Sei sulla pagina 1di 1

TPS 3R

UNIT PRICE TOTAL AMOUNT


NO DESCRIPTION VOLUME UNIT
(IDR) (IDR)
A.1 Preparation Works 1.00 ls 10,662,378.29 10,662,378.29
A.2. Construction of
1. Earthworks (Digging-Ups) 106.33 M3 314,399.79 33,430,342.00
2. Structural Work (pair, foundation,
41.53 sloop,M3colom, beam)3,377,260.52 140,256,244.58
3. Wall Work (Brick, Plaster, 532.84
Ram etc) M2 260,049.30 138,565,346.06
4. Frame work (Door-frame-glass 7.00etc) M2 901,642.18 6,307,382.97
5. Hangers (engse, windows, slots,
2.33 keys) Set 1,250,356.00 2,915,596.41
6. Roof (horse-ording horse-ridge-list)
621.57 m2 149,582.39 92,975,639.78
7. Ceiling (Frame-Plafor) 53.63 M2 99,561.11 5,339,631.61
8. Floor Work (Concrete Rebates,
41.97 Sand Sorting,
m2 Ceramics)
646,551.18 27,137,456.50
9. Bathroom Works (water tub, 2.33
bathroom,Setseptic tank) 9,139,956.24 21,312,669.03
10. Painting (Paint, etc) 1,009.68 m2 18,835.30 19,017,531.60
A3 Miscellaneous
1. Electical Installation 1.00 Set 32,454,348.60 32,454,348.60
2. Pump Work 35.00 M 777,012.36 27,195,432.58
B1 Equipment
Garbage motorbike 2.00 buah 42,000,000.00 84,000,000.00
Accessories / tools 1.00 Ls 30,000,000.00 30,000,000.00
Modified Garbage Motorcycle2.00(Iron Frame)
Unit 25,200,000.00 50,400,000.00
Counter machine 2.00 Ls 4,500,000.00 9,000,000.00
Boots 25.00 psg 150,000.00 3,750,000.00
Helmet 25.00 buah 200,000.00 5,000,000.00
Mask 25.00 buah 50,000.00 1,250,000.00
Gloves 25.00 psg 50,000.00 1,250,000.00
Trash can 20.00 Unit 250,000.00 5,000,000.00
Ordinary compost sieve 1.00 Unit 700,000.00 700,000.00
B2 Final Cleaning 1.00 ls 2,500,000.00 2,500,000.00
TOTAL A + B 750,420,000.00