Sei sulla pagina 1di 18

Orden P (mm) (Yi) Tr Xi Xi^2 Xi * Yi y (testada)

1 69.4 38.0000 1.5798 2.4957 109.6370 37.9950


2 68.5 19.0000 1.2788 1.6352 87.5946
3 58 12.6667 1.1027 1.2159 63.9544 Tr
4 53.5 9.5000 0.9777 0.9559 52.3082 2
5 53 7.6000 0.8808 0.7758 46.6831 5
6 51.5 6.3333 0.8016 0.6426 41.2841 10
7 50.5 5.4286 0.7347 0.5398 37.1016 25
8 49 4.7500 0.6767 0.4579 33.1580 50
9 46.8 4.2222 0.6255 0.3913 29.2753
10 45.5 3.8000 0.5798 0.3361 26.3802
11 45 3.4545 0.5384 0.2899 24.2276
12 41 3.1667 0.5006 0.2506 20.5247
13 38.5 2.9231 0.4658 0.2170 17.9348
14 38.2 2.7143 0.4337 0.1881 16.5656
15 37.4 2.5333 0.4037 0.1630 15.0981
16 36.5 2.3750 0.3757 0.1411 13.7117
17 36 2.2353 0.3493 0.1220 12.5760
18 34.5 2.1111 0.3245 0.1053 11.1956
19 34.1 2.0000 0.3010 0.0906 10.2651
20 34 1.9000 0.2788 0.0777 9.4776
21 33.6 1.8095 0.2576 0.0663 8.6542
22 33.5 1.7273 0.2374 0.0563 7.9516
23 32.4 1.6522 0.2181 0.0475 7.0650
24 32 1.5833 0.1996 0.0398 6.3863
25 31.1 1.5200 0.1818 0.0331 5.6553
26 31 1.4615 0.1648 0.0272 5.1091
27 30.4 1.4074 0.1484 0.0220 4.5120
28 29.1 1.3571 0.1326 0.0176 3.8594
29 29 1.3103 0.1174 0.0138 3.4042
30 28.81 1.2667 0.1027 0.0105 2.9577
31 28.8 1.2258 0.0884 0.0078 2.5466
32 28 1.1875 0.0746 0.0056 2.0897
33 27.6 1.1515 0.0613 0.0038 1.6910
34 26.1 1.1176 0.0483 0.0023 1.2608
35 26 1.0857 0.0357 0.0013 0.9286
36 25.3 1.0556 0.0235 0.0006 0.5941
37 25.2 1.0270 0.0116 0.0001 0.2919
38 25 1.0000 0.0000 0.0000 0.0000
∑= 1443.8100 160.6603 15.3133 11.4473 743.9109
x (testada) SX^2 SXY m b
0.4030 0.1389 4.2654 30.7191 25.6158

P P (corregida) No. De dias con lluvia Cociente


34.8632 39.3954 1a7 0.2
47.0875 53.2089 8 a 15 0.3
56.3349 63.6585 16 a 23 0.4
68.5593 77.4720 24 a 25 0.5
77.8067 87.9215 26 o mas 0.6
P
23.6372
P-D-Tr
100.0000

p (mm) 10.0000

1.0000
1 10 100 1000

T (min)
P-D-Tr
T
Tr 5 10 20 30 60 120 1440 Tr
2 7.2871 10.9078 15.2137 18.1008 23.7676 30.5065 39.3954 2
5 9.6180 14.3969 20.0800 23.8907 31.3701 40.2647 53.2089 5
10 11.3813 17.0363 23.7613 28.2706 37.1212 47.6464 63.6585 10
25 13.7122 20.5254 28.6277 34.0605 44.7237 57.4045 77.4720 25
50 15.4755 23.1648 32.3090 38.4403 50.4748 64.7862 87.9215 50
r

Tr2
Tr5
Tr10
Tr25
Tr50

1000 10000
I-D-Tr
T
5 10 20 30 60 120 1440
87.4450 65.4470 45.6410 36.2016 23.7676 15.2533 1.6415
115.4160 86.3815 60.2401 47.7814 31.3701 20.1323 2.2170
136.5752 102.2178 71.2840 56.5411 37.1212 23.8232 2.6524
164.5462 123.1523 85.8831 68.1209 44.7237 28.7023 3.2280
185.7054 138.9887 96.9270 76.8807 50.4748 32.3931 3.6634
I-D-Tr
1000.0000

100.0000

I (mm/hrs)

10.0000

1.0000
1 10 100 1000 10

T (min)
Tr2
Tr5
Tr10
Tr25
Tr50

1000 10000
A (Km^2) LcP (Km) Desnivel compensado (m) Uso del terreno
28 6.9 124 Pastizal natural
Bosque

Tc (hrs) Tc (min) Tc (seg)


1.3726 82.3561588923 4,941.3695

Tc Q
0 0
4,941.3695 113.9934
9,882.74 0
Condicion Hidrologica Grupo hidrologico de suelos
Pobre D
Buena D

N (total) P (mm) en base a la grafica pdtr a 360 min en Tr25


84.2 67
0
120

100

80

Q (m^3/seg) 60

40

20

0
0
40

20

0
0
% N N (aplicando %)
60 89 53.4
40 77 30.8

Gasto Unitario ( m^3/seg/mm/Km^2) Interpolado Pe (mm) Q (m^3/seg)


0.1296 31.4135 113.9934
Hidrograma
0 2000 4000 6000 800
120

100

80

Q (m^3/seg) 60

40

20

0
0 2000 4000 6000 800
40

20

0
0 2000 4000 6000 800

Tc (seg)
S (%)
1.7971

V (m^3)
563,283.4555
ma
000 8000 10000 12000
120

100

80

60

40

20

0
000 8000 10000 12000
40

20

0
000 8000 10000 12000

c (seg)

Potrebbero piacerti anche