Sei sulla pagina 1di 6

PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI

CALCULATION FOR FOUL WATER SUMP PUMP CAPACITY

Calculation of Pump Flow Rate

Description Value Unit


Assumed Flow 1 L/s

Pump Selection
Hence, two pumps with one duty and one duty-assist
are selected.
Each Sump Pump capacity 1 L/s

Head Calculation

Description Value Unit


Vertical Lift 10 m
Hence, Vertical Lift Pr.Drop 1 bar
Additional Line Pr.Drop,valves and fittings 0.5 bar
Total 1.5 bar

Assumed Sump Pump Head - 1.50 Bar

Quantity- 1 No (Ref: FWSP-01)


PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
CALCULATION FOR SUMP PUMP CAPACITY

Calculation of Pump Flow Rate

Description Value Unit


Assumed Flow 1 L/s

Pump Selection
Hence, two pumps with one duty and one duty-assist
are selected.
Each Sump Pump capacity 1 L/s

Head Calculation

Description Value Unit


Vertical Lift 10 m
Hence, Vertical Lift Pr.Drop 1 bar
Additional Line Pr.Drop,valves and fittings 0.5 bar
Total 1.5 bar

Assumed Sump Pump Head - 1.50 Bar

Quantity- 2 Nos (Ref: SP-01 to SP-02)


PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING,DUBAI
CALCULATION FOR FIRE PUMP CAPACITY

Calculation of Pump Flow Rate

Description Value Unit


NFPA recommended Flow Rate for Fire pump 47.25 L/s

Transfer Time 45 Min


Hence, Fire Reserve required 128 m3

Pump Selection

Hence, two pumps with one duty and one standby are
selected, FP-01(Electric) and FP-02 (Diesel Driven)
Each Fire pump capacity 47.25 L/s

Capacity of Jockey Pump, FJP-01 5.00 L/s


Jockey pump capacity 5.00 L/s

Head Calculation

Description Value Unit


Vertical Lift 95 m
Hence, Vertical Lift Pr.Drop 9.5 bar
Additional Line Pr.Drop 2 bar
Pressure required at the farthest landing valve 7 bar
Total 18.5 bar

Assumed Fire Pump Head - 18.5 Bar

Quantity- 1 No Electrical. 1 No. Diesel, 1 No Jockey

Basis of Design: NFPA 14 2003 Edition


PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
CALCULATION FOR TRANSFER PUMP CAPACITY

Calculation of Pump Flow Rate- CWTP-01,02,03

Description Value Unit


Quantity of water to be transferred from B2 tank to Roof
tank 160 M3
Transfer time 4 Hrs
Hence, Flow = 160 / 4 40.00 M3/Hr
Total Flow 11.15 L/s

Pump Selection

Hence, two pumps with one duty and one stand-by are
selected.
Each Transfer pump capacity 5.58 L/s

Head Calculation

Description Value Unit


Vertical Lift 95 m
Hence, Vertical Lift Pr.Drop 9.5 bar
Additional Line Pr.Drop 1.5 bar
Total 11 bar

Assumed Transfer Pump Head - 11 Bar


PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
LOADING UNITS FOR BOOSTER PUMP FLOW CALCULATION- CWBP-01,02

Area WC BIDET Wash Basin Kitchen Sink Dish Washer Water Tub Shower Bib Tap
Cold Cold Cold Hot Cold Hot Cold Hot Cold Hot Cold Hot Cold
Loading units per Application
Considered 2 2 2 2 3 3 3 3 10 10 3 3 10

PENTHOUSE ROOF FLOOR


Bib tap 6

PENTHOUSE FLOOR
PH1 3 2 3 3 1 1 1 1 2 2 1 1
PH2 5 4 5 5 1 1 1 1 3 3 1 1
PH3 5 4 5 5 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap 6

21st FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap

20th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap

19th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap

18th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap

17th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Swimming Pool 4 4 4 4 4 6
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
LOADING UNITS FOR BOOSTER PUMP FLOW CALCULATION- CWBP-01,02

Area WC BIDET Wash Basin Kitchen Sink Dish Washer Water Tub Shower Bib Tap
Cold Cold Cold Hot Cold Hot Cold Hot Cold Hot Cold Hot Cold
Loading units per Application
Considered 2 2 2 2 3 3 3 3 10 10 3 3 10

TOTAL 127 90 127 127 33 33 33 33 88 88 37 37 24

Total Loading Units 877


Flow Rate From Chart (L/s) 7
Total Flowrate (L/s) 7
Flow Required For Pumpset 4
(L/s)
(One Duty+One Duty Assist)
Assumed Pump Head 3.5 Bar

Jockey Pump

Assumed Flow 1.6 L/s


Assumed Pump Head 3.5 Bar

Head Calculation

Description Value Unit

Horizontal Length from riser to the last connection. 50 m


Hence, Horizontal Pr.Drop (200 Pascals for 1
Meter) 0.1 bar
Additional Line, Valves and Fittings Pr.Drop 1.5 bar
Pressure require at the farthest water supply point 1.5 bar
Total 3.1 bar

Assumed Transfer Pump Head - 3.5 Bar

Potrebbero piacerti anche