Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
in Metro Manila
Engr. Deo Leo N. Manalo, PhD
30/11/2017 1
Abstract
An introduction to railways
development rationale and system
choices. Best practices in the context
of Philippine rail industry.
30/11/2017 2
Urban Development
Scenario
30/11/2017 3
■ Growth of Metro Manila
30/11/2017
4
■ Growth of Metro Manila and Sorrounding Areas
30/11/2017
5
p Expansion of Urban Areas
30/11/2017
6
■ Traffic congestions
2030
2012 2030 ‘30/’12
Volume/ Capacity Ratio
Traffic demand (mil. trips/day 12.8 14.5 1.13
Public transport share in total demand 69% 69% 1.00 V/C > 1.50 (beyond capacity)
V/C = 1.00 – 1.50 (at & above capacity)
Occupancy of road space by private vehicles 78% 78% 1.00 V/C = 0.75 – 1.00 (reaching capacity)
Transport cost (Php bil./day) 2.4 6.0 2.50 V/C < 0.75 (below capacity)
30/11/2017
1) Results from 11 survey stations, 2012 7
■ Redefine spatial structure
Shift from radial/circumferential to Population Density
ladder form
1977 Metro Plan
● High density residential areas in city center
→ suburban
● Development of peri-urban/ suburban
areas
● Development of subcenters
● Recovery of green space
● Redevelopment/retrofitting of city center
areas
Conventional Proposed
30/11/2017
8
■ Spatial development strategy for GCR
Today: growth with single Future: growth with tri-
engine engines
150km 150km
Baler Baler
p Development of
Palayan
125km Palayan
125km
Tarlac Cabamatuan hierarchical Tarlac
Cabanatuan
100km
regional 100km
centers/clusters Mabalacat
Gapan
Mabalacat
Angels
75km
p Economic 75km
San Fernando development San Fernando
Baliuag
50km ● Agro-based Lubao
50km
Olongapo Malolos Sta. Maria Malolos Sta.Maria
San Jose Del Monte
Rodriguez
● Manufacturing Olongapo Meycauayan
San Jose Del Monte
Rodriguez
Services, BPO
Balanga 25km San Mateo San Mateo
● Balanga 25km
Antipolo Antipolo
Cainta
Tourism, others
Cainta
Taytay ● Taytay
Binangonan Bacoor Binangonan
Bacoor
p Improved
Imus Imus
Gen. Trias San Pedro Gen. Trias San Pedro
Sta. Rosa
connectivity
Binan Dasmarinas Sta. Rosa
Dasmarinas Cabuyao Sta Cruz Binan Cabuyao Sta Cruz
Trece Martires
Calamba
(between Calamba
center, urban-rural)
Tayabas
30/11/2017 10
Why Railways? Why Not?
30/11/2017 11
Transport Infrastructure Types
Access Access
Alley Tram
(Brgy. Road)
Highway LRT-MRT
(Secondary)
Boulevard Subway/
(Primary) Commuter
Expressway Inter-City
Speed Speed
30/11/2017 12
Project Development
Decision Points
• What railway lines to build?
• Between points A & B and how to expand
• What type of service and capacity?
• Passenger or cargo?
• Metro, Commuter or Inter-city?
• How the project will be financed?
• Government budget (GAA)
• Government loan (ODA)
• Privatization (PPP)
30/11/2017 13
Railway Projects
30/11/2017 14
Philippine Railways Program
1. Infrastructure Development Program
a. Manila Metro System
b. Luzon System
c. Cebu Metro System
d. Mindanao Railway System
2. Institutional Rationalization Program
a. Operations and maintenance
b. Regulation and training
c. Construction and development
30/11/2017 15
30/11/2017 16
Projects
• On-going
• Line 1/3/7 Common Station and DPWH Underpass
• LRT Line 1 South Extension: Baclaran to Bacoor
• LRT Line 2 East Extension: Santolan to Antipolo
• PNR North 1: Tutuban-Malolos (NSCR)
• LRT Line 7: North Avenue to Tala, SJDM
• Moving
• PNR North 2: Malolos-Clark
• Metro Manila Subway
• LRT Line 4: Ortigas to Tikling
• LRT Line 2 West Extension: Recto to Tutuban/Pier 4
• Mindanao Railways: Tagum-Davao-Digos
• PNR South Commuter and Inter-city, Manila to
Lucena/Matnog
30/11/2017 17
30/11/2017 18
30/11/2017 19
Status:
• On-going commissioning
of Feasibility Study for
AGT-CML Line
30/11/2017 20
30/11/2017 21
Key points in railway development
• Start early, 6-years will be tight
• Project development: 2 years
• Programming: 1 year
• Procurement: 1 year
• ROWA and Resettlement: 2 or more…
• Construction: 4 years
• Organize a dedicated team, institutionalize and
professionalize railway personnel
• Establish research institution for localization of technology
and industry development
30/11/2017 22
Project Implementation
Decision Points
• Engineering design discussions
• Standards
• Structure types and architectural
• Technology
• Social considerations
• Right of way and acquisition
• Procurement
• Project Team
30/11/2017 23
Railway Operations
30/11/2017 24
Approx. Railway Ridership and Share
Line Average Daily Ridership
1 500,000
2 500,000
3 200000
PNR 50,000
MODE Pax-km
Car 40,723
Public (Road) 81,624
Rail 9,616
Total 131,963
30/11/2017 27
Summary
More Railway infrastructure will contribute to
the decongestion of Metro Manila
• Stronger North-South and East-West lines
• Better station access and passenger transfers
• Build faster and better
• Institutional reforms