Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
\
NCR DAILY
10/
Obesrvation /
No Observation Positive or Negative Site Location NO
Dificiency
Poor housekeeping
occurred since there were
scrap and material scattered
16 Negative (-) BOP Area in work area Daily
Company : TJE & GUT
Location : Boiler #1
Scaffolding materials
were
BOP Area Boiler
19 Negative (-) located on access and MSWD
Elv. 43.000
not being
arranged properly
Poor housekeeping
occurred since there
were scrap and material
20 Negative (-) BOP Area scattered in work area Daily
Company : TJE & GUT
Location : Bagfilter #2
Hole open need to cover
with hard barricade or
some hard material to cover
21 Negative (-) BOP Area it. Daily
Company : GUT
Location : CCR Building.
Material scaffold
accumulated
27 Negative (-) BOP Area need to move other safe Daily
place.
Housekeeping need to
improved I daily base.
28 Negative (-) BOP Area Company : GUT, TJE, PEC. Daily
Location : STG Gate A2
Prepared by,
Randy Aditya H
LECTRICAL ERECTION WORK KALSEL PROJECT
10/1/2018
10/1/2018
10/4/2018
10/4/2018
10/4/2018
10/5/2018
10/8/2018
10/8/2018
10/8/2018
10/8/2018
10/9/2018
10/9/2018
10/12/2018
10/11/2018
10/15/2018
10/16/1900
10/17/2018
10/17/2018
10/18/2018
10/18/2018
10/19/2018
10/22/2018
10/22/2018
10/22/2018
10/22/2018
10/23/2018
10/25/2018
10/25/2018
10/29/2018
10/29/2018
10/29/2018
10/29/2018
10/30/2018
10/30/2018
10/30/2018
10/31/2018
Insert Photo Corrective Action and Remark
Already
Remove
Frame
Ladder
Our Team
Scaffolder
already remove
material
scaffolding from
boiler 2 to boiler
1 "Site Material
Placement
Specially Boiler
NOT GUT PANEL...