2/11/2018 72-00-52-020-001 Step(7)


If you use the mechanical wrench,
Step(7)

2/11/2018 72-00-52-020-001 Step(8)


Remove the turbine shaft washer from
the nut. Discard the washer.

2/11/2018 72-00-52-020-001 Step(9)


Install the PWA 101557 Fixture on the
high pressure turbine

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

24/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

25/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

2/11/2018 PW 4158 Task 72-00-52-020-001 72-00-52-020-001 Step(10)


E.S.N: 724027 Remove The High Pressure Turbine Attach the PWA 29389 Hydraulic Pump
Horizontal to the fitting on the hydraulic cylinder.

2/11/2018 72-00-52-020-001 Step(11)


With the hoist, attach the PWA 87303
Sling with the two PWA 76156 Adapters
to the trunnion spools of the fixture.
Tighten the sling cables.

2/11/2018 72-00-52-020-001 Step(12)


Remove the Flange M lockwire, bolts,
nuts and brackets

2/11/2018 72-00-52-020-001 Step(13)


Apply hydraulic pressure to separate
the turbine front hub from the HPC rear
hub (approximately 0.750 inch 19.050
mm).

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

26/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709


2/11/2018 PW 4158 Task 72-00-52-020-001 72-00-52-020-001 Step(14)
E.S.N: 724027 Remove The High Pressure Turbine Remove the pump and the hydraulic
Horizontal cylinder.

2/11/2018 72-00-52-020-001 Step(15)


Move the turbine to the rear and
separate it from the engine.

2/11/2018 72-00-52-020-001 Step(16)


Optional, put the PWA 85112 Retaining
Fixture into the ID of the turbine hubs.

2/11/2018 72-00-52-020-001 Step(17)


Remove the gasket from the front outer
flange of the turbine case.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

27/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


2/11/2018 PW 4158 Task 72-00-52-020-001 72-00-52-020-001 Step(18)
E.S.N: 724027 Remove The High Pressure Turbine Put the turbine front end down into the
Horizontal PWA 87022 Storage Stand.

2/11/2018 72-00-52-020-001 Step(19)


Adjust the center plug of the storage
stand to keep the running clearance of
the turbine rotors. Install the assembly
in the stand.

2/11/2018 72-00-52-020-001 Step(20)


Remove the fixture (PWA 101557) from
the turbine case.

28/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

29/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)


E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

30/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

31/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

32/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

33/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

34/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

35/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/4/2018 PW 4158 Task 72-00-34-990-010 72-00-34-990-010 Step(1)


E.S.N: 724027 Intermediate Case Module Assembly Visual Visually examine the case outer
Inspection diameter area for surface damage and
wear. See Table 801 and Figure 801.

3/4/2018 72-00-34-990-010 Step(2)


Visually examine the case inner
diameter and gas path area for surface
damage and wear

3/4/2018 72-00-34-990-010 Step(3)


Visually examine the case rear
surfaces,

3/4/2018 72-00-34-990-010 Step(4)


Visually examine the case rear cover
and fairing for damage and wear. See
Table 804 and Figure 804.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

36/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

37/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/4/2018 PW 4158 Task 72-00-34-990-010 72-00-34-990-010 Step(5)


E.S.N: 724027 Intermediate Case Module Assembly Visual Visually examine the visible areas of
Inspection the strut fairings and fan exit liner
assemblies for damage and wear. See
Table 805 and Figure 805.
3/4/2018

72-00-34-990-010 Step(6)
If installed, visually examine the stage
4 compressor stator assembly. See
Table 806 and Figure 806.

3/4/2018 72-00-34-990-010 Step(7)


If cracks are found on the fan exit case
of the Intermediate Case assembly (at
maximum three strut locations), follow
the criteria below.See Figure801

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

38/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/5/2018 PW 4158 Task 72-00-35-210-010 72-00-35-210-010 Step(1)


E.S.N: 724027 Visually Examine The High Pressure Compressor Examine the high pressure
(HPC) Module compressor (HPC) front hub. See
Figure 801 (Sheet 2) and Table 801.

3/5/2018 72-00-35-210-010 Step(2)


Examine the inlet guide vane (IGV)
inner shroud lugs. See Figure 802 and
Table 802.

3/5/2018 72-00-35-210-010 Step(3)


Examine the inlet guide vane airfoils.
See Figure 803 and Table 803.

3/5/2018 72-00-35-210-010 Step(4)


Examine the stage 5 Blades. See
Figure 804 and Table 804.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

39/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

40/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/5/2018 PW 4158 Task 72-00-35-210-010 72-00-35-210-010 Step(5)


E.S.N: 724027 Visually Examine The High Pressure Compressor Examine the stage 5 and stage 15
(HPC) Module outer air seal abradable rub strips

3/5/2018 72-00-35-210-010 Step(6)


Examine the synchronizing ring
assemblies and vespel runner pads for
damaged, cracked or bad worn parts.

3/5/2018 72-00-35-210-010 Step(7)


Examine the HPC front case.

3/5/2018 72-00-35-210-010 Step(8)


Examine the HPC outer rear case. See
Figure 808 and Table 808.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

41/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

42/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/5/2018 PW 4158 Task 72-00-35-210-010 72-00-35-210-010 Step(9)


E.S.N: 724027 Visually Examine The High Pressure Compressor Examine the HPC rear support.
(HPC) Module

3/5/2018 72-00-35-210-010 Step(10)


Examine the stage 15 blades.

3/5/2018 72-00-35-210-010 Step(11)


Examine the HPC drum rotor (rear)
disk assembly

3/5/2018 72-00-35-210-010 Step(12)


Examine the turbine drive shaft

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

43/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

44/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/5/2018 PW 4158 Task 72-00-35-210-010 72-00-35-210-010 Step(13)


E.S.N: 724027 Visually Examine The High Pressure Compressor Examine the HPC drum rotor (rear)
(HPC) Module disk assembly

3/5/2018 72-00-35-210-010 Step(14)


Examine the diffuser air seal. See
Figure 814 (Sheet 1), Figure 814 (Sheet
2) and Table 814.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

45/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

46/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/6/2018 PW 4158 Task 72-00-41-210-010 72-00-41-210-010 Step(1)


E.S.N: 724027 Visually Examine The Diffuser And Combustor Examine the diffuser case. See Table
Module Assembly 801, Figure 801 (Sheet 1) and Figure
801 (Sheet 2)
3/6/2018 72-00-41-210-010 Step(2)
Examine the diffuser case bosses. See
Table 802, Figure 802 (Sheet 1) and
Figure 802 (Sheet 2).

3/6/2018 72-00-41-210-010 Step(3)


Examine the HPC exit stator assembly.
See Table 803 and Figure 803.

3/6/2018 72-00-41-210-010 Step(4)


Examine the Stage 5 HPC air sealing
ring assembly and front HPC exit
brush seal support assembly.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

47/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/6/2018 PW 4158 Task 72-00-41-210-010 72-00-41-210-010 Step(5)


E.S.N: 724027 Visually Examine The Diffuser And Combustor Examine the No. 3 bearing housing.
Module Assembly See Table 805 and Figure 805.

3/6/2018 72-00-41-210-010 Step(6)


Examine the rear HPC exit brush seal
support assembly or diffuser air
sealing ring assembly.
3/6/2018 72-00-41-210-010 Step(7)
Examine the double-pass outer
combustion chamber configuration.

3/6/2018 72-00-41-210-010 Step(8)


Examine the talon configuration outer
combustion chamber. See Table 808,
Figure 808 (Sheet 1) and Figure 808
(Sheet 2).

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

48/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

49/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/7/2018 PW 4158 Task 72-00-53-210-010 72-00-53-210-010 Step(1)


E.S.N: 724027 Visually Examine The Low Pressure Turbine (LPT) Examine the external low pressure
Module Assembly turbine (LPT) case. See Table 801 and
Figure 801.

3/7/2018 72-00-53-210-010 Step(2)


Examine the turbine case front inner
rail. See Table 802 and Figure 802.

3/7/2018 72-00-53-210-010 Step(3)


Examine the turbine case cooling
manifolds and supply tubes. See Table
803 and Figure 803.

3/7/2018 72-00-53-210-010 Step(4)


Examine the Stage 3 outer (transition)
duct segments, flow guide seal and
seals between the segments.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

50/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/7/2018 PW 4158 Task 72-00-53-210-010 72-00-53-210-010 Step(5)


E.S.N: 724027 Visually Examine The Low Pressure Turbine (LPT) Examine the Stage 3 inner (transition)
Module Assembly duct segments for wear, damage and
coat condition. Examine the seals
between the segments.

3/7/2018 72-00-53-210-010 Step(6)


Examine the inner and outer seals
between the Stage 3 vane cluster
assemblies

3/7/2018 72-00-53-210-010 Step(7)


Examine the circumferential spacing
(gaps) between Stage 3 vanes. See
Table 807, Figure 806 (Sheet 2), and
Figure 806 (Sheet 3).

3/7/2018 72-00-53-210-010 Step(8)


Examine the Stage 3 vane airfoil
surfaces. See Table 807 and Figure
807.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

51/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

52/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/8/2018 PW 4158 Task 72-00-53-210-010 72-00-53-210-010 Step(9)


E.S.N: 724027 Visually Examine The Low Pressure Turbine (LPT) Examine the Stage 3 blade airfoil
Module Assembly surfaces. See Table 808 and Figure
808.

3/8/2018 72-00-53-210-010 Step(10)


Examine the Stage 3 inner rotating air
seal surfaces. See Table 809 and
Figure 809.
3/8/2018 72-00-53-210-010 Step(11)
Examine the inner air sealing ring
assembly. See Table 810 and Figure
810.

3/8/2018 72-00-53-210-010 Step(12)


Examine the Stages 3, 4, 5 and 6 disks.
See Table 811 and Figure 811 (Sheet 1),
Figure 811 (Sheet 2).

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

53/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/8/2018 PW 4158 Task 72-00-53-210-010 72-00-53-210-010 Step(13)


E.S.N: 724027 Visually Examine The Low Pressure Turbine (LPT) Examine the Stage 6 blade airfoil
Module Assembly surfaces. See Table 812 and Figure
812.

3/8/2018 72-00-53-210-010 Step(14)


Examine the Stage 6 vane airfoil
surfaces. See Table 813 and Figure
813.
3/8/2018 72-00-53-210-010 Step(15)
Examine the LPT shaft surfaces. See
Table 814 and Figure 814.

3/8/2018 72-00-52-210-010 step(16)


Do a borescope inspection of the
Stage 4 LPT vane See Table 815,
Figure 815 thru Figure 821

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

54/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/8/2018 PW 4158 Task 72-00-51-210-010 72-00-51-210-010 Step(1)


E.S.N: 724027 Visually Examine The Turbine Nozzle Module Examine the Stage 1 vane ceramic
Assembly coat. See Table 801, Figure 801 (Sheet
1) and Figure 801 (Sheet 2).
3/8/2018 72-00-51-210-010 Step(2)
Examine the Stage 1 vane for crack.
See Table 802, Figure 802 (Sheet 1),
Figure 802 (Sheet 2), Figure 802 (Sheet
3) and Figure 802 (Sheet 4).
3/8/2018 72-00-51-210-010 Step(3)
Examine the vane outer and inner
diameter platform non- gas path side.
See Table 803, Figure 803 (Sheet 1) and
Figure 803 (Sheet 2).

3/8/2018 72-00-51-210-010 Step(4)


Examine the inner combustion liner for
non-talon burners. See Table 804 and
Figure 804.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

55/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/8/2018 PW 4158 Task 72-00-51-210-010 72-00-51-210-010 Step(5)


E.S.N: 724027 Visually Examine The Turbine Nozzle Module Examine the inner combustion
Assembly chamber for the low emission talon
burner. See Table 805 and Figure 805.

3/8/2018 72-00-51-210-010 Step(6)


Examine the cooling duct assembly (to
bi). See Table 806 and Figure 806.

3/8/2018 72-00-51-210-010 Step(7)


Examine the duct segments. See Table
807 and Figure 807.

3/8/2018 72-00-51-210-010 Step(8)


Examine the Stage 1 vane support. See
Table 808 and Figure 808.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

56/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

57/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/7/2018 PW 4158 Task 72-00-52-420-001-005 72-00-52-420-001-005 Step(1)


E.S.N: 724027 Install The High Pressure Turbine - Horizontal Install the PWA 85107 Fixture to the
high pressure turbine

72-00-52-420-001-005 Step(2)
FOR THE HPC REAR SHAFT
INTEGRAL WITH HPC REAR DRUM
(ONE

72-00-52-420-001-005 Step(3)
Trunnion the HPT and fixture assembly
to the rear end down position

72-00-52-420-001-005 Step(4)
Put the PWA 87870 Heater on the front
end of the HPT front hub. Make sure
the thermocouple touches the part
before you apply the heat.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

58/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

59/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-52-420-001-005 72-00-52-420-001-005 Step(5)


E.S.N: 724027 Install The High Pressure Turbine - Horizontal Install the gasket on the front outer
flange of the turbine case.

72-00-52-420-001-005 Step(6)
After the hub is heated, remove the
heater and controller.

72-00-52-420-001-005 Step(7)
Trunnion the turbine to the horizontal
position and put it to the rear of the
engine.

72-00-52-420-001-005 Step(8)
Install the hydraulic cylinder (410/2) to
the fixture

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

60/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

61/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-52-420-001-005 72-00-52-420-001-005 Step(9)


E.S.N: 724027 Remove The High Pressure Turbine Install ten workbolts and nuts evenly
Horizontal spaced through turbine front case and
diffuser case, Flange M, from rear to
front.

72-00-52-420-001-005 Step(10)
Lubricate the axial faces of the turbine
shaft spacer with Anti?seize Paste
P06-054.

72-00-52-420-001-005 Step(11)
Install turbine shaft spacer (411/9) onto
the HPC rear hub.

72-00-52-420-001-005 Step(12)
Install the No. 3 bearing retaining nut
(411/8) to the HPC rear hub.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

62/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709


PW 4158 Task 72-00-52-420-001-005
E.S.N: 724027 Remove The High Pressure Turbine Install the wrenches and adapter to
Horizontal torque the No. 3 bearing nut

Install the No. 3 bearing retaining nut


lock

Install Flange M bolts, nuts and


brackets. Refer to 72-00-52,
Installation?20 (Task 72-00-52-420-
020).

Install The External Plumbing After The


High Pressure Turbine Installation

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

63/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


PW 4158 Task 72-00-52-420-001-005
E.S.N: 724027 Remove The High Pressure Turbine
Horizontal

64/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

65/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/8/2018 PW 4158 Task 72-00-53-420-002 72-00-53-420-002 step(1)


E.S.N: 724027 Install The Low Pressure Turbine And Turbine Install turbine shaft spacer into front
Exhaust Case With Shaft end of front compressor drive turbine
shaft using PWA 85490 Drift.

72-00-53-420-002 step(2)
Position and adjust PWA 102727 Fan
Case Support to engage and hold the
fan inlet case at Flange "A" at the 6
o'clock location.
72-00-53-420-002 step(3)
Install PWA 85195 Support Brackets

72-00-53-420-002 step(4)
If the turbine shaft spline is not clean,
or if it has a heavy type of rust
preventive, clean the spline by SPOP
209 (wipe method).

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

66/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

67/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-53-420-002 72-00-53-420-002 step(5)


E.S.N: 724027 Install The Low Pressure Turbine And Turbine Using hoist, attach PWA 28657 Sling
Exhaust Case With Shaft with two PWA 76154 Adapters to
trunnion spools of brackets at 3 and 9
o'clock locations on exhaust case.

72-00-53-420-002 step(6)
Install seal to rear flange of high
pressure turbine case.

72-00-53-420-002 step(7)
Using hoists, lift low pressure turbine
and turbine exhaust case from stand
and align shaft with high pressure
compressor rear hub.

72-00-53-420-002 step(8)
Thread the puck end of PWA 88204
Guide into the front end of the turbine
shaft.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

68/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

69/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-53-420-002 72-00-53-420-002 step(9)


E.S.N: 724027 Remove The High Pressure Turbine Remove the retainer (409/3) from the
Horizontal front flange of the turbine rear case
and the front compressor drive turbine
shaft.

72-00-53-420-002 step(9)
Install several work bolts and nuts to
boltholes in Flange N.

72-00-53-420-002 step(10)
Thread the puck end of PWA 88204
Guide into the front end of the turbine
shaft.

72-00-53-420-002 step(11)
Install Flange N hardware. Refer to 72-
00-53, Installation-20 (Task 72-00-53-
420-020).

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

70/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

71/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-31-420-001 72-00-31-420-001 Step(1)


E.S.N: 724027 Install Compressor Inlet Cone If installed, remove any shims between
the tips of the lower fan blades and the
fan case rubstrip

72-00-31-420-001 Step(2)
Install the cone front segment

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

72/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

73/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-31-420-001


E.S.N: 724027 Install Compressor Inlet Cone

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

74/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

75/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

PW 4158 Task 72-00-31-420-001


E.S.N: 724027 Remove The High Pressure Turbine
Horizontal

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

76/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709


PW 4158 Task 72-00-31-420-001
E.S.N: 724027 Remove The High Pressure Turbine
Horizontal

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

77/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


PW 4158 Task 72-00-31-420-001
E.S.N: 724027 Remove The High Pressure Turbine
Horizontal

78/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

79/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/5/2018 PW 4158 Task 72-00-51-020-001 72-00-51-020-001 Step(1)


E.S.N: 724027 Remove Turbine Nozzle-Horizontal Remove instrumentation plug
(borescope) (302/3) and washer (302/2)
from diffuser case (302/1) at 3 o'clock
position as viewed from rear.

6/5/2018 72-00-51-020-001 Step(2)


Install PWA 85078 Fixture to turbine
nozzle.

6/5/2018 72-00-51-020-001 Step(3)


Using PWA 85063 Wrench Adapter
remove bolts (303/1) securing lst stage
HPT cooling duct (303/2) to diffuser
case flange.

6/5/2018 72-00-51-020-001 Step(4)


Install three PWA 85170 Aligning Pins
into bolt holes in 1st stage HPT cooling
duct, and thread into inner rear flange
of diffuser case.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

80/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

81/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/5/2018 PW 4158 Task 72-00-51-020-001 72-00-51-020-001 Step(5)


E.S.N: 724027 Remove Turbine Nozzle-Horizontal Install four 0.3125-24 Jackscrews into
recessed jackscrew holes in front
flange of cooling duct.

6/5/2018 72-00-51-020-001 Step(6)


Evenly tighten 12 bolts (304/7) in outer
ring of fixture and four jackscrews in
cooling duct flange to separate turbine
nozzle from diffuser case.

6/5/2018 72-00-51-020-001 Step(7)


Move the turbine nozzle rearward far
enough to disengage the turbine
cooling duct sensing tube from the
mating hole in the 1st stage HPT
cooling duct.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

82/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/5/2018 PW 4158 Task 72-00-51-020-001 72-00-51-020-001 Step(8)


E.S.N: 724027 Remove Turbine Nozzle-Horizontal Trunnion assembly to rear end down
position and place assembly on pallet.

6/5/2018 72-00-51-020-001 Step(9)


Remove spring gasket (305/1) from
upper OD groove in 1st stage HPT
support (305/2).
6/5/2018 72-00-51-020-001 Step(10)
Using hoist, lift and trunnion assembly
to front, inner combustion chamber,
end down position. Lower assembly
onto pallet.

6/5/2018 72-00-51-020-001 Step(11)


Turbine nozzle

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

83/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

84/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/10/2018 PW 4158 Task 72-00-51-420-001 72-00-51-420-001 Step(1)


E.S.N: 724027 Install Turbine Nozzle - Horizontal Install PWA 85078 Fixture to turbine
nozzle.

6/10/2018 72-00-51-420-001 Step(2)


Use the hoist to lift and trunnion the
assembly to rear end down position
and rest it on the feet of the fixture.

6/10/2018 72-00-51-420-001 Step(3)


(Reference 1000) (Engines Without The
Talon II Low Emmision Burner)
Determine combustion chamber clamp
spacer thickness.

6/10/2018 72-00-51-420-001 Step(4)


(Reference 1015) (Engines With The
Talon II Low Emmision Burner) Find
the combustion chamber clamp spacer
thickness.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

85/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

86/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/10/2018 PW 4158 Task 72-00-51-420-001 72-00-51-420-001 Step(5)


E.S.N: 724027 Install Turbine Nozzle - Horizontal Install spring gasket (404/1) in upper
OD groove in 1st stage HPT support
(404/2).

6/10/2018 72-00-51-420-001 Step(6)


Thread three PWA 85170 Aligning Pins
into equally spaced boltholes in inner
rear flange of diffuser case.
6/10/2018 72-00-51-420-001 Step(7)
Using hoist, lift assembly and trunnion
to horizontal, flight, position.

6/10/2018 72-00-51-420-001 Step(8)


Locate the turbine cooling duct
sensing tube (405/6) at the rear of the
diffuser case at 15 degrees
counterclockwise from TDC.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

87/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709

88/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/10/2018 PW 4158 Task 72-00-51-420-001 72-00-51-420-001 Step(9)


E.S.N: 724027 Remove The High Pressure Turbine Use a flashlight or equivalent light
Horizontal source to check the engagement of the
forward

6/10/2018 72-00-51-420-001 Step(10)


Install ten bolt assemblies (406/7)
through bolt holes in rear flange of
diffuser case (406/9) and bolt holes in
outer ring of Fixture (PWA 85078). Se

6/10/2018 72-00-51-420-001 Step(11)


Evenly tighten ten nuts (406/8) to seat
1st stage HPT support in diffuser case.

6/10/2018 72-00-51-420-001 Step(12)


Secure inner flange of 1st stage HPT
cooling duct (407/2) to diffuser case
with several bolts (407/1) lubricated
with Engine Oil P03-001.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

89/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Amend No.:1 :Dated :Dec 2005 Form 709


6/10/2018 PW 4158 Task 72-00-51-420-001 72-00-51-420-001 Step(13)
E.S.N: 724027 Remove The High Pressure Turbine Do a check of the PS4I pressure tube,
Horizontal located at approximately the 11 o’clock
position on the OD of the diffuser case,
for blockage

6/10/2018 72-00-51-420-001 Step(14)


Remove Fixture (PWA 85078) from the
turbine nozzle.

6/10/2018 72-00-51-420-001 Step(15)


Removing aligning pins as required,
install remaining bolts (407/1),
lubricated with Engine Oil P03-001,

6/10/2018 72-00-51-420-001 Step(17)


Install washer (409/2) and
instrumentation plug (borescope)
(409/3),

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

90/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

91/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 V2500 Task 72-00-00-200-001 72-00-00-490-055 Step(1)


E.S.N: V0060 Borescope Inspection of the LP Compressor Install the Support Equipment to
Examine the Stage 1.5 Blades

24/10/2018 72-00-00-220-131 Step(2)


Examine the Stage 1.5 LP Compressor
Blades

24/10/2018 72-00-00-220-132 Step(3)


Examine the Front Surface of Each
Stage 1.5 LP Compressor Blade

24/10/2018 72-00-00-220-133 Step(4)


Remove the Borescope Probe and
Guide Tube

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

92/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-001 72-00-00-490-056 Step(5)
E.S.N: V0060 Borescope Inspection of the LP Compressor Install the Borescope Probe to
Examine the Stage 2.5 Blades

24/10/2018 72-00-00-220-134 Step(6)


Examine the Stage 2.5 Blades

24/10/2018 72-00-00-220-135 Step(7)


Examine the Rear Surface of each
Stage 2.5 Blade

72-00-00-220-136 Step(8)
24/10/2018 Remove the Support Equipment

93/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-001 72-00-00-090-053 Step(9)
E.S.N: V0060 Borescope Inspection of the LP Compressor Remove the LP Compressor (Fan)
Module and the Fan exit Guide Vanes
to Remove Plug

24/10/2018 72-00-00-090-054 Step(9)


Remove the Plug from the LP
Compressor Rear

24/10/2018 72-00-00-490-057 Step(10)


Install the Borescope Probe to
Examine the Stage 2.0 and 2.3 LP
Compressor Blades

24/10/2018 72-00-00-220-137 Step(11)


Examine the Stage 2.0 LP Compressor
Blades

94/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Examine the Stage 2.0 LP Compressor Signature Signature
Blades

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-001 72-00-00-220-138 Step(12)
E.S.N: V0060 Borescope Inspection of the LP Compressor Examine the Rear Surface of each
Stage 2.0 LP Compressor Blade

24/10/2018 72-00-00-220-139 Step(13)


Examine the Stage 2.3 LP Compressor
Blades

24/10/2018 72-00-00-220-140 Step(14)


Examine the Front Surface of each
Stage 2.3 LP Compressor Blade

24/10/2018 72-00-00-220-141 Step(15)

95/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Remove the Support Equipment

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-001 72-00-00-430-083 Step(16)
E.S.N: V0060 Borescope Inspection of the LP Compressor Install the Plug in to the Rear Case

24/10/2018 72-00-00-410-051 Step(17)


Install the Fan Exit Guide Vanes and LP
Compressor (FAN) Module

96/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

97/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 V2500 Task 72-00-00-200-002 72-00-33-210-001 Step(1)


E.S.N: V0060 Borescope Examine the HP Compressor Inspect PT4.95 exhaust gas pressure
water trap.

24/10/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

24/10/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

98/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-002 72-00-33-210-001 Step(1)
E.S.N: V0060 Borescope Examine the HP Compressor Inspect PT4.95 exhaust gas pressure
water trap.

24/10/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

24/10/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

99/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-002 72-00-33-210-001 Step(1)
E.S.N: Borescope Examine the HP Compressor Inspect PT4.95 exhaust gas pressure
water trap.

24/10/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

24/10/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

100/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-002 72-00-33-210-001 Step(1)
E.S.N: V0060 Borescope Examine the HP Compressor Inspect PT4.95 exhaust gas pressure
water trap.

24/10/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

24/10/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

101/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-002 72-00-33-210-001 Step(1)
E.S.N: V0060 Borescope Examine the HP Compressor Inspect PT4.95 exhaust gas pressure
water trap.

24/10/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

24/10/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

102/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

103/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 V2500 task 72-00-00-200-003 ,004 & 005 72-00-00-220-105 Step(1)


E.S.N: V0060 Examine the Combustion Chamber , Stage 1 HPT Examine the Combustion Chamber
Vanes and Stage 1&2 HPT Blades Fuel Injectors and the Stage 1 HPT
Vanes for Damage,

24/10/2018 72-00-00-220-106 Step(2)


Examine the Combustion Chamber
Concave Surface Cracks/Burns

24/10/2018 72-00-00-220-107 Step(3)


Leading Edge Cracks, Leading Edge
Burns and Convex Surface Cracks

24/10/2018 72-00-00-220-108 Step(4)


Trailing Edge Burns

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

104/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 task 72-00-00-200-003 ,004 & 005 72-00-00-220-109 Step(5)
E.S.N: V0060 Examine the Combustion Chamber , Stage 1 HPT Cracks on Inner and Outer Platforms
Vanes and Stage 1&2 HPT Blades

v 72-00-00-220-110 Step(6)
Cracks on the Inner and Oute Platform
Air foil Fillet Radii

24/10/2018 72-00-00-220-111 Step(7)


Burns on the inner and outer platforms

24/10/2018 72-00-00-220-112 Step(8)


Burner LinerSegment Cracks

105/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 task 72-00-00-200-003 ,004 & 005 72-00-00-220-113 Step(9)
E.S.N: V0060 Examine the Combustion Chamber , Stage 1 HPT Segment Edge Burnback
Vanes and Stage 1&2 HPT Blades

24/10/2018 72-00-00-220-114 Step(10)


Surface Burns andBurn-ThroughHoles
inLinerSegments

24/10/2018 72-00-00-220-115 Step(11)


Bulkhead Segment Cracks

24/10/2018 72-00-00-220-116 Step(12)


Bulkhead Segment Burnsand Burn-
Through Holes

106/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Bulkhead Segment Burnsand Burn- Signature Signature
Through Holes

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 task 72-00-00-200-003 ,004 & 005 72-00-00-220-117 Step(13)
E.S.N: V0060 Examine the Combustion Chamber , Stage 1 HPT Bulkhead Deflector Cracks
Vanes and Stage 1&2 HPT Blades

24/10/2018 72-00-00-220-118 Step(14)


Bulkhead Segment Burns

24/10/2018 72-00-00-220-171 Step(15)


End Cap Damage on the Fuel Nozzles

24/10/2018 72-00-00-020-070 Step(16)

107/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Remove the Borescope Equipment


from the Borescope Inspection Ports

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 task 72-00-00-200-003 ,004 & 005 72-00-00-420-078 Step(17)
E.S.N: V0060 Examine the Combustion Chamber , Stage 1 HPT Close the Borescope Inspection Ports,
Vanes and Stage 1&2 HPT Blades after the Borescope Inspection is
completed.

108/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

109/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 V2500 Task 72-00-00-200-005 72-00-00-200-004-B00 Step(1)


E.S.N: V0060 Examine the Stage 1 HPT Vanes and Stage 1&2 HPT Examine the Stage 1 HPT Blades
Blades

24/10/2018 72-00-00-420-079 Step(2)


Install the Foot-Operated Motor Drive
Unit to the Gearbox Crank Pad

24/10/2018 72-00-00-420-080 Step(3)


Install the Guide Tube and the Flexible
Borescope into the IP1 Borescope Port
to Examine the Stage 1 HPT Blades,

24/10/2018 72-00-00-020-071 Step(4)


Install a Rigid Borescope to Examine
the Stage 1 HPT Blades through the B3
or B4 and T1/2L or T1/2R Ports

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

110/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-005 72-00-00-220-119 Step(5)
E.S.N: V0060 Examine the Stage 1 HPT Vanes and Stage 1&2 HPT Examine the Stage 1 HPT Blades for
Blades Nicks or Dents on the Airfoil

24/10/2018 72-00-00-220-120 Step(6)


Examine the Stage 1 HPT Blades for
Cracks on the Airfoil

24/10/2018 72-00-00-220-121 Step(7)


Examine the Stage 1 HPT Blades for
Cracks on the Platform

24/10/2018 72-00-00-220-122 Step(8)


Examine the Stage 1 HPT Blades for
Erosion or Burns on the Airfoil or
Platform

111/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-005 72-00-00-220-123 Step(9)
E.S.N: V0060 Examine the Stage 1 HPT Vanes and Stage 1&2 HPT Examine the Stage 1 HPT Duct
Blades Segments.

24/10/2018 72-00-00-020-072 Step(10)


Remove the Borescope Equipment
from the Borescope Inspection Ports

24/10/2018 72-00-00-420-081 Step(11)


Close the Borescope Inspection Ports
after the Borescope Inspection is
Completed

24/10/2018 72-00-00-420-082 Step(12)


Examine the Stage 2 HPT Blades

112/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Examine the Stage 2 HPT Blades Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-005 72-00-00-020-074 Step(13)
E.S.N: V0060 Examine the Stage 1 HPT Vanes and Stage 1&2 HPT Get Access to the Stage 2 HPT Blades
Blades through the T1/2L or T1/2R or T2/3L or
T2/3R Ports,

24/10/2018 72-00-00-220-125 Step(14)


Do a Borescope Inspection of the
Stage 2 HPT Blades.

24/10/2018 72-00-00-220-126 Step(15)


Examine the Blades for Nicks, Dents
and Holes on the Airfoil of the Stage 2
HPT Blades

24/10/2018 72-00-00-220-127 Step(16)

113/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Examine the Blades for Erosion or


Burns on the Airfoil or Platform of the
Stage 2 HPT Blades

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 Task 72-00-00-200-005 72-00-00-220-128 Step(17)
E.S.N: V0060 Examine the Stage 1 HPT Vanes and Stage 1&2 HPT Examine the Blades for Cracks on the
Blades Airfoil of the Stage 2 HPT Blades

24/10/2018 72-00-00-220-129 Step(18)


Examine the Blades for Cracks on the
Platform of the Stage 2 HPT Blades

24/10/2018 72-00-00-220-130 Step(19)


Examine for Burn Holes in the Stage 2
HPT Duct Segments

114/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 72-00-00-020-075 Step(20)


Remove the Borescope Equipment
from the Borescope Inspection Ports

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

115/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 v2500 72-00-00-200-006 & 72-00-00-200-007 72-00-00-020-063 Step(1)


E.S.N: V0060 Examine (Borescope) The LPT Stage 3&7 Blades Remove the Borescope Blanking Plugs
and Vanes

24/10/2018 72-00-00-200-006 Step(2)


Examine the Stage 3 Turbine Blades

24/10/2018 72-00-00-420-064 Step(3)


Install the Borescope Probe

24/10/2018 72-00-00-220-082 Step(4)


Examine the Stage 3 Turbine Blades
for Cracks

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

116/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 v2500 72-00-00-200-006 & 72-00-00-200-007 72-00-00-220-083 Step(5)
E.S.N: V0060 Examine (Borescope) The LPT Stage 3&7 Blades Examine the Stage 3 Turbine Blades
and Vanes for Nicks and Pits

24/10/2018 72-00-00-220-084 Step(6)


Examine the Stage 3 Turbine Blades
for Dents,

24/10/2018 72-00-00-220-085 Step(7)


Examine the Stage 3 Turbine Blades
for Tears,

24/10/2018 72-00-00-220-086 Step(8)


Examine the Stage 3 Turbine Blades
for Bends

117/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 72-00-00-200-006 & 72-00-00-200-007 72-00-00-220-087 Step(9)
E.S.N: V0060 Examine (Borescope) The LPT Stage 3&7 Blades Examine the Stage 3 Turbine Blades
and Vanes for Build-Up of Deposits

24/10/2018 72-00-00-220-088 Step(10)


Examine the Stage 3 Turbine Blades
for Blistering and Loss of Coating

24/10/2018 72-00-00-220-161 Step(11)


Visually Examine the Stage 3 Blades
for Unlatching

72-00-00-220-001 Step(12)
Visually Examine the Stage 3 Blades
for Shingling

118/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Visually Examine the Stage 3 Blades Signature Signature
for Shingling

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 72-00-00-200-006 & 72-00-00-200-007 72-00-00-220-157 Step(13)
E.S.N: V0060 Examine (Borescope) The LPT Stage 3&7 Blades Examine the Stage 3 Turbine Vane
and Vanes

24/10/2018 72-00-00-420-065 Step(14)


Install the Two Blanking Plugs (72-50-
10,01-420) after Borescope Inspection

24/10/2018 72-00-00-220-090 Step(15)


Examine the Stage 7 Turbine Blades
and Vanes

24/10/2018 72-00-00-220-090 Step(16)

119/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


24/10/2018 V2500 72-00-00-200-006 & 72-00-00-200-007 72-00-00-220-091 Step(17)
E.S.N: V0060 Examine (Borescope) The LPT Stage 3&7 Blades Examine the Stage 7 Turbine Blades
and Vanes and Vanes for Erosion

24/10/2018 72-00-00-220-092 Step(16)


Examine the Stage 7 Turbine Blades
and Vanes for Cracks

24/10/2018 72-00-00-220-102 Step(17)


Examine the Stage 7 Turbine Blades
and Vanes for Dents,

120/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: V2500

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

24/10/2018 72-00-00-220-103 Step(18)


Examine the Stage 7 Turbine Blades
and Vanes for Nicks,

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

121/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

6/3/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)


E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

6/3/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

6/3/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

122/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


6/3/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

6/3/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

6/3/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

123/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

6/3/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

6/3/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

124/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

6/3/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

6/3/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

125/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


6/3/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

6/3/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

6/3/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

126/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

127/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)


E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

128/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

129/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

130/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

131/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

132/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

133/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)


E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

134/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

135/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

136/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

137/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709


3/1/2018 PW 4158 Task 72-00-33-210-001 72-00-33-210-001 Step(1)
E.S.N: 724027 Inspect Electronic Engine Control (EEC) Water Inspect PT4.95 exhaust gas pressure
Traps water trap.

3/1/2018 72-00-33-210-001 Step(2)


Inspect the PAMB (ambient pressure)
water trap.

3/1/2018 72-00-33-210-001 Step(3)


Inspect the PT2 inlet pressure water
trap.

138/139
Engineer's Worksheets
EgyptAir Maintenance and Engineering

Name of Applicant: ….Araby Abdel Hamed Sadek Department/Section : ...EngineWorkshop.... Rating:......E....... Required Type: PW4000-94

License No: 2862 Issue Date :11/7/2007 Expiry date:10/7/2019


Date Aircraft / Engine /Component Defect or Check Action Taken ( Details of Work) Applicant Authorized
Data Signature Signature

Inspection Unit Manager : Name : SALAH EL DIN ABD EL HAMED Date:.......................

Manager Technical Authorization Name : Date:.......................

Amend No.:1 :Dated :Dec 2005 Form 709

139/139

Potrebbero piacerti anche