Sei sulla pagina 1di 21

TARGET CONSTRUCTION SAUDI ARABIA [W.L.

L]
PROJECT: CLOSED DRAIN SYSTEM IN ABQIQ PLANT PROJECT
BI-10-00934 Revision:00

SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
Date Nov, 21st 2018
S.No Plant Description Tag no Remarks
AT-1, QA-1 Scraper Receivers and AD1, AD2 Scraper.
1 271 Launcher Drain Vessel 271-D-0119 BA-152982-001

2 271 AD-3, QA-4 and QA-5 Scraper Launchers Drain Vessel 271-D-0120 BA-146880-001
3 271 QA-6 AND QA-7 Scraper Launchers Drain Vessel 271-D-0121 BA-146879-001
4 271 QA-3 Scraper Launcher Drain Vessel 271-D-0122 BA-152966-001
5 271 24" ARTCL-1 Scraper Launcher Drain Vessel 271-D-0123 BA-152967-001
Shaybah Scraper Receiver Drain
6 106 Vessel 106-D-934 BA-129378-001
UA-2 and UA-4 Scraper Receivers
7 106 Drain Vessel 106-D-940 BA-129379-001
8 106 AA-1/2 Scraper Receivers Drain Vessel 106-D-941 BA-130307-001
9 106 UA-6 Scraper Receiver Drain Vessel 106-D-942 BA-130308-001
10 106 UA-1/3, and GC Scraper Receivers Drain Vessel 106-D-943 BA-130387-001
11 106 AA-3 Scraper Receiver Drain Vessel 106-D-944 BA-130388-001
UA-1 Scraper Receivers and GC Surge Relief Skid Drain
12 106 Vessel 106-D-945 BA-130389-001
13 106 IP-LP Scraper Receiver Drain Vessel 106-D-946 BA-130416-001
14 271 Process Interface Building #10 PIB #10
15 106 Process Interface Building #7 PIB #7
16 106 HVAC-Substaion #34 Plant #106
17 106 HVAC-Substaion #36 Plant #106
Ref # OVER ALL SITE PLAN BA-139837-001

1of21
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
AT-1, QA-1 Scraper Receivers and AD1, AD2 Scraper & Launcher Drain Vessel
(Tag no 271-D-0119)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 271-D-0119 In Progress BA-312221-002
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress
5 Foundation for Guard Post In Progress
6 Misc civil works In Progress
7 Exisiting Asphalt road modification In Progress
Related to hold electrical design, hence execution will have cost
8 Duct bank PVC sleeve impact
Related to hold electrical design, hence execution will have cost
9 Excavation for cable trench works impact
10 Foundation for lighting post Related to task lighting change order
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Bollard post In Progress
3 Installation of ladder,Platform & handrails In Progress
Piping Works
1 Piping 1CS2P06, OW lines In Progress BA-152982-001
2 Vent Piping In Progress
3 Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
BB-243492,
BA-243503,
6 Tie work/Modification (17NOS)
HA-110052,
In Progress HA-110853
7 Installation of Valves & Accessories In Progress
8 Piping Insulation In Progress BA-690282-001
9 Pipe supports in Progress
Electrical Works
Installation, termination & commission of power cables from 271-DJB-2001 to E710-DS-
1 11 (120 VAC UPS power supply) Related to Change Order for cable tray BA-108221-001
2 Installation of Cable Trays / Conduits in PIB #10 Related to Change Order for cable tray BA-321655-001
Related to hold electrical design, hence execution ill have cost
3 Electrical duct bank PVC conduit works impact BA-102762-002
Related to hold electrical design, hence execution ill have cost
4 Modification in exisiting cable trays works impact
Related to hold electrical design, hence execution ill have cost
5 Installation of Static Grounding panel impact HA-318029-001
Related to hold electrical design, hence execution ill have cost
6 Interface connection from grounding panel to the existing ground grid impact
7 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690890-001

Related to hold electrical design, hence execution ill have cost


8 Installation, termination & commission of UPS power cables to H2S gas detector impact

Instrumentation Works

Cost impact as materials were On hold due to change order for


cable trays and Contract amendment which requires additional
1 Installation, termination & commission of Junction box (271-AJB-2001) Engineering BA-225109-001
Cost impact as materials were On hold due to change order for
Installation & Termination of Cable (IC-2478 &2479) from JB 271-AJB-2001 to the cable trays and Contract amendment which requires additional BA-102841-002
2 existing DCS cabinet E710-DT-11B Engineering (PIB#10)
Cost impact as materials were On hold due to change order for
cable trays and Contract amendment which requires additional
3 Installation, termination & commission of Junction box (271-DJB-2001) Engineering
Cost impact as materials were On hold due to change order for
Installation & Termination of Cable IC-2482 from JB 271-DJB-2001 to the existing DCS cable trays and Contract amendment which requires additional
4 cabinet E710-DT-04B Engineering
Cost impact as materials were On hold due to change order for
cable trays and Contract amendment which requires additional
5 Installation of LIT, LG, PI & SG Engineering BA-690571-001
Cost impact as materials were On hold due to change order for
cable trays and Contract amendment which requires additional
6 Installation of Instrument Cables Engineering BD-277195
Cost impact as materials were On hold due to change order for
cable trays and Contract amendment which requires additional
7 Installation of H2S Gas detetctor (AE/AIT) Engineering BA-690572-001
Cost impact as materials were On hold due to change order for
cable trays and Contract amendment which requires additional
8 Installation of LEL (AE/AIT) Engineering
Cost impact as materials were On hold due to change order for
cable trays and Contract amendment which requires additional
9 Installation of AHB (HORN & BEACON) Engineering

Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact BA-423431-001
2 Loop test & Functional Test Refer to comments under instrumentation

2 of 21
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
AD-3, QA-4 and QA-5 Scraper Launchers Drain Vessel
(Tag no 271-D-0120)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 271-D-0120 In Progress BA-312221-002
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress
5 Misc civil works In Progress
6 Exisiting Asphalt road modification In Progress
7 Excavation for cable trench works & U/G pipe lines In Progress

8 Foundation for Guard Post Related to hold electrical design, hence execution will have cost impact

9 Duct bank PVC sleeve Related to hold electrical design, hence execution will have cost impact
10 Foundation for lighting post Related to task lighting change order
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
4 8" Pipe sleeves for U/G line In Progress BA-690279.001
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
3 Installation ofGuard Post In Progress
4 Cathodic protectionfor U/G line In Progress BA-690279.001
Piping Works
1 Piping 1CS2P06, OW lines In Progress BA-146880-001
2 Vent Piping In Progress
3 Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
DA-942550
BA-108187
6 Tie work/Modification (14NOS) In Progress HA-110054
7 Installation of Valves & Accessories In Progress
8 Piping Insulation In Progress BA-690279-001
9 Pipe supports In Progress
Electrical Works
Installation, termination & commission of power cables from 271-DJB-2002 to
1 E710-DS-11 (120 VAC UPS power supply) Related to Change Order for cable tray BA-225109-001
2 Installation, termination of Cable Trays / Conduits in PIB #10 Related to Change Order for cable tray DA-942956-001
3 Electrical duct bank PVC conduit works Related to hold electrical design, hence execution ill have cost impact
4 Modification in exisiting cable trays works Related to hold electrical design, hence execution ill have cost impact
5 Installation of Static Grounding panel Related to hold electrical design, hence execution ill have cost impact BA-690791-001
6 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution ill have cost impact
7 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690890-002

8 Installation, termination & commission of UPS power cables to H2S gas detector Related to hold electrical design, hence execution ill have cost impact

Instrumentation Works
Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (271-AJB-2002) Contract amendment which requires additional Engineering BA-225109-001
Installation & Termination of Cable (IC-2480 &2481) from JB 271-AJB-2002 to the Cost impact as materials were On hold due to change order for cable trays and
2 existing DCS cabinet E710-DT-11B Contract amendment which requires additional Engineering PIB#10
Cost impact as materials were On hold due to change order for cable trays and
3 Installation, termination & commission of Junction box (271-DJB-2002) Contract amendment which requires additional Engineering
Installation & Termination of Cable IC-2483 from JB 271-DJB-2002 to the existing Cost impact as materials were On hold due to change order for cable trays and
4 DCS cabinet E710-DT-04B Contract amendment which requires additional Engineering PIB#10
Cost impact as materials were On hold due to change order for cable trays and
5 Installation of LIT, LG, PI & SG Contract amendment which requires additional Engineering BA-690571-002
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690572-002
Cost impact as materials were On hold due to change order for cable trays and
8 Installation of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation of AHB (HORN & BEACON) Contract amendment which requires additional Engineering

Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact BA-423429-001
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
QA-6 AND QA-7 Scraper Launchers Drain Vessel
(Tag no 271-D-0121)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 271-D-0121 In Progress BA-312221-002
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress
5 Foundation for Guard Post In Progress
6 Misc civil works In Progress
7 Exisiting Asphalt road modification In Progress

8 Duct bank PVC sleeve Related to hold electrical design, hence execution will have cost impact
9 Foundation for lighting post Related to task lighting change order
10 Foundation for Guard Post In Progress

11 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
4 6" Pipe sleeves for U/G line In Progress BA-690280.001
Mechanical Works
1 Installation of Vessel In Progress
2 Bollard post In Progress
3 Installation of ladder,Platform & handrails In Progress
4 Cathodic protectionfor U/G line In Progress BA-690280.001
Piping Works
1 Piping 1CS2P06, OW lines In Progress BA-146679-001
2 Vent Piping In Progress
3 Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
BA-108188
6 Tie work/Modification (10NOS) In Progress BA-108189
7 Installation of Valves & Accessories In Progress
8 Piping Insulation In Progress BA-690280-001
9 Pipe supports In Progress
Electrical Works
1 Installation, termination of Cable Trays / Conduits in PIB #10 Related to Change Order for cable tray DA-942956-001

2 Electrical duct bank PVC conduit works Related to hold electrical design, hence execution will have cost impact

3 Modification in exisiting cable trays works Related to hold electrical design, hence execution will have cost impact

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690791-001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-108221-001

Instrumentation Works Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (271-AJB-2003) Contract amendment which requires additional Engineering BA-225109-002
Installation & Termination of Cable (IC-2491 &2492) from JB 271-AJB-2003 to the Cost impact as materials were On hold due to change order for cable trays and
2 existing DCS cabinet E710-DT-11B Contract amendment which requires additional Engineering PIB#10
Cost impact as materials were On hold due to change order for cable trays and
3 Installation, termination & commission of Junction box (271-DJB-2003) Contract amendment which requires additional Engineering
Installation & Termination of Cable IC-2493 from JB 271-DJB-2003 to the existing Cost impact as materials were On hold due to change order for cable trays and
4 DCS cabinet E710-DT-04B Contract amendment which requires additional Engineering PIB#10
Cost impact as materials were On hold due to change order for cable trays and
5 Installation of LIT, LG, PI & SG Contract amendment which requires additional Engineering BA-690571-003
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690572-003
Cost impact as materials were On hold due to change order for cable trays and
8 Installation of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation of AHB (HORN & BEACON) Contract amendment which requires additional Engineering

Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact BA-423428-001
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
QA-3 Scraper Launcher Drain Vessel
(Tag no 271-D-0122)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 271-D-0122 In Progress BA-312221-002
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress
5 Misc civil works In Progress
6 Exisiting Asphalt road modification In Progress
7 Duct bank PVC sleeve In Progress
8 Foundation for lighting post Related to task lighting change order

9 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
10 Concrete pavement area around vessel In Progress
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
Piping Works
1 Piping 1CS2P06, OW lines In Progress BA-152966-001
2 Vent Piping In Progress
3 Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (6NOS) In Progress DA-243504
7 Installation of Valves & Accessories In Progress
8 Piping Insulation In Progress BA-690277-001
9 Pipe supports In Progress
Electrical Works
Installation, termination & commission of power cables between 120 VAC UPS
1 power supply to 271-DJB-2006 Related to Change Order for cable tray BA-225109-003
2 Installation of Cable Trays / Conduits in PIB #10 Related to Change Order for cable tray BA-321655-001

3 Electrical duct bank PVC conduit works Related to hold electrical design, hence execution will have cost impact

4 Modification in exisiting cable trays works Related to hold electrical design, hence execution will have cost impact

5 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact

6 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
7 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690893-001

Instrumentation Works Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (271-AJB-2006) Contract amendment which requires additional Engineering BA-225109-003

Installation & Termination of Cable (IC-2522 & 2523) from JB 271-AJB-2006 to Cost impact as materials were On hold due to change order for cable trays and BLDG.E710 PIB#10
2 the existing DCS cabinet E710-DT-11B Contract amendment which requires additional Engineering DCS-4B (PLANT 462)
Cost impact as materials were On hold due to change order for cable trays and
3 Installation, termination & commission of Junction box (271-DJB-2006) Contract amendment which requires additional Engineering
Installation & Termination of Cable IC-2524 from JB 271-DJB-2006 to the existing Cost impact as materials were On hold due to change order for cable trays and
4 DCS cabinet E710-DT-04B Contract amendment which requires additional Engineering PIB#10
Cost impact as materials were On hold due to change order for cable trays and
5 Installation of LIT, LG, PI & SG Contract amendment which requires additional Engineering BA-690571-004
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690572-004
Cost impact as materials were On hold due to change order for cable trays and
8 Installation of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation of AHB (HORN & BEACON) Contract amendment which requires additional Engineering

Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact BA-423430-001
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
24" ARTCL-1 Scraper Launcher Drain Vessel
(Tag no 271-D-0123)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 271-D-0123 In Progress BA-312221-002
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress
5 Misc civil works In Progress
6 Exisiting Asphalt road modification In Progress
7 Duct bank PVC sleeve In Progress
8 Foundation for lighting post Related to task lighting change order

9 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
Piping Works
1 Piping 1CS2P06, OW lines In Progress BA-152967-001
2 Vent Piping In Progress
3 Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (2NOS) In Progress DA-538135
7 Installation of Valves & Accessories In Progress
8 Piping Insulation In Progress
9 Pipe supports In Progress
Electrical Works
Installation, termination & commission of power cables between 120 VAC UPS
1 power supply to 271-DJB-2007 Related to Change Order for cable tray BA-225109-004
2 Installation of Cable Trays / Conduits in PIB #10 Related to Change Order for cable tray BA-374221.001

3 Electrical duct bank PVC conduit works Related to hold electrical design, hence execution will have cost impact

4 Modification in exisiting cable trays works Related to hold electrical design, hence execution will have cost impact

5 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690791.002

6 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact BA-374221.001
7 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690893-001

Instrumentation Works Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (271-AJB-2007) Contract amendment which requires additional Engineering BA-225109-001

Installation & Termination of Cable (IC-2532 & 2533) from JB 271-AJB-2007 to Cost impact as materials were On hold due to change order for cable trays and BLDG.E710 PIB#10
2 the existing DCS cabinet E710-DT-11B Contract amendment which requires additional Engineering DCS-4B (PLANT 462)
Cost impact as materials were On hold due to change order for cable trays and
3 Installation, termination & commission of Junction box (271-DJB-2007) Contract amendment which requires additional Engineering
Installation & Termination of Cable IC-2482 from JB 271-DJB-2007 to the existing Cost impact as materials were On hold due to change order for cable trays and
4 DCS cabinet E710-DT-04B Contract amendment which requires additional Engineering PIB#10
Cost impact as materials were On hold due to change order for cable trays and
5 Installation of LIT, LG, PI & SG Contract amendment which requires additional Engineering BA-690571-005
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690572-005
Cost impact as materials were On hold due to change order for cable trays and
8 Installation of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation of AHB (HORN & BEACON) Contract amendment which requires additional Engineering

Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
Shaybah Scraper Receiver Drain Vessel
(Tag no 106-D-0934)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0934 In Progress BA-290752-001
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress BA-690722-001
5 Misc civil works (Catch basin) In Progress

6 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
7 Demolish works In Progress
8 Foundation for lighting post Related to task lighting change order
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification ( 5Nos) In Progress BA-141645-001
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
7 Accessories In Progress BA-129378-001
8 Piping Insulation In Progress
9 Pipe supports, cathodic protection In Progress BA-342631-001
10 Demolish (partical ) the existing drain lines In Progress
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray BA-374221.001
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray

3 Modification in exisiting cable trays works Related to hold electrical design, hence execution will have cost impact

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690778.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690880.001
7 Interface connection from new lighting works to the existing setups Related to task lighting change order

8 New cable trays works in PIB #7 Related to hold electrical design, hence execution will have cost impact BA-103816.006

Instrumentation Works Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-1016) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2003 Contract amendment which requires additional Engineering

Installation & Termination of Cable (IC-6907 &6908) from JB 106-AJB-1016 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-014
Installation & Termination of Cable (IC-6909) from JB 106-DJB-2003 to the Cost impact as materials were On hold due to change order for cable trays and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI & SG Contract amendment which requires additional Engineering BA-251958-006
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-251958-001
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment

Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
UA-2 and UA-4 Scraper Receivers Drain Vessel
(Tag no 106-D-0940)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0940 In Progress BA-290752-001
3 Foundation for Access Platform In Progress
4 Foundation for Pipe Supports In Progress BA-690726-001
5 Misc civil works In Progress
6 New 6m wide Asphault access road In Progress BA-299794-001
7 Demolish works In Progress

8 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
9 Concrete pavement area around vessel In Progress
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
4 6" & 8" Pipe sleeves for U/G line In Progress BA-690259.001
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
3 Cathodic protectionfor U/G line In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (11nos) In Progress DA-528731.002
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
7 Accessories In Progress BA-129379-001
8 Piping Insulation In Progress
9 Pipe supports In Progress BA-690258-001
10 Demolish (partical ) the existing drain lines In Progress
11 Drain line to existing sump pit In Progress BA-690259-001
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray HA-318154.001
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray
4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690778.001
5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690887.003
7 Interface connection from new lighting works to the existing setups Related to task lighting change order
8 New cable trays works in PIB #7 Related to hold electrical design, hence execution will have cost impact
9 U/G cable from vessel to PIB #7 Related to hold electrical design, hence execution will have cost impact BA-102624.010

Instrumentation Works
Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-1017) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2004 Contract amendment which requires additional Engineering

Installation & Termination of Cable (IC-6910 &6911) from JB 106-AJB-1017 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-014
Installation & Termination of Cable (IC-6912) from JB 106-DJB-2004 to the Cost impact as materials were On hold due to change order for cable trays and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI & SG Contract amendment which requires additional Engineering BA-251958-001
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-007
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
AA-1/2 Scraper Receivers Drain Vessel
(Tag no 106-D-0941)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0941 In Progress BA-290752-002
4 Foundation for Access Platform In Progress
5 Foundation for Pipe Supports In Progress BA-313120-001
6 Misc civil works In Progress

7 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
8 Demolish works In Progress BE-690704
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
3 Pipe sleeves In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
2 Existing support modifictaion In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress BA-342631-001
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (10NOS) In Progress DA-528605.001
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
7 Accessories In Progress BA-130307-001
8 Piping Insulation In Progress
9 Pipe supports In Progress BA-690275-001
10 Sampling lines In Progress
11 Demolish (partical ) the existing drain lines In Progress
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690782.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690887.004
7 Interface connection from new lighting works to the existing setups Related to task lighting change order

8 New cable trays works from vessel 106-D-0941 to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-102624.009

9 New cable routing underground trench from vessel 106-D-0941 to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-229228.002

Instrumentation Works
Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-1018) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2005 Contract amendment which requires additional Engineering

Installation & Termination of Cable (IC-6927 &6928) from JB 106-AJB-1018 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-015
Installation & Termination of Cable (IC-6929) from JB 106-DJB-2005 to the Cost impact as materials were On hold due to change order for cable trays and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI, FG & SG Contract amendment which requires additional Engineering BA-251958-002
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-008
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
UA-6 Scraper Receiver Drain Vessel
(Tag no 106-D-0942)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0942 In Progress BA-290752-001
4 Foundation for Access Platform In Progress
5 Foundation for Pipe Supports In Progress BA-690714-001
6 Misc civil works In Progress
7 New 6m wide Asphault access road In Progress BA-299794-002

8 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
9 Demolish works In Progress
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform In Progress
3 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
2 Existing support modifictaion In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress BA-342631-001
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (5nos) In Progress BA-130387.001
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
7 Accessories In Progress BA-130308-001
8 Piping Insulation In Progress
9 Pipe supports In Progress BA-690262-001
10 Demolish (partical ) the existing drain lines In Progress BE-690704
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690778.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690887.001
7 Interface connection from new lighting works to the existing setups Related to task lighting change order
8 New cable trays works from vessel 106-D-0942to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-103816.006

9 New cable routing underground trench from vessel 106-D-0942 to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-141869.001

Instrumentation Works
Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-1019) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2006) Contract amendment which requires additional Engineering

Installation & Termination of Cable (IC-6930 &6931) from JB 106-AJB-1019 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-015
Installation & Termination of Cable (IC-6932) from JB 106-DJB-2006 to the Cost impact as materials were On hold due to change order for cable trays and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI, FG & SG Contract amendment which requires additional Engineering BA-251958-003
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-009
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
UA-1/3, and GC Scraper Receivers Drain Vessel
(Tag no 106-D-0943)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0943 In Progress BA-290752-001
4 Foundation for Access Platform In Progress
5 Foundation for Pipe Supports In Progress BA-690712-001
6 Misc civil works In Progress
7 Demolish works In Progress

8 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform for vessel In Progress
3 Platform for exiting utilites In Progress DA-528850-001
4 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
2 Existing support modifictaion In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress BA-342631-001
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (18NOS) In Progress DA-528730.008
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
7 Accessories In Progress BA-130387-001
8 Piping Insulation In Progress
9 Pipe supports In Progress BA-690261-001
10 12FEOU piping (UG RTR) In Progress BA-421942-006
11 Demolish (partical ) the existing drain lines In Progress
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690781.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690887.002
7 Interface connection from new lighting works to the existing setups Related to task lighting change order

8 New cable trays works in PIB #7 Related to hold electrical design, hence execution will have cost impact
9 New cable trays works from vessel 106-D-0943to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-366169.004

10 New cable routing underground trench from vessel 106-D-0943 to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-102624.010

Instrumentation Works Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-2020) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2007) Contract amendment which requires additional Engineering
Installation & Termination of Cable (IC-6947 & 6948) from JB 106-AJB-2020 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-016
Installation & Termination of Cable (IC-6949) from JB 106-DJB-2007 to the Cost impact as materials were On hold due to change order for cable trays and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI, FG & SG Contract amendment which requires additional Engineering BA-251958-004
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-010
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
AA-3 Scraper Receiver Drain Vessel
(Tag no 106-D-0944)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0944 In Progress BA-290752-002
4 Foundation for Access Platform In Progress
5 Foundation for Pipe Supports In Progress BA-313119-001
6 Misc civil works In Progress
8 Demolish works In Progress
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform for vessel In Progress
3 Platform for exiting utilites In Progress DA-528850-001
4 Field pipe support In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
2 Existing support modifictaion In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress BA-342631-001
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Sampling lines In Progress
6 Instrument Piping (FBE Coating) In Progress
7 Tie work/Modification (5NOS) In Progress DA-528606.002
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
8 Accessories In Progress BA-130388-001
9 Piping Insulation In Progress
10 Pipe supports In Progress BA-690260-001
11 12FEOU piping (UG RTR) In Progress BA-421942-006
12 Demolish (partical ) the existing drain lines In Progress
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray
2 Electrical duct bank PVC conduit works in road crossing Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690779.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690888.001
7 Interface connection from new lighting works to the existing setups Related to task lighting change order

8 New cable underground from vessel to PIB #7 Related to hold electrical design, hence execution will have cost impact BA-322749.001
9 New cable trays works from vessel 106-D-0944to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-339169.004

10 New cable routing underground trench from vessel 106-D-0944 to the PIB #7 Related to hold electrical design, hence execution will have cost impact

Instrumentation Works
Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-2021) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2008) Contract amendment which requires additional Engineering
Installation & Termination of Cable (IC-6950 & 6951) from JB 106-AJB-2021 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-016
Installation & Termination of Cable (IC-6952) from JB 106-DJB-2008 to the Cost impact as materials were On hold due to change order for cable trays and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI, FG & SG Contract amendment which requires additional Engineering BA-251958-005
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-011
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
UA-1 Scraper Receivers and GC Surge Relief Skid Drain Vessel
(Tag no 106-D-0945)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0945 In Progress BA-290752-002
4 Foundation for Access Platform In Progress
5 Foundation for Pipe Supports In Progress BA-312230-001
6 Misc civil works In Progress

8 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform for vessel In Progress
3 Field pipe support In Progress
4 New guard rails In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
2 Existing support modifictaion In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress BA-342631-001
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (2NOS) In Progress RA-215214.001

7 Installation of Valves ( Gate, Globe, check, ball valves, spectable plate & Accessories In Progress BA-130389-001
8 Piping Insulation In Progress
9 Pipe supports In Progress BA-215158-001
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690781.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690887.002
7 Interface connection from new lighting works to the existing setups Related to task lighting change order

8 New cable trays works in PIB #7 Related to hold electrical design, hence execution will have cost impact
9 New cable trays works from vessel 106-D-0945to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-366169.004

10 New cable routing underground trench from vessel 106-D-0945 to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-102624.010

Instrumentation Works
Cost impact as materials were On hold due to change order for cable trays and
1 Installation, termination & commission of Junction box (106-AJB-2022) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
2 Installation, termination & commission of Junction box (106-DJB-2009) Contract amendment which requires additional Engineering
Installation & Termination of Cable (IC-6960 & 6961) from JB 106-AJB-2022 to the Cost impact as materials were On hold due to change order for cable trays and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-017
Installation & Termination of Cable (IC-6962) from JB 106-DJB-2009 to the existing Cost impact as materials were On hold due to change order for cable trays and
4 DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable trays and
5 Installation, termination & commission of LIT, LG, PI, FG & SG Contract amendment which requires additional Engineering BA-251958-007
Cost impact as materials were On hold due to change order for cable trays and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-013
Cost impact as materials were On hold due to change order for cable trays and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable trays and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
IP-LP Scraper Receiver Drain Vessel
(Tag no 106-D-0946)
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works In Progress
2 Foundation for Vessel 106-D-0946 In Progress BA-290752-003
4 Foundation for Access Platform In Progress
5 Foundation for Pipe Supports In Progress BA-313121-001
5 Foundation for Guard Post In Progress
6 Misc civil works In Progress
7 New 6m wide Asphault access road In Progress BA-298948-001

8 Excavation for cable trench works Related to hold electrical design, hence execution will have cost impact
Steel Structure Works
1 Misc. Steel Structure In Progress
2 Access Platform for vessel In Progress
3 Field pipe support In Progress
4 Guard post In Progress
Mechanical Works
1 Installation of Vessel In Progress
2 Installation of ladder,Platform & handrails In Progress
Installation of Guard Post around the vessel In Progress
2 Existing support modifictaion In Progress
Piping Works
1 OW Pipe lines 1CS2P06 In Progress BA-342631-001
2 Vent Pipe lines 1CS2P06 In Progress
3 Blowdown, Steam & Nitrogen Piping In Progress
4 U/G Piping & fittings In Progress
5 Instrument Piping (FBE Coating) In Progress
6 Tie work/Modification (2NOS) In Progress DA-538135.001
Installation of Valves ( Gate, Globe, check, ball valves, spectable plate &
7 Accessories In Progress BA-130416-001
8 Piping Insulation In Progress
9 Pipe supports In Progress BA-230753-001
Electrical Works
1 Installation of Cable Trays / Conduits in PIB #7 Related to Change Order for cable tray
2 Electrical duct bank PVC conduit works Related to Change Order for cable tray
3 Modification in exisiting cable trays works Related to Change Order for cable tray

4 Installation of Static Grounding panel Related to hold electrical design, hence execution will have cost impact BA-690780.001

5 Interface connection from grounding panel to the existing ground grid Related to hold electrical design, hence execution will have cost impact
6 Installation of PC around the vessel for lighting works Related to task lighting change order BA-690887.005
7 Interface connection from new lighting works to the existing setups Related to task lighting change order

8 New cable trays works in PIB #7 Related to hold electrical design, hence execution will have cost impact
9 New cable trays works from vessel 106-D-0946to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-103802.010

10 New cable routing underground trench from vessel 106-D-0946 to the PIB #7 Related to hold electrical design, hence execution will have cost impact BA-102624.010

Instrumentation Works
Cost impact as materials were On hold due to change order for cable tray and
1 Installation, termination & commission of Junction box (106-AJB-2026) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable tray and
2 Installation, termination & commission of Junction box (106-DJB-2011) Contract amendment which requires additional Engineering
Installation & Termination of Cable (IC-7061 & 7062) from JB 106-AJB-2026 to the Cost impact as materials were On hold due to change order for cable tray and
3 existing DCS cabinet D57-DT-04A Contract amendment which requires additional Engineering BA-225110-019
Installation & Termination of Cable (IC-7063) from JB 106-DJB-2011 to the Cost impact as materials were On hold due to change order for cable tray and
4 existing DCS cabinet D57-DT-03B Contract amendment which requires additional Engineering PIB #7
Cost impact as materials were On hold due to change order for cable tray and
5 Installation, termination & commission of LIT, LG, PI, FG & SG Contract amendment which requires additional Engineering BA-251958-008
Cost impact as materials were On hold due to change order for cable tray and
6 Installation of Instrument Cables Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable tray and
7 Installation, termination & commission of H2S Gas detetctor (AE/AIT) Contract amendment which requires additional Engineering BA-690560-014
Cost impact as materials were On hold due to change order for cable tray and
8 Installation, termination & commission of LEL (AE/AIT) Contract amendment which requires additional Engineering
Cost impact as materials were On hold due to change order for cable tray and
9 Installation, termination & commission of AHB (HORN & BEACON) Contract amendment which requires additional Engineering
10 Sampling system Deleted in Contract amendment
Pre-commissioning Works
1 Hydro testing of Piping Will be done with schedule impact
2 Loop test & Functional Test Refer to comments under instrumentation
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
PROCESS INTERFACE BUILDING #10
S.No Scope Description Reference Remarks
Electrical Works
1 Installation of Cable Trays / Conduits Related to change order for DCS BA-102762.001
2 Misc. electrical works Related to change order for DCS
3 Grounding panel Related to change order for DCS BA-102738.001
4 Modification in exisiting cable trays works Related to change order for DCS
5 New cable trays works in the PIB #10 Related to change order for DCS
6 New cable routing underground trench Related to change order for DCS
7 Existing cable routing & Conduit works Related to change order for DCS

Instrumentation Works
1 Installation of PCS Related to change order for DCS HA-318029-001
2 Installation of DCS E710-DS-11 Related to change order for DCS PIB #10
3 Installation of smoke detector Related to change order for DCS

4 Installation of NEW DCS E710-DS-11 to existing DCS E710-DT-11B & E710-DT-04B Related to change order for DCS
5 Misc. instrumentation works Related to change order for DCS
Pre-commissioning Works
1 Loop test & Functional Test Related to change order for DCS
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
PROCESS INTERFACE BUILDING #7
S.No Scope Description Remarks Reference
Electrical Works
1 Installation of Cable Trays / Conduits Related to change order for DCS BA-102820.002
2 Misc. electrical works Related to change order for DCS
3 Grounding panel Related to change order for DCS
4 Modification in exisiting cable trays works Related to change order for DCS
5 New cable trays works in the PIB #7 Related to change order for DCS
6 New cable routing underground trench Related to change order for DCS
7 Existing cable routing & Conduit works Related to change order for DCS
8 Pre Fab cable works Related to change order for DCS BA-225110.014

Instrumentation Works
1 Installation of DCS D57-DS-21 Related to change order for DCS PIB #7
2 Installation of smoke detector Related to change order for DCS

3 Installation of new DCS D57-DS-21 to the existing DCS D57-DT-04A & D57-DS-21 Related to change order for DCS
Interface between new DCS D57-DS-21 to the existing DCS D57-DT-04A & D57-DS-
4 21 Related to change order for DCS
5 Misc. instrumentation works Related to change order for DCS
Pre-commissioning Works
1 Loop test & Functional Test Related to change order for DCS
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
HVAC- SUBSTATION #34
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works for new HVAC PACU-1 & PACU-2 Completed
2 Excavation works new Fresh air intake stack Completed
3 Foundation works for new HVAC PACU-1 & PACU-2 Completed
4 Foundation works for new Fresh air intake stack Completed
5 Foundation works for ladders with cage Under process

Demolition Works
1 Demolishing of 2 DX type split Air Handing Units (AHU) After commissioning of new HVAC
2 Demolishing of 2 Air-cooled Condensing Units (ACCU) After commissioning of new HVAC
3 Demolishing of refrigerant pipe and related accessories After commissioning of new HVAC
4 Demolishing of 2 window AC units in battery room After commissioning of new HVAC
Demolishing of 2 exhaust fans along with related accessories in
5 battery room After commissioning of new HVAC

Mechanical Works
1 Installation of new HVAC PACU-1 & PACU-2 Completed
2 Installation of Fresh air intake stack Completed
3 Installation of Chemical filter Completed
4 Installation of Exhaust fans In progress

5 Installation of duct works (Supply, Return, Fresh and Exhaust). Completed


6 Installation of fire & smoke dampers Completed
7 Installation of volume control dampers Completed
8 Installation of Motorized dampers Completed
9 External duct installation work In progress BA-152982-001
10 Provide Chemical Filter in fresh air duct. Completed
11 Provide Battery Room Ventilation System. Completed

Piping Works
1 New HVAC PACU-1 & PACU-2 Drain lines In progress
Steel Structure Works
1 Misc. Steel Structure In progress
2 Access ladder to substation #34 In progress

Electrical Works

1 Installation of power cables for PACU, DDC & exhaust fans Related to Change Order for cable tray NA-946547
Part of Electrical IFC package which is on hold as per
transmittal no. BI 00934-T-1479-17 & BI 00934-T-1963-19 &
BI 00934-T-1984-17 & BI 00934-T-1982-17 & BI 00934-T-
2 Replace exisiting circuit breaker in MCC #1 for PACU-1 1981-17
Part of Electrical IFC package which is on hold as per
transmittal no. BI 00934-T-1479-17 & BI 00934-T-1963-19 &
BI 00934-T-1984-17 & BI 00934-T-1982-17 & BI 00934-T-
3 Replace exisiting circuit breaker in MCC #1 for PACU-2 1981-18
4 Installation of HVAC Duct heater On hold due to Electrical Design Package hold
5 Installation of Exhaust fan in battery room Waiting demolishing of existing exhaust fan
6 Grounding system On hold due to Electrical Design Package hold
7 Misc. electrical works On hold due to Electrical Design Package hold
8 Modification in exisiting cable trays works On hold due to Electrical Design Package hold
9 New cable trays works On hold due to Electrical Design Package hold
10 Field Control cable termination On hold due to Electrical Design Package hold
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
HVAC- SUBSTATION #34
S.No Scope Description Remarks Reference
Civil Works
Instrumentation Works
1 Installation of LEL (HVAC fresh intake) Related to Change Order for cable tray BA-225110.020
2 Installation of Horn & Beacon (Outside battery room) Related to Change Order for cable tray BA-225110.020
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
3 Installation of Analog Junction box – 106-AJB-2027 additional Engineering BA-225110.020
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
4 Installation of Digital Junction box - 106-AJB-628 additional Engineering BA-225110.020
Installation of homerun cables (IC-6818, 6PR - #14AWG & IC-
5 6828, 4TR #18AWG) from SS#34 to PIB #7 Related to Change Order for cable tray BA-225110.020
6 Installation of DDC panel Waiting demolishing of existing AC units BA-225110.020
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
7 Misc. instrumentation works additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
8 Control cable installation additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
9 Field devices installation additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
10 Starter panel additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
11 Disconnect switch installation additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
12 External Conduit pipe support installation work additional Engineering
13 UPS cabling to DDC panel Related to Change Order for cable tray

Pre-commissioning Works
1 Pre-commissioning of HVAC system
2 Testing and Air Balancing - TAB
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
HVAC- SUBSTATION #36
S.No Scope Description Remarks Reference
Civil Works
1 Excavation works for new HVAC PACU-1 & PACU-2 Completed
2 Excavation works new Fresh air intake stack Completed
3 Foundation works for new HVAC PACU-1 & PACU-2 Completed
4 Foundation works for new Fresh air intake stack Completed

Demolition Works
1 Demolishing of 2 DX type split Air Handing Units (AHU) After commissioning of new HVAC
2 Demolishing of 2 Air-cooled Condensing Units (ACCU) After commissioning of new HVAC
3 Demolishing of refrigerant pipe and related accessories After commissioning of new HVAC
4 Demolishing of 2 window AC units in battery room After commissioning of new HVAC
Demolishing of 2 exhaust fans along with related accessories
5 in battery room After commissioning of new HVAC

Mechanical Works
1 Installation of new HVAC PACU-1 & PACU-2 Completed
2 Installation of Fresh air intake stack Completed
3 Installation of Chemical filter Completed
4 Installation of Exhaust fans In Progress

5 Installation of duct works (Supply, Return, Fresh and Exhaust). Completed


6 Installation of fire & smoke dampers Completed
7 Installation of volume control dampers Completed
8 Installation of Motorized dampers Completed
9 External duct installation work Completed BA-152982-001
10 Provide Chemical Filter in fresh air duct. Completed
11 Provide Battery Room Ventilation System. Completed

Piping Works
1 New HVAC PACU-1 & PACU-2 Drain lines In Progress
Steel Structure Works
1 Misc. Steel Structure for duct support In progress

Electrical Works

1 Installation of power cables for PACU, DDC and exhaust fans Related to Change Order for cable tray NA-946547

Part of Electrical IFC package which is on hold as per


transmittal no. BI 00934-T-1479-17 & BI 00934-T-1963-19 & BI
2 Replace exisiting circuit breaker in MCC #4 for PACU-1 00934-T-1984-17 & BI 00934-T-1982-17 & BI 00934-T-1981-17

Part of Electrical IFC package which is on hold as per


transmittal no. BI 00934-T-1479-17 & BI 00934-T-1963-19 & BI
3 New circuit breaker at MCC 106-036-MCC-001 for PACU-2 00934-T-1984-17 & BI 00934-T-1982-17 & BI 00934-T-1981-18
4 Installation of HVAC Duct heater On hold due to Electrical Design Package hold
5 Installation of Exhaust fan in battery room Waiting demolishing of existing exhaust fan
6 Grounding system On hold due to Electrical Design Package hold
7 Misc. electrical works On hold due to Electrical Design Package hold
8 Modification in exisiting cable trays works On hold due to Electrical Design Package hold
9 New cable trays works On hold due to Electrical Design Package hold
10 Field Control cable termination On hold due to Electrical Design Package hold

19 of 21
CLOSED DRAIN SYSTEM PROJECT
SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I
HVAC- SUBSTATION #36
S.No Scope Description Remarks Reference
Civil Works
Instrumentation Works
1 Installation of LEL (HVAC fresh intake) Related to Change Order for cable tray BA-280606
2 Installation of Horn & Beacon (Outside battery room) Related to Change Order for cable tray BA-280607
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
3 Installation of Analog Junction box – 106-AJB-2027 additional Engineering BA-280608
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
4 Installation of Digital Junction box - 106-AJB-628 additional Engineering
Installation of homerun cables (IC-7398, 6PR - #14AWG & IC-
5 7398, 4TR #18AWG) from SS#36 to PIB #12 Related to Change Order for cable tray BA-225110.020
6 Installation of LCP – 106-LCP-1002 Waiting demolishing of existing AC units BA-225110.020
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
7 Misc. instrumentation works additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
8 Control cable installation additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
9 Field devices installation additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
10 Starter panel additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
11 Disconnect switch installation additional Engineering
Cost impact as materials were On hold due to change order
for cable tray and Contract amendment which requires
12 External Conduit pipe support installation work additional Engineering
13 UPS cabling to DDC panel Related to Change Order for cable tray

Pre-commissioning Works
1 Pre-commissioning of HVAC system
2 Testing and Air Balancing - TAB

20 of 21
CLOSED DRAIN SYSTEM PROJECT

SCOPE OF WORK OF SCRAPPER RECEIVER /LAUNCHER AS PER CONTRACT- CIVIL, MECH, E & I

BILL OF QUANTITY OF INSTRUMENT CABLES & POWER CABLES FROM AJB, DJB & LCP TO DCS MARSHALLING CABINET IN PIB# 10 & 7.

PRESSURE VESSEL INSTRUMENT CABLES POWER CABLES AJB DJB SGP PANEL LIGHTING POLE

Reference

NO & Size

NO & Size

Qty (Nos)

Qty (Nos)

Qty (Nos)

Qty (Nos)
Cable no

Cable no
Location

Location
Tag no

Type

Type

TAG

TAG

TAG

TAG
SIZE
S.No Plant Description

AT-1, QA-1 Scraper Receivers and AD1, AD2


1 271 Scraper. Launcher Drain Vessel 271-D-0119 BD-277195-001 IC-2478 3/4" 1-6PRX18AWG XLPE U PC-2761 2/C 10MM2 XLPE U 271-AJB-2001 1 271-DJB-2001 1 Task Light,150w 2
IC-2482 3/4" 1-6PRX14AWG XLPE U PC-2762 2/C 16MM2 XLPE U
PC-2766 3/C 6MM2 XLPE 271-LCP-SGX1 1
AD-3, QA-4 and QA-5 Scraper Launchers Drain
2 271 Vessel 271-D-0120 BD-277195-001 IC-2480 3/4" 1-6PRX18AWG XLPE U PC-2763 2/C 10MM2 XLPE U 271-AJB-2002 1 271-DJB-2002 1 Task Light,150w 2
IC-2483 3/4" 1-6PRX14AWG XLPE U PC-2764 2/C 16MM2 XLPE U
PC-2767 3/C 6MM2 XLPE U 271-LCP-SGX2 1
QA-6 AND QA-7 Scraper Launchers Drain
3 271 Vessel 271-D-0121 BD-277195-002 IC-2491 3/4" 1-2PRX18AWG XLPE U 0 0 0 0 271-AJB-2003 1 271-DJB-2003 1 Task Light,150w 2
IC-2492 1" 1-4TRX18AWG XLPE U 0 0 0 0
IC-2493 1" 1-6PRX14AWG XLPE A PC-2768 3/C 6MM2 XLPE U 271-LCP-SGX3 1

4 271 QA-3 Scraper Launcher Drain Vessel 271-D-0122 BD-277195-003 IC-2522 3/4" 1-6PRX18AWG XLPE U PC-2777 2/C 16MM2 XLPE U 271-AJB-2006 1 271-DJB-2006 1 Task Light,150w 2
IC-2524 1" 1-6PRX14AWG XLPE U PC-2765 2/C 16MM2 XLPE U
PC-2769 3/C 6MM2 XLPE U 271-LCP-SGX4 1

5 271 24" ARTCL-1 Scraper Launcher Drain Vessel 271-D-0123 BD-277195-004 IC-2532 1" 1-6PRX18AWG XLPE U PC-2778 2/C 10MM2 XLPE U 271-AJB-2007 1 271-DJB-2007 1 Task Light,150w 2
IC-2534 1" 1-6PRX14AWG XLPE U PC-2779 2/C 10MM2 XLPE U
PC-2770 3/C 6MM2 XLPE U 271-LCP-SGX5 1
Shaybah Scraper Receiver Drain
6 106 Vessel 106-D-934 BA-129378-001 IC-6907 1" 1-4TRX18AWG XLPE U PC-7392 3/C 10MM2 XLPE 0 106-AJB-1016 1 106-DJB-2003 1 Task Light,150w 3
IC-6908 3/4" 1-2PRX18AWG XLPE U PC-7401 3/C 6MM2 XLPE 0
IC-6909 1" 1-8PRX14AWG XLPE U PC-7330 3/C 4MM2 XLPE U 106-LCP-SGX1 1
UA-2 and UA-4 Scraper Receivers
7 106 Drain Vessel 106-D-940 BA-129379-001 IC-6910 1" 1-4TRX18AWG XLPE A PC-7393 3/C 10MM2 XLPE 0 106-AJB-1017 1 106-DJB-2004 1 Task Light,150w 2
IC-6911 3/4" 1-2PRX18AWG XLPE U PC-7402 3/C 10MM2 XLPE 0
IC-6912 1" 1-8PRX14AWG XLPE E PC-7331 3/C 6MM2 XLPE U 106-LCP-SGX2 1
8 106 AA-1/2 Scraper Receivers Drain Vessel 106-D-941 BA-130307-001 IC-6927 1" 1-4TRX18AWG XLPE A PC-7394 3/C 10MM2 XLPE 0 106-AJB-1018 1 106-DJB-2005 1 Task Light,150w 2
IC-6928 3/4" 1-2PRX18AWG XLPE U PC-7403 3/C 10MM2 XLPE 0
IC-6929 1" 1-8PRX14AWG XLPE E PC-7332 3/C 6MM2 XLPE U 106-LCP-SGX3 1
9 106 UA-6 Scraper Receiver Drain Vessel 106-D-942 BA-130308-001 IC-6930 1" 1-4TRX18AWG XLPE A PC-7395 3/C 10MM2 XLPE 0 106-AJB-1019 1 106-DJB-2006 1 Task Light,150w 2
IC-6931 3/4" 1-2PRX18AWG XLPE U PC-7404 3/C 10MM2 XLPE 0
IC-6932 1" 1-8PRX14AWG XLPE E PC-7333 3/C 6MM2 XLPE U 106-LCP-SGX4 1
UA-1/3, and GC Scraper Receivers Drain
10 106 Vessel 106-D-943 BA-130387-001 IC-6947 1" 1-4TRX18AWG XLPE A PC-7396 3/C 10MM2 XLPE 0 106-AJB-2020 1 106-DJB-2007 1 Task Light,150w 2
IC-6948 3/4" 1-2PRX18AWG XLPE U PC-7405 3/C 10MM2 XLPE 0
IC-6949 1" 1-8PRX14AWG XLPE E PC-7334 3/C 10MM2 XLPE U 106-LCP-SGX5 1
11 106 AA-3 Scraper Receiver Drain Vessel 106-D-944 BA-130388-001 IC-6950 1" 1-4TRX18AWG XLPE A PC-7397 3/C 16MM2 XLPE 0 106-AJB-2021 1 106-DJB-2008 1 Task Light,150w 2
IC-6951 3/4" 1-2PRX18AWG XLPE U PC-7406 3/C 16MM2 XLPE 0
IC-6952 1" 1-8PRX14AWG XLPE E PC-7335 3/C 10MM2 XLPE U 106-LCP-SGX6 1
UA-1 Scraper Receivers and GC Surge Relief
12 106 Skid Drain Vessel 106-D-945 BA-130389-001 IC-6960 1" 1-4TRX18AWG XLPE A PC-7398 3/C 16MM2 XLPE 0 106-AJB-2022 1 106-DJB-2009 1 Task Light,150w 2
IC-6961 3/4" 1-2PRX18AWG XLPE U PC-7407 3/C 16MM2 XLPE 0
IC-6962 1" 1-8PRX14AWG XLPE E PC-7336 3/C 10MM2 XLPE U 106-LCP-SGX7 1
13 106 IP-LP Scraper Receiver Drain Vessel 106-D-946 BA-130416-001 IC-7061 3/4" 1-2PRX18AWG XLPE A PC-7399 3/C 6MM2 XLPE 0 106-AJB-2026 1 106-DJB-2011 1 106-LCP-SGX7 1 Task Light,150w 2
IC-7062 1" 1-4TRX18AWG XLPE U PC-7408 3/C 6MM2 XLPE 0
IC-7063 1" 1-8PRX14AWG XLPE E PC-7337 3/C 4MM2 XLPE U
TOTAL QTY 13 13 13 27

Potrebbero piacerti anche