MATERIA PRIMA
COSTO DE EXTRACCION U/M COSTO TOTAL AGOTAMIENTO
SERVICIO DE MAQUINARIA 4 H/M 80.00 320.00
Leña 15 m3 1,000.00
OTROS GASTOS
ALIMENTACION CANTIDAD SOLES SUB TOTAL DIAS TOTAL
DESAYUNO 7.00 5.00 35.00 3 105.00
ALMUERZO 7.00 5.00 35.00 3 105.00
AGUA 5.00 5.00 3 15.00
OTROS 50.00 50.00 1 50.00
TOTAL 275.00
ELABORACION DE LADRILLO
CONCEPTO PRECIO SUB TOTAL
LABRADOR 1 1800 1,800.00
LABRADOR 2 1800 1,800.00
TOTAL 3,600.00
CARGADO DE LADRILLO
CONCEPTO CANTIDAD PRECIO SUB TOTAL N/D MONTO
CARGADORES 5 50.00 250.00 3.00 750.00
ASENTADOR 1 80.00 80.00 3.00 240.00
CARBONADOR 1 80.00 80.00 3.00 240.00
TOTAL 410.00 3.00 1,230.00
QUEMADO DE LADRILLOS
CONCEPTO CANTIDAD PRECIO SUB TOTAL
Quemador 2 225.00 450.00
TOTAL 450.00
CONCEPTO CP GA GV TOTAL
Servicio de fluido 48.00 9.00 3.00 60.00
Mantenimiento-maq. 40.00 5.00 5.00 50.00
Combustible 150.00 35.00 15.00 200.00
TOTAL 238.00 49.00 23.00 310.00
S/25,600.00
TERRENO: 20,000.00
AGOTAMIENTO M 83.33
70 M3
10 M3
Ñ
10 M 3
para : 4 meses 500.00
: 1 mes 125.00
t/c 2012
volquete $ 70,000.00 2.638
PE 70%
E 20% H 80%
E 20% H 80%
COSTO DE PRODUCCION
Datos sobre el producto a fabricar:
PE
PE
E 20% H 80%
E 20% H 80%
E 20% H 80%
PE
PE
PE
INVERSION FINANCIAMIENTO
10,940.59
120.00
228,346.83
239,167.42
239,287.42 239,287.42
DATOS UNIDADES COSTOS VARIABLES TOTAL UNITARIO COSTOS FIJOS
CAPACIDAD INSTALADA 72,000 Tierra blanca S/ 403.33 S/ 0.011 Volquete
CAPACIDAD PRODUCIDA 36,000 Tierra roja S/ 150.00 S/ 0.004 Horno
PRECIO POR MILLAR S/. 400.00 Mano de obra directa S/ 5,280.00 S/ 0.147 Pozo de agua
PRECIO UNITARIO S/. 0.40 TOTAL S/ 5,833.33 S/ 0.162 Motobomba
Otros
CIF VARIABLE TOTAL UNITARIO TOTAL
Arena fina S/. 125.00 S/. 0.003
Lenñ a S/. 1,000.00 S/. 0.028
Carboó n mineral S/. 1,600.00 S/. 0.044
Servicio de fluido S/. 48.00 S/. 0.001
Mantenimiento-maq. S/. 40.00 S/. 0.001
Alimentacion S/. 275.00 S/. 0.008
Combustible S/. 150.00 S/. 0.004
TOTAL S/ 3,238.00 S/ 0.09
PUNTO DE EQUILIBRIO
PE = 7,171 Unidades producidas
INTERPRETACIÓN La empresa CELESTE SAC tiene que vender 12 283 ladrillos para no ganar ni perder (cubre
todos sus costos y gastos)
Ventas 400.00 36
Costo Variable 253.38 36
Margen de Contribucion
Costo Fijo
Utilidad antes de Impuestos
Impuesto a la Renta
Resultado del Ejercicio
MILLAR DE LADRILLO UNIDAD DE LADRILLO
P S/ 400.00 P S/ 0.40
CV S/ 253.38 CV S/ 0.25
Cf S/ 1,051.43
Q 36 Qº 7
IT 14,400.00 ITº 2,868.49
Importe
14,400.00
-9,071.33
5,328.67
-50.40
5,278.27
-1,029.83
-21.6
4,226.83
4,226.83
NAL
Importe
14,400.00
-9,121.73
5,278.27
-1,051.43
4,226.83
4,226.83
Utilidad
-1,051.43
-904.81
-758.20
-611.58
-464.96
-318.34
-171.72
-25.10
121.51
268.13
414.75
561.37
707.99
854.61
1,001.23
1,147.84
1,294.46
1,441.08
1,587.70
1,734.32
1,880.94
2,027.56
2,174.17
2,320.79
2,467.41
2,614.03
2,760.65
2,907.27
3,053.89
3,200.50
3,347.12
3,493.74
3,640.36
3,786.98
3,933.60
4,080.21
4,226.83
5 26 27 28 29 30 31 32 33 34 35 36
Total Utilidad
INCLUYE M.P.
COSTEO ABC
Descripcion/Producto Ladrillo
Unidades (Millar) 36
Valor de Venta por Unidad S/ 0.40
Valor de Venta por Millar 1,000 S/ 400.00
Descripcion/Producto
Número de Cubos de Tierra por Millar 2.22
Tierra Blanca 1.94
Tierra Roja 0.28
Costo por cubo 20.76
Tierra Blanca 5.76
Tierra Roja 15.00
Descripcion/Producto
Número de Horas por Millar
Extracción de tierra 0.11
Preparación y elaboración 10
Cargado al horno 0.50
Cocción 0.83
Costo por Hora de Producción
Extracción de tierra 80.00
Preparación y elaboración 10.00
Cargado al horno 68.33
Cocción 15.00
4. Los Gastos de Fabricacion y el numero de transacciones o inductores por actividad es como sigue:
Actividad Inductor
Extracción de tierra Horas Maquina
Preparación y elaboración Horas Hombre
Cargado al horno Horas Hombre
Cocción Horas Hombre
Descripcion/Producto
Horas Maquina 0.11
Horas Hombre 10
Horas Hombre 0.50
Horas Hombre 0.83
METODO CONVENCIONAL
Descripcion Ladrillo
Ventas (Unidades) 36
valor de Venta Unitario 400.00
valor de Venta 14,400.00
Costo de Produccion
Unidades Producidas 36
Numero de cubos por Millar 2.22
Materia Prima utilizada(unidades) 80
Costo por Millar 20.76
Costo de Materia Prima(Unid. Monetarias) 553.33
Costo de Materia Prima Utilizada por Millar 15.37
Mano de Obra Directo
Unidades Producidas 36
Numero de Horas por Millar 11.33
Preparación y elaboración 10
Cargado al horno 0.5
Cocción 0.83
Total de Horas 408
Costo por Hora
Preparación y elaboración 10.00
Cargado al horno 68.33
Cocción 15.00
Costo de Mano de Obra Directa 5,280.00
Costo de Mano de Obra Directa por Unidad 146.67
Gastos Generales de Fabricacion(base de distribucion costo de M.O.D.)
Costo de M.O.D. 5,280.00
Factor de distribucion 0.81
Gasto de Fabricacion 4,267.83
Gasto de Fabricacion por Unidad 118.55
Costo de produccion 10,101.17
Costo de Produccion por unidad 280.59
Utilidad Bruta 4,298.83
Utilidad Bruta Unitario 119.41
PROCEDIMIENTO ABC
ACTIVIDADES
COCCIÓN Ladrillo
Número de Ladrillos 36.00
Numero de horas por producto 0.83
Total de Horas 30.00
CIF por unidad de actividad 88.33
CIF de la actividad asignado a los productos 2,650.00
CIF de la actividad asignado a cada producto 73.61
DESCRIPCION
Total Gastos de Fabricacion 4,267.83
Gastos de Fabricacion por unidad 118.55
Comparacion de Resultados
Metodo Convencional
Valor de Venta 14,400.00
Costo de Produccion -10,101.17
Utilidad Bruta 4,298.83
Metodo ABC
Valor de Venta 14,400.00
Costo de Produccion -10,101.17
Utilidad Bruta 4,298.83
es por actividad es como sigue:
Coste
191.88
383.42
1,042.53
2,650.00
Total
14,400.00
553.33
5,280.00
de M.O.D.)
5,280.00
4,267.83
10,101.17
4,298.83
Total
4.00
191.88
Total
360.00
383.42
Total
18.00
1,042.53
Total
30.00
2,650.00
PRESUPUESTO DE VENTA
DETALLE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO
Ventas proyectadas del mes 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000
Valor de venta unitario 0.40 0.39 0.45 0.48 0.41 0.40 0.40 0.40
Valor de venta total 14,400.00 14,040.00 16,200.00 17,280.00 14,760.00 14,400.00 14,400.00 14,400.00
Precio de venta 14,400.00 14,040.00 16,200.00 17,280.00 14,760.00 14,400.00 14,400.00 14,400.00
PRESUPUESTO DE PRODUCCION
DETALLE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO
Ventas proyectadas 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000
Inv. Final de Productos terminados 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
Necesidad total 37,000 37,000 37,000 37,000 37,000 37,000 37,000 37,000
Inv. Inicial de productos terminados 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
Produccion requerida 36,000.00 36,000.00 36,000.00 36,000.00 36,000.00 36,000.00 36,000.00 36,000.00
Costos Fijos
Depreciación
Volquete 769.42 769.42 769.42 769.42 769.42 769.42 769.42 769.42
Horno 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Pozo de agua 5.21 5.21 5.21 5.21 5.21 5.21 5.21 5.21
Motobomba 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21
Otros 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00
Costos Indirectos Fijos 1,029.83 1,029.83 1,029.83 1,029.83 1,029.83 1,029.83 1,029.83 1,029.83
COSTOS INDIRECTOS DE FABRICACIÓN 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83
Gastos de Operación Variables 50.40 50.40 50.40 50.40 50.40 50.40 50.40 50.40
Servicio de fluido 8.40 8.40 8.40 8.40 8.40 8.40 8.40 8.40
Mantenimiento-maq. 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Combustible 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
Gastos de Operación Fijos 21.60 21.60 21.60 21.60 21.60 21.60 21.60 21.60
Servicio de fluido 3.60 3.60 3.60 3.60 3.60 3.60 3.60 3.60
Mantenimiento-maq. 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Combustible 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
GASTOS DE OPERACIÓN 72.00 72.00 72.00 72.00 72.00 72.00 72.00 72.00
ESTADO DE RESULTADOS PROYECTADOS
DETALLE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO
Ventas (presupuesto de Ventas) 14,400.00 14,040.00 16,200.00 17,280.00 14,760.00 14,400.00 14,400.00 14,400.00
Presupuesto de Consumo de Materia Prima 553.33 553.33 583.33 583.33 553.33 553.33 553.33 553.33
Presupuesto de Mano de Obra Directo 5,280.00 5,280.00 6,000.00 6,000.00 5,640.00 5,280.00 5,280.00 5,280.00
Presupuesto de Costos Indirectos deFabricación 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83 4,267.83
Costo de Producción 10,101.17 10,101.17 10,851.17 10,851.17 10,461.17 10,101.17 10,101.17 10,101.17
Inventario Inicial 280.00 280.59 280.59 301.42 301.42 290.59 280.59 280.59
Inventario Final 280.59 280.59 301.42 301.42 290.59 280.59 280.59 280.59
Costo de Ladrillos Vendidos 10,100.58 10,101.17 10,830.33 10,851.17 10,472.00 10,111.17 10,101.17 10,101.17
Desvaloriazación de Ladrillos 120.00 108.00 756.00 108.00
Margen bruto proyectado 4,179.42 3,830.83 5,369.67 6,428.83 3,532.00 4,180.83 4,298.83 4,298.83
Presupuesto de Gastos de Operación -72.00 -72.00 -72.00 -72.00 -72.00 -72.00 -72.00 -72.00
Otros Ingresos 648.00 324.00
Utilidad proyectada antes de impuestos 4,107.42 3,758.83 5,945.67 6,680.83 3,460.00 4,108.83 4,226.83 4,226.83
Impuesto a la renta proyectado
Utilidad neta proyectada 4,107.42 3,758.83 5,945.67 6,680.83 3,460.00 4,108.83 4,226.83 4,226.83
FLUJO (PRESUPUESTO) DE CAJA
DETALLE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO
Saldo Inicial 1,000.00 6,340.00 11,320.00 17,710.00 25,180.00 30,520.00 35,860.00 41,200.00
Ingresos a caja
Ventas al contado 10,080.00 9,828.00 11,340.00 12,096.00 10,332.00 10,080.00 10,080.00 10,080.00
Cobranza de cuentas 4,320.00 4,212.00 4,860.00 5,184.00 4,428.00 4,320.00 4,320.00 4,320.00
Total ingreso a caja 14,400.00 14,040.00 16,200.00 17,280.00 14,760.00 14,400.00 14,400.00 14,400.00
Disponible en caja 15,400.00 20,380.00 27,520.00 34,990.00 39,940.00 44,920.00 50,260.00 55,600.00
Desembolsos de caja
Compras al contado 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Cancelación de cuentas 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00
Flete de Servicio de maquinaria 320.00 320.00 350.00 350.00 320.00 320.00 320.00 320.00
Mano de obra directa 5,280.00 5,280.00 6,000.00 6,000.00 5,640.00 5,280.00 5,280.00 5,280.00
Costos indirectos de fabricación 3,238.00 3,238.00 3,238.00 3,238.00 3,238.00 3,238.00 3,238.00 3,238.00
Gastos de Operación 72.00 72.00 72.00 72.00 72.00 72.00 72.00 72.00
Total de desembolsos de caja 9,060.00 9,060.00 9,810.00 9,810.00 9,420.00 9,060.00 9,060.00 9,060.00
SUPERAVIT (Déficit) 6,340.00 11,320.00 17,710.00 25,180.00 30,520.00 35,860.00 41,200.00 46,540.00
ACTIVO
Efectivo y Equivalentes al Efectivo 6,340.00 11,320.00 17,710.00 25,180.00 30,520.00 35,860.00 41,200.00 46,540.00
Cuentas por Cobrar Comerciales (neto) 4,320.00 4,212.00 4,860.00 5,184.00 4,428.00 4,320.00 4,320.00 4,320.00
Inventario 280.59 280.59 301.42 301.42 290.59 280.59 280.59 280.59
Propiedades, Planta y Equipo 229,460.00 229,460.00 229,460.00 229,460.00 229,460.00 229,460.00 229,460.00 229,460.00
Depreciación y agotamiento -1,113.17 -2,226.33 -3,339.50 -4,452.67 -5,565.83 -6,679.00 -7,792.17 -8,905.33
TOTAL ACTIVO 239,287.42 243,046.25 248,991.92 255,672.75 259,132.75 263,241.59 267,468.42 271,695.25
PASIVO Y PATRIMONIO
Cuentas por Pagar Comerciales 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00
Capital Emitido 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00
Resultados Acumulados 4,107.42 7,866.25 13,811.92 20,492.75 23,952.75 28,061.59 32,288.42 36,515.25
TOTAL PASIVO Y PATRIMONIO 239,287.42 243,046.25 248,991.92 255,672.75 259,132.75 263,241.59 267,468.42 271,695.25
ESTO DE VENTA
JULIO AGOSTO SETIEMBRE OCTUBRE
36,000 36,000 36,000 36,000
0.37 0.35 0.38 0.40
13,320.00 12,600.00 13,680.00 14,400.00
13,320.00 12,600.00 13,680.00 14,400.00
TO DE PRODUCCION
JULIO AGOSTO SETIEMBRE OCTUBRE
36,000 36,000 36,000 36,000
1,000 1,000 1,000 1,000
37,000 37,000 37,000 37,000
1,000 1,000 1,000 1,000
36,000.00 36,000.00 36,000.00 36,000.00
GASTOS DE OPERACIÓN
JULIO AGOSTO SETIEMBRE OCTUBRE
N FINANCIERA PROYECTADA
JULIO AGOSTO SETIEMBRE OCTUBRE
NOV. DIC ENE FEB MAR ABR MAY JUN JUL AGO
Utilidad Neta 4,107.42 3,758.83 5,945.67 6,680.83 3,460.00 4,108.83 4,226.83 4,226.83 2,822.83 2,210.83
ROE
Capital social 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00
1.75% 1.60% 2.53% 2.84% 1.47% 1.75% 1.80% 1.80% 1.20% 0.94%
CPPC
NOV. DIC ENE FEB MAR ABR MAY JUN JUL AGO
Re. Anual 15%
Deuda 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00
Capital 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00 235,060.00
Re m. 1.171% 1.171% 1.171% 1.171% 1.171% 1.171% 1.171% 1.171% 1.171% 1.171% 1.171%
Ie. 0 0 0 0 0 0 0 0 0 0
CPPC 1.17% 1.17% 1.17% 1.17% 1.17% 1.17% 1.17% 1.17% 1.17% 1.17%
EVA
EVA > 0 1,305.62 913.02 3,030.24 3,687.18 425.83 1,026.55 1,095.06 1,045.57 - 391.48 - 1,029.37
ROA > CPPC 0.55% 0.38% 1.22% 1.44% 0.16% 0.39% 0.41% 0.38% -0.14% -0.37%
ROE > CPPC 0.58% 0.43% 1.36% 1.67% 0.30% 0.58% 0.63% 0.63% 0.03% -0.23%
SET OCT
3,830.83 4,442.83
280,559.75 285,002.59
1.37% 1.56%
SET OCT
3,830.83 4,442.83
235,060.00 235,060.00
1.63% 1.89%
CPPC
SET OCT
120.00 120.00
235,060.00 235,060.00
1.171% 1.171%
0 0
1.17% 1.17%
EVA
545.78 1,105.76
0.19% 0.39%
0.46% 0.72%