DESCRIPTION SQUARIN G DIMENSIO N TESTING

CW

P2: 20\100 ; 50\100 = 0.2 m ; 0.50m 3.60


L7: (B7 – D7)= 1.30+2.40-0.10-0.50=3.60m 0.50
0.20
CW FOR BEAMS : B2 0.36

B3 , B4 , B5 , B6 :20\100 ;60\100 = 0,20 ; 0.60m


L7 : (A8 –B8)= 4.20-0.10-0.40 = 3.70m
(B8 –D8)= 1.80+2.40-0.30-0.30 = 3.60m
(A5 –A8)=1.00+1.50+1.70-0.10-0.10 = 4.00m
(A5 –B5)=4.20-0.10-0.40 =0.70m
(B8 –B7)= 1.70-1.10-0.10 = 1.50m
(B7 –B3) =0.5+1.20+1.00+1.50-0.50-0.50 =3.20m
(D8 –D7) =1.70-0.10-0.10 = 1.50m
(D7 –D3) =0.50+1.20+1.00+1.50-0.10-0.60 =3.50m
(B3 –D3) =1.80+2.40-0.10-0.10 =4.00m
(A5 –A3) =0.5+1.20-0.10-0.10 =1.50m
(A3 –B3) =4.20-0.10-0.40 =3.70m
(D6 –E6) =5.20-0.10-0.30 =4.30m
(D4 –E4) =5.20-0.10-0.10 = 5.00m
(E6 –E4) =1.20+1.00-0.10-0.10 =2.00m
(A3 –A2) =4.20-0.10-0.10 =4.00m
(C3 –C2) =4.20-0.10-0.10 =4.00m
(D3 –D1) =4.20-1.50-0.6-0.4 =5.20m
(E4 –E1) =0.50+4.20+1.50-0.40-0.40 =5.20m
(A2-C2) =4.20+1.80-0.40-0.40 =5.20m
(C2 –D2) =2.40-0.10-0.10 =2.20m
(A2 –A1) =1.50-0.10-0.10 =1.30m
(C2 –C1) =1.50-0.10-0.10 =1.30m
(A1 –C1) =4.20+1.30-0.01-0.10 =5.80m
(C1 –D1) =2.40-0.10-0.10 =2.20m
(D1 –E1) =5.20-0.10-0.10 =5.00m
_______
87.10m
Page No : 2 Title: BEAM
DESCRIPTION SQUARIN G DIMENSIO N TESTING
DITTO FOR – B3&B4&B5&B6 10.45 87.10
10.81 0.60
CW FOR BEAMS B2&B3&B4&B5&B6 0.20
10.81m3

FW
B2
WB2=(50\100*2)+20\100=1.20m
3.60
FW FOR B2 4.32 1.20
B2;B4;B5;B6
WB=60\100 (2)+20\100 =1.40m

FW FOR BEAMS : B3;B4;B5;B6 121.94 87.10


Ddt 1.40
SIDE d COLUMNS 0.20
Ddt 0.50
DITTO 4.92 21
0.20
121.14
FW FOR BEAMS : B3;B4;B5;B6 411
0.60
0.20
Page No : 3 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

FIRST FLOOR

CW

B4:20\100;60\100 =0.60m
L7: (B7 –D7) =1.80+2.40-0.10-(0.60-0.10) =3.60m
(B3 –B7) =0.50+1.20+1.00+1.50-(0.60-0.10) =3.20m
(D3 –D7)=0.50+1.20+1.00+1.50-0.10-(0.7-0.10) =3.50m
(B3 –D3)=1.80+2.40-(0.10*2)=4.00m
----------
14.30m 0.60
0.20
CW FOR BEAMES-B4 1.716 14.30

FW
B4:
P=(0.6*2)+0.20=1.40m

FW FOR B4 20.02 14.30


Ddt 1.40
C4 & C5: 20\100 ; 60\100= 0.20 ; 0.60m

FROM THE COLUME – C4&C5 0.72 0.60


C6:20\100 ; 70\100=0.20;0.70m Ddt 0.20 61

Ditt – C6 0.28 0.70


FW FOR BEAMES – B4 19.02 0.20 21
Page No : 1 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B2(B7-D7)
L straight BOT = 1.80+2.40+0.10(2)-2(0.04)+2(0.5-2(0.025))=5.22m

Straight Bottom Bar – 16mm

L Straight Top Bar = 1.80+2.40+0.10(2)-2(0.04)+2(13(16)\1000) 15.66 5.22 13


=4.74m

Straight top Bar – 16mm 9.48 4.74 21

STIRRUPS
LC – C cd COLUM = 1.80+2.40+0.10-0.60\2 =4.00m
STIRRUP SPAN = L-2(L\3) =L\3 =4.00\3=1.33m
NO OF STIRRUP = 1.33\(15\100)+1 =9.8=10PCS

L= {13(8)\1000}(2) = 1.41m

STIRRUPS – 8mm 14.10 1.41 101


Page No : 2 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(A8-B8)L =4.20+0.1-0.5\2-0.1+0.4\2=4.15m

Straight Bat Bar = 4.20+0.10-0.04+0.06-2(0.025)-


0.10+0.04\2+{0.40\2 +13(16)\1000} =5.32m
15.96 5.32 31
Straight Bottom Bar – 16 mm

Straight top Bar = 4.20+0.10-0.04+(13(16)\1000)-0.1+0.4\2=5.57m

Straight top Bar – 16 mm 11.14 5.57 21

LEOCS = L\3+0.4\2+13(16)\1000=4.15\3+0.40\2+13(16)\1000 =1.79m

EOCS – 16m 3.58 1.79 21

STURRPS

Stirrups spam= L\3 = 4.15\3=1.38m


NO OF stirrups = 1.38\(15\100)+1=10.2=11pcs

L ={0.20-2(0.025}(2)+{0.60-2(0.025)}(2)+{13(8)\1000}(2) =1.61m

STIRRUPS – 8mm 17.71 1.61 111


Page No : 3 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(B8-D8)
L = 1.30+2.40+0.10-0.40\2+0.10-0.4\2 =4.00m

Straight BOT .Bar =1.20+2.40+0.10-0.04+0.06-2(0.023)+0.01-


0.40\2+0.4\2+13(16)\1000 = 5.12m

Straight Bottom Bar – 16m 15.36 5.12 31

Straight TOP Bar = 1.80+2.40+0.10-0.04+(13(16)\1000)+0.10-0.4\2


=4.37m

Straight top Bar – 16 mm 8.74 4.37 21

LEQCS = L\3+0.40\2+13(16)\1000=4.00\3+0.40\2=13(16)\1000 =
1.74m

Extra over Colum support – 16 mm 3.48 1.74 21


Stirrups span = L\3 = 4.00\3 = 1.33m
NO OF STIRRUPS = 1.33\(15\100)+1 = 9.8 = 10 PCS

L ={0.20-2(0.025)}(2)+{0.60-2(0.025)}(2)+{13(8) = 1.61m

STIRRUPS – 8mm 16.10 1.61 101


Page No : 4 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(A5-A8)
L= 1.00+1.50+1.70=4.20m

LBOT =1.00+1.50+1.70+0.10-0.04+0.60-2(0.025)+0.2\2+13(16)\1000
=5.12m

Straight Bottom Bar – 16mm 15.36 5.12 31

LTOP Bar = 1.00+1.50+1.70=0.10-0.04+(13(16)\1000) =4.47m

Straight TOP Bar – 16mm 8.94 4.47 21

LE.O.C.S = L\3+0.20\2+13(16)\1000 =4.20+0.20+13(16)\1000 =1.71m

EXTRA OVER COLUM SUPPORT – 16mm 3.42 1.71 21

Stirrups span = L\3=4.20\3 =1.40m


NO of stirrups =1.40\(15\100)+1=10.3 =11PCS

L ={0.20-2(0.025)}(2)+{0.60-2(0.075)}(2)+{13(8)\1000}(2)=1.61m

STIRRUPS – 8mm 17.71 1.61 111


Page No : 5 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(A3-B3)
L= 4.20+0.10-)-0.50\2=4.05m

LBOT =4.20+0.10-0.04+0.60-2(0.025)+0.20\2+13(16)\1000=5.12m

Straight Bottom Bar – 16mm 15.36 5.12 31

LTOP =4.20+0.10-0.04+(13(16)\1000) =4.47m

Straight TOP Bar – 16mm 8.94 4.47 21

LE.O.C.S =L\3+0.20+13(16)\1000 =4.05\3+0.20+13(16)\1000 =1.66m

Extra over Colum support – 16mm 3.32 1.66 21


Stirrups span = L\3 =4.05\3 =1.35m
No of stirrups = 1.35\(15\100)+1= 10pcs

L =1.61m

Stirrups – 8mm 16.10 1.61 101


Page No : 6 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(A2-A3)
L= 4.20

LBOT =4.20+{0.20\2(2)+13(16)\1000(2)}=4.82m

Straight Bottom Bar – 16mm 14.46 4.82


31
LTOP =4.20m

Straight TOP Bar – 16mm 8.40 4.20


21
LE.O.C.S =4.20\3(2)+0.20\2+13(16)\1000(2) =3.42m

Extra over Colum support – 16mm 6.84 3.42


Stirrups span = L\3 =4.20\3 =1.40 21
No of stirrups = 1.40\(15\100)+1= 11pcs

L =1.61m

Stirrups – 8mm 17.71 1.61


111
Page No : 7 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(C2-C3)
L= 4.20

LBOT =4.20+0.10-0.04+0.60-2(0.025)+0.10-0.025+0.60-2(0.025)
=5.44m

Straight Bottom Bar – 16mm 16.32 5.44 31

LTOP =4.20+0.10-0.04+(13(16)\1000)+0.10-0.025+13(16)\1000
=4.75m

Straight TOP Bar – 16mm 9.50 4.75 21

Stirrups span = L\3 =4.20\3 =1.40m


No of stirrups = 1.40\(15\100)+1= 11pcs

L =1.61m

Stirrups – 8mm 17.71 1.61 111


Page No : 8 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B4(A5-A5)
L= 4.20+0.01-0.50\2=4.05m

LBOT =4.20+0.10-0.04+0.60-2(0.025)+0.10-0.025+0.60-2(0.025)
=5.44m

Straight Bottom Bar – 16mm 16.32 5.44 31

LCURAIL =L –L\7 –L\7+13(16)\1000(2)=4.05-4.05\7-


4.05\7+13(16)\1000(2)=3.31m

CURTAIL -16mm 6.62 3.31 21

L TOP =4.20+0.10-0.04+(13(16)\100)+0.01-0.025+(13(16)\100)
=4.75m

Straight TOP Bar – 16mm

Stirrups span = L\3 =4.05\3 =1.35m 9.50 4.75 21


No of stirrups = 1.35\(15\100)+1= 10pcs

L =1.61m

Stirrups – 8mm 16.10 1.61 101


Page No : 9 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B3(B3-D3)
L= 1.20+2.40=4.20m

LBOT =1.20+2.40+0.10-0.04+0.60-2(0.025)+0.2\2+13(16)\1000
=5.12m

Straight Bottom Bar – 16mm 15.36 5.12 31

LCURTAIL= L-L\5-L\7+(13(16)\1000(2) = 4.20-4.20\5-


4.20\7+13(16)\1000(2) =3.18m
3.18 21
CURTAIL – 16m 6.36

LTOP Bar = 1.80+2.40+0.10-0.04+13(16)\1000 =4.47m


4.47 21
Straight TOP Bar – 16mm 8.94

LE.O.C.S = 4.20\3+0.20\2+13(16)\1000=1.71m

EXTRA OVER COLUM SUPPORT – 16mm 3.42 1.71 21

Stirrups span = L\3=4.20\3 =1.40m


NO of stirrups =1.40\(15\100)+1=10.3 =11PCS

L =1.61m

17.71 1.61 111


STIRRUPS – 8mm
Page No : 10 Title:

DESCRIPTION SQUARIN G DIMENSIO N TESTING

B4(D6-E6)
L= 5.20+0.01-0.40\2=5.10m

LBOT =5.20+0.10-0.04+0.60-2(0.025)+0.10-0.025+0.60-2(0.025)
=6.44m

Straight Bottom Bar – 16mm 19.32 6.44 31

LCURAIL =L –L\7(2)+13(16)\1000(2)=5.20-2(5.20\7)+13(16)\1000(2)
=4.13m

4.13 21
CURTAIL -16mm 8.26

L TOP =5.20+0.10-0.04+(13(16)\100)+0.01-0.025+(13(16)\100)
=5.75m

Straight TOP Bar – 16mm 11.50


5.75 21
Stirrups span = L\3 =5.10\3 =1.70m
No of stirrups = 1.35\(15\100)+1= 10pcs

L =1.61m

Stirrups – 8mm 20.93 1.61 131