4
Let,
Proportion by weight
Cement ∶ FA ∶ CA
4.8∗40 4.8∗60
1∶ 100
∶ 100
1 ∶ 1.92 ∶ 2.88
Proportion by volume
Cement ∶ FA ∶ CA
1.92∗1472 2.88∗1472
1∶ 1680
∶ 1520
1 ∶ 1.68 ∶ 2.78
⟹ 0.002742892 C = 1
∴ C = 365 kg
Materials quantities by weight
Cement = 365 kg
Water = 365 ∗ 0.57 = 208 kg
F. A = 2 ∗ 365 = 730 kg
C. A = 3 ∗ 365 = 1095 kg
Density of fresh concrete = 2275 kg
Materials quantities by volume
365
Cement = 1472 = 0.248 m3
208
Water = = 0.208 m3
1000
730
F. A = 1680 = 0.435 m3
1095
C. A = 1520 = 0.720m3
From cylinder
πD2 h 3.1416∗0.332 ∗0.67
Aria = 4
= 4
= 0.057 ∗ 3 = 0.17 ∗ 1.54 = 0.265 ft 3
F. A = 1.94 ≈ 2 cft
C. A = 6.74 ≈ 7 cft
Beam Calculation
Let,
= 2018 𝑖𝑛 − 𝑘𝑖𝑝𝑠
𝑓𝑐′ ℰ𝑈
𝜌0.005 = 0.85𝛽1 𝑓𝑦 ℰ𝑈 +0.005
4 0.003
= 0.85 ∗ 0.85 (60) (0.003+0.005)
= 0.0181
𝜌𝑓𝑦
∅𝑀𝑛 = ∅𝜌𝑓𝑦 𝑏𝑑2 (1 − 0.59 )
𝑓𝑐′
0.0181∗60
= 0.9 ∗ 0.0181 ∗ 60 𝑏𝑑 2 (1 − 0.59 4
)
= 0.821𝑏𝑑2
𝑀𝑈 = ∅𝑀𝑛
⟹ 2018 = 0.821 𝑏𝑑2
⟹ 𝑏𝑑2 = 2458
𝑁𝑜𝑤 𝑡ℎ𝑒 𝑏𝑒𝑎𝑚 𝑤𝑖𝑑𝑡ℎ 𝑖𝑠 𝑏 = 11 𝑖𝑛 & 𝑑 = 15 𝑖𝑛
∴ ℎ = 15 + 2.5 = 17.5 𝑖𝑛
∴ 𝐴𝑠 = 0.0181 ∗ 11 ∗ 15
= 3 𝑖𝑛2
1.27∗12
Use #10 bar, = 5.1" 𝑐/𝑐
3
2018∗12
𝑑 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 = √ 4
0.9∗6∗0.021∗11(1−0.59∗0.021 )
60
= 13.94 = 14 𝑓𝑡
Let, a = 5 in
2018
𝐴𝑠 = 5 = 3.25 𝑖𝑛2
0.9∗6(14− )
2
3.25∗60
𝑎 = 0.85∗4∗11 = 5.21 𝑖𝑛
2018
𝐴𝑠 = 5.21 = 3.27 𝑖𝑛2
0.9∗6(14− )
2
3.27∗60
𝑎= = 5.24 𝑖𝑛
0.85∗4∗11
Shear check
𝑉𝑢 = 19.75 𝑘 − 𝑖𝑛
𝐴𝑠 = 0.0018 𝑏𝑡