Sei sulla pagina 1di 1

CASCADE Air Lines

DATE VERIFIED
ONSHORE OPERATION DAILY MAINTENANCE REPORT
Company man Name Syed Mehmood ul hassan shah
RIG NAME SLR-215

EEBA
SABA

SCBA
LOCATION Maino 28 WELL No.: 1
USL H2S Support Engineer Shahzad Sultan STATIONS
DATE 17-Nov-18

Status
Monkey Board 1 1 10/28/2018
DAILY REQUIREMENTS Rig Floor 5 6 10/28/2018
Dog house 1 1 10/28/2018
Carried out regular inspection for all mesh guard devices overall around of RIG's H2S Office 1 10/28/2018
Regulary monitoring and inspect all Breathing Air supply - all HP & LP gauges, lines, manifolds, regulators, fittings, cascade racks for leaks and appropriate pressure readings. Shale shakers 2 3 10/28/2018
To Check fixed gas monitoring system for all stations . Muster station A 4 10/28/2018
To inspect & maintain all SCBAs & SABAs. Muster Station B 4 10/28/2018
Conducting, H2S awarness training as mandatory requirements for new commer, Visitor Orientations & H2S Refresh Trainings as required - and recorded accordingly Mud logging unit 10/28/2018
Actively monitoring the RIG operation Medic 2 10/28/2018
#REF! Company man office 2 10/28/2018
Rig manager office 2 10/28/2018
Cementing unit dowel 2 10/28/2018
Mud pits 2 3 10/28/2018
ACTIVITIES FOR 24 HOURS : DAY & Night shahzad sultan Pump room 10/28/2018
Sack area 1 2 10/28/2018
* Training conducted with 5 person, discuss H2S theory. * Training Room 1 10/28/2018
* Emergency response planning during h2s RELEASE, and alarm sounds * Choke manifold 1 3 10/28/2018
* showed donning of BA and EEBA sets, and asked to wear in class room one by one. * Client HSE 1 10/28/2018
* Inspected cascade system pressure many times to assure availablity or any problem occuring. * Rig HSE 1 10/28/2018
* Inspected High pressure regulators and low pressure to terminals. * Step oil tool 2 10/28/2018
* Checked Gas Detection system and Detector communication * Enviromental office 1 10/28/2018
* Keep one system in active mode and connected with delivery network * Material man office 1 10/28/2018
* Mud engineer 1 10/28/2018
security 1 10/28/2018
Geologist 1 10/28/2018
Rig ware house 1 10/28/2018
PMS office 2 10/28/2018
Radio Room 1 10/28/2018
Mud logger 4 10/28/2018
US unit 1 10/28/2018
Engine area 2 10/28/2018
Well head area 2 10/28/2018
Welding Work Shop 1 10/28/2018
DD unit 2 10/28/2018

MONTHLY REPORTS & SUBMISSION Fire, Abandon & H2S Drill


Last H2S drill was conducted on 13 November 2018
Mesh Guard calibration was done on 24 october 2018 & next due on 24 nov.
Gas alert micro 5 & single gas clip bump tested on 24 oct. 2018 & next due on 24 nov.2018.

TOTAL : 14 16 23 22

QUARTERLY ACCOMMODATIONS*
Cabin # Occupy N0. Cabin # Occup.N0. Cabin # Occup.N0

TOOLS & EQUIPMENT ONBOARD DETECTION SYSTEM Fixed sensors, ITX & GAS badges sensor calibration
NO. ITEMS QTY SERIAL NO. Station QTY TYPE LAST DATE NEXT DATE
Wire Brush 1 Main Deck 1 H2S 24-Oct-18 24-Nov-18
Bug Blowers - 30 inches in size 2 Rig Floor 1 H2S 24-Oct-18 24-Nov-18
Bull Hornes 1 Shale Shakers 1 H2S 24-Oct-18 24-Nov-18
Windsock w/Poles - Windsocks & Poles 2 Mud Pits 1 H2S 24-Oct-18 24-Nov-18
Intrinsically safe Torches - Flash Lights Well Head 1 H2S 24-Oct-18 24-Nov-18
Screw drivers 1 Choke Manifold 1 H2S 24-Oct-18 24-Nov-18
Rescue Stretcher
Oxygen Resuscitator
Air analysis Kit 1
Air analysis Test tubes 1
Digital Anometer 1
Allen Key Set 1
Cutter 1 Single Gas Clip 12 H2S 10-Oct-18 24-Nov-18
Pliers 1 Multi Gas Detector 3 H2S,LEL,CO,O2 10-Oct-18 24-Nov-18
Crescent Wrench 1 Rae Pump 2 Multi Tubes Nill Nill
Tool Bag 1
Printer 1
Voice amplifiers 3

PENDING ISSUES ACTION TAKEN

* POB in Chambers:
POB Total onboard = 137 Max. allowable POB =

BA on board & operational ( SCBA 2216psi & SABA 4500psi )


DAILY OPERATIONS SUMMARY MISCELLANEOUS / OTHER Cascade racks 3 ( With 6 cylinders)
Cascade Air Lines 23

Day Shift Rescue Team : Night Shift Rescue Team :


Crane C
Team # 1: Rig Manager, Roustabouts Team # 2: Doctor, Electrician, Mechanic
Rig : Drilling, near to TD, wireline rig up,

Shahzad Sultan
H2S Support Engineer

Potrebbero piacerti anche