Sei sulla pagina 1di 1

6

B of
HA556 EA-381703 P 3-1313003.05 4400004657 3 4 5 6 7
03 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

OW NER.
1 2

115V BUS SECTION CB-A601 PROTN. PANEL

TS
OF I
CONSENT
A A

TO SAS
I/O BOX

TTEN
X4S

THE W RI
1 SL.NO DESCRIPTION ROUTING SOURCE

1 CB A603 115kV BC PH-A 51 TOC OPTD THROUGH IEC61850 P142


74DC/BC X4S
LOSS OF DC
1 3 2 CB A603 115kV BC PH-B 51 TOC OPTD THROUGH IEC61850 P142 LEGEND

THOUT
2
SHT.01/7D
RELAY DESCRIPTION TYPE MAKE
F1
3 CB A603 115kV BC PH-C 51 TOC OPTD THROUGH IEC61850 P142
51/BC

WI
O/C & E/F RELAY P142 SCHNEIDER
11 14
51N/BC

BI
4 CB A603 115kV BC PH-A 51N TOC OPTD THROUGH IEC61850 P142

DOCUMENT
12

SEL2440
SHT.01/2E TS,... TEST SWITCH FT-19R ABB
5 CB A603 115kV BC PH-B 51N TOC OPTD THROUGH IEC61850 P142

B 51/BC B
BC-1 6 86BC LOCK OUT RELAY 7810F ES
CB A603 115kV BC PH-C 51N TOC OPTD THROUGH IEC61850 P142

BOX
O/C & E/F
F11 F12
3 RELAY FAULTY

S
(WD)

THI
7 CB A603 115kV BC GROUND 51N TOC OPTD THROUGH IEC61850 P142 TRIP RELAY

/O
SHT.05/2B 74/86BC SPER1C1 ABB

I
COIL SUPERVISION

TO
51N/BC CB A603 115kV BC 86BC TRIP RELAY OPTD THROUGH IEC61850

FROM
8 P142
74DC/BC DC SUPERVISION MVAX12 ALSTOM
F11 F12
(WD) 9 CB A603 115kV BC 74/86BC LOCKOUT SUPVN OPTD THROUGH I/O BOX SEL 2440

NED
SHT.06/2B F1 6A, MCB FOR DC SUPPLY EP102UCC06 GE
10 CB A603 115kV BC O/C & E/F PROT. FAULTY THROUGH I/O BOX SEL 2440

SHALL BE OBTAI
74/86BC

16 15 11 CB A603 115kV BC DC SUPPLY FAIL THROUGH I/O BOX SEL 2440


74DC/BC 86BC LOR
SUPV. RELAY
17 5 7
4 OPTD.
SHT.01/6D SHT.01/7D

74TC1/A603

PART
TRIP CIRCUIT 1
1 3
5 SUPERVISION
SHT.02/1C

N
I
C C

FULL OR
74TC2/A603
TRIP CIRCUIT 2
1 3 SUPERVISION
6
SHT.02/1E

N
I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET EE-383111

RELAYING & METERING ONE LINE DIAGRAM EA-382856

NO
TO TFR

d SA
TFR

onalGri
D TFR
D
51N/BC
TS5
X81 C X81

OF Nati
51N OPTD.
6 5 E1 E2
1 2
SHT.04/4D RELAY 1
SHT.06/2B

51/BC
TS5

ARE THE SOLE PROPERTY


D
51 OPTD.
8 7 E1 E2
3 4
SHT.04/4D RELAY 1
SHT.05/2B

86BC
86BC OPTD.
64 66
5 6
SHT.01/4D

AS-BUILT BY DATE
X81 74DC/BC X81
LOSS OF DC
2 4 SUPLLY

N
7 8

HEREI
SHT.01/7D

E E

B 2017-01-16 AES AS PER CUSTOMER COMMENTS SF AS AS

NED
A 2015-10-12 AES ISSUED FOR DETAILED DESIGN KAM AS AS

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
THE I
DRAWN BY DINAKAR CHECKED BY KAMAL SCALE: NONE

2015-10-12
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

F
F THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

CONTACT DISTRIBUTION DIAGRAM +BS


115KV BUS SECTION CB-A601 PROTN. PANEL

S
THI
AL-UQAIR 115/13.8kV SUBSTATION-B
MANUFACTURER/VENDOR NAME
AL-UQAIR SAUDI ARABIA
ALFANAR ELECTRICAL SYSTEMS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
DRAWING NO. SHEET NO. REV. NO.
03
EA-381703 03 of 6 B 1 2 3 4 5 6 7
4400004657 3-1313003.05 P HA556 EA-381703 of
6 B
NG-A (2012/01)

DMS VECTOR NGA00

Potrebbero piacerti anche