ANNUAL REPORT

2017-18

NORTHERN REGIONAL LOAD DESPATCH CENTRE


NEW DELHI
Document Management Information

Document Name Annual report 2017-18

Document ID NRLDC/Annual Report 2017-18/V0

Version No 01 Date 30th June,2018

Classification Public

Document Modification History

Date Version Name Comment

Disclaimer
This is an operational report with
data analysis of the year 2017-18.
Data / information in this report are
indicative only and should not be
used for any Commercial purpose.

.
Mission
Ensure Integrated Operation of Regional and National Power
Systems to facilitate transfer of electric power within and
across the regions and trans-national exchange of power with
Reliability, Security and Economy.

FUNCTIONS OF NRLDC
(Section 28 of Electricity Act, 2003)

(i) Be responsible for optimum scheduling and despatch of electricity


within the region, in accordance with the contracts entered into with the
licensees or the generating companies operating in the region;

(ii)Monitor grid operations;

(iii)Keep accounts of quantity of electricity transmitted through the


regional grid;

(iv)Exercise supervision and control over the inter-State transmission


system; and

(v)Be responsible for carrying out real time operations for grid control and
despatch of electricity within the region through secure and economic
operation of the regional grid in accordance with the Grid Standards and
the Grid Code.

(vi)To levy and collect such fees & charges from the generating companies
or licensees engaged in inter-state transmission of electricity as may be
specified by the Central Commission
ववर्य-िच
ू ी
पष्ृ ठ / page
प्राक्किन
Preface
उत्तरी क्षेत्र एक सिंहावलोकन
अनुभाग 1 1
NR-An Overview
उत्तर क्षेत्रीय धिड प्रचालन का िारांश
2
Operational Summary of Northern Regional Grid

ववद्युत आपूनति की स्स्िनत


अनुभाग 2 4
Power Supply Position

प्रणाली प्रचालन एवं िंिस्न्ित क्षेत्रों में ववकाि


अनुभाग 3 13
Developments in System Operation & Associated areas

उत्पादन क्षमता
अनुभाग 4
Generation Capacity
स्िावपत और प्रभावी उत्पादन क्षमता का वववरण
4.1 25
Details of installed and effective generating capacity
र्लीय ऊर्ाि िायंत्रों मे प्रभावी क्षमता का ब्योरा
4.2 34
Break-up of effective Hydro capacity
वपछले दशक के दौरान उत्पादन ियंन्त्रों की िंस्िावपत क्षमता का वववरण
4.3 35
Growth of installed generating capacity during last decade

ववद्यत
ु आपनू ति की स्स्िनत (आंकड़े)
अनुभाग 5
Power Supply Position (data)
वर्ि 2017-2018 की ववद्युत आपूनति की स्स्िनत का िारांश
5.1 36
Summary of 2017-18 power supply position
मासिक बिर्ली आपूनति की स्स्िनत (ऊर्ाि एवं उच्चतम मांग)
5.2 37
Month wise power supply position (Energy & Max Demand Met)
मासिक अधिकतम, न्यूनतम ऊर्ाि मांग और आवश्यकता (नतधि िहहत)
5.3 Month wise maximum , minimum energy consumption & requirement with 41
corresponding dates
मासिक पीक घंटा मांग एवं आवश्यकता (नतधि िहहत)
5.4 Month wise peak hour demand met & requirement with corresponding 43
dates
मासिक ऑफ पीक घंटा मांग (नतधि िहहत)
5.5 45
Month wise off peak hour demand met with corresponding dates
वपछले दशक के दौरान राज्यों में औित ऊर्ाि की मांग/आवश्यकता
5.6 Demand met (MU) per day and Requirement (MU/day) of states during 48
last decade
वपछले दशक के दौरान राज्यों में उच्चतम मांग आपूनति / आवश्यकता
5.7 Peak demand met (MW) and Requirement (MW) of states during last 49
decade
वपछले दशक के दौरान उत्तरी क्षेत्र में ऊर्ाि की मांग आपनू ति / आवश्यकता
5.8 50
Demand met and Requirement in Northern Region during last decade

राज्यों की मासिक अनि


ु च
ू ी व वास्तववक आहरण
5.9 53
Month wise schedule vis-à-vis actual drawal by constituents
मासिक अंतर क्षेत्रीय ववननमय
5.10 60
Month wise inter-regional exchanges
उत्पादन िंयन्त्रों का कायि िम्पादन
अनभ
ु ाग 6
Generating Stations Performance
उत्पादन िन्यंत्रों/बिर्ली घरों का कायि िम्पादन
6.1 63
Performance of power generating stations
क्षेत्रीय ववद्युत उत्पादन का िारांश
6.2 71
Summary of regional energy generation
स्रोत अनि
ु ार मासिक ववद्यतु उत्पादन में योगदान
6.3 72
Source wise contribution to monthly generation
मासिक तापीय/नासभकीय ऊर्ाि ियन्त्रों का िंयंत्र भार गुणांक
6.4 75
Month wise PLF of thermal/ nuclear generating units
वपछले दशक में ववद्युत उत्पादन एवं िंयन्त्र भार गुणांक
6.5 80
Energy generation & PLF during last decade

क्षेत्रीय भार व उत्पादन आंकड़े


अनुभाग 7
Regional Load and Generation data
वावर्िक भार अवधि आंकड़े
7.1 81
Annual load duration data

आववृ त्त
अनुभाग 8
Frequency
मासिक आववृ त्त ववष्लेर्ण
8.1 83
Month wise frequency analysis

पन बिर्ली र्लाशय स्तर


अनुभाग 9
Hydro Reservoir Levels
र्लाशय आंकड़े
9.1 84
Reservoir data

वाणणस्ज्यक आंकड़े
अनुभाग 10
Commercial data
वर्ि 2017-2018में ओपन एक्िेि के आंकड़े
10.1 89
Open Acces data for the year 2017-2018
वर्ि 2017-18 में उत्तरी क्षेत्रीय ववचलन पूल खाता के िंचनयत आंकड़े
10.2 Northern region Deviation Pool Account Cumulative status for year 2017- 91
18
ररयेस्क्टव चार्ि पूल खाता
10.3 92
Reactive charges pool account

10.4 Pooled Inter State transmission Losses 93

उत्तरी क्षेत्र में ननम्न आववृ त्त ररले प्राविान


अनुभाग 11 94
Under frequency and df/dt relays provision in Northern region
धिड घटनाएँ
अनुभाग 12 95
Grid Incidents
रार्भार्ा गनतववधियाँ
अनुभाग 13 107
Activities in Rajbhasha
धिड मानधचत्र
अनुभाग 14
Power Map 109
अनभु ाग - 1
Section-1

NR-An Overview
उत्तरी क्षेत्र - एक स हिं ावलोकन
NRLDC ANNUAL REPORT 2017-18

1. NORTHERN REGION –AN OVERVIEW

• Largest in geographical area amongst the five regions covering 30.7%

of the area and 28% of the country’s population.

• Largest sized hydro unit (250 MW at Nathpa Jhakri/Tehri/Karchham

Wnagtoo) in the country.

• Establishment of the first super thermal power station (Singrauli STPS)

and 400 kV transmission systems in the country.

• Establishment of the first High Voltage Direct Current (HVDC) long

distance transmission system in the country (2x750 MW + 500 kV

Rihand-Dadri HVDC Bi-pole).

• First HVDC back-to-back interconnection with Western Region (2x250

MW back-to-back HVDC station at Vindhyachal).

• First 400 kV Static Var Compensators (SVC’s) in the country (2x140

MVAR SVC at Kanpur).

• World's longest multi terminal HVDC transmission line & first 800kV

HVDC Transmission Line in the country 800kV Agra - Bishwanath

Chariali HVDC Line having line length of 1,750 km and capacity of

6,000 MW HVDC commissioned.

1
NRLDC ANNUAL REPORT 2017-18

उत्तर क्षेत्रीय ग्रिड प्रचालन का सारांश


OPERATIONAL SUMMARY OF NORTHERN REGIONAL GRID

क्र. सं. मापदं ड Change %Change


2017-18 2016-17
S.No. Parameters (+/-) (+/-)
1 Effective capacity (on the last day of the financial year) (MW) 79132 75150 3982 5.298

2 Average Energy (MU/day )

2(a) Demand met 999 946 53 5.6

2(b) Estimated Requirement 1014 962 52 5.5

2(c) Shortage 15.12 15.39 0 -1.8

2(d) Shortage (%) 1.5 1.6 0 -6.9

3 Maximum ( MW )

3(a) Demand met* 58448 52612 5836 11.1

3(b) Requirement that time 60749 53372 7377 13.8

3(c) Shortage 2301 760 1541 202.8

3(d) % Shortage 3.8 1.4 2 166.0

3(e) Demand met at peak hours 57013 52612 4401 8.4

3(f) Shortage that time 2100 760 1340 176.3

3(g) % Shortage 3.7 1.4 2 155.0

4 Frequency ( Hz )

4 (a) Average 49.98 49.99 -0.01 -0.02

4 (b) % of time above 50.05 Hz 13.46 19.34 -5.88 -30.39

4 (c) % of time below 49.90Hz 10.55 13.48 -2.93 -21.74

4(e ) % of time between 49.9 to 50.05 Hz(Freq Band) 76.23 67.19 9.04 13.45

6 Gross generation (MU/day Average)

6 (a) Hydro 213.35 211.93 1.42 0.67

6 (b) Thermal (Coal fired) 578.99 535.30 43.69 8.16

6 (c) Thermal (Gas fired) 26.81 30.99 -4.18 -13.49

6 (d) Nuclear 34.77 29.69 5.08 17.10

6 (e) Non-conventional 16.99 15.72 1.27 8.06

6 (f) Total (MU/day) 870.90 823.62 47.28 5.74

2
NRLDC ANNUAL REPORT 2017-18

उत्तर क्षेत्रीय ग्रिड प्रचालन का सारांश


OPERATIONAL SUMMARY OF NORTHERN REGIONAL GRID

क्र. सं. मापदं ड Change %Change


2017-18 2016-17
S.No. Parameters (+/-) (+/-)
7 PLF (%)

7 (a) Thermal (Coal fired) 56.3 55.2 1.0 1.9

7 (b) Thermal (Gas fired) 22.4 25.8 -3.3 -12.9

7 (c) Nuclear (MW) 89.2 76.1 13.1 17.2

7 (d) Total (Coal+Gas+nuclear) 53.7 52.7 1.1 2.0

7 (e) Central sector (Coal) 71.6 68.7 2.9 4.3

7 (f) Central sector (Gas) 12.8 22.0 -9.2 -41.8

7 (g) Central Sector (Nuclear) 89.2 76.1 13.1 17.2

7 (h) Central Sector (Total) 63.8 62.0 1.8 2.9

7 (i) State Sector (Gas) 30.9 29.1 1.8 6.2

7 (j) State Sector (Coal) 50.5 49.8 0.7 1.4

7 (k) State Sector (Total) 48.8 48.0 0.9 1.8

8 Water level on Last day of the Year (In meters)

8 (a) Bhakra (FRL: 514.50 MDDL: 445.62) 472.72 464.38 8.34 1.80

8 (b) Pong (FRL: 433.12 MDDL: 384.05) 394.05 396.47 -2.42 -0.61

8 (c) Rihand (FRL: 268.22 MDDL: 252.98) 256.89 261.09 -4.21 -1.61

8 (d) R.P.S (FRL: 352.65 MDDL: 342.90) 346.62 346.81 -0.20 -0.06

8 (e) Gandhi Sagar (FRL: 402.64 MDDL: 381.00) 389.80 395.33 -5.53 -1.40

3
अनभ
ु ाग - 2
Section-2

विद्यत
ु आपर्ू ति की स्थिर्त
Power Supply Position
NRLDC ANNUAL REPORT 2017-18

2. Power Supply Position

Northern Region

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met (MU/Day) 1315.26 1207.64 107.61 8.91%

Maximum Demand met (MW) 58448 52612 5836 11.09%

Fig-1 Consumption of NR - 2016-17 vs 2017-18

4
NRLDC ANNUAL REPORT 2017-18

STATEWISE POWER SUPPLY POSITION

PUNJAB:

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 261.84 247.49 14.35 5.80%

Maximum Demand met (MW) 11681 11228 453 4.03%

Fig-2 Consumption of Punjab - 2016-17 vs 2017-18

5
NRLDC ANNUAL REPORT 2017-18

HARYANA:

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 205.60 194.60 10.99 5.65%

Maximum Demand met (MW) 9539 9152 277 2.99%

Fig-3 Consumption of Haryana - 2016-17 vs 2017-18

6
NRLDC ANNUAL REPORT 2017-18

RAJASTHAN:

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 229.51 221.47 7.82 3.53%

Maximum Demand met (MW) 11564 10682 1216 11.75%

Fig-4 Consumption of Rajasthan - 2016-17 vs 2017-18

7
NRLDC ANNUAL REPORT 2017-18

DELHI:

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 133.85 129.52 4.32 3.34%

Maximum Demand met (MW) 6526 6261 265 4.23%

Fig-5 Consumption of Delhi - 2016-17 vs 2017-18

8
NRLDC ANNUAL REPORT 2017-18

UTTAR PRADESH

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 403.05 344.76 58.31 16.91%

Maximum Demand met (MW) 18061 16110 1951 12.11%

Fig-6 Consumption of Uttar Pradesh - 2016-17 vs 2017-18

9
NRLDC ANNUAL REPORT 2017-18

UTTARAKHAND

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 43.30 42.42 0.88 2.06%

Maximum Demand met (MW) 2149 2023 126 6.23%

Fig-7: Consumption of Uttarakhand - 2016-17 & 2017-18

10
NRLDC ANNUAL REPORT 2017-18

HIMACHAL PRADESH

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 29.07 27.81 1.25 4.51%

Maximum Demand met (MW) 1594 1492 102 6.84%

Fig-8: Consumption of Himachal Pradesh - 2016-17 vs 2017-18

11
NRLDC ANNUAL REPORT 2017-18

Jammu & Kashmir

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 47.97 45.56 2.42 5.30

Maximum Demand met (MW) 2255 2140 179 8.36%

Fig-9: Consumption of J&K - 2016-17 vs 2017-18

12
NRLDC ANNUAL REPORT 2017-18

CHANDIGARH:

Parameters 2017-18 2016-17 Increase % Increase

Maximum Energy Met(MU/Day) 7.97 7.81 0.15 1.97%

Maximum Demand met (MW) 363 361 2 0.55%

Fig10: Consumption of UT Chandigarh - 2016-17 vs 2017-18

13
अनभ
ु ाग - 3
Section-3

प्रणाली प्रचालन एवं संबन्धित क्षेत्रों में


ववकास
Developments in System Operation &
Associated areas
NRLDC Annual Report 2017-18

Generating Unit :

Serial Element Name COD Date


Number
1. 50 MW Unit # 2 at Sainj 04.09.2017
2. 50 MW Unit # 1 at Sainj 04.09.2017
3. 500MW Unit# 6 at Unchahar 30.09.2017
4. 4 MW Singrauli Hydro Unit-1 05.03.2018
5. 4 MW Singrauli Hydro Unit-2 05.03.2018

Transmission Lines :

Serial Transmission Element Name Date of Charging Time of


Number Charging(Hrs)
1. 400kV Amritsar-Malerkotla-II 01.04.2017 15:39
2. Kanpur(PG)-Raniya(UPPTCL){LILO of 220 kV
03.04.2017 16:40
Kanpur(PG)-Panki at Raniya(UPPTCL)}
3. 400kV Fatehabad-Mathura through bay No
23.04.2017 18:54 with load
413,414 and 415
4. 220kV Bhinmal-Sayala-I 22.04.2017 19:17
5. 220kV Bhinmal-Sayala-II 23.04.2017 17:32
6. 765kV Lalitpur-Fatehabad-II 11.04.2017 20:41
7. 220kV Ganguwal-Bhari{LILO of 220kV
20.04.2017 18:18
Ganguwal-Gobindgarh at Bhari}
8. 220kV Gobindgarh-Bhari{LILO of 220kV
20.04.2017 17:50
Ganguwal-Gobindgarh at Bhari}
9. 220kV Mathura-Chhata-1 through Bay 208 &
23.04.2017 18:54
209
10. 220kV Sikandrabad-Sikandrabad-I & II 25.04.201712:06
11. 400kV Sainj(HP)-Parbati II{LILO of 400kV Parbati
31.05.2017 13:57
II-Parbati III at Sainj}
12. 400kV Sainj(HP)-Parbati III{LILO of 400kV
26.05.2017 16:36
Parbati II-Parbati III at Sainj}
13. 400kV Allahabad (Rewa Rd)-Banda-DC-II 08.05.2017(As per
Banda)/11.05.2017/22:57 21:15 & 22:57
from both end
14. 400kV Parbati-II-Banala 01.06.2017 18:40
15. 400kV Allahabad (Rewa Rd)-Banda-DC-I 02.06.2017 18:41
16. 400kV Rishikesh-Nehtaur{LILO of 400kV
03.06.2017 16:56
Rishikesh-Kashipur at Nehtaur}
17. 400kV Kashipur-Nehtaur{LILO of 400kV
03.06.2017 16:56
Rishikesh-Kashipur at Nehtaur}

13
NRLDC Annual Report 2017-18

18. 400kV Aligarh-mainpuri-II 13.07.2017 16:56


19. 765 kV G.Noida-Mainpuri {Bays No. 710 at
26.07.2017 16:29
G.Noida & 706 at Mainpuri}
20. 400kV Mainpuri(UP)-Mainpuri(PG)-I{LILP of
25.07.2017 18:14
400kV Mainpuri(PG)-Orai at Mainpuri(UP)}
21. 400kV Mainpuri(UP)-Mainpuri(PG)-II{LILP of
26.07.2017 12:38
400kV Mainpuri(PG)-Paricha at Mainpuri(UP)}
22. 400kV Mainpuri(UP)-Orai-I{LILO of 400kV
27.07.2017 19:13
Mainpuri(PG)-Orai at Mainpuri(UP)}
23. 400kV Kishenpur-New Wanpoh-I 29.07.2017 18:54
24. 400kV Kishenpur-New Wanpoh-II 29.07.2017 19:21
25. 400kV Agra(Fatehabad)-Agra(South)-II 07.07.2017 18:27
26. 400kV RAPP 7 & 8-Kota bay no 407 at Kota 31.07.2017 19:24
27. 400kV Gorakhpur-Motihari-II{ LILO of 400kV
31.07.2017 22:54
Barh-Gorakhpur-I at Motihari}
28. 400kV RAPP 7 & 8-Kota bay no 407 at Kota 01.08.2017 12:58
29. 400kV Gorakhpur-Motihari-I{ LILO of 400kV
07.08.2017 12:14
Barh-Gorakhpur-I at Motihari}
30. 400kV Gorakhpur-Motihari-II{ LILO of 400kV
01.08.2017 19:29
Barh-Gorakhpur-I at Motihari}
31. 220kV Kankroli-Amberii(LILO of 220kV Kankroli-
11.08.2017 18:08
Debari at Amberi)
32. 220kV Debari-Amberii(LILO of 220kV Kankroli-
04.08.2017 18:35
Debari at Amberi)
33. 765 kV G.Noida-Hapur Bays No. 710,711 at
14.08.2017 14:23
G.Noida & 712 at Hapur
34. 400kV G.Noida(400kV)-G.Noida(765kV)-1 26.08.2017 14:33
35. 220kV Baghpat-Barut-I & bay no 212 at
26.09.2017 17:10
Baghpat(PG)
36. 400kV Mainpuri(UP)-Paricha-2 & bay no 401 at
both end { LILO arrangement of 400kV 24.09.2017 13:41
Mainpuri(PG)-Paricha-2 at Mainpuri(UP)}
37. 400kV Allahabad-Kanpur(New)-I 416,417 at
26.09.2017 19:11
Kanpur end & 430,429 at Allahabad
38. 400kV Allahabad-Kanpur(New)-II bay no
26.09.2017 18:29
413,414 at Kanpur & 427,426 at Allahabad
39. 400kV Muzaffarnagar-Ataur bay no 403 at
Ataur ,93 at Muzaffarnagar(LILO of 400kV 29.09.2017 11:29
Muzaffarnagar-Muradanagar at Ataur)
40. 400kV Muradnagar-Ataur bay no 404 at Ataur,
91 at Muradnagar (LILO of 400kV 28.09.2017 21:43
Muzaffarnagar-Muradanagar at Ataur)
41. 400kV Muradnagar-Mathura bay no 409,408 at
Mathura( LILO of 400kV Fatehabad-Muradnagar 28.09.2017 16:48
at Mathura)
42. 400kV Fatehabad-Mathura-2 bay no 412,411( 02.10.2017 16:15

14
NRLDC Annual Report 2017-18

LILO of 400kV Fatehabad-Muradnagar New at


Mathura)
43. 400kV Indirapuram-Ataur-I bay 405 at Ataur &
09.10.2017 12:00
406 at Indirapuram and 400kV Bus-I,II
44. 400kV Indirapuram-Ataur-II bay 409 at Ataur &
09.10.2017 14:07
402 ,403(BC)at Indirapuram
45. 220kV Baghpat-Barut-II bay no 87 at Baraut(UP)
23.10.2017 12:20
& bay no 211 at Baghpat(PG)
46. 400 kV Agra(south)-Fatehabad-1 bay no 401 at
09.10.2017 14:39
Fatehabad, bay no 409 at Agra(south)
47. 400kV Karcham-Kala Amb-I with FSC at Kala
Amb & Bay No 413 at Karcham and 403A,403B
14.11.2017 16:13
at Kala Amb( LILO of 400kV Karcham-
Abdullapur-I at Kala Amb)
48. 400kV Abdullapur-Kala Amb-I & Bay No 419 at
Abdullapur & 401A,401B at Kala Amb( LILO of 14.11.2017 16:13
400kV Karcham-Abdullapur-I at Kala Amb)
49. 220kV Madanpur(Panchkula)-Pinjore-2 { LILO of
17.11.2017 20:17
220kV Madanpur-Kunihar(HP) at Pinjore}
50. 220kV Baddi-Pinjore-1 { LILO of 220kV
17.11.2017 20:17
Madanpur-Baddi(HP)Pinjore}
51. 400kV Karcham-Kala Amb-II with FSC at Kala
Amb & Bay No 412 at Karcham and 404A,404B
21.11.2017 18:24
at Kala Amb( LILO of 400kV Karcham-
Abdullapur-II at Kala Amb)
52. 400kV Abdullapur-Kala Amb-II & Bay No 422 at
Abdullapur and 402A,402B at Kala Amb( LILO of 21.11.2017 18:24
400kV Karcham-Abdullapur-I at Kala Amb)
53. 400kV Chittorgarh(PG)-Chittorgarh(RRVPNL)-
24.11.2017 19:58
DC-I & bays 405A,405T and 419(Main),420(Tie)
54. 400kV Chittorgarh(PG)-Chittorgarh(RRVPNL)-
DC-II & bays 406A,406T and 24.11.2017 20:00
41\69(Main),417(Tie)
55. 400kV Hapur-Dasna-I (410 (main) at Hapur &
28.11.2017 15:06
411 at Dasna
56. 400kV Hapur-Dasna-II {413 (main) }at Hapur &
28.11.2017 17:27
410 at Dasna
57. 400kV Bikaner-Sikar-DC-I along with 50 MVAR
non-switchable LR at Sikar end bay (403A,403T 29.11.2017 14:22
and 428,429,430)
58. 220kV DC Allahabad-Naini Railway-I & bays no
28.11.2017 11:45
210(Allahabad end), 201(Railway end)
59. 220kV DC Allahabad-Naini Railway-II & bays no
28.11.2017 12:51
211(Allahabad end), 202(Railway end)
60. 400kV Bikaner-Sikar-DC-II along with 50 MVAR
non-switchable LR at Sikar end(404A,404T and 01.12.2017 17:48
419,420,421)

15
NRLDC Annual Report 2017-18

61. 400kV G.Noida(765kV)-G.Noida(400kV)-I & bay


01.12.2017 15:19
no 418 765kV G.Noida and 93 at 400kV G.Noida
62. 400kV Kurukshetra-Jind-1 and bay 409,410 at
09.12.2017 17:14
Kurukshetra & 417,418 at Jind
63. 400kV Kurukshetra-Jind-2 and bay 412,413 at
09.12.2017 17:42
Kurukshetra & 420,421 at Jind
64. 400kV Akal-Ramgarh-II bay no 403
15.12.2017 12:05
B(Akal),407A(Ramgarh)
65. 220kV DC Allahabad-Naini Railway-I & bays no
18.12.2017 06:00
210(Allahabad end), 201(Railway end)
66. 220kV DC Allahabad-Naini Railway-II & bays no
18.12.2017 06:00
211(Allahabad end), 202(Railway end)
67. 400kV G.Noida(400kV)-G.Noida(765kV)-II bays
shifting{earlier ckt was charged through
412,411 & now shifted to be on 415,414 at 21.12.2017 14:10
G.Noida(765kV)Noew 412/411 would be used
for Noida Sec-148-I}
68. 765kV Chittorgarh-Ajmer-1 associated bays no
713(main),714 at Chittorgarh with switchable
Line Reactor 240 MVAR(713R) at Chittorgarh 28.12.2017 22:18
end and 703(main),702(tie) switchable Line
Reactor 240 MVAR(703R) at Ajmer end
69. 400kV Ajmer(RRVPNL)-Ajmer(PG)-I and
associated bays no 422,423 at Ajmer(RRVPNL) 28.12.2017 22:18
& 403,402 at Ajmer(PG)
70. 400kV Ajmer(RRVPNL)-Ajmer(PG)-II and
associated bays no 419,420 at Ajmer(RRVPNL) 28.12.2017 22:18
& 406,405 at Ajmer(PG)
71. 765kV Chittorgarh-Ajmer-2 associated bays no
710(main),711 at Chittorgarh with switchable
Line Reactor 240 MVAR(710R) at Chittorgarh 28.12.2017 22:18
end and 706(main),705(tie) switchable Line
Reactor 240 MVAR(706R) at Ajmer end
72. 400kV Chittorgarh(PG)-Chittorgarh(RRVPNL)-
28.12.2017 22:18
DC-I & bays 405A,405T and 419(Main),420(Tie)
73. 400kV Chittorgarh(PG)-Chittorgarh(RRVPNL)-
DC-II & bays 406A,406T and 28.12.2017 22:18
41\69(Main),417(Tie)
74. 220kV Behor-Neemrana-1 ( bay no 203 & 209) 29.12.2017 18:14
75. 220kV Behor-Neemrana-1 ( bay no 204 & 210) 29.12.2017 18:14
76. 400kV Meja-Bara-II & bay no 406 (Meja),
411(Bara){LILO of DC 400kV Bara-Rewa Rd at 10.01.2018 12:51
Meja}
77.
11.01.2018 14:45
220kV Kotputli-Bansur-1 ( bay no 208 & 203)
78. 220kV Kotputli-Bansur-2 ( bay no 209 & 204) 11.01.2018 16:08

16
NRLDC Annual Report 2017-18

79. 400kV Kishenpur-Dulhasti-2 ( bays 404 & 52LRL) 19.01.2018 17:29


80. 400kV Ajmer-Bhilwara-DC-1 {401(main),402(tie)
22.01.2018 12:40
or dia1 & 409(main) or dia 3}
81. 220kV Jaipur(s)-Goner with associated bays
(205 & 203){ LILO of 220kV Jaipur(s)-Chaksu-I at 25.01.2018 13:27
220kV Goner}
82. 400kV Ajmer-Bhilwara-DC-2 {404(main),405(tie)
26.01.2018 13:45
or dia2 & 412(main) or dia 4}
83. 400kV Neemrana(PGCIL)-Babai(RRVPNL) and
17.02.2018 12:50
associated bays 8A,8T at Babai(RRVPNL)
84. 400kV Sikar(PGCIL)-Babai(RRVPNL) and
17.02.2018 12:50
associated bays 7A,7T at Babai(RRVPNL)
85. 220kV Kishenganga-Delina-1 associated bays
25.02.2018 19:23
206(NHPC) & 202 (J&k PDD)
86. 220kV Kishenganga-Delina-2 associated bays
25.02.2018 19:29
207(NHPC) & 201 (J&k PDD)
87. 400kV Orai(UP)-Orai(PG)-Dc-1 and associated
bays no 419(main), 420(tie) at Orai(UP) & 23.02.2018 17:35
404(main),405(tie) 406(main of other)
88. 765kV Orai-Jabalpur-1 along with 3*110 MVAR
non-switchable at both ends and associated
26.03.2018 14:17
bays no 713,714,715(OTHER
MAIN)(Orai),831,832(JBL)
89. 765kV Orai-Jabalpur-2 along with 3*110 MVAR
non-switchable at both ends and associated
26.03.2018 14:17
bays no 716,717,718(OTHER
MAIN)(Orai),834,835(JBL)
90. 220kV Mainpuri(PG)-Neebkrori-1 with
associated bays no 205 at Neebkrori & 210 at 31.03.2018 16:43
Mainpuri(PG)
91. 400kV Dehradun-Abdullapur-1 along with
assciated bays no 410 main & 411 tie (DDN end) 29.03.2018 23:13
and 404 & 405 at (Abdullapur end)
92. 400kV Dehradun-Abdullapur-2 along with
assciated bays no 407 main & 408 tie (DDN end) 30.03.2018 18:58
and 401 & 402 at (Abdullapur end)
93. 765kV Orai-Aligarh-1 along with 3*80 MVAR
non-switchable at both ends and associated 26.03.2018 14:17
bays no 704,705(Orai),803,802(Aligarh)
94. 765kV Orai-Aligarh-2 along with 3*80 MVAR
non-switchable at both ends and associated
26.03.2018 19:42
bays no 701,702(OTHER
MAIN)(Orai),806,805(Aligarh)
95. 400kV Orai(UP)-Orai(PG)-Dc-1 and associated
bays no 419(main), 420(tie) at Orai(UP) & 26.03.2018 16:29
404(main),405(tie) 406(main of other)
96. 400kV Orai(UP)-Orai(PG)-Dc-2 and associated 26.03.2018 16:29

17
NRLDC Annual Report 2017-18

bays no 422(main), 423(tie) at Orai(UP) &


401(main),402(tie) 403(main of other)
97. 765kV Kanpur-Aligarh along with 330 MVAR
switchable LR (807R) at Aligarh end and 330
MVAR switchable LR (712R) & associated main 10.03.2018 17:54
bay 807 at Kanpur { LILO of 765kV Kanpur-
Jatikara at Aligarh}
98. 765kV Jatikara-Aligarh along with 3*100 MVAR
non-switchable Line Reactor at Jhatikara
10.03.2018 17:54
associated main bay 810 at Aligarh { LILO of
765kV Kanpur-Jatikara at Aligarh}
99. 400kV Amargarh(NRSS XXIX)-Wagoora-2 &
main bay no 412 at Amargarh(NRSS XXIX) {LILO 15.03.2018 20:35
of Uri1-Wagoora-DC}
100. 400kV Amargarh(NRSS XXIX)-Uri1-2 & main bay
no 407, tie bay 408 at Amargarh(NRSS XXIX) 15.03.2018 20:35
{LILO of Uri1-Wagoora-DC}
101. 765kV Agra-Aligarh along with associated main
bay 804 at Aligarh & 705(main), 705(tie){ LILO 17.03.2018 16:55
of 765kV Agra-Gr. Noida at Aligarh}
102. 765kV Gr. Noida-Aligarh along with associated
main bay 803 at Aligarh & 703(main), 702(tie){ 17.03.2018 16:55
LILO of 765kV Agra-Gr. Noida at Aligarh}
103. 400kV Meja-Bara-I & bay no 407 (Meja),
408(Bara){LILO of DC 400kV Bara-Rewa Rd at 17.03.2018 18:34
Meja}
104. 400kV Meja-Rewa Rd-I & bay no 409 (Meja),
407(Bara){LILO of DC 400kV Bara-Rewa Rd at 20.03.2018 16:50
Meja}
105. 765kV Orai-Satna along with 240 MVAR non-
switchable LR at Orai and 240 MVAR switchable
LR at Satna and associated bays 710(M),711(T) 29.03.2018 17:24
at Orai & 712(M),711(T) at Satna { LILO of
765kV Satna-Gwalior at Orai}
106. 765kV Orai-Gwalior along with 240 MVAR non-
switchable LR at Gwalior and associated bays
29.03.2018 13:32
707(M),708(T) at Orai & 713(M),714(T) at
Gwalior { LILO of 765kV Satna-Gwalior at Orai}
107. 200kV Gorakhpur-Bansi & bay no 201 (Bansi) {
24.03.2018 23:43
LILO of 220kV Gorakhpur-Basti at Bansi}
108. 200kV Basti-Bansi & bay no 202 (Bansi){ LILO of
24.03.2018 23:43
220kV Gorakhpur-Basti at Bansi}
109. 220kV Saharanpur-Sarsawa bay no 202 (SRE){
31.03.2018 19:42
LILO of 220kV Saharabpur-Khodri-1 at Sarsawa}

18
NRLDC Annual Report 2017-18

ICTs /GTs :
Serial Element Name Date of Charging Time of
Number Charging(Hrs)
1. 315 MVA ICT-II at Gonda 01.04.2017 16:46
2. 500 MVA ICT-II at Azamgarh(Augmentation of ICT-II) 29.04.2017 13:32
a.315 MVA ICT-I at Mathura(UP) through 407,408 & 409 20.04.2017 18:54
3. 315 MVA ICT-II at Gonda through Bay No. 410 01.04.2017 &
16:46 & 18:44
04.05.2017
4. 500 MVA ICT-II at Agra UP(Augmentation of ICT-II) 02.05.2017 17:45
5. 315 MVA ICT-II at Mathura(UP) 26.05.2017 16:19
6. 315 MVA ICT-I at Banda (UP) 12.05.2017 16:24
7. 315 MVA ICT-I at Gonda through Bay No. 407 & 201 17.05.2017 18:44
8. 500 MVA ICT-2 at Hapur through 419 26.05.2017 13:22
9. 500 MVA ICT-1 at Hapur through 416 26.05.2017 12:24
10. 315 MVA ICT-II at Agra(PG) along with ass.400kV bay & 16.06.2017(400kV
22:12
220kV bay side)
11. 1500 MVA ICT-II at Hapur (UP) at bay no 421 21.06.2017 16:14
12. 500 MVA ICT-3 at Ballabhgarh {Replacing 315 MVA ICT} 02.06.2017 17:38
13. 200 MVA ICT-3 at Mau 03.06.2017 23:48
14. 200 MVA ICT-2 at Nehtaur 09.06.2017 19:25
15. 1000 MVA ICT-III at Unnao 19.06.2017 19:08
16. 61.5 MVA GT-2 at Sainj along with bay no 402 19.06.2017 17:50
17. 61.5 MVA GT-1 at Sainj along with bay no 401 30.06.2017 14:20
18. 500 MVA ICT-4 at Ballabhgarh {Replacing 315 MVA ICT} 29.06.2017 18:48
19. 61.5 MVA GT-1 at Sainj along with bay no 401 06.07.2017 17:28
20. 500 MVA ICT-4 at Ballabhgarh {Replacing 315 MVA ICT} 01.07.2017 14:42
21. 500 MVA ICT-3 at Dhuri Bays 411,412 & 205 21.07.2017 17:10
22. 500 MVA ICT-1 at Bhadla 25.07.2017 18:42
23. 246 MVA GT-1 at Parbati-II through 408 29.07.2017 22:53
24. 500 MVA ICT-3 at Gurgaon 30.07.2017 19:50
25. 200 MVA ICT-1 at Agra(South) 10.07.2017 17:09
26. 200 MVA ICT-2 at Agra(South) 24.07.2017 16:11
27. 200 MVA ICT-3 at Agra(South) 26.07.2017 14:42
28. 315 MVA ICT-1 at Chittorgarh (404T & 404B) 01.08.2017 17:35
29. 500 MVA ICT-3 at Mainpuri (401,205,210,211) 30.08.2017 18:22
30. 315 MVA ICT-2 at Chittorgarh(405A,405B,405T & 206) 18.08.2017 13:52
31. 500 MVA ICT-2 at Bhadala with 406 and 208 18.08.2017 14:05
32. 500 MVA ICT-3 at Gurgaon 01.08.2017 19:31
33. 1500 MVA ICT-II at Hapur (UP) at bay no 421 14.08.2017 14:23
34. 500 MVA ICT-3 at Bhadala with 408 and 212 05.09.2017 13:57
35. 200 MVA ICT-1 at Nehtaur & bay no 401 , 103 11.09.2017 13:57
36. 500 MVA ICT at Unchahar & bay 404,224 15.09.2017 11:55
37. 500 MVA ICT-3 at Ramgarh bay 408A,408T,408B & 215 21.09.2017 & 15:05 & 16:25

19
NRLDC Annual Report 2017-18

22.09.2017
38. 500 MVA ICT-1 at Ataur bay no 407,204 27.09.2017 &
17:31 & 16:52
29.09.2017
39. 500 MVA ICT-2 at Ramgarh and bays no
10.10.2017 19:55
403A,403T,403B,205
40. 500 MVA ICT-1 at Ramgarh and bays no
10.10.2017 19:14
406A,406T,406B,211
41. 315 MVA ICT-1 at Sultanpur (Augmentation of ICT by
11.10.2017 22:28
replacing 240 MVA ICT-1 with 315 MVA ICT)
42. 500 MVA ICT-1 at Indirapuram along with associated bay
10.10.2017 12:43
no 401 & 203
43. 500 MVA ICT-2 at Indirapuram along with associated bay
10.10.2017 15:08
no 405 & 204
44. 500 MVA ICT-4 at Gurgaon (bay no 411 &211) 26.10.2017 16:09
45. 315 MVA ICT-2 at Kirori (Replacing old damage ICT) 19.10.2017 12:30
46. 315 MVA ICT-3 at Kaithal bay no 418 & 209 31.10.2017 19:14
47. 315 MVA ICT-2 at Orai bay no 412 & 203 16.11.2017 19:40
48. 315 (105*4) MVA ICT-1 & Bay No 403C and 203 at Kala 14.11.2017 &
17:47 & 15:24
Amb 15.11.2017
49. 315 (105*4) MVA ICT-2 & Bay No 404C and 207 at Kala 23.11.2017 &
11:44 & 12:11
Amb 24.11.2017
50. 200 MVA ICT-3 at Raibareilly & bay 205{ Augmentation
of transformer capacity by replacing 100 MVA ICT with 28.11.2017 16:54
200 MVA)
51. 500 MVA ICT-2 at Ataur bay no 410,203 29.11.2017 13:32
52. 315 MVA ICT-1 and bay 407,209 at Dasna 28.11.2017 16:11
53. 315 MVA ICT-1 and bay no 404,208 at Dasna 28.11.2017 16:46
54. 200 MVA ICT-1 at Meja bay no 424 & 212 06.12.2017 (on
13:05
Load)
55. 500 MVA ICT-3 at Ramgarh bay 408A,408T,408B & 215 15.12.2017 (on
12:05
Load)
56. 500 MVA ICT-2 at Ataur and bay no 203 21.12.2017 (220kV
11:12
side)
57. 315 MVA ICT-2 and associated bays no 402 ,201 at 26.12.20017 (400kV
Banala side) 17:02
& 27.12.2017 18:02
(220kV Side)
58. 315 MVA ICT-1 and bay no. 209 at Dasna 27.12.2017 (220kV
13:15
side)
59. 315 MVA ICT-3 (bays no 406B & 208)at Ajmer(RRVPNL) 27.12.2017 (no
18:35
load)
60. 1500 MVA ICT-1 at Chittorgarh(PG) bays no 414,415 & 28.12.2017 (on
22:18
706,705 Load)
61. 1500 MVA ICT-2 at Chittorgarh(PG) bays no 420,421 & 28.12.2017 (on
22:18
709,708 Load)
62. 1500 MVA ICT-1 at Ajmer(PG) bays no 401,402 & 28.12.2017 (on 22:18

20
NRLDC Annual Report 2017-18

701,702 Load)
63. 315 MVA ICT-1 and associated bays no 403 ,202 at 28.12.2017 (no 15:37(400kV side)
Banala load) 16:01 (220kV side)
64. 500 MVA ICT-4 at Gurgaon (bay no 411 &211) 29.12.2017 (on
12:46
Load)
65. 315 MVA ICT-2 and bay no 208 at Dasna 29.12.2017 (220kV
16:32
side)
66. 1500 MVA ICT-2 at Ajmer bays no 410,411 & 704,705 29.12.2017 (on
00:16
load)
67. 500 MVA ICT-2 at Moradabad {augmentation of ICT 30.12.2017 (no
15:52
capacity by replacing 315 MVA ICT with 500 MVA} Load)
68. 315 MVA ICT-2 at Muradnagar New {augmentation of
31.12.2017 (on
Transfer capacity by replacing 240 MVA ICT with 315 17:06
Load)
MVA}
69. 500 MVA ICT-2 at Moradabad {augmentation of ICT
01.01.2018 20:53
capacity by replacing 315 MVA ICT with 500 MVA}
70. 315 MVA ICT-3 (bays no 406B & 208)at Ajmer(RRVPNL) 02.01.2018 11:07
71. 1500 MVA, 3*500 MVA ICT-1 at Hapur (bays
27.01.2018 13:48
707,418,417)
72. 500 MVA ICT-1 at Gorakhpur(UP) with existing bays 404
13.01.2018 18:13
& 201{ by replacing existing 240 MVA ICT}
73. 315 MVA ICT-2 at Muzaffarnagar(UP) with existing bays 31.01.2018 (no
19:49
404 & 201{ by replacing existing 240 MVA ICT} load)
74. 315 MVA ICT-2 at Muzaffarnagar(UP) with existing bays
01.02.2018 21:35
404 & 201{ by replacing existing 240 MVA ICT}
75. 1500 MVA, 3*500 MVA ICT-1 at G.Noida (bays 701,403) 06.02.2018 14:18
76. 200 MVA ICT-2 at Raebareilly with bay no 204 {
Augmentation of ICT by replacing 100 MVA ICT with 200 17.02.2018 16:47
MVA}
77. 315 MVA ICT-1 at Babai(RRVPNL) and associated bays
26.02.2018 19:06
401B(main),401T(tie) & 204
78. 500 MVA ICT-2 at Muradnagar(old) with existing bays {
06.03.2018 15:44
by replacing existing 315 MVA ICT-2}
79. 500 MVA ICT-3 & associated bays no 412, 206 at
29.03.2018 22:14
Sikar(PG)
80. 3*333 1000 MVA ICT-1 along with associated bays no
26.03.2018 16:29
703,702 & 401,402 at Orai(PG)
81. 315 MVA ICT-3 at Babai(RRVPNL) and associated bays 30.03.2018 (No
20:28
404B(main) & 210 Load)
82. Singrauli Hydro Unit-1 along with 5 MVA GT & 33kV
05.03.2018
single dog (8.5km) cable
83. Singrauli Hydro Unit-2 along with 5 MVA GT & 33kV
05.03.2018
single dog (8.5km) cable
84. 110 MW Unit-1 at Kishenganga NHPC Trial Run on
31.03.2018 to
01.04.2018

21
NRLDC Annual Report 2017-18

BUS REACTOR :
Serial Element Name Date of Charging Time of
Number Charging(Hrs)
01. 330 MVAr B/Reactor at Anpara D of Anpara-Unnao line 06.04.2017 19:41
02. 80 MVA Bus Reactor at Mathura(UP) through 411 & 412 17.04.2017 18:23
03. 63 MVAR B/Reactor at Banda(UP) 12.05.2017 14:07
04. 125 MVAR B/Reactor at Hapur(UP) 19.05.2017 17:47
05. 80 MVA Bus Reactor at Agra(South)(UP) through 407,408
11.07.2017 14:46
& 409
06. 125 MVAR Bus Reactor at Koteshwar 20.07.2017 17:15
07. 3*80 Bus Reactor at Mainpuri(UP) 20.07.2017 16:36
08. 63 MVAR Bus Reactor at Sohawal 27.07.2017 18:12
09. 3*80 MVAR Bus Reactor at Hapur 11.08.2017 19:50
10. 125 MVAR Bus Reactor at Nehtaur & bay no 404, 405 19.09.2017 11:42
11. 125 MVAR Bus Reactor at Bhadla 28.09.2017 16:10
12. 63 MVAR Bus Reactor-2 at Dehar 28.09.2017 12:01
13. 125 MVAR Bus Reactor-2 at Manesar & bay no 409 29.09.2017 22:52
14. 240(80*3) MVAR Bus Reactor-1 and associated bays no
15.12.2017 17:12
712,711 at Chittorgarh
15. 240(80*3) MVAR Bus Reactor and associated bays no
22.12.2017 16:16
707,708 at Ajmer
16. 125 MVAR Bus Reactor at Ajmer & bay no 404,405 22.12.2017 17:37
17. 240(80*3) MVAR Bus Reactor-1 and associated bays no
15.12.2017 17:12
712,711 at Chittorgarh
18. 240(80*3) MVAR Bus Reactor and associated bays no
22.12.2017 16:16
707,708 at Ajmer
19. 125 MVAR Bus Reactor at Ajmer & bay no 404,405 22.12.2017 17:37
20. 125 MVAR Bus Reactor at Metra on existing bays
{Augmentation of Reactor capacity by replacing 50 07.02.2018 14:18
MVAR}
21. 3*110 MVAR Bus Reactor-1 and associated bays no 809
17.03.2018 15:21
(main) & 808(tie) at Aligarh(PG)
22. 3*110 MVAR Bus Reactor-2 and associated bays no 812
10.03.2018 18:37
(main) & 811(tie) at Aligarh
23. 3*110 MVAR BR-1 along with associated bays no 712,711
25.03.2018 22:43
at Orai
24. 125 MVAR Bus Reactor at Hindaun bay no 402A & 402T 30.03.2018 16:54

22
NRLDC Annual Report 2017-18

LINE REACTOR:

Serial Element Name Date of Charging Time of


Number Charging(Hrs)
1. 330 MVAR L/Reactor at 765kV Lalitpur of
11.04.2017 20:41
Lalitpur-Fatehabad-II & associated bay 712
2. 50 MVAr L/Reactor at Bikaner of Bikaner-Merta 11.04.2017 16:23
3. 80 MVAR L/Reactor at Agra of Sikar-1 23.07.2017 03:12
4. 80 MVAR L/Reactor at Agra of Sikar-2 30.07.2017 20:13
5. 50 MVAR L/Reactor at Bhadla of Bikaner-1 20.07.2017 20:09
6. 50 MVAR L/Reactor at Bhadla of Bikaner-2 22.07.2017 13:16
7. 3*80 MVAr L/Reactor at G.Noida of Mainpuri 26.07.2017 16:29
8. 50 MVAR Non-switchable L/Reactor-1 at Sikar of 29.11.2017
14:22
Sikar-Bikaner-I
9. 50 MVAR Non-switchable L/Reactor-2 at Sikar of 01.12.2017
17:48
Sikar-Bikaner-II
10. 240 (80*3)MVAR switchable Line Reactor-1 and 19.12.2017
19:57
assocaited bay no 713R at Chittorgarh(PG)
11. 240 (80*3)MVAR switchable Line Reactor-1 and 21.12.2017
18:58
assocaited bay no 703R at Ajmer(PG)
12. 240 (80*3)MVAR switchable Line Reactor-2 and 23.12.2017
18:59
associated bay 710R at Chittorgarh(PG)
13. 240 (80*3)MVAR switchable Line Reactor-2 and 23.12.2017
18:59
associated bay no 706R at Ajmer(PG)
14. 50 MVAR Line Reactor at Akal of 400kV Akal- 03.01.2018
12:28
Jodhpur {replacing damage 50 MVAR LR}
15. 50 MVAR LR(bay no 403A) of 400kV Bhadla-Metra 03.01.2018
14:26
at Bhadla
16. 50 MVAR LR(bay no 404A) of 400kV Bhadla- 03.01.2018
13:29
Jodhpur at Bhadla
17. 63 MVAR L/Reactor at Aligarh of 400kVPanki- 04.01.2018
08:52
Aligarh(replacing existing 50 MVAR L/Reactor)
18. 3*110 MVAR Line Reactor at Aligarh end of 765kV 10.03.2018
15:30
Kanpur-Aligarh
19. 3*110 MVAr non-switcable Line Reactor at Orai 25.03.2018
20:09
end of 765kV Orai-Jabalpur-1
20. 3*110 MVAr non-switcable Line Reactor at Orai 26.03.2018
00:30
end of 765kV Orai-Jabalpur-2
21. 3*80 MVAr non-switcable Line Reactor at Orai end 26.03.2018
14:17
of 765kV Orai-Aliagrh-1
22. 3*80 MVAr non-switcable Line Reactor at Orai end 26.03.2018
19:42
of 765kV Orai-Aligarh-2

23
NRLDC Annual Report 2017-18

FSC :

Serial Element Name Date of Charging Time of


Number Charging(Hrs)
1. FSC-1 at Kala Amb of 400kV Karcham-Kala Amb-I 16.11.2017 15:53
2. FSC-2 at Kala Amb of 400kV Karcham-Kala Amb-II 22.11.2017 16:41
3. (-200/+300)MVAR SVC at New Wanpoh 28.12.2017 22:14

24
अनभ
ु ाग - 4
Section-4

उत्पादन क्षमता
Generation Capacity
NRLDC ANNUAL REPORT 2017-18

4.1 31 माचच2018 को उत्तरी क्षेत्र की स्थावपत और प्रभािी उत्पादन क्षमता का वििरण


DETAILS OF INSTALLED AND EFFECTIVE CAPACITY IN NORTHERN REGION AS ON 31.03.2018

विद्युत उत्पादन केंद्र संस्थावपत क्षमता (मेगा िाट) प्रभािी क्षमता (मेगा िाट) विद्युत उत्पादन केंद्र
ORIGINAL INSTALLED
POWER STATION EFFECTIVE CAPACITY(MW) POWER STATION
CAPACITY(MW)

1 केन्द्द्रीय क्षेत्र
A एन. टी. पी. सी.
(a) बदरपुर ता. वि. के. 3x100+2x210 720.00 3x95+2x210 705.00 Badarpur T.P.S
(b) स ग
िं रौली ता. वि. के. 5x200+2x500 2000.00 5x200+2x500 2000.00 Singrauli STPS

(c) ररहिं द ता. वि. के. 2x500 +2x500+2x500 3000.00 2x500 +2x500+2x500 3000.00 Rihand TPS

(d) दादरी ता. वि. के. 4x210 840.00 4x210 840.00 Dadri NCTPS
(e) दादरी एन ीपीए अिस्था II 2x490 980.00 2x490 980.00 Dadri NCPS Stage-II
(f) ऊिंचाहार-I ता. वि. के. 2x210 420.00 2x210 420.00 Unchahar -I TPS
(g) ऊिंचाहार-II ता. वि. के. 2x210 420.00 2x210 420.00 Unchahar -II TPS
(h) ऊिंचाहार-III ता. वि. के. 1x210 210.00 1x210 210.00 Unchahar -III TPS
(i) ऊिंचाहार-IV ता. वि. के. 1x500 500.00 1x500 500.00 Unchahar -IV TPS
(j) टािंडा ता. वि. के. 4x110 440.00 4x110 440.00 Tanda TPS
(k) आन्टा गै वि. के. 3x88.71+1x153.20 419.33 3x88.71+1x153.20 419.33 Anta GPS
(l) औरै या गै वि. के. 4x111.19+2x109.30 663.36 4x111.19+2x109.30 663.36 Auraiya GPS
(m) दादरी गै वि. के. 4x130.19+2x154.51 829.78 4x130.19+2x154.51 829.78 Dadri GPS
(n) फ़रीदाबाद गै वि. के. 2x137.75+1x156.07 431.57 2x137.75+1x156.07 431.57 Faridabad GPS
(o) आइ टीपीअ झज्जर 3x500 1500.00 3x500 1500.00 ISTPS Jhajjar
(p) दादरी ोलर 5.00 5.00 Dadri Solar
(q) ऊिंचाहार ोलर 10.00 10.00 Unchahar Solar
(r ) स ग
िं रौली ोलर 15.00 15.00 Singrauli Solar
(s ) कोलडेम हाइड्रो 4x200 800.00 4x200 800.00 Koldam Hydro
उप-योग 14204.04 14189.04 Sub-Total

B एन. एच. पी. सी. NHPC


(a) बैरा ूल ज.िी.के. 3x60 180.00 3x60 180.00 Bairasiul
(b) लाल स्टे ज - I 3x115 345.00 3x115 345.00 Salal Stage - I
(c) लाल स्टे ज - II 3x115 345.00 3x115 345.00 Salal Stage - II
(d) टनकपुर ज.िी.के. 3x40 120.00 3x31.4 94.20 Tanakpur HPS
(e) चमेरा-I ज.िी.के. 3x180 540.00 3x180 540.00 Chamera HPS-I
(f) चमेरा-II ज.िी.के. 3x100 300.00 3x100 300.00 Chamera HPS-II
(g) चमेरा-III ज.िी.के. 3x77 231.00 3x77 231.00 Chamera HPS-III
(h) ऊरी 4x120 480.00 4x120 480.00 URI
(i) ऊरी -2 4x60 240.00 4x60 240.00 URI -2
(j) धौलीगिंगा 4x70 280.00 4x70 280.00 Dhaulliganga
(k) दल
ु हस्ती 3x130 390.00 3x130 390.00 Dulhasti
(l) ेिा-II 3x40 120.00 3x40 120.00 Sewa-II
(m) पाबबती -3 4x130 520.00 4x130 520.00 Parbati -3
उप-योग 4091.00 4065.20 Sub-Total

C एन. पी. सी NPC


(a) रा. आ. ऊ. के. (अ) 2x220 440.00 1x100+1x200 300.00 RAPS -A
(b) रा. आ. ऊ. के. (ब) 2x220 440.00 2x220 440.00 RAPS -B
(c) रा. आ. ऊ. के. ( ) 2x220 440.00 2x220 440.00 RAPS-C
(d) न. आ. ऊ. के. 2x220 440.00 2x220 440.00 NAPS

25
NRLDC ANNUAL REPORT 2017-18

विद्यत
ु उत्पादन केंद्र संस्थावपत क्षमता (मेगा िाट) प्रभािी क्षमता (मेगा िाट) विद्यत
ु उत्पादन केंद्र
ORIGINAL INSTALLED
POWER STATION EFFECTIVE CAPACITY(MW) POWER STATION
CAPACITY(MW)
उप-योग 1760.00 1620.00 Sub-Total

D एन. एल. सी NLC


बरस ग
िं र 2x125 250.00 2x125 250.00 Barsingsar

E नाथपा-झाकरी+रामपुर 6x250 + 6x68.67 1912.00 6x250 + 4x68.67 1912.00 Nathpa-Jhakri + Rampur

F टे हरी+कोटे श्िर 4x250+4X100 1400.00 4x250+4X100 1400.00 Tehri+Koteshwar


G केंद्रीय आईपीपी Regional IPP
(a) एडीएचपीएल 2x96 192.00 2x96 192.00 ADHPL
Karcham Wangtoo Hydro
करचम ििंगतू हाइड्रो पािर स्टे शन
(b) 4X250 1000.00 4X250 1000.00 Power Station
Malana Stage-II Hydro
मलाना स्टे ज-II हाइड्रो पािर स्टे शन
(c) 2X50 100.00 2X50 100.00 power Station
(d) श्री ीमें ट थमबल पािर स्टे शन 2X150 300.00 2X150 300.00 Shree Cement TPS
(e ) बधु धल 2x35 70.00 2x35 70.00 Budhil
(f ) ज
ैं 2X50 100.00 2X50 100.00 Sainj
उप-योग 1762.00 1762.00 Sub-Total

कुल केन्द्द्रीय सैक्टर Total Central Sector


( ए+बी+ ी+डी+ई+एफ़+जी ) 25379.04 25198.24 (A+B+C+D+E+F+G )

2 बी. बी. एम. बी BBMB


(a) भाकड़ा कॉम्प्लेक् Bhakra Complex
(i) भाकड़ा(एल) 3x126+2x108 594.00 3x126+2x108 594.00 (i) Bhakra (L)
(ii) भाकड़ा(आर) 5x157 785.00 5x157 785.00 (ii) Bhakra (R)
1x29.25+1x24.20+1x2 1x29.25+1x24.20+1x24
गिंगुिाल
(iii) • 4.20 77.65 .20 77.65 (iii) Ganguwal
1x29.25+1x24.20+1x2 1x29.25+1x24.20+1x24
कोटला
(iv) • 4.20 77.65 .20 77.65 (iv) Kotla

उप-योग 1534.30 1534.30 Sub-Total

(b) दे हर 6x165 990.00 6x165 990.00 Dehar


(c) पोंग 6x66 396.00 6x66 396.00 Pong

कुल बीबीएमबी 2920.30 2920.30 Total BBMB

3 चंडीगढ़ CHANDIGARH
(a) डीजल 2.00 1.40 Diesel Gen Set
4 ददल्ली DELHI
तापीय THERMAL
(a) राजघाट 2x67.5 135.00 2x67.5 135.00 Rajghat
(b) ददल्ली गै टरबाइन 6x30+3x30 270.00 6x30+3x30 270.00 Delhi.Gas Turbines
(c) प्रगतत गै टरबाइन 2x104.6+1x121.2 330.00 2x104.6+1x121.2 330.00 Pragati Gas Turbines
(d) ररठाला गै टरबाइन 2x31.6+1x31.6 94.80 2x31.6+1x31.6 94.80 Rithala
(e) बिाना गै टरबाइन 4x216+2x253 1370.00 4x216+2x253 1370.00 Bawana Gas Turbine
Timarpur Waste Mgmt
(f) ततमारपुर ्लािंट 1x16 16.00 1x16 16.00 Plant
कुल ददल्ली 2215.80 2215.80 Total DELHI

26
NRLDC ANNUAL REPORT 2017-18

विद्यत
ु उत्पादन केंद्र संस्थावपत क्षमता (मेगा िाट) प्रभािी क्षमता (मेगा िाट) विद्यत
ु उत्पादन केंद्र
ORIGINAL INSTALLED
POWER STATION EFFECTIVE CAPACITY(MW) POWER STATION
CAPACITY(MW)

5 हररयाणा HARYANA
जलीय HYDRO
(a) पश्चचमी यमुना 6x8+2x7.2 62.40 6x8+2x7.2 62.40 Western Yamuna -I & II
नहर (पयन) Canal (WYC)

कुल जलीय 62.40 62.40 Total Hydro


तापीय THERMAL
(b) पानीपत 2x210+2x250 920.00 2x210+2x250 920.00 Panipat
DCRTPP (Yamuna
(c) डी ीआरटीपीपी (यमुना नगर) 2x300 600.00 2x300 600.00 Nagar)
(d) आरजीटीपीपी खेदर 2x600 1200.00 2x600 1200.00 RGTPP Kheddar
( e) झज्जर- ी एल पी (आईपीपी) 2X660 1320.00 2X660 1320.00 Jhajjar-CLP (IPP)
कुल तापीय 4040.00 4040.00 Total Thermal

(f) मगनुम डीजल (आईपीपी) 4x6.3 25.20 4x6.3 25.20 Magnum Diesel (IPP)

कुल हररयाणा 4127.60 4127.60 Total HARYANA

6 दहमाचल प्रदे श HP
जलीय HYDRO
(a) धगरर 2x30.00 60.00 2x30.00 60.00 Giri
(b) बस् ी 4x16.5 66.00 4x16.5 66.00 Bassi
(c) बबनिा 2x 3.00 6.00 2x 3.00 6.00 Binwa
(d) आिंध्रा 3x 5.65 16.95 3x 5.65 16.95 Andhra
Micros(Gumma,Holi,Bhab
(e) ूक्ष्म(गुम्पमा,होली,भाभा और अन्य) 44.85 44.85 a and others)
(f) भाभा 3x40.00 120.00 3x40.00 120.00 Bhabha
(g) बनेर 3x 4.00 12.00 3x 4.00 12.00 Baner
(h) गज 3x 3.50 10.50 3x 3.50 10.50 Gaj
(i) घनिी -1 2x11.25 22.50 2x11.25 22.50 Ghanvi -1
(j) घनिी -2 2x5 10.00 2x5 10.00 Ghanvi -2
(k) लाजी 3x42 126.00 3x42 126.00 Larji
(l) खौली 2x6 12.00 2x6 12.00 Khauli
(m) मलाना (आईपीपी) 2x43.00 86.00 2x43.00 86.00 Malana(IPP)
(n) ब पा (आईपीपी) 3x100 300.00 3x100 300.00 Baspa(IPP)
(o) एमएमएच (आईपीपी) 362.00 362.00 MMH(IPP)
Patihkari (IPP)(under
(p) पाततहकारी(एमएमएच के अिंदर) 2x8 2x8 MMH)

(q) टो (आईपीपी)(एमएमएच के अिंदर) 2x5 2x5 TOSS (IPP)(under MMH)

(r) बरागािंि 3x8 24.00 3x8 24.00 Baragaon


(s) बनेर 2 2x3 6.00 2x3 6.00 Baner 2
(t) सशमला 2x2.5 5.00 2x2.5 5.00 Shimla
(u) कशािंग 3x65 195.00 3x65 195.00 Kashang
(v) बा ी 4x15 60.00 4x15 60.00 Bassi
(w) चािंजू 2x12 24.00 2x12 24.00 chanju
कुल दहमाचल प्रदे श 1568.80 1568.80 Total HP

27
NRLDC ANNUAL REPORT 2017-18

विद्यत
ु उत्पादन केंद्र संस्थावपत क्षमता (मेगा िाट) प्रभािी क्षमता (मेगा िाट) विद्यत
ु उत्पादन केंद्र
ORIGINAL INSTALLED
POWER STATION EFFECTIVE CAPACITY(MW) POWER STATION
CAPACITY(MW)
7 जम्मू और कश्मीर J&K
जलीय HYDRO
(a) तनचली झेलम 3x35.0 105.00 3x35.0 105.00 Lower Jhelum
(b) ऊपरी स ध
िं 2x11.30+3x35.0 127.60 2x11.30+3x35.0 127.60 Upper Sindh
(c) गनदे रबल 2x3+2x4.5 15.00 2x3+2x4.5 15.00 Ganderbal
(d) चेनानी (I+II+III) 5x4.66 +2x1.0+3x2.5 32.80 5x4.66 +2x1.0+3x2.5 32.80 Chenani (I+II+III)
( e) स्तकना 2x2.0+3x1.25+2.0 4.00 2x2.0+3x1.25+2.0 4.00 Stakna
(f) ेिा (III) 3x3.0 9.00 3x3.0 9.00 Sewa-III
(g) लघु जलीय 15.30 15.30 Small Hydel
(h) आइपीपी 42.50 42.5 IPP
(i) बगसलहार(स्टे ज 1 और 2) 6x150 900.00 6x150 900.00 Baglihar(Stage 1 and 2)
(j) नीमो बाजगो 3x15 45.00 45.00 Neemo Baazgo
(k) चत
ू क 4x11 44.00 4x11 44.00 Chutak
कुल जलीय 1340.20 1340.20 Total Hydro

जम्मू कश्मीर J & K (Contd.)


गै टरबाइन GAS TURBINES
(k) पिंपोर जी.टी. स्टे - I 3x25.0 75.00 3x25.0 75.00 Pampore GT St - I
पिंपोर जी.टी. स्टे - II 4x25.0 100.00 4x25.0 100.00 Pampore GT St - II

कुल गैस 175.00 175.00 Total Gas

(l) डीजल 15.40 15.40 Diesel Gen. Set

कुल जम्मू और कश्मीर 1530.60 1530.60 Total J & K

8 पंजाब PUNJAB
जलीय HYDRO
(a) जोधगिंदर नगर / 4x15+1x50 110.00 4x15+1x50 110.00 Jogindernagar/
शानन Shanan
(b) ऊपरी बेहरी दोआब 3x15+3x15.45 91.35 3x15+3x15.45 91.35 Upper Behari Doab
नहर (यूबीडी ी) Canal (UBDC)
(c) मुकेररयान 6x15+6x19.5 + 207.00 6x15+6x19.5 207.00 Mukerian
(d) आनिंदपुर ादहब 4x33.5 134.00 4x33.5 134.00 Anandpur Sahib (APS)

(e) रिं जीत ागर 4x150 600.00 4x150 600.00 Ranjit Sagar (Thein Dam)

(f) लघु जलीय 5.60 5.60 Small Hydel

कुल जलीय 1147.95 1147.95 Total Hydro

तापीय THERMAL
(g) गुरु नानक दे ि 2x110+2x120 460.00 2x110+2x120 460.00 Guru Nanak Dev
ता.वि.के. (भदटिंडा) TPS (Bhatinda)
(h) गुरु गोबबन्द स हिं 6x210 1260.00 6x210 1260.00 Guru Gobind Singh
ता.वि.के. (रोपर) TPS (Ropar)
(i) लेहरा मोहब्बत ता.वि.के. 2x210 +2x250 920.00 2x210 +2x250 920.00 Lehra Mohabbat TPS
(j) राजपुरा 2x700 1400.00 2x700 1400.00 Rajpura

28
NRLDC ANNUAL REPORT 2017-18

विद्यत
ु उत्पादन केंद्र संस्थावपत क्षमता (मेगा िाट) प्रभािी क्षमता (मेगा िाट) विद्यत
ु उत्पादन केंद्र
ORIGINAL INSTALLED
POWER STATION EFFECTIVE CAPACITY(MW) POWER STATION
CAPACITY(MW)
(k) तलििंडी ाबू 3x660 1980.00 3x660 1980.00 Talwandi Saboo
(l) आईपीपी ( एन आर ए ई + पेडा) 1237.07 1237.07 IPP (NRSE +PEDA)
कुल तापीय 7257.07 7257.07 Total Thermal

कुल पंजाब 8405.02 8405.02 Total PUNJAB

9 राजस्थान RAJASTHAN
जलीय HYDRO
(a) माही बजाज ागर 2x25+2x45 140.00 2x25+2x45 140.00 Mahi Bajaj Sagar

(b) राणा प्रताप ागर 4x43 172.00 4x43 172.00 Rana Pratap Sagar (RPS)

(c) जिाहर ागर 3x33 99.00 3x33 99.00 Jawahar Sagar (JS)
(d) गािंधी ागर 5x23 115.00 5x23 115.00 Gandhi Sagar
(e) छोटे जलीय 14.85 14.85 Small Hydro
(f) अनूपगढ़ 6x1.5 9.00 6x1.5 9.00 Anoopgarh

कुल जलीय 549.85 549.85 Total Hydro

तापीय THERMAL

(g) कोटा ता.वि.के. 2x110+3x210 +2x195 1240.00 2x110+3x210+2x195 1240.00 Kota TPS

(h) ुरतगढ़ ता.वि.के. 6x250 1500.00 6x250 1500.00 Suratgarh TPS


1x35.5+2x37.5+1X110 1x35.5+2x37.5+1X110+
(I) रामगढ़ गै विस्तार
+1x50 271.00 1x50 271.00 RAMGARH GT EXT

(j) धगराल एलटीपीए 2x125 250.00 2x125 250.00 Giral LTPS


(k) ढोलपुर ी ीपीपी 3x110 330.00 3x110 330.00 Dholpur CCPP
(l) छाबरा टीपीए 4x250 1000.00 4x250 1000.00 Chhbra TPS
(m) राज(पश्चचम) 8x135 1080.00 8x135 1080.00 RajWest

(n) िीए सलगनईट पािर प्रा. सल. 1x135 135.00 1x135 135.00 VS Lignite Power Pvt Ltd

(o) कासलस न्ध 2X600 1200.00 2X600 1200.00 Kalisindh


(p) किई 2X660 1320.00 2X660 1320.00 Kawai
कुल तापीय 8326.00 8326.00 Total Thermal

(q) पिन ऊजाब + दे िगढ़ 4292.00 4292 Wind Farm+ devgarh W.T

(r ) बायो मा 120.45 120.45 Bio-mass


(s) ौर उजाब 2263.82 2263.82 Solar Energy
कुल राजस्थान 15552.12 15552.12 Total RAJASTHAN

10 उत्तर प्रदे श UP
जलीय HYDRO
(a) ररहिं द 6x50.0 300.00 6x50.0 300.00 Rihand
(b) ओबरा 3x33.0 99.00 3x33.0 99.00 Obra
(c) माताटीला 3x10.2 30.60 3x10.2 30.60 Matatilla
(d) खारा 3x24.0 72.00 3x24.0 72.00 Khara
(e) एमएमएच 25.30 25.30 MMH
(f) विष्णुप्रयाग आईपीपी 4x110 440.00 4x110 440.00 VishnuPrayag IPP
(g) अलकनिंदा 4x82.5 330.00 4x82.5 330.00 Alaknanda
कुल जलीय 1296.90 1296.90 Total Hydro

29
NRLDC ANNUAL REPORT 2017-18

विद्यत
ु उत्पादन केंद्र संस्थावपत क्षमता (मेगा िाट) प्रभािी क्षमता (मेगा िाट) विद्यत
ु उत्पादन केंद्र
ORIGINAL INSTALLED
POWER STATION EFFECTIVE CAPACITY(MW) POWER STATION
CAPACITY(MW)
तापीय THERMAL
(h) ओबरा ए 2x50+1X94 194.00 2x50+1X94 194.00 Obra A
(i) ओबरा बी 5X200 1000.00 5X200 1000.00 Obra B
(j) पनकी 2x105 210.00 2x105 210.00 Panki
(k) हरदआ
ु गिंज - बी 1x60+1x105 165.00 1x60+1x105 165.00 Harduaganj - B
(l) हरदआ
ु गिंज - ी 2x250 500.00 2x250 500.00 Harduaganj - C
(m) पररछा ए,बी, ी 2x110+2x210+2x250 1140.00 2x110+2x210+2x250 1140.00 Paricha - A,B,C
(n) अनपरा-ए 3x210 630.00 3x210 630.00 Anpara - A
(o) अनपरा-बी 2x500 1000.00 2x500 1000.00 Anpara - B
(p) अनपरा- ी(आइपीपी) 2x600 1200.00 2x600 1200.00 Anpara - C(IPP)
(q) रोज़ा(आइपीपी) 4x300 1200.00 4x300 1200.00 Rosa (IPP)

बजाज ऊजाब प्राइिेट सलसमटे ड(आइपीपी) Bajaj Energy Pvt. Ltd(IPP)


( r) 10x45 450.00 10x45 450.00
(s) ह उत्पादन 981.00 981.00 Cogeneration
(t) अनपरा- डी 2x500 1000.00 2x500 1000.00 Anpara - D
(u) लसलतपुर 3x660 1980.00 3x660 1980.00 Lalitpur
(v) बारा 3x660 1980.00 3x660 1980.00 Bara

कुल तापीय 13630.00 13630.00 Total Thermal

(w) ोलर 450 450 Solar


कुल उत्तर प्रदे श 15376.90 15376.90 Total UP

11 उत्तराखंड UTTARAKHAND
जलीय HYDRO
(a) खाततमा 3x13.8 41.40 3x13.8 41.40 Khatima
(b) रामगिंगा 3x66.0 198.00 3x66.0 198.00 Ramganga
(c) गिंगा नहर Ganga Canal
मोहम्पमदपुर 3x3.1 9.30 3x3.1 9.30 Mohamedpur
पथरी 3x6.8 20.40 3x6.8 20.40 Pathri
धचल्ला 4x36.00 144.00 4x36.0 144.00 Chilla
(d) यमुना (I&IV) Yamuna ( I & IV )
धालीपुर 3x17.00 51.00 3x17.00 51.00 - Dhalipur
धकरानी 3x11.25 33.75 3x11.25 33.75 - Dhakrani
कुलहाल 3x10.00 30.00 3x10.00 30.00 - Kulhal
तछबरो 4x60.0 240.00 4x60.0 240.00 Chibro
खोदरी 4x30.0 120.00 4x30.0 120.00 Khodri
(e ) मनेरी भाली 3*30+4*76 394.00 3x30.0 +4x76 394.00 Maneri Bhali
Other Small
अन्य ूक्ष्म जलीय(सभलािंगना को समला कर) 149.00 149.00 hydel(Including
(f) Bhilangana)
(g) शुगर समल 20.00 20.00 Sugar Mill
Gamma Infra Private
(h) गाम्पमा इन्रा प्राइिेट सलसमटे ड 3x75 225.00 3x75 225.00 Limited
(i) श्रििंती प्राइिेट सलसमटे ड 3x75 225.00 3x75 225.00 Shravanti Pvt.Ltd
(j) बायो गॅ / फिउल 128.00 128.00 Bio Gas/Fuel
(k) सभलािंगना 25.00 25.00 Bhilangana
(l) ोलर 181.40 181.40 solar
कुल उत्तराखंड 2235.25 2235.25 Total UTTARAKHAND
कुल क्षेत्रीय(1 से 11) 79313.43 79132.03 Total Region (1 to 11)

30
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र की प्रिावी उत्पािन क्षमता का सारांश सभी आंकड़े मेगा वाट में
THE SUMMARY OF EFFECTIVE GENERATING CAPACITY IN THE NORTHERN REGION All figures are in MW

जलीय तापीय डीजल बायो - मास सौर (Solar- पवन ऊजाा नाभिकीय
अजेंसी/स्रोत गैस (Gas) कुल (Total) Agency/ Source
(Hydro) (Thermal) (Diesel) (Bio-mass) Gen.) (Wind Gen. ) (Nuclear)

एनटीपीसी 800.00 11015.00 2344.04 --- --- 30.00 --- --- 14189.04 NTPC

एनएचपीसी 4065.20 --- --- --- --- --- --- --- 4065.20 NHPC

एसजेवीएनएल 1912.00 --- --- --- --- --- --- --- 1912.00 SJVNL

टीएचडीसी 1400.00 --- --- --- --- --- --- --- 1400.00 THDC

एनएलसी --- 250.00 --- --- --- --- --- --- 250.00 NLC

एनपीसी --- --- --- --- --- --- --- 1620.00 1620.00 NPC

केंद्रीय आईपीपी 1462.00 300.00 --- --- --- --- --- --- 1762.00 Regional IPP

बीबीएमबी 2920.30 --- --- --- --- --- --- --- 2920.30 BBMB

चंडीगढ़ --- --- 1.40 --- --- --- --- --- 1.40 Chandigarh

दिल्ली --- 135.00 2064.80 --- 16.00 --- --- --- 2215.80 Delhi

हररयाणा 62.40 4040.00 --- 25.20 --- --- --- --- 4127.60 Haryana

दहमाचल प्रिे श 1568.80 --- --- --- --- --- --- --- 1568.80 Himachal

जम्मू और कश्मीर 1340.20 --- 175.00 15.40 --- --- --- --- 1530.60 J&K

पंजाब 1147.95 6020.00 --- --- 1237.07 --- --- --- 8405.02 Punjab

राजस्थान 549.85 7725.00 601.00 --- 120.45 2263.82 4292.00 15552.12 Rajasthan

उत्तर प्रिे श 1296.90 12649.00 --- --- 981.00 450.00 --- --- 15376.90 UP

उत्तराखंड 1455.85 --- 450.00 --- 148.00 181.40 --- --- 2235.25 Uttakhand

कुल 19981.45 42134.00 5636.24 40.60 2502.52 2925.22 4292.00 1620.00 79132.03 Total

कुल प्रततशत 25.25% 53.25% 7.12% 0.05% 3.16% 3.70% 5.42% 2.05% 100.00% % age

31
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र /NORTHERN REGION


BREAK UP OF EFFECTIVE GENERATING CAPACITY (SOURCE WISE)

Solar NUCLEAR
Biomass 3.70% 2.05%
Wind 3.16%
5.42%
GAS/DIESEL
7.17%

HYDRO
25.25% THERMAL
53.25%

32
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र /NORTHERN REGION


BREAKUP OF EFFECTIVE GENERATING CAPACITY (CONSTITUENT WISE)
AS ON 31st MARCH 2018
NTPC
Uttakhand 18.98%
2.50%
UP
18.09%

NHPC
5.64%

THDC
1.94%
NLC
NPC 0.35%
2.25%

Rajasthan BBMB Regional IPP


19.64% 4.05% 2.30%
Haryana Delhi
Himachal5.72% 3.07%
J&K 1.76%
Punjab 1.91%
9.13%

33
NRLDC ANNUAL REPORT 2017-18

4.2 31 माचच 2018 को उत्तरी क्षेत्र में प्रभावी जल ववद्युत क्षमता (मेगा वाट) का वववरण
BREAKUP OF EFFECTIVE HYDRO CAPACITY (MW) IN NORTHERN REGION AS ON 31.03.2018
सभी आंकड़े मेगा वाट में
All figures are in MW

अजेंसी/स्रोत Run-of -the -river Reservoir / Pondage कुल (Total) Agency/Source


एनएचपीसी 1504.20 2561.00 4065.20 NHPC
एनटीपीसी 0.00 800.00 800.00 NTPC
एसजेवीएनपी 0.00 1500.00 1500.00 SJVNL
रामपुर 412 0.00 412.00 Rampur
करचम वंगतू 1000.00 0.00 1000.00 KWHEP
टे हरी 0 1000.00 1000.00 Tehri
कोटे श्वर 400.00 0.00 400.00 Koteshwar
बीबीएमबी 1145.30 1775.00 2920.30 BBMB
एडीएचपीएल 192.00 0.00 192.00 ADHPL
मलाना स्टे ज-II 100.00 0.00 100.00 Malana Stage-II
बुधिल 70.00 0.00 70.00 Budhil
दिल्ली 0.00 0.00 0.00 Delhi
हररयाणा 62.40 0.00 62.40 Haryana
दहमाचल प्रिे श 1568.80 0.00 1568.80 Himachal
जम्मू और कश्मीर 1340.20 0.00 1340.20 J&K
पंजाब 547.95 600.00 1147.95 Punjab
राजस्थान 23.85 526.00 549.85 Rajasthan
उत्तर प्रिे श 867.30 429.60 1296.90 Uttar Pradesh
उत्तराखंड 1257.85 198.00 1455.85 Uttarakhand
कुल 10491.85 9389.60 19881.45 Total
प्रततशत 52.77 47.23 100% % age

34
NRLDC ANNUAL REPORT 2017-18

4.3 र्िछले दशक के दौरान उत्िादन सयंन्त्रों की संस्थार्ित क्षमता में वद्
ृ धि का र्ववरण
GROWTH OF INSTALLED CAPACITY IN NORTHERN REGION DURING LAST DECADE
सभी आंकड़े मेगा वाट में
All figures are in MW

क्र. सं. वषि तािीय जलीय गैस/डीजल िवन नाभिकीय कुल संस्थार्ित क्षमता

Non conventional Total Installed


S.No. Year Thermal Hydro Gas/Diesel Nuclear
(wind/Biomass/Solar) capacity

1 2007-08 18025 12844 3516 563 1350 36298

2 2008-09 19627 13436 3736 659 1350 38808

3 2009-10 21905 13940 3605 1129 1620 42199

4 2010-11 24093 14467 3713 1428 1620 45322

5 2011-12 28099 15903 4385 1843 1620 51850

6 2012-13 30295 16327 4374 3512 1620 56127

7 2013-14 34231 17389 5207 4987 1620 63434

8 2014-15 36301 18253 5239 5755 1620 67167

9 2015-16 38994 18810 5452 7247 1620 72122

10 2016-17 40814 19089 5452 8016 1620 74990


11 2017-18 42134 19981 5677 9720 1620 79132
वार्षिक योग व्रद्धि
(CAGR)% 8.86 4.52 4.91 34.85 1.84 8.11
दर
Growth Rate
र्िछले साल से
from Last 3.2% 4.7% 4.1% 21.3% 0.0% 5.5%
वद्ृ धि दर
Year %

35
अनभु ाग - 5
Section-5

विद्यत
ु आपर्ू ति की स्थिर्त (आंकड़े)
Power Supply Position (Data)
NRLDC ANNUAL REPORT 2017-18

5.1 वर्ा 2017-2018 की ववद्युत आपूतता की स्स्थतत कज सजिजंश


SUMMARY OF POWER SUPPLY POSITION IN THE NORTHERN REGION FOR THE YEAR 2017-2018

A. औसत ऊर्जा प्रततदिन (शुद्ध)


Average Energy /day (Net)

उपलब्धतज आवश्यकतज कमी


क्र. सं. िजज्य/के. शज. कमी %
मम.य.ू /प्रततदिन मम.य.ू /प्रततदिन मम.य.ू /प्रततदिन State / U.T.
S.No. Availability Requirement Shortage Shortage %
MU/Day MU/Day MU/Day
1 चंडीगढ़ 4.39 4.41 0.02 0.56 Chandigarh

2 दिल्ली 86.30 86.34 0.04 0.05 Delhi

3 हरियजणज 139.00 139.53 0.52 0.38 Haryana

4 दहमजचल प्रिे श 25.72 25.84 0.12 0.47 H.P.

5 र्म्मू औि कश्मीि 40.59 50.43 9.84 19.52 J&K

6 पंर्जब 146.22 146.23 0.01 0.00 Punjab

7 िजर्स्थजन 196.64 198.17 1.52 0.77 Rajasthan

8 उत्ति प्रिे श 321.36 324.30 2.95 0.91 U.P.

9 उत्तिजखंड 36.41 36.50 0.09 0.24 U'KHAND

10 एनएफ़एफ़/िे ल 2.29 2.29 0.00 0.00 N.F.F./Rail

कुल 998.89 1014.01 15.12 1.49 Total

B. उच्चतम मेगजवजट
Peak MW

क्र. सं. उच्चतम उपलब्धतज उच्चतम आवश्यकतज कमी कमी %


मेगजवजट मेगजवजट मेगजवजट
िजज्य/के. शज. Max. Availability Max. Requirement Shortage MW Shortage % State/UT
S.No. MW MW
A B C=B-A (C/B)*100

1 चंडीगढ़ 363.00 363.00 0.00 0.00 Chandigarh

2 दिल्ली 6526.00 6553.00 27.00 0.41 Delhi

3 हरियजणज 9539.00 9671.00 132.00 1.36 Haryana

4 दहमजचल प्रिे श 1594.00 1594.00 0.00 0.00 H.P.

5 र्म्मू औि कश्मीि 2319.00 2899.00 580.00 20.01 J&K

6 पंर्जब 11681.00 11681.00 0.00 0.00 Punjab

7 िजर्स्थजन 11564.00 11722.00 158.00 1.35 Rajasthan

8 उत्ति प्रिे श 18061.00 20274.00 2213.00 10.92 U.P.

9 उत्तिजखंड 2149.00 2149.00 0.00 0.00 U'KHAND

10 एनएफ़एफ़/िे ल 121.00 121.00 0.00 0.00 N.F.F./Rail

कुल 58448.00 60749.00 2301.00 3.79 Total

Diversity Factor = 1.09

36
NRLDC ANNUAL REPORT 2017-18

5.2 वर्ष 2017-2018 के िौरान उत्तर क्षेत्र में बबजली आपूततष की मामसक स्थितत (औसत ऊजाष/प्रततदिन)
MONTHWISE POWER SUPPLY POSITION (Average energy in MU/ Day) IN NORTHERN REGION DURING 2017-2018

सभी आंकड़े औसत शुद्ध मिमियन यूननट िें


राज्य चंडीगढ़ Chandigarh दिल्ली Delhi State
मास उपलब्धता आवश्यकता कमी कमी % उपलब्धता आवश्यकता कमी कमी % मास
मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन

Availability Requirement Shortage % Shortage Availability Requirement Shortage % Shortage Month


Month
MU/Day MU/Day MU/Day MU/Day MU/Day MU/Day
अप्रैि-2017 4.45 4.45 0.00 0.00 90.96 91.00 0.04 0.04 April-2017
िई-2017 5.62 5.62 0.00 0.00 108.77 108.81 0.05 0.04 May-2017
जून-2017 5.66 5.96 0.30 5.03 110.34 110.38 0.04 0.04 June-2017
जि
ु ाई-2017 6.10 6.10 0.00 0.00 109.66 109.70 0.04 0.04 July-2017
अगस्त-2017 5.48 5.48 0.00 0.00 109.23 109.27 0.04 0.04 August-2017
मसतंबर-2017 4.99 4.99 0.00 0.00 101.81 101.85 0.04 0.04 September-2017
अक्टूबर-2017 3.90 3.90 0.00 0.00 83.19 83.23 0.04 0.05 October-2017
नवम्बर-2017 3.13 3.13 0.00 0.00 62.46 62.50 0.04 0.06 November-2017
दिसम्बर-2017 3.32 3.32 0.00 0.00 62.70 62.74 0.04 0.06 December-2017
जनवरी-2018 3.57 3.57 0.00 0.00 66.16 66.20 0.04 0.06 January-2018
फ़रवरी-2018 3.22 3.22 0.00 0.00 62.71 62.75 0.04 0.06 February-2018
िार्च-2018 3.11 3.11 0.00 0.00 65.94 65.98 0.04 0.06 March-2018
2017-2018 4.39 4.41 0.02 0.56 86.30 86.34 0.04 0.05 2017-2018

सभी आंकड़े औसत शुद्ध मिमियन यूननट िें


राज्य हररयाणा Haryana दहमाचल प्रिे श HP State
मास उपलब्धता आवश्यकता कमी कमी % उपलब्धता आवश्यकता कमी कमी % मास
मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन
Month Availability Requirement Shortage % Shortage Availability Requirement Shortage % Shortage Month
MU/Day MU/Day MU/Day MU/Day MU/Day MU/Day
अप्रैि-2017 120.98 121.54 0.56 0.46 25.27 25.40 0.13 0.51 April-2017
िई-2017 149.43 149.44 0.01 0.01 25.50 25.58 0.08 0.31 May-2017
जून-2017 152.82 153.19 0.37 0.24 25.91 25.94 0.03 0.12 June-2017
जि
ु ाई-2017 183.88 184.12 0.24 0.13 26.13 26.32 0.19 0.72 July-2017
अगस्त-2017 175.33 175.75 0.42 0.24 26.16 26.41 0.25 0.95 August-2017
मसतंबर-2017 155.34 156.28 0.94 0.60 25.12 25.26 0.14 0.55 September-2017
अक्टूबर-2017 137.72 138.27 0.55 0.40 23.69 23.79 0.10 0.42 October-2017
नवम्बर-2017 109.10 109.54 0.44 0.40 25.23 25.26 0.03 0.12 November-2017
दिसम्बर-2017 116.78 117.55 0.77 0.66 26.74 26.85 0.11 0.41 December-2017
जनवरी-2018 119.75 120.01 0.26 0.22 27.18 27.30 0.12 0.44 January-2018
फ़रवरी-2018 120.96 121.39 0.43 0.35 26.44 26.56 0.12 0.45 February-2018
िार्च-2018 123.63 124.93 0.08 0.07 25.31 25.47 0.06 0.23 March-2018
2017-2018 139.00 139.53 0.52 0.38 25.72 25.84 0.12 0.47 2017-2018

सभी आंकड़े औसत शुद्ध मिमियन यूननट िें


राज्य जम्मू और कश्मीर J&K पंजाब PUNJAB State
मास उपलब्धता आवश्यकता कमी कमी % उपलब्धता आवश्यकता कमी कमी % मास
मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन
Month Availability Requirement Shortage % Shortage Availability Requirement Shortage % Shortage Month
MU/Day MU/Day MU/Day MU/Day MU/Day MU/Day
अप्रैि-2017 37.95 50.34 12.39 24.61 115.37 115.37 0.00 0.00 April-2017
िई-2017 37.61 46.79 9.18 19.62 157.42 157.42 0.00 0.00 May-2017
जून-2017 38.23 46.64 8.41 17.97 178.07 178.07 0.00 0.00 June-2017
जुिाई-2017 38.06 47.08 9.02 19.16 229.65 229.65 0.00 0.00 July-2017
अगस्त-2017 38.61 47.87 9.26 19.34 214.66 214.66 0.00 0.00 August-2017
मसतंबर-2017 40.41 49.99 9.58 19.16 187.05 187.05 0.00 0.00 September-2017
अक्टूबर-2017 40.18 49.77 9.59 19.27 137.20 137.20 0.00 0.00 October-2017
नवम्बर-2017 40.44 49.98 9.54 19.09 94.72 94.72 0.00 0.00 November-2017
दिसम्बर-2017 42.90 52.99 10.09 19.04 100.51 100.51 0.00 0.00 December-2017
जनवरी-2018 46.17 57.03 10.86 19.04 104.11 104.11 0.00 0.00 January-2018
फ़रवरी-2018 43.34 52.84 9.50 17.98 110.38 110.38 0.00 0.00 February-2018
िार्च-2018 43.28 53.95 10.29 20.02 121.70 121.78 0.00 0.00 March-2018
2017-2018 40.59 50.43 9.84 19.52 146.22 146.23 0.01 0.00 2017-2018

37
NRLDC ANNUAL REPORT 2017-18

5.2 वर्ष 2017-2018 के िौरान उत्तर क्षेत्र में बबजली आपूततष की मामसक स्थितत (औसत ऊजाष/प्रततदिन)
MONTHWISE POWER SUPPLY POSITION (Average energy in MU/ Day) IN NORTHERN REGION DURING 2017-2018
सभी आंकड़े औसत शुद्ध मिमियन यूननट िें
राज्य राजथिान Rajasthan उत्तर प्रिे श Uttar Pradesh State
मास उपलब्धता आवश्यकता कमी कमी % उपलब्धता आवश्यकता कमी कमी % मास
मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन
Month Availability Requirement Shortage % Shortage Availability Requirement Shortage % Shortage Month
MU/Day MU/Day MU/Day MU/Day MU/Day MU/Day
अप्रैि-2017 184.26 184.63 0.37 0.20 318.36 318.71 0.35 0.11 April-2017
िई-2017 199.25 202.10 2.85 1.41 351.35 352.10 0.75 0.21 May-2017
जन
ू -2017 192.78 193.01 0.23 0.12 364.26 365.89 1.63 0.45 June-2017
जुिाई-2017 177.64 178.43 0.79 0.44 341.18 343.00 1.82 0.53 July-2017
अगस्त-2017 197.58 198.28 0.70 0.35 360.51 362.33 1.82 0.50 August-2017
मसतंबर-2017 199.37 201.57 2.20 1.09 361.74 367.11 5.37 1.46 September-2017
अक्टूबर-2017 197.09 200.99 3.90 1.94 333.84 339.17 5.33 1.57 October-2017
नवम्बर-2017 202.30 203.83 1.53 0.75 273.78 275.11 1.33 0.48 November-2017
दिसम्बर-2017 201.61 202.57 0.96 0.47 276.75 289.26 12.51 4.32 December-2017
जनवरी-2018 211.69 213.25 1.56 0.73 296.27 297.25 0.98 0.33 January-2018
फ़रवरी-2018 207.81 210.54 2.73 1.30 286.19 286.95 0.76 0.26 February-2018
िार्च-2018 189.18 189.69 0.06 0.03 289.70 292.11 0.45 0.16 March-2018
2017-2018 196.64 198.17 1.52 0.77 321.36 324.30 2.95 0.91 2017-2018

सभी आंकड़े औसत शुद्ध मिमियन यूननट िें


राज्य एन.एफ़.एफ़./रे ल NFF/Rail उत्तराखंड Uttarakhand State
मास उपलब्धता आवश्यकता कमी कमी % उपलब्धता आवश्यकता कमी कमी % मास
मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन
Month Availability Requirement Shortage % Shortage Availability Requirement Shortage % Shortage Month
MU/Day MU/Day MU/Day MU/Day MU/Day MU/Day
अप्रैि-2017 2.23 2.23 0.00 0.00 35.02 35.06 0.04 0.11 April-2017
िई-2017 2.27 2.27 0.00 0.00 38.71 38.89 0.18 0.46 May-2017
जून-2017 2.30 2.30 0.00 0.00 39.88 39.89 0.01 0.03 June-2017
जुिाई-2017 2.25 2.25 0.00 0.00 37.77 38.09 0.32 0.84 July-2017
अगस्त-2017 2.22 2.22 0.00 0.00 37.90 38.05 0.15 0.39 August-2017
मसतंबर-2017 2.32 2.32 0.00 0.00 38.34 38.40 0.06 0.16 September-2017
अक्टूबर-2017 2.40 2.40 0.00 0.00 34.23 34.25 0.02 0.06 October-2017
नवम्बर-2017 2.35 2.35 0.00 0.00 33.32 33.40 0.08 0.24 November-2017
दिसम्बर-2017 2.18 2.18 0.00 0.00 34.85 34.93 0.08 0.23 December-2017
जनवरी-2018 2.19 2.19 0.00 0.00 37.53 37.58 0.05 0.13 January-2018
फ़रवरी-2018 2.42 2.42 0.00 0.00 35.28 35.32 0.04 0.11 February-2018
िार्च-2018 2.38 2.38 0.00 0.00 34.00 34.03 0.23 0.69 March-2018
2017-2018 2.29 2.29 0.00 0.00 36.41 36.50 0.09 0.24 2017-2018

सभी आंकड़े औसत शुद्ध मिमियन यूननट िें


राज्य क्षेत्र Region State
मास उपलब्धता आवश्यकता कमी कमी % मास
मम.यू./प्रततदिन मम.यू./प्रततदिन मम.यू./प्रततदिन
Month Availability Requirement Shortage % Shortage Month
MU/Day MU/Day MU/Day
अप्रैि-2017 934.73 948.61 13.88 1.46 April-2017
िई-2017 1075.76 1088.84 13.08 1.20 May-2017
जून-2017 1110.25 1121.27 11.02 0.98 June-2017
जुिाई-2017 1152.33 1164.73 12.40 1.06 July-2017
अगस्त-2017 1167.68 1180.31 12.63 1.07 August-2017
मसतंबर-2017 1116.46 1134.80 18.34 1.62 September-2017
अक्टूबर-2017 993.44 1012.95 19.51 1.93 October-2017
नवम्बर-2017 846.82 859.80 12.98 1.51 November-2017
दिसम्बर-2017 868.34 892.90 24.56 2.75 December-2017
जनवरी-2018 914.63 928.50 13.87 1.49 January-2018
फ़रवरी-2018 898.75 912.39 13.64 1.49 February-2018
िार्च-2018 898.24 913.44 11.21 1.29 March-2018
2017-2018 998.89 1014.01 15.12 1.49 2017-2018

38
NRLDC ANNUAL REPORT 2017-18

5.2 वर्ि 2017-2018 के दौरान उत्तरी क्षेत्र में माससक बबजली आपूर्ति की स्थिर्त (अधिकतम)
MONTHWISE POWER SUPPLY POSITION (MAX MW) IN NORTHERN REGION DURING 2017-18
सभी आंकड़े मेगा वाट में
All figures are in MW
राज्य/
State चंडीगढ़ Chandigarh ददल्ली Delhi State

अधिकतम अधिकतम
आवश्यकता कमी कमी % आवश्यकता कमी कमी %
मास आपूर्ति आपूर्ति मास
मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट

Max Demand % Max


Month Requirement Shortage Requirement Shortage % Shortage Month
met Shortage Demand met

अप्रैल-2017 321 321 0 0.00 5685 5688 3 0.05 April-2017


मई-2017 340 340 0 0.00 6021 6031 10 0.17 May-2017
जून-2017 356 356 0 0.00 6526 6553 27 0.41 June-2017
जुलाई-2017 363 363 0 0.00 6109 6109 0 0.00 July-2017
अगस्त-2017 335 335 0 0.00 6129 6133 4 0.07 August-2017
ससतंबर-2017 287 287 0 0.00 5637 5637 0 0.00 September-2017
अक्टूबर-2017 244 244 0 0.00 4645 4645 0 0.00 October-2017
नवम्बर-2017 189 189 0 0.00 3682 3682 0 0.00 November-2017
दिसम्बर-2017 218 218 0 0.00 3971 3971 0 0.00 December-2017
जनवरी-2018 242 242 0 0.00 4464 4464 0 0.00 January-2018
फ़रवरी-2018 235 235 0 0.00 3992 3992 0 0.00 February-2018
मार्च-2018 232 232 0 0.00 3688 3688 0 0.00 March-2018
2017-2018 363 363 0 0.00 6526 6553 27 0.41 2017-2018

राज्य/
State हररयाणा Haryana दहमाचल प्रदे श HP State

अधिकतम अधिकतम
आवश्यकता कमी कमी % आवश्यकता कमी कमी %
मास आपूर्ति आपूर्ति मास
मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट
Max Demand % Max
Month Requirement Shortage Requirement Shortage % Shortage Month
met Shortage Demand met
अप्रैल-2017 7463 7463 0 0.00 1329 1329 0 0.00 April-2017
मई-2017 7780 7780 0 0.00 1349 1349 0 0.00 May-2017
जून-2017 8912 8912 0 0.00 1377 1377 0 0.00 June-2017
जुलाई-2017 9539 9539 0 0.00 1346 1346 0 0.00 July-2017
अगस्त-2017 9501 9671 170 1.76 1369 1369 0 0.00 August-2017
ससतंबर-2017 8932 9082 150 1.65 1413 1413 0 0.00 September-2017
अक्टूबर-2017 7860 7860 0 0.00 1425 1425 0 0.00 October-2017
नवम्बर-2017 6593 6593 0 0.00 1491 1491 0 0.00 November-2017
दिसम्बर-2017 7042 7042 0 0.00 1560 1560 0 0.00 December-2017
जनवरी-2018 6940 6990 50 0.72 1594 1594 0 0.00 January-2018
फ़रवरी-2018 7120 7120 0 0.00 1555 1555 0 0.00 February-2018
मार्च-2018 6815 6815 0 0.00 1494 1494 0 0.00 March-2018
2017-2018 9539 9671 132 1.36 1594 1594 0 0.00 2017-2018

राज्य/
State जम्मू और कश्मीर J&K पंजाब Punjab State

अधिकतम अधिकतम
आवश्यकता कमी कमी % आवश्यकता कमी कमी %
मास आपूर्ति आपूर्ति मास
मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट
Max Demand % Max
Month Requirement Shortage Requirement Shortage % Shortage Month
met Shortage Demand met
अप्रैल-2017 2062 2577 515 19.98 7097 7097 0 0.00 April-2017
मई-2017 2134 2668 534 20.01 8229 8229 0 0.00 May-2017
जून-2017 2214 2768 554 20.01 10786 10786 0 0.00 June-2017
जुलाई-2017 2133 2666 533 19.99 11681 11681 0 0.00 July-2017
अगस्त-2017 2113 2634 521 19.78 11082 11082 0 0.00 August-2017
ससतंबर-2017 2163 2704 541 20.01 9978 9978 0 0.00 September-2017
अक्टूबर-2017 2297 2737 440 16.08 8348 8348 0 0.00 October-2017
नवम्बर-2017 2198 2712 514 18.95 5883 5883 0 0.00 November-2017
दिसम्बर-2017 2206 2758 552 20.01 6050 6050 0 0.00 December-2017
जनवरी-2018 2319 2899 580 20.01 5874 5874 0 0.00 January-2018
फ़रवरी-2018 2199 2748 549 19.98 6538 6538 0 0.00 February-2018
मार्च-2018 2162 2703 541 20.01 6694 6694 0 0.00 March-2018
2017-2018 2319 2899 580 20.01 11681 11681 0 0.00 2017-2018

39
NRLDC ANNUAL REPORT 2017-18

5.2 वर्ि 2017-2018 के दौरान उत्तरी क्षेत्र में माससक बबजली आपूर्ति की स्थिर्त (अधिकतम)
MONTHWISE POWER SUPPLY POSITION (MAX MW) IN NORTHERN REGION DURING 2017-18
सभी आंकड़े मेगा वाट में
All figures are in MW

राज्य/
State राजथिान Rajasthan उत्तर प्रदे श Uttar Pradesh State

अधिकतम अधिकतम
आवश्यकता कमी कमी % आवश्यकता कमी कमी %
मास आपर्ू ति आपर्ू ति मास
मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट

Max Demand % Max


Month Requirement Shortage Requirement Shortage % Shortage Month
met Shortage Demand met

अप्रैल-2017 9155 9187 32 0.35 17332 17332 0 0.00 April-2017


मई-2017 10305 10305 0 0.00 17819 18519 700 3.78 May-2017
जून-2017 10347 10347 0 0.00 18061 18061 0 0.00 June-2017
जुलाई-2017 9795 9795 0 0.00 17394 18554 1160 6.25 July-2017
अगस्त-2017 10293 10293 0 0.00 17719 20274 2555 12.60 August-2017
ससतंबर-2017 9900 9900 0 0.00 17902 19132 1230 6.43 September-2017
अक्टूबर-2017 10357 10357 0 0.00 17966 17966 0 0.00 October-2017
नवम्बर-2017 11215 11215 0 0.00 13247 14017 770 5.49 November-2017
दिसम्बर-2017 11290 11290 0 0.00 14427 14427 0 0.00 December-2017
जनवरी-2018 11564 11722 158 1.35 14989 14989 0 0.00 January-2018
फ़रवरी-2018 11307 11307 0 0.00 15015 15095 80 0.53 February-2018
मार्च-2018 10723 10723 0 0.00 15223 15558 335 2.15 March-2018
2017-2018 11564 11722 158 1.35 18061 20274 2213 10.92 2017-2018

राज्य/
State एन.एफ़.एफ़./रे ल NFF/Rail उत्तराखंड Uttrakhand
अधिकतम अधिकतम
आवश्यकता कमी कमी % आवश्यकता कमी कमी %
मास आपर्ू ति आपर्ू ति मास
मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट मेगावाट
Max Demand % Max
Month Requirement Shortage Requirement Shortage % Shortage Month
met Shortage Demand met
अप्रैल-2017 98 98 0 0.00 1917 1917 0 0.00 April-2017
मई-2017 98 98 0 0.00 1992 1992 0 0.00 May-2017
जून-2017 102 102 0 0.00 2027 2027 0 0.00 June-2017
जुलाई-2017 83 83 0 0.00 1971 1971 0 0.00 July-2017
अगस्त-2017 116 116 0 0.00 1987 1987 0 0.00 August-2017
ससतंबर-2017 114 114 0 0.00 2033 2033 0 0.00 September-2017
अक्टूबर-2017 117 117 0 0.00 1920 1920 0 0.00 October-2017
नवम्बर-2017 121 121 0 0.00 1886 1886 0 0.00 November-2017
दिसम्बर-2017 94 94 0 0.00 2025 2025 0 0.00 December-2017
जनवरी-2018 94 94 0 0.00 2149 2149 0 0.00 January-2018
फ़रवरी-2018 110 110 0 0.00 2134 2134 0 0.00 February-2018
मार्च-2018 101 101 0 0.00 1886 1886 0 0.00 March-2018
2017-2018 121 121 0 0.00 2149 2149 0 0.00 2017-2018

राज्य/
State क्षेत्र Region State
अधिकतम
आवश्यकता कमी कमी % मास
मास आपूर्ति
मेगावाट मेगावाट मेगावाट
Max Demand %
Month Requirement Shortage Month
met Shortage
अप्रैल-2017 49643 50213 570 1.14 April-2017
मई-2017 51820 52517 697 1.33 May-2017
जून-2017 54890 56119 1229 2.19 June-2017
जुलाई-2017 55865 56398 533 0.95 July-2017
अगस्त-2017 58448 60749 2301 3.79 August-2017
ससतंबर-2017 54649 57203 2554 4.46 September-2017
अक्टूबर-2017 50289 51307 1018 1.98 October-2017
नवम्बर-2017 42390 43240 850 1.97 November-2017
दिसम्बर-2017 45360 46038 678 1.47 December-2017
जनवरी-2018 46252 47214 962 2.04 January-2018
फ़रवरी-2018 46578 47171 593 1.26 February-2018
मार्च-2018 43777 44348 571 1.29 March-2018
2017-2018 58448 60749 2301 3.79 2017-2018

40
NRLDC ANNUAL REPORT 2017-18
5.3 वर्ष 2017-2018 के िौरान उत्तर क्षेत्रीय महीनावार अधिकतम व न्यूनतम ऊजाष (ततधि सदहत)
MONTHWISE MAXIMUM AND MINIMUM ENERGY CONSUMPTION WITH CORRESPONDING DATES IN NORTHERN REGION DURING 2017-
18

राज्य/
राज्य/ State
State चंडीगढ़ Chandigarh दिल्ली Delhi
अधिकतम
दिनााँक न्यूनतम खपत दिनााँक अधिकतम खपत दिनााँक न्यूनतम खपत दिनााँक
मास खपत मास
Maximum Minimum Maximum Minimum
Date Date Date Date
consumption consumption consumption consumption
Month Month
MU MU MU MU
अप्रैल-2017 6.74 21.04.2017 3.60 09.04.2017 114.88 21.04.2017 69.45 09.04.2017 April-2017
मई-2017 7.27 26.05.2017 5.42 03.05.2017 122.03 16.05.2017 92.70 22.05.2017 May-2017
जून-2017 7.97 06.06.2017 5.31 11.06.2017 133.78 06.06.2017 95.70 21.06.2017 June-2017
जल
ु ाई-2017 7.71 10.07.2017 5.70 02.07.2017 122.32 10.07.2017 90.44 02.07.2017 July-2017
अगस्त-2017 7.40 18.08.2017 5.40 28.08.2017 124.58 18.08.2017 97.68 15.08.2017 August-2017
सितंबर-2017 5.48 14.09.2017 3.63 24.09.2017 117.20 14.09.2017 77.63 24.09.2017 September-2017
अक्टूबर-2017 5.39 09.10.2017 3.28 29.10.2017 98.87 05.10.2017 65.84 29.10.2017 October-2017
नवम्बर-2017 3.70 01.11.2017 3.16 12.11.2017 69.94 03.11.2017 57.38 26.11.2017 November-2017
दििम्बर-2017 4.01 15.12.2017 3.34 03.12.2017 67.03 15.12.2017 57.62 03.12.2017 December-2017
जनवरी-2018 4.07 04.01.2018 3.27 21.01.2018 71.59 05.01.2018 57.56 26.01.2018 January-2018
फ़रवरी-2018 3.69 02.02.2018 2.99 25.02.2018 66.24 09.02.2018 58.35 18.02.2018 February-2018
मार्च-2018 3.91 28.03.2018 2.79 02.03.2018 75.79 30.03.2018 46.55 02.03.2018 March-2018
2017-2018 7.97 06.06.2017 2.79 02.03.2018 133.78 06.06.2017 46.55 02.03.2018 2017-2018

राज्य/
राज्य/ State
State हररयाणा Haryana दहमाचल प्रिे श HP
अधिकतम
दिनााँक न्यूनतम खपत दिनााँक अधिकतम खपत दिनााँक न्यूनतम खपत दिनााँक
मास खपत मास
Maximum Minimum Maximum Minimum
Date Date Date Date
consumption consumption consumption consumption
Month Month
MU MU MU MU
अप्रैल-2017 141.02 29.04.2017 91.21 05.04.2017 27.95 08.04.2017 20.01 22.04.2017 April-2017
मई-2017 162.76 15.05.2017 122.55 29.05.2017 26.71 13.05.2017 21.56 21.05.2017 May-2017
जून-2017 186.17 27.06.2017 117.45 11.06.2017 26.10 16.06.2017 18.76 07.06.2017 June-2017
जुलाई-2017 200.55 19.07.2017 133.82 01.07.2017 25.33 17.07.2017 20.50 19.07.2017 July-2017
अगस्त-2017 205.72 18.08.2017 150.19 02.08.2017 29.07 18.08.2017 20.58 07.08.2017 August-2017
सितंबर-2017 187.51 18.09.2017 112.92 29.09.2017 27.76 21.09.2017 19.75 24.09.2017 September-2017
अक्टूबर-2017 160.06 06.10.2017 114.53 20.10.2017 27.45 17.10.2017 15.94 20.10.2017 October-2017
नवम्बर-2017 120.00 02.11.2017 93.01 12.11.2017 27.98 28.11.2017 22.20 05.11.2017 November-2017
दििम्बर-2017 126.82 23.12.2017 91.95 12.12.2017 28.49 14.12.2017 24.54 12.12.2017 December-2017
जनवरी-2018 129.88 10.01.2018 104.30 26.01.2018 28.34 17.01.2018 24.73 26.01.2018 January-2018
फ़रवरी-2018 131.25 09.02.2018 104.80 12.02.2018 27.94 09.02.2018 23.30 25.02.2018 February-2018
मार्च-2018 137.26 13.03.2018 103.51 02.03.2018 27.38 14.03.2018 18.59 02.03.2018 March-2018
2017-2018 205.72 18.08.2017 91.21 05.04.2017 29.07 18.08.2017 15.94 20.10.2017 2017-2018

राज्य/
राज्य/ State
State जम्मू और कश्मीर J&K पंजाब PUNJAB
अधिकतम
दिनााँक न्यूनतम खपत दिनााँक अधिकतम खपत दिनााँक न्यूनतम खपत दिनााँक
मास खपत मास
Maximum Minimum Maximum Minimum
Date Date Date Date
consumption consumption consumption consumption
Month Month
MU MU MU MU
अप्रैल-2017 45.57 14.04.2017 33.90 05.04.2017 139.85 29.04.2017 81.51 06.04.2016 April-2017
मई-2017 43.84 12.05.2017 36.49 20.05.2017 175.34 13.05.2017 130.85 01.05.2017 May-2017
जून-2017 44.31 26.06.2017 32.87 21.06.2017 244.25 27.06.2017 120.80 11.06.2017 June-2017
जल
ु ाई-2017 41.28 21.07.2017 36.75 17.07.2017 259.69 10.07.2017 183.34 01.07.2017 July-2017
अगस्त-2017 43.15 18.08.2017 34.53 02.08.2017 249.79 18.08.2017 166.10 02.08.2017 August-2017
सितंबर-2017 43.15 29.09.2017 33.55 10.09.2017 226.18 10.09.2017 135.50 02.09.2017 September-2017
अक्टूबर-2017 41.60 04.10.2017 37.40 21.10.2017 174.71 07.10.2017 103.73 30.10.2017 October-2017
नवम्बर-2017 42.18 29.11.2017 31.38 15.11.2017 104.14 02.11.2017 80.50 07.11.2017 November-2017
दििम्बर-2017 46.39 31.12.2017 35.48 11.12.2017 116.91 26.12.2017 87.65 11.12.2017 December-2017
जनवरी-2018 47.97 26.01.2018 44.33 23.01.2018 112.37 19.01.2018 92.80 28.01.2018 January-2018
फ़रवरी-2018 46.64 09.02.2018 31.32 12.02.2018 130.77 10.02.2018 84.93 12.02.2018 February-2018
मार्च-2018 44.88 18.03.2018 39.79 02.03.2018 137.25 14.03.2018 92.12 02.03.2018 March-2018
2017-2018 47.97 26.01.2018 31.32 12.02.2018 259.69 10.07.2017 80.50 07.11.2017 2017-2018

41
NRLDC ANNUAL REPORT 2017-18
5.3 वर्ष 2017-2018 के िौरान उत्तर क्षेत्रीय महीनावार अधिकतम व न्यूनतम ऊजाष (ततधि सदहत)
MONTHWISE MAXIMUM AND MINIMUM ENERGY CONSUMPTION WITH CORRESPONDING DATES IN NORTHERN REGION DURING 2017-
18

राज्य/
राज्य/ State
State राजस्िान Rajasthan उत्तर प्रिे श Uttar Pradesh
अधिकतम
दिनााँक न्यूनतम खपत दिनााँक अधिकतम खपत दिनााँक न्यूनतम खपत दिनााँक
मास खपत मास
Maximum Minimum Maximum Minimum
Date Date Date Date
consumption consumption consumption consumption
Month Month
MU MU MU MU
अप्रैल-2017 200.43 07.04.2017 160.49 09.04.2017 358.40 20.04.2017 259.79 10.04.2017 April-2017
मई-2017 225.12 15.05.2017 172.36 22.05.2017 385.25 25.05.2017 303.86 29.05.2017 May-2017
जून-2017 224.06 06.06.2017 151.60 29.06.2017 384.40 05.06.2017 323.21 29.06.2017 June-2017
जुलाई-2017 214.52 11.07.2017 148.57 02.07.2017 373.64 16.07.2017 296.78 05.07.2017 July-2017
अगस्त-2017 229.71 18.08.2017 161.66 01.08.2017 390.46 18.08.2017 342.66 02.08.2017 August-2017
सितंबर-2017 216.89 19.09.2017 168.40 01.09.2017 403.05 16.09.2017 285.05 23.09.2017 September-2017
अक्टूबर-2017 203.93 11.10.2017 176.25 20.10.2017 370.43 09.10.2017 283.61 31.10.2017 October-2017
नवम्बर-2017 213.00 09.11.2017 190.77 19.11.2017 284.85 03.11.2017 261.40 30.11.2017 November-2017
दििम्बर-2017 215.69 26.12.2017 183.51 06.12.2017 293.65 22.12.2017 247.08 12.12.2017 December-2017
जनवरी-2018 219.62 12.01.2018 203.56 01.01.2018 314.49 10.01.2018 269.51 24.01.2018 January-2018
फ़रवरी-2018 217.88 12.02.2018 198.07 19.02.2018 303.03 28.02.2018 253.65 12.02.2018 February-2018
मार्च-2018 208.89 08.03.2018 172.62 30.03.2018 309.11 01.03.2018 260.69 31.03.2018 March-2018
2017-2018 229.71 18.08.2017 148.57 02.07.2017 403.05 16.09.2017 247.08 12.12.2017 2017-2018

राज्य/
राज्य/ State
State एन.एफ़.एफ़./रे ल NFF/Rail उत्तराखंड Uttarakhand
अधिकतम
दिनााँक न्यन
ू तम खपत दिनााँक अधिकतम खपत दिनााँक न्यन
ू तम खपत दिनााँक
मास खपत मास
Maximum Minimum Maximum Minimum
Date Date Date Date
consumption consumption consumption consumption
Month Month
MU MU MU MU
अप्रैल-2017 2.34 11.04.2017 2.08 16.04.2018 39.83 21.04.2017 28.35 06.04.2017 April-2017
मई-2017 2.32 12.05.2016 2.01 18.05.2016 42.95 16.05.2017 34.52 01.05.2017 May-2017
जून-2017 2.44 28.06.2017 2.17 02.06.2017 43.30 24.06.2017 30.19 07.06.2017 June-2017
जुलाई-2017 2.38 27.07.2017 2.04 08.07.2017 40.44 29.07.2017 31.86 02.07.2017 July-2017
अगस्त-2017 2.44 15.08.2017 1.10 27.08.2017 40.20 18.08.2017 30.76 07.08.2017 August-2017
सितंबर-2017 2.31 06.09.2017 1.90 11.09.2017 41.54 15.09.2017 30.56 24.09.2017 September-2017
अक्टूबर-2017 2.98 24.10.2017 2.06 05.10.2017 39.11 06.10.2017 26.16 20.10.2017 October-2017
नवम्बर-2017 2.47 21.11.2017 2.07 10.11.2017 34.11 30.11.2017 28.80 12.11.2017 November-2017
दििम्बर-2017 2.38 03.12.2017 1.78 30.12.2017 36.05 20.12.2017 29.11 12.12.2017 December-2017
जनवरी-2018 2.44 16.01.2018 1.90 01.01.2018 38.97 10.01.2018 32.84 26.01.2018 January-2018
फ़रवरी-2018 2.56 14.02.2018 2.26 18.02.2018 36.86 15.02.2018 30.74 25.02.2018 February-2018
मार्च-2018 2.64 02.03.2018 2.03 16.03.2018 35.09 22.03.2018 22.31 02.03.2018 March-2018
2017-2018 2.98 24.10.2017 1.10 27.08.2017 43.30 24.06.2017 22.31 02.03.2018 2017-2018

राज्य/
राज्य/ State
State क्षेत्र Region
अधिकतम
दिनााँक न्यूनतम खपत दिनााँक मास
मास खपत
Maximum Minimum
Date Date Month
consumption consumption
Month
MU MU
अप्रैल-2017 1044.66 21.04.2017 793.91 10.04.2017 April-2017
मई-2017 1163.79 15.05.2017 959.16 29.05.2017 May-2017
जून-2017 1233.59 26.06.2017 939.93 29.06.2017 June-2017
जल
ु ाई-2017 1214.16 15.07.2017 980.55 02.07.2017 July-2017
अगस्त-2017 1318.68 18.08.2017 1060.51 02.08.2017 August-2017
सितंबर-2017 1218.36 16.09.2017 949.43 23.09.2017 September-2017
अक्टूबर-2017 1102.12 10.10.2017 872.17 29.10.2017 October-2017
नवम्बर-2017 886.25 03.11.2017 799.73 19.11.2017 November-2017
दििम्बर-2017 927.02 26.12.2017 774.76 12.12.2017 December-2017
जनवरी-2018 958.47 10.01.2018 866.76 26.01.2018 January-2018
फ़रवरी-2018 947.63 09.02.2018 822.12 12.02.2018 February-2018
मार्च-2018 939.49 13.03.2018 800.46 03.03.2018 March-2018
2017-2018 1318.68 18.08.2017 774.76 12.12.2017 2017-2018

42
NRLDC ANNUAL REPORT 2017-18
5.4 वर्ष 2017-2018 के िौरान उत्तरी क्षेत्रीय माससक पीक घंटा मांग एवं आवश्यकता (ततथि सदित)
MONTHWISE PEAK HOUR DEMAND MET (MW) WITH DATES AND CORRESPONDING REQUIREMENT
IN NORTHERN REGION DURING 2017-18

राज्य/State चंडीगढ़ Chandigarh दिल्ली Delhi राज्य/State


उच्चतम
उच्चतम मााँग आवश्यकता दिनााँक आवश्यकता दिनााँक
मास मााँग मास
Maximum Maximum
Requirement Date Requirement Date
Month demand demand Month
MW MW MW MW
अप्रैल-2017 281 281 21.04.2017 4949 4949 21.04.2017 April-2017
मई-2017 272 272 15.05.2017 5015 5015 26.05.2017 May-2017
जून-2017 296 296 05.06.2017 5415 5415 06.06.2017 June-2017
जुलाई-2017 318 318 17.07.2017 4956 4956 07.07.2017 July-2017
अगस्त-2017 291 291 04.08.2017 5287 5287 18.08.2017 August-2017
सितंबर-2017 283 283 15.09.2017 5553 5553 18.09.2017 September-2017
अक्टूबर-2017 244 244 04.10.2017 4498 4498 05.10.2017 October-2017
नवम्बर-2017 180 180 03.11.2017 3681 3681 02.11.2017 November-2017
दििम्बर-2017 189 189 29.12.2017 3401 3401 15.12.2017 December-2017
जनवरी-2018 196 196 03.01.2018 3624 3624 05.01.2018 January-2018
फ़रवरी-2018 182 182 07.02.2018 3160 3160 23.02.2018 February-2018
मार्च-2018 186 186 28.03.2018 3555 3555 28.03.2018 March-2018
2017-2018 318 318 17.07.2017 5553 5553 18.09.2017 2017-2018

राज्य/State िररयाणा Haryana दिमाचल प्रिे श HP राज्य/State


उच्चतम
उच्चतम मााँग आवश्यकता दिनााँक आवश्यकता दिनााँक
मास मााँग मास
Maximum Maximum
Requirement Date Requirement Date
Month demand demand Month
MW MW MW MW
अप्रैल-2017 7055 7234 21.04.2017 1207 1207 21.04.2017 April-2017
मई-2017 7565 7950 15.05.2017 1149 1149 19.05.2017 May-2017
जून-2017 8464 8473 27.06.2017 1089 1089 05.06.2017 June-2017
जल
ु ाई-2017 8731 8767 27.07.2017 1180 1180 28.07.2017 July-2017
अगस्त-2017 8869 9282 17.08.2017 1246 1246 18.08.2017 August-2017
सितंबर-2017 8662 8948 15.09.2017 1404 1404 21.09.2017 September-2017
अक्टूबर-2017 7350 7350 10.10.2017 1299 1299 09.10.2017 October-2017
नवम्बर-2017 6487 6487 03.11.2017 1349 1349 29.11.2017 November-2017
दििम्बर-2017 6753 6753 21.12.2017 1538 1538 22.12.2017 December-2017
जनवरी-2018 6845 6845 06.01.2018 1443 1443 05.01.2018 January-2018
फ़रवरी-2018 6404 6404 01.02.2018 1345 1345 12.02.2018 February-2018
मार्च-2018 6732 6760 11.03.2018 1216 1216 16.03.2018 March-2018
2017-2018 8869 9282 17.08.2017 1538 1538 22.12.2017 2017-2018

राज्य/State जम्मू और कश्मीर J&K पंजाब PUNJAB राज्य/State


उच्चतम
उच्चतम मााँग आवश्यकता दिनााँक आवश्यकता दिनााँक
मास मााँग मास
Maximum Maximum
Requirement Date Requirement Date
Month demand demand Month
MW MW MW MW
अप्रैल-2017 2201 2751 10.04.2017 6464 6464 20.04.2017 April-2017
मई-2017 2024 2530 07.05.2017 7317 7317 25.05.2017 May-2017
जून-2017 2117 2646 02.06.2017 10476 10476 26.06.2017 June-2017
जुलाई-2017 2056 2570 28.07.2017 11185 11185 10.07.2017 July-2017
अगस्त-2017 2113 2641 29.08.2017 10782 10782 18.08.2017 August-2017
सितंबर-2017 2235 2794 18.09.2017 9728 9728 11.09.2017 September-2017
अक्टूबर-2017 2071 2589 05.10.2017 8087 8087 06.10.2017 October-2017
नवम्बर-2017 2198 2748 19.11.2017 5766 5766 12.11.2017 November-2017
दििम्बर-2017 2234 2792 26.12.2017 5976 5976 26.12.2017 December-2017
जनवरी-2018 2240 2800 10.01.2018 5638 5638 17.01.2018 January-2018
फ़रवरी-2018 2206 2758 06.02.2018 6130 6130 10.02.2018 February-2018
मार्च-2018 2255 2819 23.03.2018 6226 6326 08.03.2018 March-2018
2017-2018 2255 2819 23.03.2018 11185 11185 10.07.2017 2017-2018

43
NRLDC ANNUAL REPORT 2017-18
5.4 वर्ष 2017-2018 के िौरान उत्तरी क्षेत्रीय माससक पीक घंटा मांग एवं आवश्यकता (ततथि सदित)
MONTHWISE PEAK HOUR DEMAND MET (MW) WITH DATES AND CORRESPONDING REQUIREMENT
IN NORTHERN REGION DURING 2017-18

राज्य/State राजस्िान Rajasthan उत्तर प्रिे श Uttar Pradesh राज्य/State


उच्चतम
उच्चतम मााँग आवश्यकता दिनााँक आवश्यकता दिनााँक
मास मााँग मास
Maximum Maximum
Requirement Date Requirement Date
Month demand demand Month
MW MW MW MW
अप्रैल-2017 8330 8330 20.04.2017 17117 17117 20.04.2017 April-2017
मई-2017 8603 8603 04.05.2017 17416 18216 16.05.2017 May-2017
जनू -2017 8614 8614 06.06.2017 17641 18081 24.06.2017 June-2017
जुलाई-2017 7977 7977 11.07.2017 17328 17578 20.07.2017 July-2017
अगस्त-2017 9264 9264 18.08.2017 17274 18569 18.08.2017 August-2017
सितंबर-2017 9222 9222 09.09.2017 17487 18547 16.09.2017 September-2017
अक्टूबर-2017 9040 9040 14.10.2017 17699 17699 18.10.2017 October-2017
नवम्बर-2017 9183 9183 14.11.2017 13248 14018 04.11.2017 November-2017
दििम्बर-2017 9904 9904 27.12.2017 14427 14427 17.12.2017 December-2017
जनवरी-2018 9869 9869 12.01.2018 14989 14989 01.01.2018 January-2018
फ़रवरी-2018 9436 10749 01.02.2018 14399 14399 15.02.2018 February-2018
मार्च-2018 7954 7954 08.03.2018 15223 15558 20.03.2018 March-2018
2017-2018 9904 10749 27.12.2017 17699 18569 18.10.2017 2017-2018

राज्य/State उत्तराखंड Uttrakhand क्षेत्र Region राज्य/State


उच्चतम
उच्चतम मााँग आवश्यकता दिनााँक आवश्यकता दिनााँक
मास मााँग मास
Maximum Maximum
Requirement Date Requirement Date
Month demand demand Month
MW MW MW MW
अप्रैल-2017 1917 1917 15.04.2017 48711 49603 21.04.2017 April-2017
मई-2017 1992 1992 24.05.2017 49588 50446 13.05.2017 May-2017
जून-2017 1947 1947 24.06.2017 52429 53382 24.06.2017 June-2017
जल
ु ाई-2017 1956 1956 29.07.2017 52648 53367 20.07.2017 July-2017
अगस्त-2017 1987 1987 18.08.2017 57013 59113 18.08.2017 August-2017
सितंबर-2017 1991 1991 13.09.2017 54649 57203 18.09.2017 September-2017
अक्टूबर-2017 1920 1920 07.10.2017 49562 52132 10.10.2017 October-2017
नवम्बर-2017 1811 1811 25.11.2017 42022 43607 03.11.2017 November-2017
दििम्बर-2017 1946 1946 19.12.2017 45360 46038 26.12.2017 December-2017
जनवरी-2018 2175 2175 18.01.2018 45631 46987 05.01.2018 January-2018
फ़रवरी-2018 1966 1966 06.02.2018 43948 44699 10.02.2018 February-2018
मार्च-2018 1825 1825 23.03.2018 42162 43435 28.03.2018 March-2018
2017-2018 2175 2175 18.01.2018 57013 59113 18.08.2017 2017-2018

44
NRLDC ANNUAL REPORT 2017-18

5.5 वर्ष 2017-2018 के िौरान माससक ऑफ पीक घंटा मांग (ततथथ सदित)
MONTHWISE OFF PEAK HOURS DEMAND MET (MW) WITH CORRESPONDING DATES FOR YEAR
2017-18
सभी आंकड़े मेगा वाट में
राज्य/State दिल्ली Delhi िररयाणा Haryana पंजाब PUNJAB राज्य/State
न्यूनतम न्यूनतम न्यूनतम
मास मााँग दिनााँक मााँग दिनााँक मााँग दिनााँक मास
Month Minimum Date Minimum Date Minimum Date Month
Demand Demand Demand
अप्रैल-2017 2644 10.04.2017 3103 05.04.2017 3043 06.04.2017 April-2017
मई-2017 3717 23.05.2017 5553 29.05.2017 5220 04.05.2017 May-2017
जून-2017 3972 29.06.2017 3894 11.06.2017 4540 11.06.2017 June-2017
जुलाई-2017 3837 01.07.2017 5199 01.07.2017 6045 01.07.2017 July-2017
अगस्त-2017 4122 27.08.2017 6472 03.08.2017 6026 02.08.2017 August-2017
ससतंबर-2017 2861 24.09.2017 4612 23.09.2017 4900 02.09.2017 September-2017
अक्टूबर-2017 2149 31.10.2017 4257 30.10.2017 3373 30.10.2017 October-2017
नवम्बर-2017 1431 27.11.2017 2965 13.11.2017 2558 07.11.2017 November-2017
दिसम्बर-2017 1451 04.12.2017 2036 12.12.2017 2332 12.12.2017 December-2017
जनवरी-2018 1373 27.01.2018 3280 27.01.2018 2636 27.01.2018 January-2018
फ़रवरी-2018 1439 05.02.2018 3347 12.02.2018 2435 12.02.2018 February-2018
मार्च-2018 1449 03.03.2018 3394 03.03.2018 2131 03.03.2018 March-2018
2017-2018 1373 27.01.2018 2036 12.12.2017 2131 03.03.2018 2017-2018

राज्य/State राजस्थान Rajasthan उत्तर प्रिे श Uttar Pradesh क्षेत्र Region राज्य/State
न्यूनतम न्यूनतम न्यूनतम
मास मााँग दिनााँक मााँग दिनााँक मााँग दिनााँक मास
Month Minimum Date Minimum Date Minimum Date Month
Demand Demand Demand
अप्रैल-2017 4914 14.04.2017 11901 24.04.2017 33021 05.04.2017 April-2017
मई-2017 5326 22.05.2017 11326 09.05.2017 38392 22.05.2017 May-2017
जून-2017 6208 28.06.2017 13184 29.06.2017 37912 29.06.2017 June-2017
जुलाई-2017 6136 03.07.2017 11368 05.07.2017 40491 01.07.2017 July-2017
अगस्त-2017 6858 02.08.2017 15089 28.08.2017 43691 02.08.2017 August-2017
ससतंबर-2017 6799 01.09.2017 11186 23.09.2017 38423 23.09.2017 September-2017
अक्टूबर-2017 7208 22.10.2017 11239 31.10.2017 32181 30.10.2017 October-2017
नवम्बर-2017 7128 20.11.2017 9869 27.11.2017 28230 20.11.2017 November-2017
दिसम्बर-2017 6100 12.12.2017 7904 12.12.2017 22539 12.12.2017 December-2017
जनवरी-2018 7439 01.01.2018 8681 24.01.2018 27932 24.01.2018 January-2018
फ़रवरी-2018 7080 12.02.2018 8247 13.02.2018 26275 12.02.2018 February-2018
मार्च-2018 6929 30.03.2018 10124 05.03.2018 27753 03.03.2018 March-2018
2017-2018 4914 14.04.2017 7904 12.12.2017 22539 12.12.2017 2017-2018

45
NRLDC ANNUAL REPORT 2017-18

5.5 वर्ष 2017-2018 के िौरान माससक ऑफ पीक घंटा मांग (ततथि सदित)
MONTHWISE OFF PEAK HOURS DEMAND MET (MW) WITH CORRESPONDING DATES FOR YEAR 2017-18

सभी आंकड़े मेगा वाट में


राज्य/State उत्तराखंड/Uttrakhand दिमाचल प्रिे श/HP जम्मू और कश्मीर/J&K राज्य/State
न्यूनतम न्यूनतम न्यूनतम
मास मााँग दिनााँक मााँग दिनााँक मााँग दिनााँक मास
Month Minimum Date Minimum Date Minimum Date Month
Demand Demand Demand
अप्रैल-2017 1135 07.04.2017 684 06.04.2017 612 22.04.2017 April-2017
मई-2017 1207 27.05.2017 587 27.05.2017 880 25.05.2017 May-2017
जून-2017 1138 07.06.2017 503 07.06.2017 919 30.06.2017 June-2017
जुलाई-2017 1192 20.07.2017 650 24.07.2017 843 17.07.2017 July-2017
अगस्त-2017 1251 08.08.2017 609 20.08.2017 883 14.08.2017 August-2017
ससतंबर-2017 1110 25.09.2017 559 05.09.2017 1105 07.09.2017 September-2017
अक्टूबर-2017 931 20.10.2017 454 20.10.2017 1286 03.10.2017 October-2017
नवम्बर-2017 1024 20.11.2017 682 20.11.2017 613 15.11.2017 November-2017
दिसम्बर-2017 684 12.12.2017 535 12.12.2017 1357 12.12.2017 December-2017
जनवरी-2018 1008 01.01.2018 731 27.01.2018 1579 24.01.2018 January-2018
फ़रवरी-2018 1097 19.02.2018 686 12.02.2018 1153 13.02.2018 February-2018
मार्च-2018 685 03.03.2018 408 03.03.2018 1398 15.03.2018 March-2018
2017-2018 684 12.12.2017 408 03.03.2018 612 22.04.2017 2017-2018

राज्य/State चंडीगढ़ Chandigarh राज्य/State


न्यूनतम
मास मााँग दिनााँक मास
Month Minimum Date Month
Demand
अप्रैल-2017 109 10.04.2017 April-2017
मई-2017 174 02.05.2017 May-2017
जून-2017 175 30.06.2017 June-2017
जुलाई-2017 179 01.07.2017 July-2017
अगस्त-2017 169 26.08.2017 August-2017
ससतंबर-2017 131 24.09.2017 September-2017
अक्टूबर-2017 86 30.10.2017 October-2017
नवम्बर-2017 75 24.11.2017 November-2017
दिसम्बर-2017 77 11.12.2017 December-2017
जनवरी-2018 76 22.01.2018 January-2018
फ़रवरी-2018 69 25.02.2018 February-2018
मार्च-2018 68 03.03.2018 March-2018
2017-2018 68 03.03.2018 2017-2018

46
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


Statewise Maximum Demand during 2017-18
16000

14000

11681 11564
12000

10000 9539
MW

8000
6526
6000

4000
2319 2149
2000 1594
363 121
0
Chandigarh Delhi Haryana H.P. J&K Punjab Rajasthan U.P. U'KHAND N.F.F./Rail
STATE

Regional Maximum Demand during 2017-18


60000
58448
55865
54890 54649
55000
51820
50289
49643
50000
46252 46578
45360
MW

45000 43777
42390

40000

35000

30000

MONTHS

47
NRLDC ANNUAL GRID REPORT 2017-18

5.6 पपछले िशक के िौरान राज्यों िें औसि ऊर्ाि की आवश्यकिा/िाांग आपूतिि
AVERAGE ENERGY REQUIREMENT/CONSUMPTION (MU/DAY) OF STATES IN THE NORTHERN REGION DURING THE PAST DECADE
(सभी आँकड़े मि.य.ु /प्रतिदिन)
(All FIGS. IN MU/DAY)
चांडीगढ़ र्म्िू व कश्िीर रार्स्थान उत्तराखांड
दिल्ली Delhi हररयाणा Haryana दहिाचल प्रिे श HP पांर्ाब PUNJAB उत्तर प्रिे श UP
क्र. सां. वर्ि Chandigarh J&K Rajasthan Uttrakhand
िाांग िाांग िाांग िाांग िाांग िाांग िाांग िाांग िाांग
आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा
आपतू िि आपतू िि आपतू िि आपतू िि आपतू िि आपतू िि आपतू िि आपतू िि आपतू िि
S. No. Year REQT. CONS. REQT. CONS. REQT. CONS. REQT. CONS. REQT. CONS. REQT. CONS. REQT. CONS. REQT. CONS. REQT. CONS.

1 06-07 3.66 3.66 61.36 60.18 71.92 63.37 14.15 13.69 31.96 21.86 105.76 95.40 91.39 86.85 157.08 132.41 16.26 15.33

2 07-08 3.96 3.96 61.54 61.16 80.29 70.33 16.43 15.91 30.89 22.84 116.24 106.45 100.46 97.34 171.54 140.70 19.31 18.76

3 08-09 3.87 3.87 61.14 60.82 79.72 73.23 17.11 16.96 32.07 23.93 113.69 101.64 104.61 103.49 189.84 149.83 21.48 21.27

4 09-10 4.32 4.19 66.54 66.03 91.62 87.73 19.19 18.54 36.18 27.23 125.29 96.91 121.13 118.28 208.01 163.14 24.43 22.84

5 10-11 4.17 4.17 70.00 69.70 95.28 89.57 20.84 20.46 37.69 28.07 121.90 114.08 122.34 121.07 206.61 174.66 26.84 25.29

6 11-12 4.31 4.31 73.50 73.33 104.09 98.79 22.29 22.13 39.83 29.90 124.00 120.11 140.45 136.49 221.24 196.57 28.73 27.90

7 12-13 4.46 4.46 74.85 74.81 111.87 105.30 23.44 23.03 42.19 31.71 129.56 122.31 151.91 149.63 251.82 210.73 31.01 29.31

8 13-14 4.31 4.31 77.13 77.09 116.35 116.00 23.81 23.71 41.78 33.14 127.91 125.89 164.13 163.71 259.68 223.72 32.58 31.38

9 14-15 4.43 4.43 79.83 79.74 127.61 126.83 24.24 24.11 43.43 35.52 132.00 130.09 185.63 184.56 280.65 239.45 33.97 33.04

10 15-16 4.40 4.40 79.95 79.83 129.73 129.54 24.94 24.79 46.88 38.32 133.67 133.58 194.24 193.68 289.75 254.16 35.59 34.96

11 16-17 4.51 4.51 83.26 83.22 134.81 134.59 25.35 25.20 47.81 38.48 142.92 142.92 193.94 192.82 291.13 286.84 35.68 35.45
11 17-18 4.41 4.39 86.34 86.30 139.53 139.00 25.84 25.72 50.43 40.59 146.23 146.22 198.17 196.64 324.30 321.36 36.50 36.41
RATE OF
1.89 1.83 3.47 3.67 6.85 8.17 6.21 6.51 4.67 6.38 3.29 4.36 8.05 8.51 7.52 9.27 8.42 9.04
GROWTH C
(% PER
2.05 1.99 4.07 4.34 9.40 11.94 8.26 8.78 5.78 8.56 3.83 5.33 11.68 12.64 10.65 14.27 12.45 13.75
ANNUM) A

C: COMPOUND A: AVERAGE

48
NRLDC ANNUAL GRID REPORT 2017-18

5.7 पपछले िशक के िौरान राज्यों िें उच्चिि आवश्यकिा/िाांग आपतू िि


PEAK REQUIREMENT/DEMAND MET (MW) OF STATES IN THE NORTHERN REGION DURING THE PAST DECADE
(सभी आँकड़े: िेगा वाट)

(ALL FIGS. IN MW)


चांडीगढ़ र्म्िू व कश्िीर रार्स्थान उत्तराखांड
दिल्ली Delhi हररयाणा Haryana दहिाचल प्रिे श HP पांर्ाब PUNJAB उत्तर प्रिे श UP
Chandigarh J&K Rajasthan Uttrakhand
क्र. सां. वर्ि िाांग िाांग िाांग िाांग िाांग िाांग िाांग िाांग िाांग
आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा आवश्यकिा
आपूतिि आपूतिि आपूतिि आपूतिि आपूतिि आपूतिि आपूतिि आपूतिि आपूतिि
Dmd Dmd Dmd Dmd Dmd Dmd Dmd Dmd Dmd
S. No. Year REQT. REQT. REQT. REQT. REQT. REQT. REQT. REQT. REQT.
Met Met Met Met Met Met Met Met Met
1 06-07 247 247 4000 3736 4837 4201 873 873 1550 1309 7589 6558 5794 4946 9184 7531 1108 991

2 07-08 275 275 4075 4030 4956 4821 1061 972 1950 1439 8672 7340 6374 5564 11104 8568 1200 1199

3 08-09 279 279 4036 4034 5511 4791 1055 1014 2120 1380 8690 7309 6303 6101 10587 8248 1267 1267

4 09-10 308 308 4502 4408 6133 5678 1118 1118 2247 1487 9786 7407 6859 6859 10856 8563 1386 1313

5 10-11 301 301 4810 4739 6142 5574 1278 1187 2369 1571 9399 7938 7729 7442 11082 10672 1520 1520

6 11-12 315 315 5031 5028 6533 6259 1352 1333 2385 1789 10471 8701 8188 7605 12123 11767 1612 1600

7 12-13 340 340 5727 5642 8066 6725 1360 1360 2422 1817 10079 9074 8940 8515 13840 12048 1757 1680

8 13-14 345 345 5714 5653 8114 8114 1392 1392 2490 1991 9519 8779 10047 10038 14101 13089 1826 1826

9 14-15 367 367 5925 5925 9152 9152 1422 1422 2554 2043 10377 10377 10682 10682 15670 13003 1942 1942

10 15-16 342 342 5846 5846 8994 8994 1488 1488 2658 2158 10824 10824 10961 10961 16037 14503 2034 2034
11 16-17 361 361 6342 6261 9262 9262 1499 1492 2675 2140 11228 11228 10613 10348 16110 16110 2056 2023

11 17-18 363 363 6553 6526 9671 9539 1594 1594 2899 2319 11681 11681 11722 11564 20274 18061 2149 2149
RATE OF
3.93 3.93 5.06 5.74 7.17 8.55 6.21 6.21 6.46 5.89 4.41 5.94 7.30 8.86 8.24 9.14 6.85 8.05
GROWTH C
(% PER
4.70 4.70 6.38 7.47 9.99 12.71 8.26 8.26 8.70 7.72 5.39 7.81 10.23 13.38 12.08 13.98 9.40 11.69
ANNUM) A

C: COMPOUND A: AVERAGE

49
NRLDC ANNUAL REPORT 2017-18

5.8 पपछले दशक के दौर न उत्तरी क्षेत्र में ऊर् ष की म ांग आपूर्तष/आवश्यकत
DEMAND MET / REQUIREMENT OF ENERGY AND PEAK POWER IN NORTHERN REGION
DURING PAST DECADE

ENERGY IN MU(NET) सभी आँकड़े मम. य.ु में PEAK POWER IN MW उच्चतम ऊर् ष मेग व ट में
क्र. सां.
वर्ष म ांग आपूर्तष आवश्यकत % कमी म ांग आपूर्तष आवश्यकत % कमी
Shortage
S. no. Year Demand Met Requirement Demand Met Requirement Shortage ( % )
(%)
1 2007-08 196824 219903 10.50 29957 33412 10.34
2 2008-09 203176 228338 11.02 30287 35393 14.43
3 2009-10 223695 253551 11.78 32039 38979 17.80
4 2010-11 237011 258401 8.28 34101 37431 8.90
5 2011-12 259817 277662 6.43 39259 41982 6.49
6 2012-13 275022 300509 8.48 41790 45860 8.87
7 2013-14 293268 311060 5.72 42774 45934 6.88
8 2014-15 313883 333605 5.91 47642 51977 8.34
9 2015-16 325819 342560 4.89 50622 54474 7.07
10 2016-17 345363 350980 1.60 52612 53372 1.42
11 2017-18 364596 370113 1.49 58448 60749 3.79

Compound Annual 6.36 5.34 -17.73 6.91 6.16 -9.55


Growth Rate

50
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


DEMAND MET VS REQUIREMENT IN ENERGY DURING PAST DECADE
400000 Demand Met Requirement

350000

300000
ENERGY IN MU'S

250000

200000

150000

100000

50000

0
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
YEAR

51
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


DEMAND MET VS REQUIREMENT IN PEAK MW IN NORTHERN REGION DURING PAST DECADE
70000

60000

50000

40000
PEAK MW

30000

20000

10000 Demand Met Requirement

0
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

YEAR

52
NRLDC ANNUAL REPORT 2017-18

5.9 राज्यों की माससक अनुसूची व वास्तववक आहरण


MONTH WISE SCHEDULE VIS-A-VIS ACTUAL DRAWAL BY CONSTITUENTS
FROM NORTHERN GRID DURING 2017-18 All figs. in MU
(सभी आँकड़े मि.य.ु )

राज्य/State Chandigarh चंडीगढ़ Delhi दिल्ली राज्य/State


अध्यारण(+)/समा अध्यारण(+)/समाहर
अधिकाररता वास्तववक अधिकाररता वास्तववक
मास हरण(-) ण(-) मास
Month Schedule Actual O/D(+)/ U/D(-) Schedule Actual O/D(+)/ U/D(-) Month
अप्रैल-2017 142.59 149.73 7.14 2251.36 2226.14 -25.22 April-2017
िई-2017 169.48 181.81 12.33 2564.61 2538.41 -26.20 May-2017
जून-2017 184.91 192.62 7.71 2767.00 2746.78 -20.22 June-2017
जुलाई-2017 202.78 208.79 6.01 2699.18 2646.54 -52.64 July-2017
अगस्त-2017 189.81 190.88 1.07 2652.78 2623.08 -29.70 August-2017
मसतंबर-2017 165.70 146.63 -19.07 2375.73 2342.96 -32.77 September-2017
अक्टूबर-2017 137.84 131.61 -6.23 1996.92 1969.99 -26.93 October-2017
नवम्बर-2017 101.94 105.57 3.63 1445.57 1447.34 1.77 November-2017
दिसम्बर-2017 108.93 114.59 5.66 1510.11 1524.02 13.91 December-2017
जनवरी-2018 111.78 116.12 4.34 1564.08 1552.90 -11.18 January-2018
फ़रवरी-2018 87.20 95.74 8.54 1360.22 1349.95 -10.27 February-2018
िार्च-2018 91.39 106.25 14.86 1672.88 1669.56 -3.32 March-2018
2017-2018 1694.35 1740.34 45.99 24860.44 24637.67 -222.77 2017-2018

राज्य/State Haryana हररयाणा HP दहमाचल प्रिे श राज्य/State


मास अधिकाररता वास्तववक अध्यारण(+)/समा अधिकाररता वास्तववक अध्यारण(+)/समाहर मास
Month Schedule Actual O/D(+)/U/D(-) Schedule Actual O/D(+)/U/D(-) Month
अप्रैल-2017 2822.79 2799.98 -22.81 265.56 265.10 -0.46 April-2017
िई-2017 3019.25 3038.46 19.21 118.17 121.61 3.44 May-2017
जून-2017 3484.66 3452.16 -32.50 46.02 64.98 18.96 June-2017
जुलाई-2017 3987.04 3940.38 -46.66 -86.94 -64.19 22.75 July-2017
अगस्त-2017 3644.80 3680.07 35.27 -39.97 -12.90 27.07 August-2017
मसतंबर-2017 3223.24 3281.42 58.18 128.20 147.82 19.62 September-2017
अक्टूबर-2017 2644.79 2710.06 65.27 335.58 375.21 39.63 October-2017
नवम्बर-2017 1984.38 2026.78 42.40 530.51 553.62 23.11 November-2017
दिसम्बर-2017 1788.75 1832.43 43.68 655.45 668.65 13.20 December-2017
जनवरी-2018 1994.78 2053.16 58.38 687.66 711.50 23.84 January-2018
फ़रवरी-2018 1881.48 1954.45 72.97 620.63 630.96 10.33 February-2018
िार्च-2018 1696.61 1789.11 92.50 604.00 640.68 36.68 March-2018
2017-2018 32172.57 32558.46 385.89 3864.87 4103.04 238.17 2017-2018

53
NRLDC ANNUAL REPORT 2017-18

5.9 राज्यों की माससक अनुसूची व वास्तववक आहरण


MONTH WISE SCHEDULE VIS-A-VIS ACTUAL DRAWAL BY CONSTITUENTS
FROM NORTHERN GRID DURING 2017-18 All figs. in MU
(सभी आँकड़े मि.य.ु )

राज्य/State J&K जम्मू और कश्मीर Punjab पंजाब राज्य/State


अध्यारण(+)/समा अध्यारण(+)/समाहर
अधिकाररता वास्तववक अधिकाररता वास्तववक
मास हरण(-) ण(-) मास

Month Schedule Actual O/D(+)/ U/D(-) Schedule Actual O/D(+)/ U/D(-) Month
अप्रैल-2017 633.24 636.78 3.54 1998.96 1939.35 -59.61 April-2017
िई-2017 443.55 407.72 -35.83 2667.80 2669.43 1.63 May-2017
जून-2017 420.23 399.38 -20.85 3473.52 3424.34 -49.18 June-2017
जुलाई-2017 415.05 380.33 -34.72 4109.58 4145.87 36.29 July-2017
अगस्त-2017 416.18 395.75 -20.43 3844.84 3832.27 -12.57 August-2017
मसतंबर-2017 597.70 685.66 87.96 2872.99 2872.45 -0.54 September-2017
अक्टूबर-2017 974.39 974.19 -0.20 1649.20 1667.95 18.75 October-2017
नवम्बर-2017 1067.31 1071.66 4.35 928.48 925.63 -2.85 November-2017
दिसम्बर-2017 1234.79 1210.39 -24.40 1066.32 1072.27 5.95 December-2017
जनवरी-2018 1331.46 1328.32 -3.14 661.72 648.68 -13.04 January-2018
फ़रवरी-2018 1141.51 1118.36 -23.15 937.63 915.22 -22.41 February-2018
िार्च-2018 1199.40 1166.38 -33.02 886.42 884.25 -2.17 March-2018
2017-2018 9874.81 9774.92 -99.89 25097.46 24997.71 -99.75 2017-2018

राज्य/State Rajasthan राजस्थान UP उत्तर प्रिे श राज्य/State


अध्यारण(+)/समा अध्यारण(+)/समाहर
अधिकाररता वास्तववक अधिकाररता वास्तववक
मास हरण(-) ण(-) मास
Month Schedule Actual O/D(+)/ U/D(-) Schedule Actual O/D(+)/ U/D(-) Month
अप्रैल-2017 2032.65 2052.81 20.16 3827.20 3888.79 61.59 April-2017
िई-2017 1841.54 1889.55 48.01 4099.31 4114.21 14.90 May-2017
जून-2017 2032.46 2093.48 61.02 4753.65 4758.58 4.93 June-2017
जल
ु ाई-2017 2224.37 2263.44 39.07 4893.06 4983.30 90.24 July-2017
अगस्त-2017 2295.11 2357.12 62.01 5298.51 5429.51 131.00 August-2017
मसतंबर-2017 2167.19 2230.71 63.52 5058.95 5160.12 101.17 September-2017
अक्टूबर-2017 2142.17 2206.90 64.73 4520.45 4558.19 37.74 October-2017
नवम्बर-2017 1863.72 1943.38 79.66 2892.69 2857.57 -35.12 November-2017
दिसम्बर-2017 2163.06 2239.68 76.62 2773.45 2782.37 8.92 December-2017
जनवरी-2018 2220.44 2332.52 112.08 3216.57 3298.57 82.00 January-2018
फ़रवरी-2018 1923.17 2022.98 99.81 2804.55 2846.16 41.61 February-2018
िार्च-2018 1593.62 1629.74 36.12 3146.73 3216.48 69.75 March-2018
2017-2018 24499.50 25262.31 762.81 47285.12 47893.85 608.73 2017-2018

राज्य/State Uttarakhand उत्तराखंड राज्य/State


अध्यारण(+)/समा
अधिकाररता वास्तववक
मास हरण(-) मास
Month Schedule Actual O/D(+)/ U/D(-) Month
अप्रैल-2017 539.80 534.45 -5.35 April-2017
िई-2017 517.27 522.84 5.57 May-2017
जून-2017 465.67 461.39 -4.28 June-2017
जुलाई-2017 376.00 380.86 4.86 July-2017
अगस्त-2017 389.11 356.42 -32.69 August-2017
मसतंबर-2017 337.87 315.63 -22.24 September-2017
अक्टूबर-2017 378.10 365.41 -12.69 October-2017
नवम्बर-2017 473.23 448.40 -24.83 November-2017
दिसम्बर-2017 632.05 609.96 -22.09 December-2017
जनवरी-2018 864.98 839.18 -25.80 January-2018
फ़रवरी-2018 753.55 732.13 -21.42 February-2018
िार्च-2018 786.27 758.73 -27.54 March-2018
2017-2018 6513.90 6325.40 -188.50 2017-2018

54
Total Schedule vs Actual drawl in year (2017-18)

60000

SCHDL DRWL

50000

40000

MUs 30000

20000

10000

0
CHND HP JK UTT DEL PUN HAR RAJ UP
NRLDC ANNUAL REPORT 2016-17

5.10 िर्ा 2017-2018 के र्ौरान अंतक्षेत्रीय विद्यत


ु विननिय
INTER REGIONAL ENERGY EXCHANGES DURING 2017-18
सभी आंकड़े मिमियन यूननट िें
अंतरक्षेत्रीय अंतरक्षेत्रीय
विंध्याचि 220 के. िी. 220 के. िी. सासाराि के. िी.
220 • के. िी.
132/220 •
विननिय विननिय
Inter Vindhyachal औरै या-ििानपुर उज्जैन-िर्ोर् Sasaram साहुपुरी-पुसौिी 132/220 KV Inter Regional
Regional 220 KV
एच िी डी सी िी/िी 220 KV 220 KV एच िी डी सी िी/िी पूिी क्षेत्र Exchanges
Exchanges Sahupuri
HVDC B/B Auraiya-Malanpur Kota/Morak-Badod AC Bypass -Pusauli ER

िास/ Month आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात िास/ Month
Import Export Import Export Import Export Import Export Import Export
अप्रैल-2017 4.89 212.09 0.14 20.53 19.44 2.44 95.87 6.21 120.40 4.76 April-2017
मई-2017 17.27 224.93 1.26 34.79 10.59 14.06 132.03 0.00 103.99 0.00 May-2017
जून-2017 6.06 216.46 10.96 2.26 45.39 0.45 114.82 15.00 11.31 0.00 June-2017
जुलाई-2017 29.97 220.10 3.40 3.50 72.87 1.46 127.04 5.08 18.91 0.00 July-2017
अगस्त-2017 19.32 193.19 0.18 13.28 39.20 1.58 120.86 0.00 91.68 0.00 August-2017
सितंबर-2017 1.07 274.15 6.07 35.03 13.63 9.88 109.64 6.26 129.95 0.00 September-2017
अक्टूबर-2017 5.03 302.23 0.00 73.48 1.26 49.49 121.92 0.00 120.10 0.00 October-2017
नवम्बर-2017 13.84 297.79 3.45 56.48 0.00 75.94 127.93 0.00 62.18 0.00 November-2017
दििम्बर-2017 39.19 91.89 0.00 65.22 0.00 56.95 104.71 0.00 61.15 0.00 December-2017
जनवरी-2018 50.68 66.41 0.00 74.89 0.00 33.25 96.01 0.00 0.71 0.00 January-2018
फ़रवरी-2018 21.47 117.72 2.01 62.12 0.02 25.00 104.42 0.00 80.67 0.00 February-2018
मार्च-2018 48.27 58.78 0.00 59.91 0.59 33.18 57.00 4.64 95.81 0.00 March-2018
2017-2018 257.06 2275.74 27.47 501.49 202.99 303.68 1312.25 37.19 896.86 4.76 2017-2018

अंतरक्षेत्रीय 400 के. वि. गौरखपुर अंतरक्षेत्रीय


400 के िी कांकरौिी-जर्ाा 400 के िी मभनिाि-जर्ाा एचिीडीसी िुंर्रा िोहहंर्रगढ़ 400 के िी ग्िामियार-आगरा
विननिय िुजफ्फरपुर विननिय
Inter
400 KV Gorakhpur- HVDC Mundra- Inter Regional
Regional 400 KV Kankroli-Zerda 400 KV Bhinmal-Zerda 400 KV Gwalior-Agra
Muzaffarpur Mohindragarh Exchanges
Exchanges
आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात
िास/ Month िास/ Month
Import Export Import Export Import Export Import Export Import Export

अप्रैल-2017 108.71 2.76 0.00 122.90 3.43 80.31 1322.27 0.00 1394.85 0.00 April-2017
मई-2017 179.19 0.00 0.00 199.81 0.00 150.72 1436.54 0.00 1368.28 0.00 May-2017
जून-2017 274.92 0.00 0.00 173.70 0.00 144.01 1225.15 0.00 1461.22 0.00 June-2017
जुलाई-2017 361.80 0.00 19.71 31.46 20.15 32.91 1006.00 0.00 1516.94 0.00 July-2017
अगस्त-2017 361.70 0.00 19.42 18.38 28.53 10.20 1082.51 0.00 1488.48 0.00 August-2017
सितंबर-2017 360.94 0.00 0.00 51.29 7.85 19.68 1211.37 0.00 1453.47 0.00 September-2017
अक्टूबर-2017 330.74 0.00 2.51 118.11 1.21 71.41 1111.76 0.00 1402.90 0.00 October-2017
नवम्बर-2017 219.67 0.00 0.07 89.89 15.29 28.15 639.32 0.00 1178.50 0.00 November-2017
दििम्बर-2017 221.25 0.00 2.71 106.81 2.08 46.95 874.79 0.00 1134.77 0.00 December-2017
जनवरी-2018 183.65 0.00 0.00 82.80 4.03 25.53 870.74 0.00 1545.16 0.00 January-2018
फ़रवरी-2018 138.29 0.00 0.00 98.58 1.74 38.58 484.87 13.08 1445.08 0.00 February-2018
मार्च-2018 114.88 0.00 0.00 228.21 0.00 185.55 276.30 16.72 1477.41 0.00 March-2018
2017-2018 2855.74 2.76 44.42 1321.94 84.31 834.00 11541.62 29.80 16867.06 0.00 2017-2018

अंतरक्षेत्रीय अंतरक्षेत्रीय
विननिय विननिय
टनकपुर-िहे न्द्रनगर 400 के िी पटना-िमिया 400 के िी बिहारशरीफ़-िमिया 765 के िी सासाराि-फतेहपुर 765 के िी पुसौिी/गया-िमिया

Inter
Inter Regional
Regional
Tanakpur- Exchnage
Exchnage 400KV Patna-Balia 400KV Biharshariff-Balia 765KV Sasaram-Fatehpur 765KV Pusauli/Gaya-Balia
Mahendranagar(Nepal)

आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात
िास/ Month
िास/ Month Import Export Import Export Import Export Import Export Import Export
अप्रैल-2017 0.66 13.20 430.14 0.00 52.49 2.95 0.00 98.63 174.55 0.00 April-2017
मई-2017 0.00 14.52 440.17 0.00 103.67 0.00 10.51 71.47 173.35 0.00 May-2017
जून-2017 0.00 9.71 364.76 0.00 158.98 0.00 4.25 58.13 241.96 0.00 June-2017
जुलाई-2017 0.00 6.93 397.52 0.00 201.85 0.00 13.29 44.90 203.40 0.00 July-2017
अगस्त-2017 0.00 7.05 535.30 0.00 164.08 0.00 2.86 47.71 170.19 0.00 August-2017
सितंबर-2017 0.00 7.00 485.31 0.00 126.55 0.00 0.22 86.73 168.67 0.00 September-2017
अक्टूबर-2017 0.00 2.39 539.04 0.00 83.10 0.00 0.00 99.27 132.33 0.00 October-2017
नवम्बर-2017 0.00 2.88 527.90 0.00 61.41 0.37 0.93 38.89 102.41 0.00 November-2017
दििम्बर-2017 0.00 9.61 583.40 0.00 88.84 0.00 8.90 16.30 122.78 0.00 December-2017
जनवरी-2018 0.00 13.10 520.67 0.00 115.99 0.00 9.66 30.67 164.51 0.00 January-2018
फ़रवरी-2018 0.00 13.08 435.19 0.00 118.51 0.00 16.10 12.29 153.40 0.00 February-2018
मार्च-2018 0.00 16.72 453.74 0.00 133.09 0.00 15.36 19.44 189.70 0.00 March-2018
2017-2018 0.66 116.19 5713.14 0.00 1408.56 3.32 82.08 624.43 1997.25 0.00 2017-2018

60
NRLDC ANNUAL REPORT 2016-17

अंतरक्षेत्रीय
अंतरक्षेत्रीय विननिय
765 के िी गया-िाराणसी 400 KV ररहन्द्र् विंध्याचि 400 केिी िाढ़ गोरखपुर 765 केिी फागी ग्िामियर एच िी डी सी - िी एन सी
विननिय
Inter Regional
Inter Exchanges
765 KV Gaya-Varanasi 400 KV Rihand Vindhyachal 400 KV Barh Gorakhpur 765 KV Phagi Gwalior HVDC - BNC
Regional
Exchanges आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात
िास/ Month
िास/ Month Import Export Import Export Import Export Import Export Import Export
अप्रैल-2017 143.11 39.83 0.00 0.00 294.55 0.00 730.90 0.00 105.56 208.19 April-2017
मई-2017 210.61 7.84 0.00 0.00 323.97 0.00 708.06 0.00 89.74 99.10 May-2017
जून-2017 195.62 18.71 0.00 0.00 268.65 0.00 744.55 0.00 357.96 15.73 June-2017
जुलाई-2017 300.77 0.00 0.00 0.00 241.41 0.00 748.29 0.00 564.05 0.00 July-2017
अगस्त-2017 346.88 0.00 0.00 0.00 86.40 55.85 678.35 0.00 397.34 0.00 August-2017
सितंबर-2017 369.90 0.00 0.00 0.00 0.00 116.93 688.30 0.00 401.22 0.00 September-2017
अक्टूबर-2017 114.18 4.71 0.00 0.00 0.00 122.51 612.38 0.00 387.10 0.00 October-2017
नवम्बर-2017 112.81 17.10 0.00 45.93 0.00 124.33 610.39 0.00 361.56 0.00 November-2017
दििम्बर-2017 192.58 0.00 0.00 623.03 0.00 138.55 739.37 0.00 446.06 0.00 December-2017
जनवरी-2018 221.86 4.75 0.00 692.24 127.17 45.68 833.98 0.00 191.86 138.45 January-2018
फ़रवरी-2018 226.04 0.00 0.00 627.25 165.24 0.00 815.51 0.00 157.55 127.54 February-2018
मार्च-2018 148.89 0.00 0.00 701.92 166.69 0.00 690.47 0.00 46.56 138.57 March-2018
2017-2018 2583.25 92.94 0.00 2690.37 1674.08 603.85 8600.55 0.00 3506.56 727.58 2017-2018

अंतरक्षेत्रीय
अंतरक्षेत्रीय 400 के िी बिहारशरीफ 400 के िी आरएपीपीसी-
400 के सासाराि- इिाहािार् एच िी डी सी - चापा-कुरुक्षेत्रा एच िी डी सी - आिीपुरद्िार-आगरा विननिय
विननिय िाराणसी डीसी सुजािपुर
Inter Regional
Inter 400KV Bihar shariph - HVDC - Champa- Exchanges
400KV Sasaram-Allahabad 400KV RAPPC- Sujalpur HVDC - Alipurduar-Agra
Regional Varanasi DC Kurukshetra
Exchanges आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात आयात ननयाात िास/ Month
िास/ Month Import Export Import Export Import Export Import Export Import Export
अप्रैल-2017 11.84 38.31 8.25 2.43 163.39 1.47 731.60 0.00 0.00 0.00 April-2017
मई-2017 13.12 24.58 28.32 0.12 110.79 0.00 836.67 0.00 0.00 0.00 May-2017
जून-2017 20.31 15.85 25.29 14.16 147.62 0.00 792.35 0.00 0.00 0.00 June-2017
जुलाई-2017 37.12 11.01 28.05 4.27 116.52 0.00 773.50 0.00 0.00 0.00 July-2017
अगस्त-2017 15.47 17.05 26.93 0.00 136.84 0.63 781.72 0.00 0.00 0.00 August-2017
सितंबर-2017 14.41 6.91 27.58 8.47 129.66 0.00 1001.76 0.00 0.00 0.00 September-2017
अक्टूबर-2017 28.65 5.37 30.14 0.46 126.48 3.48 807.94 0.00 386.88 0.00 October-2017
नवम्बर-2017 21.54 7.08 48.50 0.00 83.70 5.26 410.49 0.00 229.12 0.00 November-2017
दििम्बर-2017 15.54 3.47 44.36 1.03 77.85 10.07 801.13 0.00 49.54 0.00 December-2017
जनवरी-2018 26.60 11.12 43.11 2.50 144.71 0.00 1450.31 0.00 13.23 0.00 January-2018
फ़रवरी-2018 37.63 2.28 59.23 0.00 165.77 0.00 1420.24 0.00 3.15 0.00 February-2018
मार्च-2018 40.58 3.54 33.09 18.05 131.45 0.00 1330.37 0.00 142.83 0.00 March-2018
2017-2018 282.81 146.57 402.85 51.49 1534.78 20.91 11138.08 0.00 824.75 0.00 2017-2018

अंतरक्षेत्रीय
अंतरक्षेत्रीय विननिय
765 के िी ओरई-जििपुर 765 के िी ओरई-सतना 765 के िी ओरई-ग्िामियर
विननिय
Net Inter Regional
Total Import / Export
Inter Import(+)/ Exchanges
765KV Orai-Jabalpur 765KV Orai-Satna 765KV Orai-Gwalior Export(-)
Regional
Exchanges आयात ननयाात आयात ननयाात आयात ननयाात
िास/ Month
िास/ Month Import Export Import Export Import Export Import Export
अप्रैल-2017 0.00 0.00 0.00 0.00 0.00 0.00 5917.04 857.01 5060.03 April-2017
मई-2017 0.00 0.00 0.00 0.00 0.00 0.00 6298.13 841.94 5456.19 May-2017
जून-2017 0.00 0.00 0.00 0.00 0.00 0.00 6472.13 684.17 5787.96 June-2017
जुलाई-2017 0.00 0.00 0.00 0.00 0.00 0.00 6802.56 361.62 6440.94 July-2017
अगस्त-2017 0.00 0.00 0.00 0.00 0.00 0.00 6594.24 364.92 6229.32 August-2017
सितंबर-2017 0.00 0.00 0.00 0.00 0.00 0.00 6707.57 622.33 6085.24 September-2017
अक्टूबर-2017 0.00 0.00 0.00 0.00 0.00 0.00 6345.65 852.91 5492.74 October-2017
नवम्बर-2017 0.00 0.00 0.00 0.00 0.00 0.00 4831.01 790.09 4040.92 November-2017
दििम्बर-2017 0.00 0.00 0.00 0.00 0.00 0.00 5611.00 1169.88 4441.12 December-2017
जनवरी-2018 0.00 0.00 0.00 0.00 0.00 0.00 6614.64 1221.39 5393.25 January-2018
फ़रवरी-2018 0.00 0.00 0.00 0.00 0.00 0.00 6052.13 1137.52 4914.61 February-2018
मार्च-2018 92.11 0.00 83.89 0.00 0.00 34.50 5769.08 1519.73 4249.35 March-2018
2017-2018 92.11 0.00 83.89 0.00 0.00 34.50 74015.18 10423.51 63591.67 2017-2018

61
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


Month wise Inter Regional Import & Export during
8000.00
year 2017-18
7000.00
6000.00
MU

5000.00
4000.00
3000.00
2000.00
1000.00
0.00

Import Export Net Import(+)/ Export(-)

Total Inter Regional Flow (MU) during year 2017-


18
80000.00 74015.18

70000.00
63591.67
60000.00

50000.00
MU

40000.00

30000.00

20000.00
10423.51
10000.00

0.00
Import Export Net Import(+)/ Export(-)

62
अनभु ाग - 6
Section-6

उत्पादन संयन्त्रों का कायय सम्पादन


Generating Stations Performance
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
1 केन्द्रीय सैक्टर CENTRAL SECTOR

A एनटीपीसी A. NTPC
(a) बिरपुर 705 167 236 211 232 233 209 114 0 0 0 0 0 1401 1289 Badarpur T.P.S
(b) मसंगरौिी 2000 1172 1242 1237 1333 1321 1296 1338 1108 1134 1294 1208 1076 14758 13725 Singrauli STPS
(c) ररहं ि 1 1000 658 679 674 678 472 697 725 686 690 679 601 517 7756 7135 Rihand TPS -1
(d) ररहं ि 2 1000 337 488 678 707 710 608 753 697 738 741 657 717 7830 7361 Rihand TPS -2
(e) ररहं ि 3 1000 642 688 655 379 679 690 746 696 674 730 662 739 7980 7501 Rihand TPS -3

(f) िािरी तापीय-I 840 404 388 253 323 353 327 365 262 321 421 396 480 4293 3906 Dadri NCTPS Stage-I

(g) िािरी तापीय-II 980 541 524 488 465 487 471 463 537 515 574 268 338 5673 5332 Dadri NCTPS Stage-II

(h) ऊंर्ाहार-I 420 231 222 202 212 254 257 165 115 227 232 217 256 2590 2357 Unchahar -I TPS
(i) ऊंर्ाहार-II 420 235 245 209 192 247 253 225 209 208 248 231 253 2755 2507 Unchahar -II TPS
(j) ऊंर्ाहार-III+IV 210 556 858 104 610 576 126 124 111 120 122 107 128 3541 3222 Unchahar -IIITPS
(l) टांडा 440 211 268 280 237 310 296 299 266 276 289 259 279 3271 2878 Tanda TPS
(m) आन्द्टा गैस 419 25 46 43 0 0 105 125 22 2 47 9 22 446 432 Anta GPS
(n) ओरै या गैस 663 0 0 0 0 0 32 142 17 3 55 4 0 252 245 Auraiya GPS
(o) िािरी गैस 830 27 0 190 0 32 155 196 116 145 29 101 89 1081 1048 Dadri GPS
(p) फ़रीिाबाि गैस 432 0 34 64 86 42 45 106 220 14 93 0 153 856 831 Faridabad GPS
(q) झज्जर 1500 136 219 729 142 120 426 585 610 787 584 678 787 5804 5340 Jhajhar
(r ) िािरी सोिर 5 1 1 1 1 1 1 1 0 0 0 0 1 6 6 Dadri Solar
(s) ऊंर्ाहार सोिर 10 2 1 1 1 1 1 1 1 1 1 1 1 15 15 Unchahar Solar
(t) मसंगरौिी सोिर 15 1 2 2 1 1 1 2 2 2 2 2 2 17 17 Singroli Solar
(u) कोल्डि 800 221 418 472 632 587 309 161 101 84 75 67 73 3199 3167 Koldam
कुि एनटीपीसी 14189 5400 6558 6494 6231 6424 6304 6633 5778 5939 6217 5468 5911 73524 68315 TOTAL NTPC
B एनएर्पीसी B. NHPC
(a) बैरासिू 180 117 102 86 93 83 47 26 15 18 13 16 30 643 637 Bairasiul
(b) सिाि 690 394 471 462 482 497 358 192 100 89 60 72 105 3282 3249 Salal Stage - I &II
(c) टनकपुर 94 26 34 44 66 65 67 54 30 22 17 14 15 453 448 Tanakpur HPS
(d) र्िेरा-I 540 328 317 361 404 353 211 106 55 54 55 50 71 2364 2341 Chamera HPS-I
(e) ऊरी 480 345 363 352 357 286 174 71 57 74 61 60 178 2377 2353 URI
(f) ऊरी - II 240 163 170 172 159 148 98 46 38 36 37 39 102 1207 1195 URI -2
(g) र्िेरा-II 300 181 219 214 218 217 156 86 49 40 33 31 45 1489 1474 Chamera HPS-II
(h) धौिीगंगा 280 76 105 148 194 205 155 94 49 35 28 22 27 1139 1128 Dhauliganga
(i) ििु हस्ती 390 251 290 272 286 278 277 237 127 99 77 62 79 2336 2313 Dulhasti
63
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
(j) सेवा-II 120 88 74 61 93 57 27 11 9 14 10 22 36 503 498 Sewa -2
(k) पाबचती - III 520 58 60 86 195 148 76 33 20 13 11 10 10 720 713 Parbati 3
(l) र्िेरा-III 231 113 162 163 170 164 112 60 32 27 21 20 28 1071 1060 Chamera HPS -III
कुि एनएर्पीसी 4395 2139 2367 2419 2718 2500 1757 1015 580 522 424 418 726 17585 17409 TOTALNHPC
एन एि सी
C 250 139 93 151 144 97 132 155 160 113 183 158 122 1648 1436 Barsingsar (NLC)
बरमसंगसर
D एनजेवीएनएि 1500 627 1012 1089 1068 1050 549 461 297 242 202 170 201 6967 6898 SJVNL
रािपरु 412 172 283 303 298 291 590 132 83 67 56 47 54 2377 2353 Rampur
E टे हरी 1000 165 178 168 372 533 206 228 198 251 275 206 214 2995 2965 Tehri
कोटे शवर 400 80 94 91 155 192 268 72 69 87 100 83 91 1383 1369 Koteswar
कुि(टे हरी और
1400 246 272 260 527 725 474 300 267 339 375 289 305 4378 4334 Total Tehri & Koteshwar
कोटे शवर)
F एनपीसी
(a) री. अ. ऊ. के. (अ) 300 96 128 137 142 131 99 147 145 154 174 142 155 1649 1452 RAPS -A
(b) री. अ. ऊ. के. (ब) 440 298 306 293 308 313 314 331 326 264 301 258 331 3642 3205 RAPS -B
(c) री. अ. ऊ. के. (सी) 440 188 340 327 329 342 330 345 339 354 403 186 126 3609 3176 RAPS-C
(d) न. अ. ऊ. के. 440 285 298 294 305 306 256 333 333 349 396 313 321 3789 3335 NAPS
कुि एनपीसी 1620 866 1072 1050 1083 1093 999 1156 1143 1121 1274 899 933 12690 11167 TOTAL NPC

कुि
23766 9589 11657 11765 12069 12180 10805 9852 8308 8343 8732 7449 8252 119168 111912 TOTAL(A+B+C+D+E+F)
(A+B+C+D+E+F)
2 संयुक्त बीबीएिबी
(a) भाकड़ा कॉम््िेक्स 1534 268 491 551 685 635 511 472 400 518 521 462 491 6005 5945 Bhakra
(b) िे हर 990 323 344 408 464 436 311 232 136 108 85 77 93 3017 2987 Dehar
(c) पोंग 396 35 70 76 69 217 702 206 132 193 153 146 140 2138 2117 Pong
कुि बीबीएिबी 2920 627 905 1035 1219 1288 1523 909 668 818 758 686 724 11160 11049 Total BBMB
3 केंरीय आईपीपी CENTRAL IPP
(a) एडीएर्पीएि 192 51 77 107 168 109 222 36 20 15 12 9 11 837 828 ADHPL
करर्ि वंगतू
(b) 1000 355 682 732 780 745 284 243 162 127 104 89 110 4412 4368 Karcham Wangtoo HPS
हाइड्रो पावर स्टे शन

ििाना स्टे ज-II


(c) 100 26 33 52 83 77 74 23 12 3 6 5 6 399 395 Malana Stage-II HPS
हाइड्रो पावर स्टे शन
श्री सीिें ट थिचि
(d) 300 90 103 73 57 103 68 116 79 53 93 93 184 1112 1023 Shree Cement TPS
पावर स्टे शन
64
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
(e) बधु धि 70 15 37 46 52 53 18 16 9 6 5 3 4 262 259 Budhil
कुि आईपीपी 1662 537 931 1010 1140 1086 666 432 282 204 219 199 315 7021 6873 Total IPP
कुि केन्द्रीय Total Central
28348 10753 13493 13810 14428 14554 12994 11194 9259 9365 9708 8334 9291 137349 129833
सैक्टर(1+2+3) Sector(1+2+3)
4 दिल्िी
(a) राजघाट 135 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rajghat
दिल्िी गैस
(b) 270 44 51 54 43 41 71 71 52 33 50 31 45 587 559 Delhi Gas Turbines
टरबाइन
(c) प्रगनत गैस टरबाइन 330 130 118 123 131 187 198 198 189 201 168 183 96 1923 1911 Pragati Gas Turbines
ररठािा गैस
(d) 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rithala Gas Turbines
टरबाइन
(e) बवाना गैस टरबाइन 1370 193 208 198 338 333 264 264 209 218 250 204 249 2928 2847 Bawana Gas
Timarpur Waste Mgmt
(f) नतिारपुर ्िांट 21 14 14 14 13 13 14 14 14 13 14 13 15 165 139
Plant
East Delhi waste
(g) 2 2 2 2 2 2 2 2 1 2 1 3 24 13
Processing Co. Ltd

Delhi Municipality Solid


(h) 14 6 10 9 10 10 10 9 10 10 9 5 110 87
Waste Ltd.
योग दिल्िी गैस 2065 368 377 376 511 561 533 533 450 452 468 418 390 5439 5317 Total Delhi Gas
योग दिल्िी तापीय 135 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Delhi Thermal
योग दिल्िी 2221 382 390 390 525 574 547 547 464 465 482 431 405 5603 5456 Total DELHI
5 हररयाणा
(a) पानीपत ता.वव.के. 920 62 216 150 390 297 196 233 143 219 75 89 469 2541 2337 Panipat
डीसीआरटीपी य.
(b) 600 306 327 88 327 290 258 363 320 400 382 163 400 3624 3334 DCRTP (Y'Nagar)
नगर
(c) नहर (प.य.न.) 62 17 17 16 20 24 25 23 14 5 3 4 5 174 172 WYC Hatyana Hydro

(d) आरजीटीपीएस खेिर 1200 216 431 281 440 420 277 342 38 508 520 531 508 4510 4149 RGTPP Kheddar
झज्जर-सी एि पी
(e) 1320 276 379 585 574 677 656 607 597 755 704 645 755 7211 6634 Jhajhar CLP
(आईपीपी)
योग हररयाणा
62 17 17 16 20 24 25 23 14 5 3 4 5 174 172 Total Haryana(Hy)
जिीय
योग हररयाणा
4040 860 1352 1104 1730 1685 1386 1545 1098 1882 1681 1429 2132 17885 16454 Total Haryana(Th)
तापीय
65
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
योग हररयाणा 4102 877 1369 1121 1750 1708 1411 1569 1112 1887 1684 1433 2137 18059 16626 Total Haryana
6 दहिार्ि प्रिे श
(a) िाजी 126 60 77 83 85 88 74 46 28 21 16 14 18 610 604 Largi
(b) भाभा 120 45 58 55 58 58 57 50 32 25 21 16 18 492 487 Bhabha
(c) बस्सी 66 37 46 45 48 44 36 21 12 10 7 4 6 315 312 Bassi
(d) धगरर 60 5 5 10 25 37 36 20 9 8 6 6 5 170 168 Giri
(e) घनवी 33 3 4 8 12 15 13 8 4 3 2 2 3 78 77 Ghanvi
(f) आंध्रा 17 6 6 7 9 10 11 7 3 2 2 1 2 66 65 Andhra
(g) बनेर 12 4 4 5 6 5 4 3 1 1 1 1 2 38 37 Baner
(h) खौजी 12 5 5 5 7 6 4 2 1 1 0 1 2 38 38 Khauli
(i) गज 11 4 4 3 3 5 5 3 1 2 1 1 2 34 34 Gaj
(j) बबनवा 6 4 3 3 4 4 4 3 1 1 1 1 2 32 31 Binwa
धथरोट(एिएिएर्
(k) 0 1 1 1 1 1 1 1 1 1 1 1 8 8 Thirot(Under MMH)
के अंिर)
(l) एिएिएर् 27 3 3 4 6 5 4 3 2 2 1 1 1 36 36 MMH(below 2MW)

( m) ििना (आईपीपी) 86 25 29 44 79 71 39 21 12 8 6 5 6 346 342 Malana (IPP)

(n) बसपा (आईपीपी) 300 81 172 212 237 224 157 81 48 39 32 26 28 1336 1322 Baspa (IPP)
पानतकारी
(o) एिएिएर् 16 3 3 5 11 13 10 4 3 2 2 2 2 59 58 Patikari (Under MMH IPP)
(आईपीपी) के अंिर
टीओएसएस(आईपी
(p) 10 5 6 6 6 6 5 5 4 3 2 2 2 52 52 TOSS (Under MMH IPP)
पी) के अंिर
एिएिएर्
(q) 362 134 154 161 200 187 156 97 46 38 31 24 56 1285 1272 MMH(IPP's)
(आईपीपी)
(r)) 16 30 35 39 27 14 11 6 5 4 4 3 195 193 Kashang
कुि दहिार्ि 1263 423 580 656 795 779 616 375 209 167 132 107 154 4028 3988 Total HPSEB
7 जम्िू और कश्िीर

(a) बगमिहार(जम्ि)ू -1 269 334 313 335 335 324 242 131 114 96 3 0 2495 2470 Baglihar-1

(b) बगमिहार(जम्ि)ू -II 190 301 313 313 332 140 2 0 0 0 83 108 1782 1764 Baglihar-II

Other J&K (self


(c) 111 137 138 153 124 78 41 29 36 31 30 57 965 955
Generation)

66
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus

(d) आइपीपी

(e) अथवाटू 5.2 6.0 6.2 4.8 2.8 1.4 0.4 0.3 0.3 0.2 0.2 1.4 29 29 Athwatoo

(f) 'ड्रंग 4.4 6.5 5.3 2.6 1.2 0.6 0.2 0.1 0.0 0.0 0.0 0.7 22 21 Drang

(g) बनचवार 3.3 5.0 5.0 4.9 2.5 1.5 0.6 0.4 0.0 0.3 0.2 0.8 25 24 Branwar

(h) 'आर ए डी 8.6 8.4 7.8 7.7 8.1 9.1 6.2 4.1 3.6 3.0 2.4 3.5 72 72 Rad

PRIVATE POWER
(i) 21.5 25.9 24.3 20.0 8.3 12.6 9.3 5.3 4.2 3.5 4.2 6.5 146 144
HOUSES GENERATION
कुि जम्िू कश्िीर
0 614 823 812 841 814 567 301 170 158 134 123 178 5108 5057 Total J&k (hydro)
(जिीय)
कुि जम्िू व
0 614 823 812 841 814 567 301 170 158 134 123 178 5535 5480 Total j&K
कश्िीर
8 पंजाब PUNJAB
जोधगंिर
(a) 110 58 75 73 78 72 56 33 19 16 12 7 10 508 Joginder Nagar(Shanan)
नगर(शनन)
(b) यूबीडीसी 91 12 44 46 56 56 48 43 305 UBDC
(c) िुकेररयां 207 29 74 77 55 134 133 145 109 134 127 130 123 1269 Mukerian
(d) आनंिपुर साहब 134 18 81 74 91 79 77 32 13 40 46 43 54 647 Anadpur sahib
रं जीत सागर
(e) 600 66 209 228 280 333 173 145 108 87 100 34 40 1804 Ranjit sagar HPS
एर्पीसी
(f) िघु जिीय 6 0 0 1 1 1 1 1 1 1 1 1 1 9 Small Hydel
(g) ता.वव.के. (भदटंडा) 460 28 54 44 53 99 70 0 0 0 0 0 0 349 GNDTPS (Bhatinda)
(h) ता.वव.के. (रोपड़) 1260 218 259 205 279 184 241 337 27 16 126 61 321 2274 GGSTPS (Ropar)
आईपीपी(एि एि
एर्,पेडा व
(i) 680 0 MMH , peda,Jhalkeri Rice
अन्द्य,झिकेरी
र्ावि)
(j) िेहरा िोहब्बत 920 289 478 232 302 66 307 296 28 0 384 149 413 2944 Lehra Mohabat TPS
(k) गोइंिवाि 540 0 0 53 141 162 185 157 114 179 82 117 111 1299 Goindwal
(l) राजपुरा 1400 419 723 704 884 861 636 538 701 818 849 792 974 8898 Rajpura
(m) तिवंडी साबू 1320 358 0 193 902 828 876 944 859 834 901 747 787 8229 Talwandi Saboo
67
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
कुि पंजाब (जिीय) 1148 183 483 498 561 675 488 398 250 278 286 215 228 4542 0 Total Punjab (HY)

कुि पंजाब (तापीय) 6580 1312 1514 1431 2561 2200 2315 2272 1729 1847 2342 1866 2606 23994 0 Total Punjab (Th)
कुि पंजाब 7728 1495 1997 1929 3122 2875 2803 2670 1978 2125 2627 2081 2834 28535 0 Total Punjab
9 राजस्थान RAJASTHAN
(a) िाही बजाज 140 10 10 0 1 9 4 6 18 24 24 21 24 152 143 Mahi Bajaj Sagar
(b) राणा प्रताप सागर 172 0 0 0 0 0 8 59 67 68 69 63 68 404 403 R P Sagar
(c) जवाहर सागर 99 0 0 2 5 8 7 37 44 45 45 39 45 279 280 Jawahar Sagar
(d) गांधी सागर 115 3 3 12 18 0 7 11 33 66 67 63 66 350 347 Gandhi Sagar
(e) छोटे जिीय 15 0 0 0 3 0 1 1 1 2 2 2 2 15 14 MMH
(f) कोटा ता.वव.के. 1240 283 731 421 288 430 684 630 760 766 820 682 766 7261 6468 Kota TPS
(g) रािगढ़ गैस 271 131 101 122 124 135 135 131 129 109 85 121 109 1430 1369 RAMGARH GT

(h) धगरि एिटीपीपी 250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GIRAL(LTPP)

(i) सुरतगढ़ 1500 151 408 159 161 363 458 427 514 500 733 636 500 5009 4508 Suratgarh
(j) छाबरा 1000 595 386 554 398 374 374 615 633 561 536 536 561 6123 5552 Chabra
(k) कामिमसन्द्ध 1200 430 537 536 84 487 727 528 621 414 835 733 414 6347 5929 Kalisindh
(l) कवई 1320 454 698 573 730 628 329 407 280 563 225 0 563 5449 5192 Kawai
(m) पवन ऊजाच 3896 599 605 690 618 697 338 173 190 335 175 221 335 4975 4975 Wind Farm
(n) बायो िास 114 18 18 15 15 15 14 16 14 15 14 12 15 179 179 Biomass
(o) सौर ऊजाच 1280 4 14 2 0 0 5 5 2 3 3 3 3 44 44 Solar
(p) ढोिपुर सीसीपीपी 330 0 0 0 0 0 54 79 80 35 0 0 35 282 267 Dholpur GPS
(q) राजवेस्ट 1080 536 567 519 464 550 592 606 566 606 650 561 606 6824 6109 Rajwest
सीपीपी (वीएस
(r) 135 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CPP(includes VSLPP)
मिगनाइट मििाकर)
कुि राजस्थान
541 14 14 14 27 18 27 115 163 205 208 188 205 1199 1187 Total Raj (Hy)
जिीय
कुि राजस्थान
7725 2449 3327 2762 2126 2833 3165 3213 3373 3410 3799 3147 3410 37012 33758 Total Raj (Th)
तापीय
कुि राजस्थान गैस 601 131 101 122 124 135 189 210 208 143 85 121 143 1712 1635 Total Raj (Gas)
कुि राजस्थान
5290 621 638 707 633 713 357 193 206 352 192 236 352 5198 5198 Total Raj(Wind,Bio mass)
ववंड और सोिर
कुि राजस्थान 14157 3214 4079 3605 2910 3699 3738 3730 3951 4110 4283 3693 4110 45122 41778 Total Rajasthan
10 उत्तर प्रिे श UP
68
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
(a) अिखनन्द्िा 330 70 101 157 235 219 213 120 65 48 37 28 31 1325 1312 Alakhnanda
(b) ववष्णुप्रयाग 440 130 270 308 309 296 304 198 98 69 57 44 48 2130 2109 Vishnuprayag
(c) ररहं ि 300 45 53 76 83 99 105 98 21 61 80 65 51 837 828 Rihand
(d) ओबरा 99 17 20 30 38 33 32 21 7 24 32 26 22 302 299 Obra
(e) खारा 72 3 23 27 43 34 32 29 19 17 11 10 10 257 255 Khara
(f) िाताटीिा 31 2 6 0 2 0 4 20 19 13 11 11 5 94 93 Matatilla
(g) एिएिएर् 25 3 5 2 2 2 2 1 3 3 3 3 3 30 30 MMH
कुि जिीय 1297 269 478 600 712 683 692 486 234 235 230 187 169 4975 4925 Total UP (Hydro)
(h) सह उत्पाि 981 409 161 93 18 27 49 92 496 679 684 618 684 4008 4008 Cogeneration
तापीय Thermal
(i) अनपरा 2830 1462 1660 1328 1181 1216 1142 1235 1146 1233 1243 1204 1320 15370 14141 Anpara
(j) ओबरा 1194 447 479 397 280 265 258 310 386 345 317 244 227 3957 3640 Obra
(k) पररछा 1140 597 606 616 491 474 455 483 413 346 536 453 511 5979 5501 Parichha
(l) हरिआ ु गंज 665 302 416 387 312 489 283 268 264 271 254 262 313 3822 3516 Harduaganj
(m) पनकी 210 79 92 87 3 0 54 15 0 0 0 0 0 330 304 Panki
(n) रोज़ा 1200 579 742 706 617 417 550 593 638 483 502 491 546 6865 6316 Rosa
बजाज ऊजाच
(p) 450 157 256 182 4 0 0 0 0 0 55 120 51 825 759 Bajaj Energy Private Ltd.
प्राइवेट मिमिटे ड
(q) अनपरा- डी 1000 525 378 648 660 733 681 793 526 735 777 653 715 7823 7197 Anpara D
(r) िमितपुर 1320 648 694 795 711 757 742 821 622 743 612 280 580 8003 7363 Lalitpur
(s) बारा 660 342 487 339 377 444 591 442 382 510 473 409 415 5212 4795 Bara
(t) 26 26 31 20 31 24 21 28 34 36 35 31 343 316 JP Churk
कुि तापीय 11650 5546 5972 5579 4655 4822 4805 5051 4872 5345 5453 4733 5363 62195 57540 Total UP (Th)
(t) सोिर 102 41 40 37 27 38 50 61 56 54 68 63 97 Solar
कुि उत्तर प्रिे श 13049 5856 6490 6216 5394 5543 5547 5598 5162 5634 5750 4983 5629 67171 62466 Total UP
11 उत्तराखंड Uttaranchal
जिीय Hydro
(a) खानतिा 41 16 21 21 21 25 28 26 6 14 14 11 11 213 211 Khatima
(b) रािगंगा 198 32 15 0 0 0 0 2 2 44 76 53 26 250 248 Ramganga
(c) पाथरी 20 11 14 13 12 13 10 3 12 11 12 11 12 136 134 Pathri
(d) िोहम्ििपुर 9 5 5 5 5 5 4 1 5 5 6 5 6 56 56 Mohammedpur
(e) धकरानी 34 2 10 14 19 21 21 14 8 7 5 4 4 130 128 Dhakrani
(f) धािीपुर 51 2 16 18 24 30 32 23 12 10 7 6 6 187 185 Dhalipur
(g) कुिहाि 30 1 11 12 12 19 20 15 9 8 5 5 5 124 123 Kulhal
(h) नछबरो 240 59 60 77 121 128 115 75 41 33 26 23 25 784 776 Chibro
(i) खोिरी 120 28 28 35 52 56 52 35 19 16 13 11 12 356 352 Khodri
(j) धर्ल्िा 144 66 69 84 87 87 90 83 63 59 49 22 51 812 804 Chilla
69
6.1 वर्च 2017-2018 िें उत्पािन बबजिी घरों का कायच सम्पािन
NRLDC ANNUAL REPORT 2017-18
PERFORMANCE OF GENERATING STATIONS IN THE NORTHERN REGION DURING 2017-2018

सभी आंकड़े मिमियन यूननट िें All figs. in MU


MONTH प्रभावी अप्रैि- जि
ु ाई- अगस्त- मसतंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी-
स्टे शन िई-2017 जन
ू -2017 िार्च-2018
--> क्षिता 2017 2017 2017 2017 2017 2017 2017 2018 2018 2017-2018 स्टे शन
POWER STATION िेगावाट
SL. NO. Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 कुि मि. यूननट POWER STATION
Eff
Cap.MW Gross Ex-Bus
(k) िनेर भािी-1 90 34 42 41 12 20 61 61 38 28 22 17 18 395 391 Maner Bhalli
(l) धारासु 304 90 151 191 166 169 159 115 65 50 42 37 42 1277 1264 Dharasu
(l) शुगर मिि 40 19 6 0 0 0 0 19 17 27 28 25 28 168 166 Sugar Mill
(m) 47 16 18 19 20 20 20 18 10 7 6 3 5 161 159 Bhilangana
(n) 225 59 64 57 71 57 60 62 69 60 0 0 0 559 554 GAMA (GIPL)
(o) 450 95 108 124 132 124 125 132 137 82 0 0 0 1059 1049 Sravanti (SEPL)
(p) 20 14 17 17 15 15 17 19 15 13 11 18 24 195 193 Solar

कुि उत्तरांर्ि
1328 362 459 532 551 593 613 472 291 293 283 207 224 4879 4830 Total Uttranchal Hydro
जिीय
कुि उत्तरांर्ि 2063 549 655 730 770 789 814 704 529 476 321 249 275 6861 6792 Total Uttranchal
कुि क्षेत्र 72932 24164 29875 29268 30533 31334 29038 26688 22834 24388 25122 21435 25013 318262 272419 Total Region

70
NRLDC ANNUAL REPORT 2017-18
6.2 वर्म 2017-2018 में क्षेत्रीय ववद्युत उत्पािन का सारांश
SUMMARY OF REGIONAL ENERGY GENERATION DURING 2017-2018

एजेंसी/स्रोत कुल भमभलयन यूननट GROSS MU एक्स बस भमभलयन यूननट EX-BUS MU एजेंसी/स्रोत
गैस/ गैर गैस/ गैर
Sr.
No. Agency जलीय तापीय नाभिकीय कुल जलीय तापीय नाभिकीय कुल Agency
डीजल कन्वेंशन डीजल कन्वें शन
Gas/d Non- Gas/
Source Hydro Thermal
eisel conv
Nuclear Total Hydro Thermal
Deisel
Non-conv Nuclear Total Source
1 एनटीपीसी 3199 67652 2635 39 --- 73524 3167 62554 2556 39 --- 68315 NTPC
2 एनएचपीसी 17585 --- --- --- --- 17585 17409 --- --- --- --- 17409 NHPC
3 एसजेवीएनएल 9344 --- --- --- --- 9344 9251 --- --- --- --- 9251 SJVNL
4 एनपीसी --- --- --- --- 12690 12690 --- --- --- --- 11167 11167 NPC
5 एनएलसी 1648 1648 1436 1436 NLC
6 बीबीएमबी 11160 --- --- --- --- 11160 11049 --- --- --- --- 11049 BBMB
7 चंडीगढ़ --- --- --- --- --- 0 --- --- --- --- --- 0 Chandigarh
8 दिल्ली --- 0 5439 165 --- 5603 --- 0 5317 139 --- 5456 Delhi
9 हररयाणा 174 17885 --- --- --- 18059 172 16454 --- --- --- 16626 Haryana
10 दहमाचल 4028 --- --- --- --- 4028 3988 --- --- --- --- 3988 Himachal
11 जम्मू कश्मीर 5108 --- 0 --- --- 5108 5057 --- 0 --- --- 5057 J&K
12 पंजाब 4542 23994 --- --- --- 28535 0 0 --- --- --- 0 Punjab
13 राजस्थान 1199 37012 1712 5198 --- 45122 1187 33758 1635 5198 --- 41778 Rajastan
14 उत्तरप्रिे श 4975 62195 --- 0 --- 67171 4925 57540 --- 0 --- 62466 Uttar Pradesh
15 उत्तराखंड 4879 --- --- 168 --- 5047 4830 --- --- 166 --- 4997 Uttarnchal
16 टे हरी 2995 --- --- --- --- 2995 2965 --- --- --- --- 2965 Tehri
17 कोटे शवर 1383 --- --- --- --- 1383 1369 --- --- --- --- 1369 Koteswar
18 केंद्रीय आईपीपी Central IPP

(एडीएचपीएल,करचम (Sree
वंगतू हाइड्रो पावर Cement,AD
स्टे शन,मलाना स्टे ज-
Hydro,Karcham
19 II
हाइड्रो पावर स्टे शन,
श्री सीमें ट थममल Wangtoo,Malan
पावर स्टे शन,बुधिल) a2,Budhil)
5909 4412 --- --- --- 10321 5850 1023 --- --- --- 6873
कुल 76480 214797 9786 5570 12690 319322 71219 172765 9508 5542 11167 270201
अंतर क्षेत्रीय ववननमय
Inter regional exchanges

अंतर क्षेत्रीय लाइन का नाम क्षेत्रीय क्षेत्रीय


आयात ननयामत
(एम.य)ू (एम.य)ू
Name of Interregional Line (MU) (MU)
(i) एचवीडीसी बी/बी वविंध्याचल पर 257 2276
HVDC back-to-back at Vindhyachal
केवी कोटा/मोडक बड़ोद मध्यप्रदे श से राजस्थान
(ii) 220 •
220 kV Kota/Morak Badod supply from M.P. to Rajasthan
203 304
केवी आगरा-ग्वाललयर पर
(iii) 765 •
765 KV Agra-Gwalior 16867 0
(iv) 220 KV ओरै या-मलान पर
220 KV Auraiya-Malanpur 27 501
(v) 400 के वी कािंकरोली ज़दाा
400 kv Kankroli-Zerda 44 1322
(vi) 400 के वी भीनमाल ज़दाा
400KV Bhinmal -Zerda 84 834
(vii) HVDC back-to-back/ AC link at Sasaram सासाराम
बी/बी पर 1312 37
(viii) 400 kV Muzaffarpur-Gorkhpur/ 400केवी मुजफ्फरपुर पर
2856 3
(ix) 400 kV Baila-Patna 400 केवी पटना-बललया पर 5713 0
(x) 400 kV Biharsarif-Balia 400 केवी बब ारशरीफ बललया 1409 3
(xi) 220 kV sahupuri Pusauli 220 केवी सा ु पुरी-पुसौली 897 5
(xii) 765 kv Sasaram Fatehpur 765 के वी सासाराम फ़ते पुर 82 624
(xiii) HVDC Mundra Mohindergarh मुिंदरा - मोह दिं रगढ़ 11542 30
(xiv)765KV Gaya Fatehpur/Varanasi गया फ़ते पुर/वाराणसी 2583 93
(xv) 765 kV Sasaram/Gaya-Balia 400 केवी सासाराम/गया
बललया 1997 0
(xvi) 400KV Bihar shariph -Varanasi DC / 400 के वी
बब ारशरीफ वाराणसी डीसी
283 147
(xvii) Tanakpur to Mahendragarh (NEPAL) टनकपुर से
म े न्द्रगढ़ (नेपाल) 1 116
(xviii) Rihand Vindhyachal 400 KV रर न्द्द वविंध्याचल 0 2690
(xix) 400 KV Barh Gorakhpur बाढ़ गोरखपरु 1674 604
(xx)765 KV Phagi Gwalior फागी ग्वाललयर 8601 0
(xxi) HVDC BNC बी एन सी 3507 728
400KV Sasaram-Allahabad /400 के सासाराम- इला ाबाद 403 51
400KV RAPPC- Sujalpur/400 के वी आरएपीपीसी-सुजालपुर
1535 21
HVDC - Champa-Kurukshetra/ एच वी डी सी - चापा-कुरुक्षेत्रा
11138 0
एच वी डी सी - आलीपुरद्वार-आगरा 825 0
765 के वी ओरई-जबलपुर 92 0
765 के वी ओरई-सतना 84 0
765 के वी ओरई-ग्वाललयर 0 35
कुल आयात/Total Import 74015 10424

71
NRLDC ANNUAL REPORT 2017-18

6.3 वर्ष 2017-2018 िें स्रोि अनुसार िामसक ववद्युि उत्पािन िें योगिान
SOURCE WISE CONTRIBUTION TO MONTHLY GENERATION IN 2017-2018
All figures in MU/Day
सभी आंकड़े मिमियन यूननट/प्रनिदिन
िापीय/Thermal गैर
प्रनिशि योगिान िास
िास जिीय कन्वें .
नामभकीय कुि िापीय गैर
कोयिा गैस कुि जिीय नामभकीय कुि
और गैस कन्वें .
Total
of Th Non- Thermal Non-
Month Hydro Coal Gas Nuclear Total Hydro Nuclear Total Month
and conv And Gas conv
gas
अप्रैल-2017 212 517 18 536 23 29 800 27 67 3 4 100 April-2017

मई-2017 288 594 18 612 23 35 958 30 64 2 4 100 May-2017

जून-2017 321 561 26 587 25 35 969 33 61 3 4 100 June-2017

जुलाई-2017 357 541 23 565 22 35 978 36 58 2 4 100 July-2017

अगस्त-2017 355 565 25 589 25 35 1004 35 59 2 4 100 August-2017

सितंबर-2017 294 584 35 620 14 33 961 31 64 1 3 100 September-2017

अक्टूबर-2017 176 589 42 631 9 37 854 21 74 1 4 100 October-2017

नवम्बर-2017 118 554 34 588 10 38 754 16 78 1 5 100 November-2017

दििम्बर-2017 115 592 24 616 14 36 782 15 79 2 5 100 December-2017

जनवरी-2018 106 628 25 653 10 41 810 13 81 1 5 100 January-2018

फ़रवरी-2018 100 597 23 620 12 32 765 13 81 2 4 100 February-2018

मार्च-2018 109 625 26 651 16 30 806 14 81 2 4 100 March-2018

2017-18 213 579 27 606 17 35 871 24 70 2 4 100 2017-18

72
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


85000
GROWTH OF INSTALLED GENERATING CAPACITY IN NORTHERN REGION IN LAST DECADE

80000
75000 Nuclear Non conventional Gas Hydro Thermal

70000
INSTALLED CAPACITY (MW) -->

65000
60000
55000
50000
45000
40000
35000
30000
25000
20000
15000
10000
5000
0

2016-17
2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2017-18
YEAR

73
NRLDC Annual Report 2017-18

उत्तरी क्षेत्र / Northern Region


GROWTH OF INSTALLED GENERATING CAPACITY IN NORTHERN REGION DURING LAST DECADE
45000

40000
Thermal Hydro Gas Nuclear Non conventional

35000
INSTALLED CAPACITY (MW) -->

30000

25000

20000

15000

10000

5000

0
2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18
YEAR

74
NRLDC 6.4 वर्च 2017-18 में िापीय/नासभकीय ऊजाच सयन्त्रों का माहवार संयंर भार गण
ु ांक ANNUAL REPORT 2017-18

MONTHWISE PLANT LOAD FACTORS OF THERMAL / NUCLEAR UNITS DURING 2017-18


सभी आंकड़े प्रतिशि में
अप्रैल- जल
ु ाई- अगस्ि- ससिंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी- मार्च-
मई-2017 जून-2017
क्र. सं. प्रभावी 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2017-18 POWER
ववद्युत केंद्र
क्षमता Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 STATION
Sr. No. मे.वा. MW
A सेंट्रल सैक्टर PLF (GROSS) CENTRAL SECTOR

1 एनटीपीसी NTPC
(a) बदरपरु 705 230.8 44.9 41.6 44.3 44.4 41.1 21.6 0.0 0.0 0.0 0.0 0.0 58.3 Badarpur T.P.S

(b) ससंगरौली 2000 45.7 83.4 85.9 89.6 88.8 90.0 89.9 76.9 76.2 87.0 86.8 72.3 81.1 Singrauli STPS

(c) ररहं द -1 1000 46.9 91.3 93.7 91.2 63.4 96.7 97.5 95.3 92.7 91.2 86.3 69.5 84.6 Rihand TPS -1

(d) ररहं द -2 1000 89.2 65.6 94.1 95.0 95.4 84.4 101.2 96.8 99.2 99.7 94.4 96.4 92.6 Rihand TPS-2

(e) ररहं द -3 1000 56.1 92.4 91.0 50.9 91.2 95.8 100.3 96.7 90.6 98.1 95.2 99.3 88.1 Rihand TPS-3

(f) दादरी तापीय-I 840 89.4 62.2 41.8 51.8 56.4 54.1 58.3 43.4 51.4 67.3 67.7 76.8 60.0 Dadri NCTPS Stage-I

(g) दादरी तापीय-II 980 32.7 71.9 69.2 63.8 66.8 66.8 63.5 76.1 70.7 78.8 39.3 46.4 62.4 Dadri NCTPS Stage-II

(h) ऊंचाहार-I 420 77.6 70.9 66.9 67.9 81.3 85.0 52.7 38.1 72.6 74.2 74.2 82.1 70.3 Unchahar -I TPS

(i) ऊंचाहार-II 420 184.0 78.3 69.2 61.5 79.0 83.8 71.9 69.3 66.5 79.3 78.9 81.1 83.4 Unchahar -II TPS

(j) ऊंचाहार-III 210 0.0 162.4 69.1 115.4 109.0 83.0 79.1 73.6 76.6 78.2 73.0 81.7 83.8 Unchahar -III TPS

(k) टांडा 440 66.7 81.9 88.3 72.5 94.6 93.6 91.5 83.9 84.2 88.3 84.7 85.1 84.6 Tanda TPS

(l) झज्जर 1500 12.6 20.3 67.5 13.2 11.2 39.5 54.1 56.5 72.9 54.1 62.8 72.8 44.6 Jhajhar
एनटीपीसी
10515 67.7 69.8 75.6 65.0 68.5 74.7 75.7 70.0 73.0 75.8 71.9 71.5 71.6 NTPC (COAL)
(कोयला)
(m) आन्टा गैस 419 8.4 14.7 14.2 0.0 0.0 34.7 40.0 7.4 0.6 15.2 3.2 7.0 12.1 Anta GPS

(n) ओरै या गैस 663 0.0 0.0 0.0 0.0 0.0 6.6 28.8 3.6 0.6 11.1 0.9 0.0 4.3 Auraiya GPS

(o) दादरी गैस 830 4.6 0.0 31.8 0.0 5.2 25.9 31.8 19.4 23.5 4.7 17.4 14.5 15.0 Dadri GPS

(p) फ़रीदाबाद गैस 432 0.0 10.5 20.6 26.8 12.9 14.4 32.8 70.7 4.5 28.9 0.0 47.6 22.9 Faridabad GPS
कुल एनटीपीसी
2344 3.1 4.6 17.6 4.9 4.2 19.9 32.6 22.2 9.4 12.8 7.0 15.1 12.8 NTPC (GAS)
(गैस)
कुल एनटीपीसी 12859 55.9 57.9 65.0 54.1 56.8 64.7 67.8 61.3 61.4 64.4 60.1 61.3 60.9 TOTAL NTPC

75
6.4 वर्च 2017-18 में िापीय/नासभकीय ऊजाच सयन्त्रों का माहवार संयंर भार गण
ु ांक
NRLDC ANNUAL REPORT 2017-18
MONTHWISE PLANT LOAD FACTORS OF THERMAL / NUCLEAR UNITS DURING 2017-18
सभी आंकड़े प्रतिशि में
अप्रैल- जुलाई- अगस्ि- ससिंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी- मार्च-
मई-2017 जून-2017
क्र. सं. प्रभावी 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2017-18 POWER
ववद्युत केंद्र
क्षमता Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 STATION
Sr. No. मे.वा. MW
2 एनपीसी
(a) रा.आ.ऊ.के. (अ) 300 44.4 57.5 63.3 63.5 58.9 45.6 65.9 67.0 68.8 78.2 68.1 69.3 62.6 RAPS -A

(b) रा.आ.ऊ.के. (ब) 440 94.0 93.4 92.5 94.1 95.6 99.0 101.1 102.9 80.8 91.8 84.2 101.0 94.3 RAPS -B

(c) रा.आ.ऊ.के. (स) 440 59.3 103.8 103.1 100.4 104.4 104.3 105.4 107.1 108.3 123.0 60.7 38.6 93.5 RAPP-C

(d) न.आ.ऊ.के. 440 89.9 91.1 92.7 93.1 93.6 80.9 101.8 105.0 106.6 121.1 102.2 98.2 98.0 NAPS

कुल एनपीसी 1620 74.3 89.0 90.0 89.9 90.6 85.7 95.9 98.0 93.0 105.7 79.7 77.4 89.2 NPC TOTAL

श्री सीमें ट थमचल


3 300 41.5 46.0 33.7 25.6 46.0 31.6 51.8 36.6 23.9 41.5 44.6 82.6 42.2 Shree Cement IPP
पावर स्टे शन
एन एल सी
4 250 77.1 49.8 84.1 77.4 52.2 73.6 83.3 88.9 60.6 98.6 90.8 65.7 75.0 NLC Barsingsar
बरससंगसर

कुल केन्त्रीय सैक्टर योग


Central Sector
15029 57.9 60.9 67.4 57.7 60.2 66.5 70.8 65.2 64.1 68.9 62.4 63.5 63.8 (TOTAL)

B राज्य सैक्टर State Sector

िापीय 135 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 THERMAL

(b) ददल्ली गैस टरबाईन 270 22.9 26.1 28.0 22.0 21.2 36.3 36.3 26.8 17.1 25.9 16.2 23.1 25.2 I.P.Gas Turbines

(c) प्रगतत गैस टरबाईन 330 54.7 49.6 51.9 55.0 78.8 83.5 83.5 79.7 84.6 70.5 77.1 40.6 67.4 Pragati Gas Turbines

(d) ररठाला गैस टरबाइन 95 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Rithala Gas Turbines

(e ) बवाना गैस टरबाइन 1370 19.6 21.1 20.1 34.3 33.7 26.8 26.8 21.2 22.1 24.6 21.4 24.4 24.7 Bawana Gas Turbines

कुल दिल्ली गैस 2065 24.7 25.3 25.3 34.4 37.7 35.9 35.9 30.3 30.4 31.0 28.6 25.7 30.5 TOTAL GAS

76
NRLDC ANNUAL REPORT 2017-18

6.4 वर्च 2017-18 में िापीय/नासभकीय ऊजाच सयन्त्रों का माहवार संयंर भार गुणांक
MONTHWISE PLANT LOAD FACTORS OF THERMAL / NUCLEAR UNITS DURING 2017-18
सभी आंकड़े प्रतिशि में
अप्रैल- जल
ु ाई- अगस्ि- ससिंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी- मार्च-
मई-2017 जून-2017
क्र. सं. प्रभावी 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2017-18 POWER
ववद्यत
ु केंद्र क्षमता Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 STATION
Sr. No. मे.वा. MW
2 हररयाणा Haryana
(a) पानीपत 1367 6.3 21.2 15.3 38.3 29.2 19.9 22.9 14.5 21.5 7.4 9.4 46.1 21.2 Panipat
डीसीआरटीपी
(b) 600 70.8 73.2 20.4 73.2 64.9 59.7 81.2 74.0 89.7 85.6 39.0 89.7 68.8 DCRTP Yamunanagar
यमुनानगर
(c) आरजीटीपीएस खेदर 1200 25.0 49.9 32.5 50.9 48.6 32.0 39.6 4.4 58.7 60.1 61.4 58.7 43.6 RGTPS Kheddar

झज्जर-सी एल पी
(d) 1320 29.0 39.8 61.6 60.4 71.3 69.0 63.9 62.8 79.5 74.1 67.9 79.5 63.3 Jhajhar CLP(IPP)
(आईपीपी)
कुल हररयाणा 4487 26.6 41.3 34.2 52.8 51.6 42.9 47.2 34.0 57.6 51.6 44.5 65.1 45.9 TOTAL Haryana
3 जम्मू और कश्मीर J&K
(a) पांपोर गैस 175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PAMPORE GTs

कुल जम्मू व कश्मीर 175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL J&K

4 पंजाब Punjab
(a) ता.वव.के. (भदटंडा) 460 8.5 16.4 13.3 16.0 30.0 21.2 0.0 0.0 0.0 0.0 0.0 0.0 8.8 GNDTPS (Bhatinda)
(b) ता.वव.के. (रोपर) 1260 24.0 28.5 22.6 30.7 20.3 26.6 37.2 3.0 1.8 13.9 6.7 35.4 21.0 GGSTPS (Ropar)
लहरा मोहब्बता
(c) 920 43.6 72.1 35.1 45.6 9.9 46.4 44.7 4.2 0.0 58.0 22.5 62.3 37.2 Lehra Mohabbat TPS
ता.वव.के
(d) राजपरु ा 1400 41.5 71.8 69.8 87.7 85.4 63.1 53.3 69.5 81.2 84.2 78.6 96.6 73.7 Rajpura
(e ) तलवंडी साबू 1320.0 37.7 0.0 20.3 94.9 87.2 92.2 99.4 90.4 87.8 94.8 78.6 82.8 72.2 Talwandi Saboo
कुल पंजाब 5360 34.0 39.2 35.7 62.7 52.8 55.2 54.8 41.8 43.2 58.6 45.3 64.7 49.1 TOTAL Punjab

77
NRLDC ANNUAL REPORT 2017-18

6.4 वर्च 2017-18 में िापीय/नासभकीय ऊजाच सयन्त्रों का माहवार संयंर भार गुणांक
MONTHWISE PLANT LOAD FACTORS OF THERMAL / NUCLEAR UNITS DURING 2017-18
सभी आंकड़े प्रतिशि में
अप्रैल- जुलाई- अगस्ि- ससिंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी- मार्च-
मई-2017 जन
ू -2017
क्र. सं. प्रभावी 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2017-18 POWER
ववद्युत केंद्र
क्षमता Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 STATION
Sr. No. मे.वा. MW
5 राजस्थान Rajasthan
(a) कोटा (तापीय) 1240 31.7 81.9 47.1 32.3 48.1 76.6 70.6 85.1 85.8 91.9 76.4 85.8 67.8 Kota (TH)
(b) गगराल एलटीटीपी 250 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Giral LTTP
(c) रामगढ़ गैस 271 66.9 51.5 62.7 63.6 69.2 69.3 66.9 65.9 55.7 43.4 62.0 55.7 61.0 Ramgarh GT
(d) सूरतगढ़ ता.वव.के. 1500 13.9 37.7 14.7 14.9 33.6 42.4 39.5 47.6 46.3 67.9 58.8 46.3 38.6 Suratgarh TPS
(e) छाबरा टीपीएस 1000 82.7 53.6 76.9 55.3 51.9 52.0 85.4 87.9 77.9 74.4 74.4 77.9 70.8 Chabra TPS
(f) धौलपुर जीपीएस 330 0.0 0.0 0.0 0.0 0.0 22.7 33.3 33.6 14.6 0.0 0.0 14.6 9.9 Dholpur GPS
(g) राजवेस्ट 1080 69.0 72.9 66.8 59.7 70.8 76.2 78.0 72.8 78.0 83.5 72.1 78.0 73.2 Rajwest
(h) वीएस सलगनाईट 135 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 VS Lignite
(i) कासलससन्ध 1200 49.8 62.2 62.0 9.7 56.4 84.2 61.1 71.8 47.9 96.7 84.9 47.9 61.0 Kalisindh
(j) कवई 1320 47.7 73.5 60.3 76.8 66.1 34.7 42.8 29.4 59.2 23.7 0.0 59.2 48.2 Kawai
कुल राजस्थान 8326 43.0 57.2 48.1 37.5 49.5 55.9 57.1 59.7 59.3 64.8 54.5 59.3 53.8 TOTAL Rajasthan
6 उत्तरप्रिे श Uttar Pradesh
(a) ओबरा 1194 52.0 55.7 46.2 32.6 30.9 30.0 36.0 45.0 40.2 36.8 28.4 26.4 38.4 Obra
(b) पनकी 210 52.0 61.2 57.6 2.1 0.0 36.0 9.6 0.0 0.0 0.0 0.0 0.0 18.2 Panki
(c) हरदआ ु गंज 665 63.1 86.9 80.9 65.1 102.1 59.1 56.0 55.2 56.7 53.1 54.7 65.4 66.6 Harduaganj
(d) पररछा 1140 72.7 73.8 75.0 59.8 57.7 55.5 58.8 50.3 42.1 65.3 55.2 62.3 60.7 Paricha
(e) रोज़ा 1200 67.0 85.9 81.8 71.4 48.2 63.7 68.6 73.8 55.9 58.1 56.8 63.2 66.2 ROSA
(f) अनपरा 2830 71.8 81.5 65.2 58.0 59.7 56.0 60.6 56.2 60.5 61.0 59.1 64.8 62.9 Anpara
बजाज ऊजाा प्राइवेट Bajaj Energy Private
(h) 450 48.5 78.9 56.3 1.3 0.0 0.0 0.0 0.0 0.0 17.0 37.1 15.7 21.0
सलसमटे ड Limited.
(i) अनपरा- डी 1000 72.9 52.5 90.0 91.7 101.8 94.5 110.1 73.0 102.1 108.0 90.7 99.4 90.6 Anpara D
(j) लसलतपुर 1320 68.2 73.0 83.6 74.8 79.7 78.1 86.3 65.4 78.1 64.4 29.4 61.1 70.5 Lalitpur
(k) बारा 660 69.7 99.2 69.1 76.9 90.5 120.3 90.1 38.9 52.0 48.1 41.6 42.3 70.1 Bara
कुल उत्तरप्रिे श 11869 42.4 54.2 50.9 49.8 50.9 48.7 52.8 46.7 48.6 52.9 45.7 52.2 49.7 TOTAL UP

78
NRLDC ANNUAL REPORT 2017-18

6.4 वर्च 2017-18 में िापीय/नासभकीय ऊजाच सयन्त्रों का माहवार संयंर भार गण
ु ांक
MONTHWISE PLANT LOAD FACTORS OF THERMAL / NUCLEAR UNITS DURING 2017-18
सभी आंकड़े प्रतिशि में
अप्रैल- जल
ु ाई- अगस्ि- ससिंबर- अक्टूबर- नवम्बर- दिसम्बर- जनवरी- फ़रवरी- मार्च-
मई-2017 जून-2017
क्र. सं. प्रभावी 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2017-18 POWER
ववद्यत
ु केंद्र क्षमता Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18 STATION
Sr. No. मे.वा. MW
राज्य सैक्टर (गैस)
State Sector (Gas
2666 26.0 24.9 24.4 33.1 36.3 37.6 38.7 34.3 31.0 28.4 28.5 27.4 30.9 Fired)
राज्य सैक्टर State Sector (Coal
28121 38.9 51.0 45.3 49.6 51.4 51.2 53.6 47.6 52.3 57.8 48.3 58.8 50.5 Fired)
(कोयला)
कुल राज्य सैक्टर 30787 37.8 48.7 43.5 48.2 50.1 50.0 52.3 46.4 50.5 55.2 46.6 56.1 48.8 State Sector (Total)
क्षेरीय (कोयला) 39186 46.9 56.0 53.6 53.7 55.9 57.5 59.7 53.8 57.7 62.8 54.9 62.5 56.3 Region (Coal fired)
क्षेरीय (गैस) 5010 15.3 15.4 21.2 19.9 21.3 29.4 35.9 28.7 20.9 21.1 18.4 21.7 22.4 Region (Gas fired)
क्षेरीय (नासभकीय) 1620 74.3 89.0 90.0 89.9 90.6 85.7 95.9 98.0 93.0 105.7 79.7 77.4 89.2 Region (Nuclear)
क्षेरीय
(गैस+कोयला+नासभ
Regional(Coal+Gas+N
45816 44.4 52.7 51.3 51.3 53.4 55.4 58.4 52.6 55.0 59.7 51.8 58.5 53.7 uclear)
कीय)
Notes : The following has been considered while working out the Plant Load Factor ( PLF )
i. The effective Capacity in MW has been considered instead of Installed Capacity
ii. Actual Generation has been considered. Deemed generation has not been considered
iii. Effective Capacity of new generating units has been considered from the respective synchronisation date

79
अनभु ाग - 7
Section-7

क्षेत्रीय भार व उत्पादन आंकड़े


Regional Load and Generation data
NRLDC ANNUAL REPORT 2017-18

6.5 पपछले दशक में पवद्युत उत्पादन(सकल) एवं संयन्त्त्र िार गुणांक
GROWTH OF ENERGY GENERATION (GROSS) AND P.L.F. IN NORTHERN REGION DURING PAST
DECADE

गैर संयंत्र िार


तापीय जलीय गैस/डीजल नाभिकीय कुल ऊजाष
क्र. सं. वर्ष पारं पररक गुणांक
Gas/ Non- Total (तापीय+नाभि
Thermal Hydro Nuclear
Deisel Conv Energy कीय+गैस)
S.No Year (MU) (MU) (MU)
(MU) (MU) (MU) PLF
1 2007-08 127925 50800 19755 836 3155 202471 75.4

2 2008-09 134325 53260 20244 1042 2996 211866 73.4

3 2009-10 139363 50419 23090 1245 4320 218436 77.0

4 2010-11 142377 56644 22244 1274 8868 231407 72.9

5 2011-12 155886 65911 22357 2664 10636 257454 66.4

6 2012-13 172843 66361 18868 3352 11141 272565 59.7

7 2013-14 183278 66520 15125 3677 11888 280487 60.6

8 2014-15 205144 67511 15085 3995 10652 302389 61.7

9 2015-16 194512 75456 12336 4287 11977 298569 53.8

10 2016-17 196282 77353 11312 5670 10837 301453 52.7

11 2017-18 214797 76480 9786 5570 12690 319322 53.7

COMPOUND ANNUAL 5.32 4.18 -6.78 20.88 14.93 4.66 -3.33


GROWTH RATE (CAGR %)

80
NRLDC 7.1 वषष 2016-2017 में उत्तरी क्षेत्रीय भ र अवधि आांकड़े ANNUAL REPORT 2017-18
LOAD DURATION DATA OF THE NORTHERN REGION FOR THE YEAR 2016-17

क्षेत्रीय म ांग समय क्षेत्रीय म ांग समय


(मेग व ट) (प्रतिशि) (मेग व ट) (प्रतिशि)
22000 100.00 40600 53.16
22200 99.99 40800 52.26
22400 99.99 41000 51.22
22600 99.98 41200 50.17
22800 99.98 41400 49.29
23000 99.98 41600 48.33
23200 99.97 41800 47.31
23400 99.95 42000 46.46
23600 99.95 42200 45.50
23800 99.95 42400 44.57
24000 99.95 42600 43.49
24200 99.94 42800 42.48
24400 99.94 43000 41.56
24600 99.94 43200 40.54
24800 99.94 43400 39.61
25000 99.94 43600 38.74
25200 99.94 43800 37.71
25400 99.94 44000 36.58
25600 99.94 44200 35.71
25800 99.92 44400 34.66
26000 99.92 44600 33.47
26200 99.91 44800 32.57
26400 99.89 45000 31.38
26600 99.86 45200 30.32
26800 99.85 45400 29.36
27000 99.84 45600 28.39
27200 99.83 45800 27.41
27400 99.79 46000 26.50
27600 99.76 46200 25.45
27800 99.74 46400 24.55
28000 99.67 46600 23.69
28200 99.63 46800 22.75
28400 99.58 47000 21.79
28600 99.39 47200 21.06
28800 99.27 47400 20.21
29000 99.19 47600 19.39
29200 98.98 47800 18.36
29400 98.84 48000 17.37
29600 98.58 48200 16.40
29800 98.31 48400 15.49
30000 97.99 48600 14.82
30200 97.67 48800 13.74
30400 97.29 49000 12.92
30600 96.94 49200 11.89
30800 96.62 49400 11.13
31000 96.28 49600 10.31
31200 95.86 49800 9.61
31400 95.49 50000 8.87
31600 95.07 50200 8.32
31800 94.69 50400 7.84
32000 94.17 50600 7.17
32200 93.58 50800 6.59
32400 93.09 51000 6.13
32600 92.63 51200 5.64
32800 92.20 51400 5.22
33000 91.66 51600 4.69
33200 91.08 51800 4.29
33400 90.47 52000 3.92
33600 89.87 52200 3.62
33800 89.25 52400 3.18
34000 88.60 52600 2.84
34200 87.75 52800 2.57
34400 87.12 53000 2.31
34600 86.35 53200 1.94
34800 85.43 53400 1.66
35000 84.58 53600 1.38
35200 83.73 53800 1.20
35400 82.67 54000 1.02
35600 81.67 54200 0.75
35800 80.45 54400 0.56
36000 79.46 54600 0.49
36200 78.40 54800 0.39
36400 77.19 55000 0.31
36600 76.07 55200 0.24
36800 75.18 55400 0.22
37000 73.90 55600 0.21
37200 72.67 55800 0.18
37400 71.20 56000 0.15
37600 69.78 56200 0.14
37800 68.61 56400 0.11
38000 67.37 56600 0.10
38200 65.92 56800 0.09
38400 64.52 57000 0.08
38600 63.31 57200 0.07
38800 62.27 57400 0.03
39000 61.32 57600 0.03
39200 60.39 57800 0.02
39400 59.27 58000 0.01
39600 58.23 58200 0.01
39800 57.36 58400 0.01
40000 56.31 58600 0
40200 55.15
40400 54.21
81
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


LOAD DURATION CURVE OF THE NORTHERN REGION DURING 2017-18

58000

56000

54000

52000

50000

48000

46000

44000

42000

40000

38000

36000

34000

32000

30000

28000

26000

24000

22000
0 10 20 30 40 50 60 70 80 90 100
% OF TIME

82
अनभु ाग - 8
Section-8

आवत्तृ ि
Frequency
NRLDC ANNUAL REPORT 2017-18

8.1 मासिक आवत्तृ ि त्तवष्लेषण 2017-2018


MONTHLY FREQUENCY ANALYSIS FOR 2017-18

अप्रैल-2017 मई-2017 जून-2017 जुलाई-2017 अगस्त-2017सितंबर-2017अक्टूबर-2017 नवम्बर-2017 दििम्बर-2017 जनवरी-2018 फ़रवरी-2018 मार्च-2018 2017-18
ITEM
Apr-17 May-17 June-17 July-17 Aug-17 Sep -17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar -18
Maximum
50.26 50.32 50.24 50.23 50.20 50.32 50.20 50.27 50.25 50.29 50.21 50.25 50.32
Instant Freq. Hz

Minimum
49.66 49.64 49.73 49.69 49.65 49.61 49.67 49.62 49.70 49.62 49.70 49.75 49.61
Instant Freq. Hz

Avg. freq. Hz 49.98 49.98 50.00 50.00 49.99 49.97 49.97 49.96 49.98 49.98 49.98 49.97 49.98
Frequency
Variation 0.044 0.048 0.037 0.038 0.045 0.048 0.059 0.051 0.046 0.046 0.041 0.048 0.046
Index(FVI)

<49.20 Hz (%) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

<49.70 Hz (%) 0.01 0.02 0.00 0.01 0.02 0.03 0.01 0.07 0.00 0.01 0.00 0.01 0.02

<49.80 Hz (%) 0.40 0.78 0.17 0.51 0.55 0.68 0.72 1.29 0.85 0.66 0.30 0.64 0.63

<49.90 Hz (%) 8.92 9.18 5.81 6.56 7.12 11.77 13.31 16.91 12.86 11.15 9.70 13.26 10.55

<50.00 Hz (%) 55.32 51.95 47.39 49.74 51.03 63.72 63.92 67.66 58.44 61.53 62.25 68.83 58.45

49.90 - 50.05 Hz
74.22 71.51 75.49 76.15 77.00 78.50 77.39 73.53 73.86 77.94 80.25 79.17 76.23
(%)

50.05-50.10 (%) 13.58 14.98 15.47 14.96 14.15 8.94 8.53 8.14 11.15 9.00 8.48 6.41 11.17

> 50.10 Hz (%) 3.45 4.19 3.67 2.64 2.15 1.06 1.09 1.64 2.52 2.12 1.71 1.27 2.30

> 50.20 Hz (%) 0.04 0.19 0.05 0.01 0.00 0.02 0.00 0.02 0.07 0.06 0.00 0.01 0.04

> 50.50 Hz (%) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

83
अनभु ाग - 9
Section-9

पन बिजऱी जऱाशय स्तर


Hydro Reservoir Levels
9.1 वर्ा 2017-2018 के जलीय आंकड़े
NRLDC
RESERVOIR DATA FOR 2017-2018 ANNUAL REPORT 2017-18

जलीय -----> भाकड़ा (Bhakra) Pong Resevoir


जलीय स्तर लाइव क्षमता निहित ऊजाा जलीय स्तर लाइव क्षमता निहित ऊजाा
(मीटर) (मम.य.ू ) (मीटर) (मम.य.ू )
मिीिे के
(एम.एच.मीटर) (एम.एच.मीटर)
End of the
अंत में
Energy
Reservoir Live Reservoir Month
Content Live Capacity (Mhmt) Energy Content (MU)
Level(Mtr) Capacity(Mhmt) Level(Mtr)
(MU)

अप्रैल-2017 470.90 0.19 282.71 396.58 0.21 151.67 April-2017


मई-2017 473.03 0.13 319.15 394.51 0.10 116.69 May-2017
जून-2017 477.48 0.11 407.62 394.82 0.03 121.45 June-2017
जुलाई-2017 495.26 0.25 914.64 409.83 0.11 494.27 July-2017
अगस्त-2017 508.91 0.86 1500.16 420.97 0.74 931.43 August-2017
सितंबर-2017 508.86 0.49 1500.16 420.60 0.31 916.71 September-2017
अक्टूबर-2017 507.07 0.49 1411.35 417.06 0.26 755.83 October-2017
नवम्बर-2017 504.47 0.43 1285.56 414.45 0.21 656.23 November-2017
दििम्बर-2017 499.02 0.37 1053.16 410.21 0.15 504.32 December-2017
जनवरी-2018 492.01 0.29 1041.47 406.06 0.12 370.28 January-2018
फ़रवरी-2018 484.44 0.20 569.03 401.09 0.12 244.95 February-2018
मार्च-2018 472.72 0.23 313.90 394.05 0.12 11.75 March-2018
2017-18 508.91 420.97 Max Level
(हििााँक) 31.08.2017 31.08.2017 Date
न्यूितम जल
470.90 394.05 Min. Level
स्तर
(हििााँक) 30.04.2017 30.6.2017 Date

Full Reservoir
पूर्ा जल स्तर 514.50 433.12
Level (FRL)

Min. Draw
न्यूितम डी.डी.
445.62 384.05 Down Level
स्तर
(MDDL)

84
NRLDC ANNUAL REPORT 2017-18

9.1 वर्ा 2017-2018 के जलीय आंकड़े


रार्ा प्रताप सागर (Rana Pratap Sagar) गांधी सागर (Gandhi Sagar)
जलीय -----> Resevoir
जलीय स्तर लाइव क्षमता निहित ऊजाा जलीय स्तर लाइव क्षमता निहित ऊजाा
मिीिे के (मीटर) (एम.एच.मीटर) (मम.य.ू ) (मीटर) (एम.एच.मीटर) (मम.य.ू ) End of the
अंत में
Energy
Reservoir Live Reservoir Month
Content Live Capacity (Mhmt) Energy Content (MU)
Level(Mtr) Capacity(Mhmt) Level(Mtr)
(MU)

अप्रैल-2017 346.76 0.04 NA 395.03 0.02 NA April-2017


मई-2017 346.55 0.04 NA 394.61 0.01 NA May-2017
जून-2017 347.05 0.04 NA 394.35 0.00 NA June-2017
जुलाई-2017 348.83 0.06 NA 395.28 0.10 NA July-2017
अगस्त-2017 349.23 0.18 NA 395.98 0.02 NA August-2017
सितंबर-2017 349.34 0.08 NA 396.67 0.14 NA September-2017
अक्टूबर-2017 347.10 0.07 NA 396.39 0.13 NA October-2017
नवम्बर-2017 348.68 0.04 NA 399.50 0.12 NA November-2017
दििम्बर-2017 346.27 0.04 NA 393.84 0.08 NA December-2017
जनवरी-2018 346.56 0.04 NA 391.86 0.04 NA January-2018
फ़रवरी-2018 346.27 0.04 NA 393.84 0.04 NA February-2018
मार्च-2018 346.62 0.03 NA 389.80 0.04 NA March-2018
2015-16 349.34 399.50 Max Level
(हििााँक) 30.09.2017 30.11.2017 Date
न्यूितम जल स्तर Min. Level
346.27 389.80
(हििााँक) 31.12.2017 31.03.2018 Date

Full Reservoir
पूर्ा जल स्तर
Level (FRL)
352.65 402.64

Min. Draw
न्यूितम डी.डी.
Down Level
स्तर
(MDDL)
342.90 381.00

85
9.1 वर्ा 2017-2018 के जलीय आंकड़े
NRLDC ANNUAL REPORT 2017-18

जलीय -----> ररिं ि Rihand Tehri Resevoir


जलीय स्तर लाइव क्षमता निहित ऊजाा जलीय स्तर निहित ऊजाा
(मम.य.ू ) (मम.य.ू )
मिीिे के
(मीटर) (एम.एच.मीटर) (मीटर)
End of the Month
अंत में
Energy
Reservoir Live Reservoir
Content Energy Content (MU)
Level(Mtr) Capacity(Mhmt) Level(Mtr)
(MU)

अप्रैल-2017 260.06 0.09 307.90 752.55 66.98 April-2017


मई-2017 263.47 0.05 510.00 744.00 19.04 May-2017
जून-2017 257.01 0.03 158.10 748.45 41.63 June-2017
जुलाई-2017 261.98 0.09 417.20 797.15 562.80 July-2017
अगस्त-2017 263.99 0.28 544.00 817.35 949.25 August-2017
सितंबर-2017 263.99 0.19 544.00 824.90 1105.83 September-2017
अक्टूबर-2017 262.62 0.18 455.60 823.10 1067.75 October-2017
नवम्बर-2017 262.25 0.17 433.70 818.40 970.26 November-2017
दििम्बर-2017 261.09 0.15 365.90 809.25 782.78 December-2017
जनवरी-2018 259.54 0.12 279.70 795.45 536.11 January-2018
फ़रवरी-2018 258.14 0.10 208.00 782.70 354.10 February-2018
मार्च-2018 256.89 0.07 152.90 765.85 170.65 March-2018
2015-16 263.99 824.90 Max Level
(हििााँक) 31.08.2017 30.09.2017 Date
न्यूितम जल स्तर Min. Level
256.89 744.00
(हििााँक) 31.03.2018 31.05.2017 Date

पर्
ू ा जल स्तर Full Reservoir Level (FRL)

268.22 829.79

न्यूितम डी.डी. Min. Draw Down Level


स्तर (MDDL)

252.98 740.04

86
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


Reservoir Levels Recorded during 2015-16 , 2016-17 and 2017-18
Full Resevoir Level Minimum Draw Down Level 2015-16 2016-17 2017-18
1700

1650

1600
Level (in ft) --->

1550
BHAKRA

1500

1450
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Months --->
Full Resevoir Level Minimumm Draw Down Level 2015-16 2016-17 2017-18
1430

1410

1390
Level (in ft) --->

1370

1350

1330
PONG
1310

1290

1270

1250
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Months ------>

Minimumm Draw Down Level Full Resevoir Level 2015-16 2016-17 2017-18
1350

1300

1250
Exhibit E12
Level (in ft) --->

1200

1150
Gandhi Sagar

1100

1050

1000
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Months --->

87
NRLDC ANNUAL REPORT 2017-18

Reservoir Levels Recorded during 2015-16 , 2016-17 and 2017-18


Full Resevoir Level Minimumm Draw Down Level 2015-15 2016-17 2017-18

890.00

880.00

870.00
Level (in ft) --->

860.00

850.00

RIHAND
840.00

830.00

820.00

APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Months --->

Full Resevoir Level Minimumm Draw Down Level 2015-16 2016-17 2017-18

1160

1155

1150

1145
Level (in ft) --->

1140
RPS

1135

1130

1125

1120

APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Months --->

88
अनभु ाग - 10
Section-10

वाणिज्यिक आंकड़े
Commercial data
NRLDC ANNUAL REPORT 2017-18

10.1 वर्ा 2017-2018 में ओपेन एक्सैस आंकड़े


SUMMARY OF OPEN ACCESS DATA FOR YEAR 2017-18
A. अनुमोदित लेन िे न
Approved Transactions nos.
मास अंतरक्षेत्रीय अंतक्षेत्रीय
Month Intra-regional Inter-regional Total Month
DA SD FS AD Total DA SD FS AD Total
अप्रैल-2017 92 128 16 1 237 153 68 7 0 228 465 April-2017
मई-2017 122 152 20 7 301 221 158 17 0 396 697 May-2017
जनू -2017 99 117 20 17 253 335 329 5 21 690 943 June-2017
जल
ु ाई-2017 124 117 20 16 277 560 403 12 32 1007 1284 July-2017
अगस्त-2017 133 98 23 14 268 633 202 6 23 864 1132 August-2017
सितंबर-2017 114 75 21 15 225 712 133 6 16 867 1092 September-2017
अक्टूबर-2017 133 67 14 0 214 49 49 1 2 101 315 October-2017
नवम्बर-2017 127 66 18 3 214 40 43 12 4 99 313 November-2017
दििम्बर-2017 91 62 18 11 182 34 52 22 1 109 291 December-2017
जनवरी-2018 87 55 16 10 168 43 5 22 10 80 248 January-2018
फ़रवरी-2018 93 15 19 11 138 64 11 30 4 109 247 February-2018
मार्च-2018 118 35 16 7 176 175 16 15 14 220 396 March-2018

TOTAL 1333 987 221 112 2653 3019 1469 155 127 4770 7423 Total

B. अनुमोदिन ऊर्ाा (एम.य)ू


Approved Energy (MUs)
मास अंतरक्षेत्रीय अंतक्षेत्रीय
Month Intra-regional Inter-regional Total Month
DA SD FS AD Total DA SD FS AD Total
अप्रैल-2017 55.82 75.03 148.09 18 296.94 67.36 42.55 130.53 0 240.44 537.38 April-2017

मई-2017 101.48 113.07 472.97 367.71 1055.23 92.63 79.62 200.37 0 372.62 1427.85 May-2017

जून-2017 46.14 70.07 695.69 1054.97 1866.87 114.46 125.51 29.67 524.5 794.14 2661.01 June-2017

जुलाई-2017 73.63 77.17 786.23 1260.43 2197.46 304.58 90.58 5.03 681.99 1082.18 3279.64 July-2017

अगस्त-2017 79.9 64.97 865.23 903.64 1913.74 455.81 47.08 8.15 618.7 1129.74 3043.48 August-2017

सितंबर-2017 52.34 46.68 537.99 616.7 1253.71 524.63 33.54 48.67 383.41 990.25 2243.96 September-2017

अक्टूबर-2017 49.67 58.22 164.31 0 272.2 30.56 19.05 5.72 5.43 60.76 332.96 October-2017

नवम्बर-2017 42.6 40.01 681.67 71.31 835.59 8.98 60.73 12.77 24.44 106.92 942.51 November-2017

दििम्बर-2017 15.62 21.73 537.88 693.32 1268.55 11.95 72.98 21.64 18 124.57 1393.12 December-2017

जनवरी-2018 35.84 19.18 570.1 807.31 1432.43 11.79 0.62 26.14 20.92 59.47 1491.9 January-2018

फ़रवरी-2018 29.75 3.63 591.86 476.3 1101.54 16.42 12.75 33.81 17.66 80.64 1182.18 February-2018

मार्च-2018 87.35 26.2 256.64 527.97 898.16 60.52 12.47 13.17 14.47 100.63 998.79 March-2018

कुल योग 670.14 615.96 6308.66 6797.66 14392.42 1699.69 597.48 535.67 2309.52 5142.36 19534.78 TOTAL
Legend
DA Day-Ahead Applications
SD Contigency
FS First-Come-First Serve Applications
AD Advanced Reservation

89
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


OPEN ACCESS TRANSACTIONS 2017-18
3500

Number of Approved Transactions (Inter-regional+Intra-regional)


3000
Approved Energy (Inter-regional+Intra-regional (MU))
NUMBER/ENERGY

2500

2000

1500

1000

500

0
अगस्त-2017

दििम्बर-2017
अप्रैल-2017

अक्टूबर-2017
मई-2017

जनवरी-2018

फ़रवरी-2018
ु ाई-2017

सितंबर-2017

नवम्बर-2017

मार्च-2018
ू -2017
जन

जल

MONTH

90
NRLDC ANNUAL REPORT 2016-17

10.2 वर्ष 2017-18 में उत्तर क्षेत्रीय ववचलन पल


ू खाता के संचययत आंकड़े
Northern Region Deviation Pool Account Cumulative status for year 2017-18
( All Figures are in Rupees )

Total
Total Total Deviation Total
Balance
Deviation Deviation charges Deviation
Deviation
charges charges Paid Recivable charges
NET Charges
payable to the to the pool by from the pool Disbursed
Deviation Payable by the
Sl. No. Constituents pool by the the to the from the pool
Balance for constituents
constituents constituents constituents to the
privious Year (+)/Receivable
for Current by them by them for constituents
by the
Year as per during Current Year During
constituents(-)
NRPC Bill Current Year as per NRPC Current Year
Bill

1 ADHPL -1159446 19594799 18435353 54798807 54798807 0


2 APCPL -4826885 405642114 406378886 2210578 2210578 -5563657
3 BBMB 302089 0 0 247414882 247112793 0
4 CHANDIGARH 68343910 177402869 228002246 69885232 66381788 14241089
5 DELHI -12730517 192646310 179681527 196816460 196582194 0
6 DSM Payable/ Receivable Diff.-552301826 38457348 0 5303631161 3923564555 -1893911084
7 EPPL 11259130 7019819 16209982 605688 0 1463279
8 ER-NR 0 723064913 617426003 4761142538 4655503628 0
9 HIMACHAL PRADESH 663188 1103440748 1137739902 268660 0 -33904626
10 HPPCL 0 1160973 1161265 106964933 106965225 0
11 HARYANA -13788594 1863646394 1863646394 30018269 43806863 0
12 HIMACHAL SORANG 120094 0 0 0 0 120094
13 JAMMU AND KASHMIR 399506774 665694545 595245674 150492243 0 319463402
14 HBPCL (KWHPS) -1063296 93840667 93417656 163998727 164639012 0
15 GREENKO BUDHIL 8728656 46302272 38662765 9564779 0 6803384
16 NER-NR 179955171 1228217940 1714568278 8192368451 8388350945 -110412673
17 NFL -5921887 5643592 0 30994647 0 -31272942
18 NHPC 26441949 0 0 1505676640 1479234691 0
19 NEPAL 0 1422780 1994438 67716148 67716148 -571658
20 NTPC -13231098 367134114 353903016 264569861 264569861 0
21 NTPC SOLAR -531640 18534005 18002365 4620720 4620720 0
22 POOL BALANCE (CAP) -1007488001 0 357953291 0 1365441292 0
23 POOL BALANCE (Add DEVI)-2222837446 0 769837173 2927007070 5439863332 -479818357
24 POWERGRID-NR 1203236 2429842 0 41684418 38193608 142268
25 PUNJAB -5202552 860952013 860952013 128226061 106818061 -26610552
26 RAJASTHAN -62352215 2513146207 2511692054 26776814 26776844 -60898032
27 RAILWAYS -12805471 92647021 88121420 27631850 27631850 -8279870
28 SCL -1914778 91087323 89172545 4943727 4943727 0
29 SJVN 0 0 0 593861032 593861032 0
30 THDC 0 142370 142370 171178588 171178588 0
31 UTTARAKHAND -16573891 383214981 365443240 173287223 172089373 0
32 UTTAR PRADESH 2076454915 3514705652 5759476733 32956047 0 -201272213
33 WR-NR -50059483 11391815632 11307537520 517694989 481983990 -1492370
Total -1211809914 25809007243 29394804109 25809007243 28094839505 -2511774518

91
NRLDC ANNUAL REPORT 2017-18

10.3 वर्ष 2017-18 के लिए रियक्टिव चार्ष पूि खाता


REACTIVE CHARGES POOL ACCOUNT FOR YEAR 2017-18
( All Figures in Rupees )
Total Reactive
Energy
Total RE
NET RE Total RE Total RE Total RE Charges
Charges
Charges Charges Charges Charges Balance with
Receivable by
Sl.No Constituent Balance Payable by Paid by them Disbursed to equating
them
for them for During them During payable and
During
Previous Year Current Year Current Year Current Year receivable in
Current Year
concurrence
with NRPC

1 UT Chandigarh (2759351) 0 0 10136541 7336898 (5558994)

2 DTL, Delhi 59560837 67686560 20445848 4742793 0 102058756

3 HVPNL, Haryana (155190086) 0 0 139566038 116115934 (178640190)

4 HPSEB, Himachal (7079023) 1297151 1297161 22198950 14615506 (14662477)

5 PDD,J&K 356138527 538509650 406099935 0 0 488548242

6 PSEB, Punjab 56078943 29891726 20748378 25777622 0 39444669

7 RRVPN, Rajsthan (31200605) 0 0 84913123 60650609 (55463119)

8 UPPCL, UP (139356340) 0 0 356943352 256896925 (239402767)

U
9 PCL, UTTARAKHAND (1776530) 8970307 8970307 2076975 2316307 (1537198)
Note: Bracket indicates Receivable from the pool.

92
NRLDC ANNUAL REPORT 2017-18

उत्तरी क्षेत्र / Northern Region


Pooled inter state transmission losses for Northern Region
10
2015-16 2016-17 2017-18

8
Percentage Losses

Week no.
93
अनभु ाग - 11
Section-11

उत्तरी क्षेत्र में ननम्न आवत्तृ त्त ररले प्रावधान


Under frequency and df/dt relays provision
in Northern region
NRLDC ANNUAL REPORT 2017-18

11 उत्तिी क्षेत्र में ननम्न आव्रत्तत्त रिले की सेद ग



SETTING OF FLAT UNDERFREQUENCY AND df/dt RELAYS
IN NORTHERN REGION AS APPROVED BY NRPC

सपा ननम्न आव्रत्तत्त रिले Flat under frequency df/dt Relaying Scheme

एजेन्सी 49.2 हर्ट्ज 49.0 हर्ट्ज 48.8 हर्ट्ज 48.6 हर्ट्ज Setting (Hz/s) and load relief (MW) through df/dt relays to be initialised at कुल एजेन्सी
at 49.2 Hz at 49.0 Hz at 48.8 Hz at 48.6 Hz TOTAL
49.9Hz (1st stage) 49.9Hz (2nd Stage) 49.9Hz (3rd stage) Constituents
Consti-
Load Relief Load Relief Load Relief Load Relief Load Relief
tuents 0.1 Load 0.2 Load 0.3 Load
(MW) (MW) (MW) (MW) (MW)
Hz/s Relief(MW) Hz/s Relief(MW) Hz/s Relief(MW)
चंडीगढ़ 16 16 16 16 0.1 0 0.2 50 0.3 50 100 Chandigarh

दिल्ली 258 259 262 263 0.1 250 0.2 280 0.3 280 810 Delhi

हरियाणा 308 309 312 314 0.1 280 0.2 310 0.3 310 900 Haryana

दहमाचल प्रिे श 77 77 78 78 0.1 50 0.2 70 0.3 70 190 H.P.

जम्मू कश्मीि 83 84 84 85 0.1 90 0.2 90 0.3 90 270 J&K

पंजाब 400 402 406 408 0.1 430 0.2 490 0.3 490 1410 Punjab

िाजस्थान 390 392 395 397 0.1 330 0.2 370 0.3 370 1070 Rajasthan

उत्तिप्रिे श 551 554 559 561 0.1 500 0.2 280 0.3 280 1060 U.P.

उत्तिाखंड 77 77 78 78 0.1 70 0.2 70 0.3 70 210 Uttarakhand

कुल 2160 2170 2190 2200 2000 2010 2010 6020 Total
Source: NRPC Annual Report

94
अनभ
ु ाग - 12
Section - 12

Grid Incidents
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
Multiple lines in Rajasthan tripped on over voltage. 400kV Jodhpur-
1 01-Apr-17 05:01 01-Apr-17 5:30 0:29 Nil 300 GD1
Merta-1 tripped on phase to earth fault.
R-Phase CT of 220 KV Samaypur –Palwal ckt -1 damaged at Palwal
2 02-Apr-17 01:43 02-Apr-17 4:00 2:17 End. Nil Nil GI1
Both 220kV Samaypur-Palwal D/C tripped.

3 03-Apr-17 16:15 03-Apr-17 18:40 2:25 315MVA 400/220kV ICT 2 & 3 at Daulatabad(HVPNL) tripped. Nil Nil GI2

Flashover occurred in R-phase isolator compartment of 400kV Jhakri-


4 06-Apr-17 02:07 06-Apr-17 13:10 11:03 Rampur-2 at Rampur resulting in bus bar protection operation of 70 Nil GD1
400kV Bus-2 at Rampur(SJVN).

Bus fault occurred at Bus-B of 400kV Panki(UP) station resulted in


5 06-Apr-17 16:30 06-Apr-17 17:53 1:23 Nil Nil GI2
tripping of all the elements connected to that bus.

6 10-Apr-17 10:40 10-Apr-17 14:23 3:43 400kV Alaknanda-Srinagar 1 & 2 tripped at 05:36hrs and 10:40hrs. Nil Nil GI2

Fault occurred in 400kV Azamgarh-Gorakhpur line. The aforesaid


7 11-Apr-17 23:57 12-Apr-17 12:53 12:56 element tripped along with 400kV Azamgarh-Sultanpur and Nil Nil GI2
400/220kV 315MVA ICT 2 at Gorakhpur(UP).

8 11-Apr-17 13:17 11-Apr-17 19:32 6:15 At 400kV Kirori station, 400/220kV 315MVA ICT 1 & 2 tripped. Nil Nil GI2

At 03:00hrs 400kV Agra-Sikar ckt-1 opened on voltage regulation, As


reported, R-pole of CB at Agra end got stuck and didn’t open. At
9 12-Apr-17 5:51 12-Apr-17 7:02 1:11 05:51hrs, operator observed sparking at isolator while opening the Nil 700 GD1
isolator of same pole, bus-fault occurred. All the lines tripped from
remote end.

Phase to earth fault occurred. 400kV Nakodar Kurukshetra and 400kV


10 13-Apr-17 04:06 13-Apr-17 4:13 0:07 NIL Nil GI2
Jalandhar-Moga-1 tripped.

R-N fault occurred in 220kV Wagoora-Zainakote D/C resulting in


11 14-Apr-17 18:02 14-Apr-17 18:49 0:47 NIL 320 GD1
tripping of both the lines affecting supply to valley.
12 15-Apr-17 10:41 15-Apr-17 13:55 3:14 Multiple lines emanating from 400kV Panki(UP) tripped. NIL Nil GI2
13 15-Apr-17 12:23 15-Apr-17 13:03 0:40 400kV Agra(UP)-Unnao(UP) and 400kV Agra(PG)-Agra(UP)-1 tripped. NIL Nil GI2

CT Blasted at Panipat(BBMB) yard lead to tripping of 220kV Panipat-


14 15-Apr-17 17:23 15-Apr-17 18:10 0:47 Nil 150 GD1
Narela ckt 1 &2 and 220kV Narela(DTL)-Rohtakroad(BBMB) ckt 1&2.
While changing of AC auxiliary supply, both 765/400kV 1000MVA ICT-
15 17-Apr-17 13:00 17-Apr-17 14:26 1:26 NIL Nil GI2
1 & 2 at Unnao tripped.
While charging 220kV Loni-2 line, both ICTs at Muradnagar-New
16 18-Apr-17 09:27 18-Apr-17 10:55 1:28 Nil 113 GD-1
tripped on overload and earth fault.
17 18-Apr-17 14:26 18-Apr-17 15:18 0:52 Y-N fault occurred. Multiple lines emanating from Agra(UP) tripped. NIL Nil GI2
At 400kV G.Noida(UP) station, Bus bar protection operated for 220kV
Bus-A resulting in tripping of elements connected to this bus. During
18 18-Apr-17 15:11 18-Apr-17 15:51 0:40 NIL 488 GD1
checking, inherent problem with PSL of CSC-211 protection relay
mounted of ICT and 220kV lines was found.
At 400kV G.Noida(UP) station, Bus bar protection operated for 220kV
Bus-A resulting in tripping of elements connected to this bus. During
19 19-Apr-17 14:32 19-Apr-17 15:30 0:58 NIL 492 GD1
checking, inherent problem with PSL of CSC-211 protection relay
mounted of ICT and 220kV lines was found.
B-phase CT of 220kV bus-2 at Pong HEP blasted resulting in tripping of
20 19-Apr-17 03:12 19-Apr-17 4:28 1:16 NIL Nil GI1
multiple elements.
21 20-Apr-17 12:25 20-Apr-17 13:29 1:04 Multiple elements at 400kV Agra(UP) tripped. Nil 300 GD1
Multiple elements at 400kV Panki(UP) tripped during charging of
22 20-Apr-17 21:25 20-Apr-17 23:35 2:10 NIL Nil GI2
400kV Aligarh-Panki.
B-phase CVT blasted at Unit #5 of 400kV Dehar HEP station lead to
23 21-Apr-17 00:28 21-Apr-17 1:58 1:30 400 Nil GD1
complete station outage.
24 21-Apr-17 12:46 Complete outage of 220kV Safidon(HVPNL) occurred. NIL Nil GI2
400kV Koldam-Ludhiana ckt-1 tripped on Blue-phase to earth fault
25 22-Apr-17 12:06 22-Apr-17 12:57 0:51 NIL Nil GI2
and ckt-2 tripped on Y-phase to earth fault respectively.
95
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
220kV Bus-B was out. B-N fault occurred at 220kV Lucknow(UP)-
26 25-Apr-17 02:05 25-Apr-17 2:40 0:35 Raebareilly(PG). Due to non-opening of CB at Lucknow(UP), LBB Nil 530 GD1
protection operated and all elements at Bus-A tripped.
R-phase Coupling capacitor of 220kV Pong ckt-2 damaged at Dasuya.
27 28-Apr-17 13:07 All lines tripped at 220kV Dasuya(PSTCL) resulting in complete outage NIL Nil GI2
of the station.
B-N fault in 400kV Aligarh-Muradnagar resulting in tripping of line.
28 28-Apr-17 16:57 28-Apr-17 18:08 1:11 400kV Aligarh-Panki and 400kV Aligarh-Mainpuri tripped on Nil 148 GD1
overvoltage.
400kV Muzaffarnagar-Roorkee and 400kV Meerut-Muzaffarnagar line
29 29-Apr-17 10:43 29-Apr-17 11:08 0:25 NIL Nil GI2
tripped during Y-N fault in Muzaffarnagar-Roorkee line.
765kV Fatehabad-Lalitpur ckt-1 & 2, 765/400kV 1500MVA ICT-1 at
30 29-Apr-17 15:55 29-Apr-17 16:38 0:43 Fatehabad, 240MVAr Fatehabad Bus Reactor and 400kV Fatehabad- 640 90 GD1
Mathura line tripped.
R-phase to earth fault in 400kV Dhuri-Rajpura(PSTCL) ckt-2 resulting in
31 30-Apr-17 01:33 30-Apr-17 3:45 2:12 NIL Nil GI2
tripping of line. 500MVA ICT-4 at Rajpura (PSTCL) also tripped.
Y-B phase to earth fault occurred in 400kV Abdullapur-Kurukshetra
32 30-Apr-17 01:55 30-Apr-17 3:05 1:10 ckt-2 at 17.16 Km from Abdullapur resulting in tripping of line. 400kV NIL Nil GI2
Abdullapur-Panchkulla ckt-2 also tripped.
400kV Dadri Panipat ckt-1, 500kV HVDC Rihand-Dadri Pole-1
33 30-Apr-17 09:10 30-Apr-17 9:42 NIL Nil GI2
tripped.SPS for Rihand-Dadri operated.
As per PMU (Phsor Measurement Unit) data, Y-phase to earth fault
observed in the system, fault clearing time was 120ms. During fault,
400kV Roja-Sahajanpur double circuit line tripped and 200MVA ICT-
34 01-May-17 3:02 01-May-17 4:33 1:31 400 NIL GD1
1&2 at Roja TPS also tripped on overload/ over current protection.
Unit-3&4 of Roja TPS connected on 400kV side also tripped due to
evacuation constraint after tripping of 400/220kV ICTs.
LBB (Local Breaker Backup) protection operated for 210MW Unit #5 at
35 02-May-17 23:51 03-May-17 1:08 1:17 Kota TPS . It leads to tripping of all running units and 220kV lines 996 NIL GD1
which were connected to 220kV Bus-3.

R-phase conductor of 220kV Fatehpur-Sirathu line snapped. It may


be resulted into tripping of all 220kV lines on earth fault porotection.
36 04-May-17 10:08 04-May-17 10:52 0:44 NIL 74 GD1
From PMU, the time taken to clear the fault is more than expected,
probable the fault cleared from remote end on earth fault.

400/220kV 315MVA ICT-1 of ORAI station tripped by DEF (directional


earth fault). Lines were ended up with lightly loaded, resulted into
37 06-May-17 17:32 06-May-17 19:03 1:31 tripping of 400kV ParichaTPS-Orai-1 and 400kV Paricha-Mainpuri ckt-2 500 NIL GD1
on over voltage and Unit#5 & #6 of Paricha tripped due to Boiler
tube leakage.
Bus side Y phase conductor of 220kV Bareilly-CB ganj line snapped at
38 08-May-17 14:36 08-May-17 15:30 0:54 Bareilly station, leads to tripping of all 220kV Lines by EF (earth fault). NIL 300 GD1
From PMU fault clearing time observed as approx 500msec.

Y-phase to earth fault occurred on 400kV Kishenpur- Dulhasti Line.


Line tripped in Z-2 from Dulhasti end and Z-1 from Kishenpur end and
39 11-May-17 14:47 11-May-17 15:14 0:27 further successfully auto reclosed from Kishenpur end. As 3-phase 390 NIL GD1
tripping from Kishenpur end, all the running units also tripped due to
loss of only evacuation path for generating units of Dulhasti HEP.
As reported, 132kV R-phase CT (Current Transfromer) of 220/132KV
ICT-1 bursted at Modak end. 220kV side circuit breaker of 220/132kV
40 13-May-17 20:11 13-May-17 20:30 0:19 NIL 86 GD1
100MVA ICT didn’t trip. It resulted into tripping of 220kV lines from
remote end of 220kV Modak.
220 kV Bareilly-CBGanj tripped on Y-N fault, all 220kV lines tripped
41 13-May-17 9:09 13-May-17 10:21 1:12 from remote end. Because of the trippings of 220kV lines; 220kV 56 270 GD1
Tanakpur, 220kV Sitarganj and 220kV Bareily went blackout.
400/220kV Banda station is newly commisioned.In antecedent
condition, at 400/220kV Banda station, one bus bar was in service. Y-
42 14-May-17 23:57 15-May-17 3:53 3:56 NIL 113 GD1
phase to earth fault occurred in 220kV Banda-Banda (UP) line leads to
tripping of multiple elements. .

96
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
Phase to phase fault occurred on 200kV Bassi-IG nagar and 220kV
Heerapura-IG nagar.
43 14-May-17 0:18 15/27/2017 12:57 12:39 NIL 160 GD1
From PMU, two different dips with an interval of 500msec and fault
cleared within 100msec
400/220kV ICT-2 tripped on differential protection at 14.37 Hrs &
44 16-May-17 14:37 16-May-17 16:16 1:39 400/220 kV ICT-1 tripped on overcurrent at 14.38 Hrs. From PMU, NIL 500 GD1
Fault clearing time is around 1second.
Y-N fault in 400kV Rihand-Singrauli ckt-1. At the same tim e 400kV
Rihand-Sngrauli ckt-2 tripped due to mal-operation of distance
protection. 400kV Rihand-Allahabad ckt-2 tripped from Allahabad(PG)
end due to mal-operation of stub protection and senstivie current
45 18-May-17 8:11 18-May-17 10:27 2:16 setting. Finally 400kV Rihand-Allahabad ckt-1 tripped from Rihand end 2730 NIL GD1
in Z-1 during POWER SWING. . With the loss of major power carrying
path yielded tripping of all Rihand generating units on Over
speed/turbine inter trip. HVDC Rihand-Dadri Bipole also tripped on
loss of AC sorce supply at Rihand end.
765kV Anta-Phagi ckt-2 tripped at 18:50hrs on Blue phase to earth
fault. While charging 765kV Anta-Phagi ckt-2 at 20:06hrs, the other
46 20-May-17 20:06 20-May-17 20:50 0:44 parallel circuit 765kV Anta-Phagi ckt-1 also tripped, resulting in 2500 250 GD1
evacuation constraint. As a result, the running generation at Kawai,
Kalisindh, and Chabra tripped.
A demand crash of around 10GW was observed in the northern region
on account of rain with thunderstorm. At 16:47hrs, All lines
47 21-May-17 16:43 21-May-17 17:59 1:16 emanating from 400 kV Bawana substation tripped on R N fault. 302 256 GD1
From PMU, fault clearing time of the lines tripped by R phase to earth
fault around 300msec!
Tripping occurred on 220kV/132kV wind feeders, leads to loss of Wind
generation.Ramgarh TPS units(150MW) were also connected to same
48 22-May-17 9:12 23-May-17 11:10 1:58 660 NIL GD1
path leads to loss of cummulative 600MW.
From PMU, fault clearing time was around 600msec
LA and CT of 400/220kV 240MVA ICT -2 blasted at Panki. It resulted
49 27-May-17 3:12 27-May-17 5:02 1:50 into tripping of multiple lines by earth fault. NIL 500 GD1
From PMU, two severe dip observed in R phase around(200kV).
765kV Fatehabad 765(UP)-Lalitpur TPS 2 tripped by phase to earth
fault.Due to loss of major evacuation path, Lalitpur TPS and Paricha
50 29-May-17 6:40 29-May-17 10:30 3:50 TPS Units were also tripped. 1362 300 GD1
From PMU, multiple dips observed, and fault clearing time approx
500msec
Three phase fault occurred near 220kV salal station leads to tripping
of all lines. Resulted, fall in terminal voltage of Salal generating ststion
51 28-May-17 19:58 28-May-17 23:00 3:02 660 NIL GD1
below 70% and tripped all its Generating units by dead machine
protection
400kV side main bay Blue phase CT of 400/220kV 500MVA ICT-1 at
Dhuri station damaged. It resulted into bus fault for 400kV Dhuri but
52 29-May-17 12:27 29-May-17 14:05 1:38 400kV Dhuri-Rajpura ckt-1 & 2 also tripped at the same time. From NIL 300 GD1
PMU, Blue phase max dip observed and fault clearing time around
200msec
Mal operation of ICT protection occurred while working on ICT cooling
53 31-May-17 12:54 31-May-17 13:48 0:54 fans leads to tripping of all three 400/220kV ICTs at Muzaffarnagar NIL 450 GD1
(UP)
400 kV Bus Bar protection was operated for Bus-1 of Chamba station.
Resulting in tripping of 315MVA ICT-I, 400 kV Chamba-Chamera ckt-2
54 01-Jun-17 18:24 01-Jun-17 19:36 1:12 0 0 GI2
and 400 kV Chamba-Jalandhar ckt-1. Whereas from PMU, no
significant fault observed.
400kV Banda-Rewa Road ckt 1&2 along with ICT-1 of Banda tripped
55 03-Jun-17 12:19 03-Jun-17 15:29 3:10 on R-phase to ground fault at 12:19hrs. 0 0 GI2
As per PMU, Maximum dip observed in R-phase.
At 01:06hrs, Yellow-phase jumper of 400 kV Patiala-Patran ckt -2
snapped from the jack bus and created bus fault with Blue-phase of
56 07-Jun-17 1:06 07-Jun-17 1:26 0:20 Bus-1. 0 0 GI2
From PMU, sharp dip observed in Yellow and Blue phase.
Station has closed the lines without taking code from NRLDC
Due to storm in Haryana, Multiple lines tripped on phase to earth
fault in Haryana control area nearby Sonipat.
57 13-Jun-17 22:06 13-Jun-17 22:19 0:13 0 0 GI2
From PMU and SoE, multiple faults observed in between 22:06 to
22:18 hrs.

97
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time

Multiple lines tripped on Y phase to earth fault in UP nearby Banda,


58 16-Jun-17 16:56 16-Jun-17 18:32 1:36 Rewa Road and Panki. 0 0 GI2
From PMU, multiple faults observed inbetween 16:56hrs to 16:57hrs.
Ratangarh 315 MVA ICT-2 tripped on over pressure (Pressure Relief
59 17-Jun-17 16:17 18-Jun-17 12:53 20:10 Device) along with 400kV Ratangarh-Suratgarh ckt-1. 0 0 GI2
From PMU no fault signature observed
500MVA ICT 3 of Rajpura tripped on Differential and Buchholz. Along
with that, 400kV Rajpura-Dhurickt-2 was also tripped.
60 18-Jun-17 7:02 18-Jun-17 21:40 14:38 0 0 GI2
From PMU, Max dip in Blue phase and the fault clearing time was
approx 80msec.
400kV Jhatikara-Bamnauli-2 tripped on phase to phase fault (Yellow-
Blue) at a distance of 10km from Jhatikara end. Since 400kV Bus split
at Bamnauli, 500MVA ICT-2 & 3 were radial. Hence along with line,
61 18-Jun-17 17:49 18-Jun-17 22:25 4:36 0 400 GD1
500MVA ICT-2 &3 also tripped.
From PMU, Max dip observed in Yellow and Blue phase, whereas fault
clearing time was approx 500msec.
Due to thunderstorm, at 02:22hrs multiple lines eminating from
400kV Merta tripped on over voltage. Further, at 04:42hrs Ratangarh's
62 21-Jun-17 2:22 18-Jun-17 21:40 19:18 ICT 1, 2, &3 were also tripped. 0 0 GI2
From PMU, over voltage tripping observed within 3 sec, whereas no
fault signature observed at 04:42hrs.
At 14:14:11hrs 765kV Fatehabad-Lalitpur ckt-2 tripped on zone 1
protection, 765kV Fatehabad-Lalitpur ckt-1 also tripped on Zone-1
63 21-Jun-17 14:14 21-Jun-17 18:11 3:57 protection after 10sec. Due to loss of major evacuation path, SPS 800 0 GD1
operated. Resulted into loss of 800MW geneation on tripping of
Lalitpur TPS units 2 & 3.
Bus bar protection operated at 400/220kV Dadri NTPC station leads to
tripping of 400kV Dadri-Panipat1 line.
64 22-Jun-17 20:37 23-Jun-17 17:56 21:00 0 0 GI2
From PMU, No fault signature observed. The same type of tripping
had happened at 400kV Dadri NTPC on 01-06-2017 at 04:28hrs also.
Agra(UP)-Fatehabad 765 (UP) ckt-2 was under planned shutdown, at
20:04hrs 400kV Agra(PG)-Fatehabad and 400kV Fatehabad-Mathura
lines tripped, resulted in overloading of 400kV Agra(UP)-Fatehabad
65 24-Jun-17 20:04 24-Jun-17 20:26 0:22 ckt-1 (1400MW). 0 100 GD1
From PMU, two severe dips observed in Blue-phase. Along with that,
damped osillations were also observed in Agra PMU after tripping of
both the lines.
220kV Chittorgarh-RAPS (NPCIL) ckt 1 & 2 tripped on earth fault.
66 26-Jun-17 17:10 26-Jun-17 17:44 0:34 From PMU, max dip observed in Yellow-phase and auto reclosure was 0 0 GI1
unsucessful.
Multiple 220kV lines tripped in Haryana control area nearby Kirori,
Jind, Safidon, Kaithal, Cheeka, Mund etc along with 400/220kV ICTs at
Kirori (HVPNL) and Kaithal (PG) station.
67 27-Jun-17 0:15 27-Jun-17 0:50 0:35 250 1750 GD1
From PMU, no significant fault signature observed. But, sudden
votage rise observed.
400kV Mukatsar-Talwandi Sabo ckt-2 and Makhu-Mukatsar ckt-2
tripped on earth fault.
68 27-Jun-17 15:50 27-Jun-17 17:07 1:17 0 0 GI2
From PMU, dip observed in all three phases
As reported, 220kV Sitarganj - CB Ganj Line Jumper burnt leads to
tripping of 132kV Sitarganj - PITCUL ckt-2,
69 30-Jun-17 8:55 30-Jun-17 10:55 2:00 0 34 GD1
220kV Sitarganj - Tankpur, 220kV Sitarganj - CB Ganj and ICT-I of
Sitarganj.
220kV CB Ganj and 220/132kV Tanakpur station went black out and all
40MW units of Tanakpur HEP (Unt 1,2& 3) tripped on under voltage
70 01-Jul-17 12:50 01-Jul-17 14:10 1:20 protection. 90 60 GD1

From PMU, sudden Voltage dip observed in all three phases.


Red phase to Earth fault occurred leads to tripping of 220kV Noida sec
20 (UP)-Badarpur and 220kV 220kV Noida sec 20 (UP)-Gazipur(DTL).
71 01-Jul-17 13:09 01-Jul-17 16:32 3:23 0 0 GI1
From PMU, MaxVoltage dip observed in Red-phase.

98
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time

Complete 765/400kV Balia & 400/132kV Mau stations went blackout.


During opening 400kV Patna-Balia ckt-4 for availing planned
shutdown, blue phase breaker at 400kV Balia end stucked, further line
side isolator of charged also opened. It resulted into distance
protection operation for the line. As both the trip coil of 400kV Patna-
Balia ckt-4 became faulty, operation of distance protection resulted
into LBB intiation. As LBB was inbuilt in bus bar protection and both
72 09-Jul-17 8:41 09-Jul-17 9:49 1:08 0 500 GD1
the bus bar protection was under blocked condition, all the 400kV
lines either tripped in Z-2, Z-1 from remote end or in reverse zone,
over voltage protection from Balia end. 765kV lines tripped on back
up earth fault protection either from Balia end or from remote end.

From PMU, max Voltage dip observed in Blue-phase and staged fault
clearnace.
A severe earth fault occured on 400kV Uri2-Uri1 line. Along with line ,
tripped unit#3 of Uri1.Further ,400kV Wagoora-Uri2 sensed the same
earth fault on 400kV Uri2-Uri1 line and tripped on Over current
protection. On loss of evacuation path ,all running units of URi2
73 09-Jul-17 17:16 09-Jul-17 18:50 1:34 360 0 GD1
tripped on Over frequency protection.

From PMU, Red and Yellow phase Voltage dips observed at different
timings.
Y phase CT of 400kV G.Noida- 400kVG.Noida(765kV)-2 damaged. Bus
74 11-Jul-17 12:22 11-Jul-17 13:30 1:08 0 0 GI2
bar protection operated at 400kV G.Noida station.
DC earth fault occurred at tower no. 936,which is 340.64 km from
Mundra HVDC terminal, HVDC Mundra-Mahendergarh bipole tripped.
75 24-Jul-17 12:26 - - Still out Tripping of HVDC bipole further resulted into SPS operation. 0 800 GI-2

From PMU, Multiple transients observed.


400kV Rihand(NTPC)-Singrauli(NTPC) ckt 1 tripped on R-N fault, dist.
2.5km(from Rihand end) along with that, 500kV Rihand-Dadri pole 2
76 26-Jul-17 21:23 26-Jul-17 22:57 1:34 tripped on Short circuit protection. 0 0 GI2

From PMU, Max Voltage dip observed in R-Phase.


Y phase wave trap jumper burnt at 220kV Moga (PSTCL) end of 220kV
Moga (PSTCL)-Sadiq ckt leads to bus fault at 220kV Moga (PSTCL).
220kV Bus Bar Protection was not in service at 220kV Moga (PSTCL). It
resulted into complete station outage of 220kV Moga (PSTCL) either
from remote end in Z-2, Z-3 or from Moga (PSTCL) end. All four
77 27-Jul-17 14:33 27-Jul-17 15:37 1:04 0 450 GD1
circuits of 220kV Moga(PG)-220kV Moga (PSTCL) ckts tripped from
220kV Moga (PG) end.

From PMU, Max Voltage dip observed in Y-phase.

While availing planned shutdown at 220kV Bus-2 of 400/220kV


Wagoora (PG), necessary switching operations performed.
Non uniform opening of bus isolators of 220kV Wagoora- Pampore
ckt-2 resulted into current imbalance, earth fault element of OC & EF
78 10-08-2017 11:54 10-08-2017 12:09 0:15 relay which was installed on Bus Coupler picked up and tripped bus 0 180 GD1
coupler.
The total current from 400/220kV ICT 2&4 was flew through bus
isolator of 89B of Pampore II line and bus isolator bursted. 400/220kV
315MVA ICT 2 & 4 of Wagoora (PG) tripped on backup earth fault.
B-phase jumper of the 220kV Hisar(PG)- sharwal(HVPNL) line snapped
at Powergrid Hisar end leads to tripping of the 220kV Hisar-Sharwal
79 12-08-2017 19:58 12-08-2017 21:14 1:16 ckt 1. 0 300 GD1
At 19:58hrs R-N fault occurred at Hisar end leads to tripping of 220kv
Hisar(PG)-Hisar-IA(HVPNL) ckt-1&2
400kV Akal-Jodhpur line tripped on R-Y phase to earth fault. Further,
400kV Barmer-Akal line also tripped at the same time from Barmer
end. After opening of 400kV Akal-Barmer line from Barmer end, line
80 13 -08 -2017 5:12 13 -8 -2017 5:40 0:28 400 0 GD1
was charged from Akal end only and it resulted into over voltage in
the line. Over voltage protection also operated after 3second and
send the DT command to Akal end.

99
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
400/220kV 500MVA ICT 2 & 3 of Dhuri trippeddue to operation of ICT
Bucholz protection.
81 19 -08 -2017 10:47 19 -8 -2017 11:51 1:04 0 350 GD1
From PMU,slight voltage dip observed in all phases. Voltage
recovered in 80msec
400kV Dhuri –Rajpura ckt 1&2,Rajpura 400kV Bus-2, Rajpura 500 MVA
ICT 3 & 500MVA ICT 4 of Dhuri tripped on disturbance by 400kV
82 19 -08 -2017 13:10 19 -8 -2017 15:57 2:47 (411bay)Y phase CT of ICT 4 of Rajpura station. 0 400 GD1

From PMU, Max dip observed in Y phases.


AT RAPP C end , Distance relay (Zone-2) sensed in 400kV RAPP -
Shujalpur circuit 1 & 2, whereas the mal functioning of SOTF(Switch-
On-To Fault) feature triggered three phase tripping for the detected
fault of both the circuits.
83 24 -08 -2017 17:03 24 -8 -2017 18:13 1:10 0 0 GI2
From PMU,Max dip observed in Y phase.

The similar type of fault observed on 24-08-2017 at 15:17hrs, i.e


triggering three phase tripping on single phase fault on 400kV RAPPC -
Kota line

400kV Allahabad Rewa Road-Banda 1 & 2, 400kV Allahabad Rewa


Road-Panki and 315MVA 400/220kV ICT-1 of Banda tripped during R
phase-earth fault on 400kV Allahabad Rewa Road-Panki line.
84 25 -08 -2017 20:51 25 -8 -2017 22:06 1:15 0 0 GI2
From PMU, Max dip observed in R phase, fault clearing time approx
560msec. Probable lines tripped from remote end (Zone-2 protection)

220kV Dhauliganga-Bareily tripped on Power swing. 220kV 70MW


Dhauliganga Unit #1 tripped on Over frequency and Unit #4 of
85 25-08-2017 17:04 25 -8 -2017 17:45 0:41 140 0 GD1
Dhauliganga tripped on Reverse power protection.
From PMU, Oscillations observed for 28sec
DC earth fault occurred on HVDC Agra-Biswanath Cherialli line-1&2.
86 26 -08 -2017 12:25 26 -8 -2017 16:07 3:42 Fault distance 232 Kms from Biswanath Chariali end. 0 0 GI2
From PMU, Two restart attempts observed.
220kV Dhauliganga(NHPC)-Pithorgarh(PG) line tripped on mal
switching operation of NIT switch at 220kV Pithoragarh end. 220kV
87 29 -08 -2017 11:31 29 -8 -2017 11:58 0:27 Bareilly(UP)-Dhauliganga(NHPC) tripped on Out of step protection and 400 0 GD1
finally 220kV 70MW Dhauliganga Unit 1,2,3,4,5&6 tripped on Over
frequency protection due to loss of evacuation.

Mal operation of Bus bar protection of 400kV Bus-1 and Bus 2 leads to
tripping of evacuation lines ( 400kV Mohindergarh-Bhiwani ckt 1,
400kV Mohindergarh-Dhanonda ckt 2) caused blocking of HVDC
88 29 -08 -2017 16:27 29 -8 -2017 16:48 0:21 Mohindergarh-Mundra Pole 1 on Commuatation failure. HVDC 0 0 GI 2
Mohindergarh-Mundra Pole 2 was already under shut down.
From PMU, dip observed in all three phases at 16:26:58.120hrs, and
finally HVDC tripped at 16:27:14.160hrs.
R phase to earth fault occurred on 400kV RAPP C-Kota(PG) ckt 1 .Due
to false unhealthy signal of RAPP C end breaker its auto enclosure was
blocked. Hence, maser trip initiated and all three phase of the line
89 29 -08 -2017 16:32 29 -8 -2017 17:38 1:06 0 0 GI 2
tripped from RAPP C end. Further, 400kV RAPP C –Chittorgarh line
tripped on mal-operation of stub protection (Tee section differential
protection)
400 kV Bikaner-Suratgarh line tripped on B-N fault (8.65 KM from
Bikaner end.2). 400kV Bikaner-Bhadla D/C tripped on Over voltage.
400kV Bikaner-Merta also tripped at the same time, reason awaited.
90 10-Aug-17 21:20 10-Aug-17 22:47 1:27 0 0 GI2
From PMU, max dip observed in B-phase and slight dip in voltage
observed after 5 sec.

100
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
While transfering 400kV Muzaffarnagar-Roorkee line from Main Bus
to Transfer bus, earth switch of line isoltaor (B-phase) was wrongly
operated, leads to tripping all the lines connected at Muzaffarnagar
station on bus bar protection. It leads to evacuation constraints for
91 10-Sep-17 12:02 10-Sep-17 15:28 3:26 Vishnuprayag, Alaknanda generation. Generation also tripped and 550 350 GD1
finally after offloading of connected 400kV lines, these lines tripped
on over voltage

From PMU, Max dip in B phase observed.


Heavy sparking was observed in the 6.6 KV Auxiliary Panel Room of GT
Module II.Due to stuck of R phase Breaker of HVCB of Unit #4 ( which
was being used for aux supply via back charging) which resulted into
initiation of LBB. Again due to blocking of Bus-bar protection bus bar
protection was not operated and all the 400kV lines tripped from
remote end in Z-2/Z-3 or back up protection. Huge explosion in
92 14-10-2017 10:19 14-10-2017 13:05 2:46 445 550 GD1
Station Auxiliary Transformer # 4 also occurred. Complete Black Out
occurred in PPS – III, Bawana-CCGT abd Bawana DTL

From PMU, Max dip observed in R phase. and fault clearing time
approx 560ms
At Gurgaon station,Bus-1 isolator of ICT-4 was wrongly configured
with Bus bar (external trip). Which resulted into tripping of all
elements connected to Guragaon Bus-1
93 16-10-2017 10:25 16-10-2017 12:32 2:07 0 0 GI2
From PMU, Slight dip in voltage observed in all three phaces. No
significant dip in voltage, It was maloperation of Bus Bar protection
due to wiring issue at Guragon PG
Snappping of Y phase conductor of 220kV Panipat-Panipat Thermal
ckt-4 at Thermal end, leads to tripping of 220kV Panipat-Thermal ckt
1&4 in Z-2 and 450MVA ICT 1 & 2 on back E/F protection respectively.
94 21-10-2017 12:09 21-10-2017 12:53 0:44 0 400 GD1
From PMU, Max dip observed in Y phase and fault clearing time
approx 1000ms
800kV HVDC Champa- Kurukshetra Pole-2 tripped on Commutation
failure and 800kV HVDC Champa-Kurukshetra Pole 1 tripped on
external block
95 23-10-2017 21:21 23-10-2017 22:33 1:12 0 0 GI2
From PMU,Max dip observed in R phase and fault clearing time
approx 1000ms.
Y phase to earth fault occurred in 400kV Muradnagar-Aligarh line near
by 400kV Aligarh station. At the same time 400kV Aligarh-Panki and
400kV Muradnagar-Aligarh lines tripped.

96 24-10-2017 13:56 24-10-2017 17:27 3:31 From PMU, Max dip observed in Y phase and fault clearing time 0 0 GI2
approx 120msec and seems A/R occurred at one end and

Reported, Muradnagar PLCC card burnt out.


Busbar protection operated on 220kV Bus-1 of 400/220kV Bhiwadi
(PG) station leads to tripping of all lines connected to 220kV Bhiwadi
(PG) Bus-1.
97 24-10-2017 18:48 24-10-2017 19:35 0:47 0 0 GI1
From PMU, No dip observed in any phase. Seems mal operation

Y phase to earth fault occurred in 400kV Anta- Kawai Line, caused


tripping of 400kV Anta RS-Chabra SCTPS ckt 1&2 along with Anta Rs-
Kawai ckt 1. 400kV Anta RS-Chabra SCTPS ckt 1&2 tripped on back up
98 25-10-2017 11:13 25-10-2017 12:15 1:02 660 0 GD1
earth fault protection from Chabra SCTPS end.

From PMU, Max dip observed in Y phase. Seems Unsuccessful A/R


LBB operated at 400kV Koteshwar (THDC) station leads to tripping of
400kV Koteshwar (THDC)-Koteshwar(PG) along with the unit #3
99 28-10-2017 10:11 28-10-2017 11:25 1:14 connected on 400kV Bus-1 of Kotehshwar (THDC). 100 0 GD1

From PMU, No dip observed.


101
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time

400 kV Bikaner-Suratgarh line tripped on B-N fault (8.65 KM from


Bikaner end.2). 400kV Bikaner-Bhadla D/C tripped on Over voltage.
400kV Bikaner-Merta also tripped at the same time, reason awaited.
100 10-Aug-17 21:20 10-Aug-17 22:47 1:27 0 0 GI2
From PMU, max dip observed in B-phase and slight dip in voltage
observed after 5 sec.
While transfering 400kV Muzaffarnagar-Roorkee line from Main Bus
to Transfer bus, earth switch of line isoltaor (B-phase) was wrongly
operated, leads to tripping all the lines connected at Muzaffarnagar
station on bus bar protection. It leads to evacuation constraints for
101 10-Sep-17 12:02 10-Sep-17 15:28 3:26 Vishnuprayag, Alaknanda generation. Generation also tripped and 550 350 GD1
finally after offloading of connected 400kV lines, these lines tripped
on over voltage

From PMU, Max dip in B phase observed.


Heavy sparking was observed in the 6.6 KV Auxiliary Panel Room of GT
Module II.Due to stuck of R phase Breaker of HVCB of Unit #4 ( which
was being used for aux supply via back charging) which resulted into
initiation of LBB. Again due to blocking of Bus-bar protection bus bar
protection was not operated and all the 400kV lines tripped from
remote end in Z-2/Z-3 or back up protection. Huge explosion in
102 14-10-2017 10:19 14-10-2017 13:05 2:46 445 550 GD1
Station Auxiliary Transformer # 4 also occurred. Complete Black Out
occurred in PPS – III, Bawana-CCGT abd Bawana DTL

From PMU, Max dip observed in R phase. and fault clearing time
approx 560ms
At Gurgaon station,Bus-1 isolator of ICT-4 was wrongly configured
with Bus bar (external trip). Which resulted into tripping of all
elements connected to Guragaon Bus-1
103 16-10-2017 10:25 16-10-2017 12:32 2:07 0 0 GI2
From PMU, Slight dip in voltage observed in all three phaces. No
significant dip in voltage, It was maloperation of Bus Bar protection
due to wiring issue at Guragon PG
Snappping of Y phase conductor of 220kV Panipat-Panipat Thermal
ckt-4 at Thermal end, leads to tripping of 220kV Panipat-Thermal ckt
1&4 in Z-2 and 450MVA ICT 1 & 2 on back E/F protection respectively.
104 21-10-2017 12:09 21-10-2017 12:53 0:44 0 400 GD1
From PMU, Max dip observed in Y phase and fault clearing time
approx 1000ms
800kV HVDC Champa- Kurukshetra Pole-2 tripped on Commutation
failure and 800kV HVDC Champa-Kurukshetra Pole 1 tripped on
external block
105 23-10-2017 21:21 23-10-2017 22:33 1:12 0 0 GI2
From PMU,Max dip observed in R phase and fault clearing time
approx 1000ms.
Y phase to earth fault occurred in 400kV Muradnagar-Aligarh line near
by 400kV Aligarh station. At the same time 400kV Aligarh-Panki and
400kV Muradnagar-Aligarh lines tripped.

106 24-10-2017 13:56 24-10-2017 17:27 3:31 From PMU, Max dip observed in Y phase and fault clearing time 0 0 GI2
approx 120msec and seems A/R occurred at one end and

Reported, Muradnagar PLCC card burnt out.


Busbar protection operated on 220kV Bus-1 of 400/220kV Bhiwadi
(PG) station leads to tripping of all lines connected to 220kV Bhiwadi
(PG) Bus-1.
107 24-10-2017 18:48 24-10-2017 19:35 0:47 0 0 GI1
From PMU, No dip observed in any phase. Seems mal operation

102
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
Y phase to earth fault occurred in 400kV Anta- Kawai Line, caused
tripping of 400kV Anta RS-Chabra SCTPS ckt 1&2 along with Anta Rs-
Kawai ckt 1. 400kV Anta RS-Chabra SCTPS ckt 1&2 tripped on back up
108 25-10-2017 11:13 25-10-2017 12:15 1:02 660 0 GD1
earth fault protection from Chabra SCTPS end.

From PMU, Max dip observed in Y phase. Seems Unsuccessful A/R


LBB operated at 400kV Koteshwar (THDC) station leads to tripping of
400kV Koteshwar (THDC)-Koteshwar(PG) along with the unit #3
109 28-10-2017 10:11 28-10-2017 11:25 1:14 connected on 400kV Bus-1 of Kotehshwar (THDC). 100 0 GD1

From PMU, No dip observed.


While availing planned shutdown of 400kV Rajwest-Barmer line,its
line breaker was opened. Resulted sudden increment of loading in
110 15-11-2017 9:21 15-11-2017 11:34 2:13 500 0 GD1
400/220kV 315MVA ICT and tripped on Over-current protection. Due
to loss of power evacuation path, all units of Rajwest tripped
During testing work of replaced CT's of 400kV Aligarh-Panki line,
111 16-11-2017 16:42 16-11-2017 18:19 1:37 400kV Bus Bar Protection was mal-operated .Resulted into complete 0 0 GI2
outage of 400kV Panki sttaion.
Busted R phase CVT of 220kV Panipat-Thermal 3 line at panipat
station, resulted complete outage of 220kV lines of 400/220kV
Panipat station on Bus-bar protection
112 19-11-2017 11:29 19-11-2017 12:56 1:27 0 0 GI2
From PMU, Max dip observed in R-phase, fault clearing time approx
320msec
400 KV Heerapura- Bassi Circuit 2 tripped on B-phase to earth fault.
Along with that 400kV Bassi-Sikar and 400kV Bassi-jaipur South ckt 1
&2 also tripped
113 26-11-2017 21:12 26-11-2017 21:27 0:15 0 0 GI2
From PMU, Max dip observed in B-phase, seems Auto-reclosure un-
successful
B-N fault occurred resulted in tripping of 400kV Bikaner-Suratgarh and
400kV Bikaner-Deedwana
114 28-11-2017 4:02 28-11-2017 5:32 1:30 0 0 GI2
From PMU, No fault Observed
At 1:17hrs power flow of 400kV Sarnath- Varnasi ckt 2 became zero, at
1:22hrs 400kV Sarnath- Anpara ckt2, 400kV Sarnath- Varnasi ckt1,
115 29-11-2017 1:22 29-11-2017 2:15 0:53 315MVA ICT 1 &3 tripped on Bus-bar protection. 0 0 GI2

From PMU, No fault observed


at 17:50hrs all 400kV Lines of 765/400kV Unnao station tripped on
Busbar-protection (Bus1 & 2)
116 30-11-2017 17:50 30-11-2017 20:52 3:02 0 0 GI2
From Pmu, No fault observed
400 kV Bus-2 was under shutdown for attending hotspots. Due to
117 12-Sep-17 17:29 12-Sep-17 19:55 2:26 snapping of Y phase jumper of Unit-6 on Bus-I B-phase, resulted into 1300 100 GD1
tripping of complete station on Bus bar protection
Multiple 400kV lines and ICT's tripped in NR on over voltage/Over flux
118 12-Dec-17 0:51 12-Dec-17 10:27 9:36 0 0 GI2
respectively due to bad weather condition
400kV Dehar Bus-2 was under shutdown.During testing at Dehar
station, Bus bar protection of Bus -1 was wrongly operated. Resulted
119 12-Dec-17 11:35 12-Dec-17 12:57 1:22 into tripping of 400kV Dehar-Panchkula , Dehar-Rajpura and 0 0 GI2
400/220kV 500MVA Dehar ICT.
From PMU ,No fault Observed.
Multiple times( at 02:50 and 21:29 hrs) 400kV Aligarh-Sikandrabad
D/C lines tripped on earth faults.
120 13-12-2017 1:23 13-12-2017 . 0:53 0 0 GI2
From PMU, Y and B phase dip observed.

765kV Anpara-unnao Line tripped on earth fault, subsequently Over


current protection trigerred at 1000MVA ICT3 of 765/400kV Unnao
Station.
From PMU, Max dip observed in B phase at 03:28 and fault clearing
121 14-12-2017 3:28 14-12-2017 4:51 1:23 0 100 GD1
time approx 600msec.

Further, At 05:47 765kV Unnao-Anpara line along with ICT-1 of Anpara


tripped and fault clearing time approx 400msec.

103
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time
Wave trap of 220KV Moga-bajakhana line busted, resulted into
tripping of 220kV Moga(pg)-Moga(PSEB) 1,2,3&4 ckts
122 16-12-2017 18:11 16-12-2017 19:35 1:24 0 0 GI2
From PMU, two faults observed, dip in Y phase first and R phase
respectively. Fault clearing time approx 400msec
400kV Agra Bus 1 tripped on false Bus bar protection.further,400kV
Agra-Auraiya line was opened on High Voltage and tie breaker was
123 18-12-2017 11:04 18-12-2017 11:40 0:36 0 0 GI2
not in service,caused the tripping of 400kV Agra-kanpur line along
with the Bus-1. From Pmu, No fault observed.

400kV Vishnuprayag Bus-1 was under shutdown.400kV Vishnuprayag-


124 20-12-2017 16:24 20-12-2017 19:04 2:40 Alakanada ,400kV Vishnuprayag-Mujaffarnagar along with the 90 0 GD1
generating units of Vishnuprayag tripped on Bus bar protection.
400kV Allahabad Rewa Road-Banda ckt 1 & 2 along with 315MVA at
Banda tripped on Earth fault
125 23-12-2017 14:26 23-12-2017 15:53 1:27 0 0 GI2
From PMU, max dip observed in R phase, fault clearing time approx
1160msec.
400kV Lucknow(UP) Bus B was under shutdown for retrofitting
work.At 17:23 Hrs 400kV Lucknow(UP) Bus Isolator closed
126 25-12-2017 17:23 25-12-2017 18:30 1:07 0 0 GI2
inadvertently caused earth fault on Bus-A resulted into complete
outage of Lucknow(UP) sttaion
400kV Varnasi-sarnath Ckt 1 &2 and 765kV Varnasi-New Kanpur ckt 1
& 2 tripped on earth fault.
127 27-12-2017 1:39 27-12-2017 2:35 0:56 0 0 GI2
From PMU, Max dip is in B phase.
From weather data Eastern UP and Bihar was covered with dense Fog.
400kV Rewa Road-Panki, 400kV Rewa Road-Banda and 315MVA
400/220kV ICT-1 at Banda tripped on fault (R-N) in 400kV Rewa Road-
128 29-12-2017 6:40 29-12-2017 7:56 1:16 Panki line. 0 0 GI2
From PMU, Max dip observed in R phase and fault clearing time
approx 680msec.
400kV Rewa Road-Panki, 400kV Rewa Road-Banda D/C, 400kV Rewa
Road-Obra and 315MVA 400/220kV Ict-1 at Banda tripped on LBB.
129 30-12-2017 0:05 30-12-2017 18:40 18:35 0 0 GI2
From PMU, Max dip observed in R phase and fault clearing time
approx 720msec.
R phase to earth fault occurred on 220kV Panipat-Chhajpur ckt
2.Besides the operation of Line protection, Bus bar protection
operated on 220kV Bus of Panipat station and caused complete
130 01-Jan-18 0:30 01-Jan-18 0:55 0:25 0 0 GI2
outage of 220kV Panipat station

From PMU, Max dip observed in R phase.


Due to fog, 220kV Mandola-Wazirabad ckt-2(03:35) & ckt-4 (05:16),
220kV Bawana-Kanjhawala D/C(03:43), 220kV BTPS-Mehrauli ckt-
131 01-Apr-18 5:07 01-Apr-18 10:41 5:34 0 50 GD1
2(05:35), 220kV Narela-Rohtak ckt-2(04:57)& 220kV Mandola-Narela
Ckt 1 & 2 (05:07) tripped
Flashing occurred in Y-ph wave trap of 400 KV Bawana-Dipalpur line
at Bawana station. Which caused the complete outage of Bawana
(DTL) station
132 01-Jun-18 8:27 01-Jun-18 9:49 1:22 250 600 GD1
From PMU,Max dip observed in Y phase and fault clearing time
approx 560msec
Busbar protection of Bus-1 operated at 400kV Aligarh station caused
tripping of multiple elements at 400kV Aligarh station
133 01-Dec-18 16:52 01-Dec-18 18:08 1:16 0 0 GI2
From PMU, No fault observed
400kV Sarnath-Varnasi and 400kV Anpara-Sarnath ckt 1 tripped on RY
fault.
134 14-01-2018 15:20 14-01-2018 16:23 1:03 0 0 GI2
From PMU, Max dip observed in R & Y phase. Fault clearing time
approx 1000msec
LBB (Local Breaker Backup) operated at 400kV Heerapura, leads to
tripping of multiple elements.
135 14-01-2018 16:01 14-01-2018 16:59 0:58 0 0 GI2
From PMU, Max dip observed in R phase and fault clearing time
approx 200msec

104
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time

220kV backup earth fault protection operated at Azamgarh station


and caused tripping of 500MVA and 315MVA ICT of Azamgarh station
136 17-01-2018 23:57 18-01-2018 0:51 0:54 0 450 GD1
From PMU, Max dip observed in R phase.

R-ph jumper of 220kV Bhiwadi(PG)-Bhiwadi(Raj) ckt 1 snapped at


Bhiwadi(Raj) end, which caused the operation of Bus-Bar protection
137 22-01-2018 10:33 22-01-2018 10:54 0:21 0 0 GI2
at 220kV Bus-2 of Bhiwadi(PG) leads to tripping of multiple elements
at 400/220kV Bhiwadi station along with HVDC 500kV Balia-Bhiwadi.
Bus bar protection operated on earth fault at 400kV Bawana CCGT
station, leads to tripping of multiple elements at 400kV Bawana CCGT
138 28-01-2018 6:01 28-01-2018 15:25 9:24 station 0 0 GI2

From PMU, Max dip observed in Y phase


400kV Bhiwani Hissar ckt 2 & 3 tripped on earth fault
139 28-01-2018 7:34 28-01-2018 8:23 0:49 0 0 GI2
From PMU, Max dip observed in Y phase.
At 10:38hrs,due to commutation failure both HVDC poles of Champa
140 02-Feb-18 10:38 02-Feb-18 13:17 2:39 0 0 GI2
Kurukshetra tripped.
At 11:57hrs, due to flashover in GIS disconnector, bus bar protection
operated and caused tripping of 400kV Kurukshetra Bus 2, 400kV
141 02-Feb-18 11:57 02-Feb-18 13:19 1:22 Jalandhar-Kurukshetra(PG) 1,400kV Kurukshetra(PG)-Malerkotla(PG) 1. 0 0 GI2

From PMU, Max voltage dip observed in R phase.


Due to Jumper snapping at 220 kV Amloh Line of 220kV
142 07-Feb-18 8:25 07-Feb-18 9:25 1:00 Malerkolta(PSTCL) station, busbar protection operated and caused 0 300 GD1
tripping of 220kV Bus along with ICTs
At 12:54hrs, R phase to earth fault on 400kV Manesar-Neemaran 2
caused tripping of both the lines 400kV Manesar-Neemrana 2 and
400kV Neemrana-Sikar 1.
143 11-Feb-18 12:54 11-Feb-18 13:00 0:06 0 0 GI2
At 14:38hrs again both 400kV lines (400kV Manesar-Neemrana ckt-2
and 400kVNeemrana-Sikar ckt-1) tripped on fault in 400kV Neemrana-
Sikar ckt-1.
Due to relay non-operation on R-N fault of 400kV line Kishenpur-New
Wangpoh 3 at Kishenpur station, all the lines who fed the fault
144 12-Feb-18 11:24 12-Feb-18 11:56 0:32 tripped from remote end. The loss of Kishenpur caused imbalance in 120 600 GD1
Valley ( Generation-load ) and tripped all the elements of valley
including SVC at New Wangpoh.
All feeders connected to Salal station tripped on Distance( Zone-1
)protection.
145 12-Feb-18 18:46 12-Feb-18 19:21 0:35 200 0 GD1
Whereas From Kishenpur PMU,voltage dip observed in R & Y phase
voltage and fault cleared in 200msec.
At 17:46 hrs, while availing planned shutdown of 400kV Bus 1 and 2 at
Maharani Bagh by PGCIL, ICT-1 was made openned from PGCIL end
without load shifting at 220KV Maharani Bagh substaion,caused mini
island with Pragati generation with Sarita Vihar, parkstreet, Masjid
Moth, Electric lane and Gazipur. Moreover, around 100MW Load shed
on UFR
146 14/2/2018 17:46 14/02/2018 17:48 0:02 57 100 GD1
At 17:48 hrs System was synchronized by switching 220kV BTPS-Sarita
Vihar 1 & 2 .

Along with that At 08:49hrs, R pahse jumper of 220kv Bus Coupler


snapped at 220kV Pragati caused Bus fault and tripped all the
elements of Pragati station.
While availing planned shutdown of 400kV Bhilwara-Chabra line,
Voltage shoot upto 440kV at Bhilwara end, and casused tripping of
400kV Bhilwara-Ajmer 1 &2
147 15-02-2018 11:59 15-02-2018 13:17 1:18 0 0 GI2
From Bassi PMU, Oscillations observed at 11:57hrs, and Voltage dip
observed at 11:59hrs.

105
NRLDC Annual Report 2017-18

12. Grid Incidents during the Year 2017-18


Outage
Outage Revival Duratio Generatio Load Category as
Event
S.No. n n Loss(M per CEA Grid
(As reported)
Loss(MW) W) Standards
Date Time Date Time Time

Due to delayed fault clearance of 220kV Mehrauli-BTPS ckt 2, all the


lines of 220kV BTPS tripped on Zone-3 distance protection.

Moreover,due to multiple trippings around BTPS,a small island of


Pragati Generation with Parkstreet, Saritavihar & Gazipur
148 21-02-2018 12:28 21-02-2018 13:41 1:13 268 70 GD1
formed.Along with that, 70MW load shed on UFR

But, Island has to be collapsed to proper syncronize with main grid.At


13:45hrs system was restored after getting Ballabgarh supply from
BTPS and further extended to sarita Vihar and pragati station .
At 00:24hrs, 400kV Jallandhar-Chamba 2 tripped on R phase to earth
fault, subsequently voltage shoot up at Chamera 2, all lines emintaing
149 25-02-2018 0:24 25-02-2018 2:43 2:19 from Chamera 2 tripped on Over Voltage. 0 0 GI2

From Moga PMU, Max voltage dip observed in R phase.


Lightning struck at 400kV Agra(UP) station resulted in bus faults. LBB
(400kV) for Fatehabad-1 (bus-2) and ICT-1(bus-1) operated. 315MVA
150 03-Mar-18 18:09 ICT-3 at Agra(UP) didn’t trip. 400kV Fatehabad-1 tripped in Z-4 0 100 GD1
(250ms, setting would be revised accordingly). 220kV
Shamsabadcktwas already under outage.
Bus bar protection operated at 400kV Banda(UP), lead to tripping of
151 09-Mar-18 11:03 0 0 GI2
400kV bus, 315MVA 400/220kV ICT along with Rewa road D/C.
At Kaithal, 400 kV Malerkotla line and B/R are in same dia. S/D on
Kaithal-Malerkotla line was being taken. Line opened from Malerkotla
152 09-Mar-18 11:20 end and DT received at Kaithal end opened main and Tie CBs which 0 0 GI2
also initiated LBB of B/R Main CB, resulting in operation of BB
protection for Bus-2.
At Wagoora, 400 kV Bus-1 shut down process was started. R-phase
isolator of Bus-1 was closed in addition to Bus-II Isolator. As soon as
153 10-Mar-18 9:51 this bus isolator was opened, Bus Bar relay operated which lead to 340 600 GD1
the tripping of both the buses at Wagoora. And subsequent collapse
of Kashmir Valley.
400kV Orai(UP)-Orai(PG) ckt-1 tripped on B-N permanent fault after
unsuccessful auto-reclosing. Ckt-2 also tripped along with ckt-1.
154 28-Mar-18 13:00 0 0 GI2
1000MVA, 765/400kV ICT-1 at Orai(PG) also tripped on protection mal-
operation.
Thunderstorm reported. Tripping of mulriple lines in Karcham-Baspa-
155 29-Mar-18 17:16 Jhakri-Rampur generation complex resulted in tripping runnnig 700 0 GD1
generation in the complex.
765kV Aligarh-Orai ckt-1 tripped on 3-phase fault. Ckt-2 also tripped
156 30-Mar-18 0:11 0 0 GI2
along with ckt-1.
Y-ph CT of 400kV Azamgarh-Sarnath line at Sarnath busted. Complete
157 30-Mar-18 22:07 outage of 400kV Sarnath(UP) due to operation of bus bar protection 0 170 GD1
of both 400kV buses.

106
अनभ
ु ाग - 13
Section - 13

राजभाषा गतिविधियााँ
Activity In Rajbhasga
NRLDC REPORT 2017-18

वषष 2017 – 2018 की राजभाषा गतिववधियाॉ

उिरी ऺेत्रीय भार प्रेषण केंद्र, भारि सरकार, राजभाषा तियम 10(4) के अॊिगषि
दििाॊक 09.06.2003 से अधिसधू िि कायाषऱय है I कायाषऱय के अधिकाॊश
कमषिाररयों को दहॊिी का कायषसािक ऻाि प्राप्ि है I

कायाषऱय में 92 कम्पप्यटर


ु र है र कामिमषकों की सवु विा के मिऱइ इि सभी कम्पप्यटर
ु रों
पर दहन्िी/अॉग्रेजी द्ववभाषी में काम करिे हे िु सॉफ्टर वेयर उपऱब्ि हैं I भारि
सरकार राजभाषा ववभाग द्वारा िऱाइ जा रहे ववमिभन्ि कम्पप्यटर
ु र प्रमिशऺण
कायषक्रमों हे िु कायाषऱय से कमषिाररयों को प्रमिशऺण हे िु िामिमि ककया जािा है I

कायाषऱय का अधिकिम पत्रािार दहॊिी में ककया जािा है,शि –प्रतिशि तििाषररि
ऱक्ष्यों को प्राप्ि करिे के प्रयास ककइ जा रहे हैं I‘क’ र ‘ख’ ऺेत्रों में स्थिि
कायाषऱयोंसे अॉग्रेजी में प्राप्ि पत्रों के उत्तर दहॊिी में दिये दिया जा रहे हैं I अधिकिर
ई –मेऱ दहॊिी में भेजे जािे हैं I सभी प्रकार की िोदटर ॊग इवॊ हथिाऺर दहॊिी में की
जा रही हैं I कमषिररयों में आपसी बाििीि वािाषऱाप दहॊिी में ककया जा रहा है I

कायाषऱय में उपऱब्ि सभी द्ववभाषी फामों का दहॊिी रूपाॊिरण प्रयोग में ऱाइ जािे
हैं I

कायाषऱय में भारि सरकार, गह


ृ मॊत्राऱय द्वारा जारी वावषषक कायषक्रम के अिरू
ु प
कायष ककया जािा है र तििाषररि ऱक्ष्यों को प्राप्ि करिे के प्रयास ककइ जािे हैं I

राजभाषा कायाषन्वयि समिमति की वषष की हर तिमाही में इक बैठक महाप्रबॊिक की


अध्यऺिा में आयोस्जि की जािी है I वषष की हर तिमाही में इक बैठक आयोस्जि

107
NRLDC REPORT 2017-18

की गई I इि बैठकों में सभी ववभागाध्यऺ जो राजभाषा कायाषन्वयि समिमति के


सिथय हैं उपस्थिि रहे I

वषष के िौराि 4 दहॊिी कायषशाऱाओॊ का भी आयोजि ककया दििाॊक 22.06.2017,


05.09.2017,15.12.2017 & 12.03.2018 को आयोस्जि ककया गया स्जसमे
राष्ट्रीय भार प्रेषण केंद्र र उिरी ऺेत्रीय भार प्रेषण केंद्र के कमषिररयों िे सॊयक्
ु ि
रूप से भाग मिऱया I

वषष 2017 मे दहॊिी पखवाड़े का आयोजि 01 मिसत्मम्पबर से 14 मिसत्मम्पबर िक ककया


गया स्जसमे 4 दहन्िी प्रतियोधगिाओॊ का आयोजि ककया गया प्रतियोधगिाओॊ में
ऱगभग 90 कमषिारी प्रतिभागी बिे र प्रतियोधगिाओॊ के अॊि में 21 ववजेिाओॊ
को परु थकारों से सम्पमातिि ककया गया I

108
अनभ
ु ाग - 14
Section - 14

ग्रिड मानग्रित्र
PowerMap
POWER MAP OF PUNJAB

JAMMU AND KASHMIR

Samba Chamera Pooling


Udampur

Hiranagar
Kishenpur RSD
Sujanpur(RLY)
Chamera1
Mamun
Pathankot
Sarna Jassore
Parbati-PO(Banala)
Hamirpur(PG)
Kangra

PAKISTAN Tibber
Kotli Surat Mali PONG

Wadalagranthian Dasuya
Majitha F.G.Churian HIMACHAL PRADESH
Chogawan
C.L.Amritsar Udoke Hamirpur
Khassa
Amritsar(PG)
Amritsar Charged at 400kV Koldam

Naraingarh Butari Hamirpur(HP)


Chohal
Verpal Hamirpur(PG)
Rashiana Kartarpur
GVK Bhakra_R
Science
Goindwal sahib city Rehana Jattan Bhakra_L
Kanjli Jalandhar(PG)
Jalandhar
Mahilpur
Algaon Jalandhar BB
Badshahpur
Patti Kotla Ganguwal
Anandgarh Sahib-1

Sultanpur Jamsher Anandpur


Anandgarh
Chola Sahib Jamalpur Shahib-2
Panipat
Nakodar Nawanshar
Makhu Goraya Jadla
Nurmehal
Botianawala Mastewala
Ferozpur Rd Asron

Ferozpur Dharamkot Humbaran Ropar


Ludhiana
Ludhiana(PG) Gaunsgarh Dhulkot
Moga(PSEB) Dandharikalan
Ajitwal Kohara
Talwandi Bhai Ghulal Majra
Sahnewal Bassi
(Kotkrore) Pathana
Moga(PG) Lalton-Kalan Railway Pinjore
Himmatpura Jagraon Doraha Ropar Kharar
Baghapurana Bhari
Sadiq Pakhowal Mohali-1
Sandour Nallagarh(PG)
Nallagar
Amloh Road Gobindgarh 2
1 Mohali-2
Ikolaha
Gubaya Derabassi
Lalru
Malerkotla
Malerkotla(PG)
RLY
Kotakpura Amloh Banur
Malerkotla(PSEB)
Muktsar Bajakhana Mehal Kalan Rajpura Rajpura

Barnala(PSEB) Dhuri RLY


Bahadurgarh
Barnala(BBMB)
Fp Nabha Devigarh
Lehramohabbat Dhanaula
Abohar Patiala(PG)
Sangrur Bhawanigarh PSEB Kurukshetra(PG)

Malout Bathinda
Rajla Passiana
Sunam Chhajli Jagadhari
Talwandi
Sabo
Badal Kakrala
Bhiwani
Mansa Bangan
Talwandi Sabo
Patran
Patran
Meerut Punchkula(PG)
Jhunir

Hisar(PG) Kaithal(PG)
Fatehabad(PG)
RAJASTHAN Dadri

Hisar(BBMB)
Bhiwani(PG)
Hisar(PG)

HARYANA LEGEND
132kV Transmission Substation 132kV Lline

220kV Transmission Substation 220kV Line

400kV Transmission Substation 400kV Line

765kV Transmission Substation 765kV Line

Hydro Generating Station International Boundary

Thermal Generating Station State Boundary


POWER MAP OF HARYANA
HIMACHAL PRADESH
Kunihar

Baddi

Ropar Pinjore Nathpa Jhakri


Rajpura
Dehar
CHANDIGARH Panchkula(PG)
Madanpur

Karcham
Wangtu

Rewali Sorang
PUNJAB
Ganguwal

Dhulkote
Jallandhar
Nakodar
Tepla
Patiala(PG)
Jagadhari
Sonta
Shahbad Jagadhari-Rly. Abdullapur
Abdullapur(PG)
Jorian Rampur Kambon
Kurukshetra(PG) DCRTP Yamunagar
Malerkotla Dhurala
Cheeka
Kurukshetra
Pehowa Salempur
Patran
Moga(PG) Unispur
Sangrur Kaul
Chormar Kaithal(PG)

Batta Kaithal Baghpat(PG)


Nuhiyawali Nissing
Hukmawali Bastra Karnal

Narwana
Mund
Rania Sirsa Fatehabad
Bhuna
Fatehabad Chhajpur
Samain Champa (WR)
Khedar Panipat(BBMB)
PTPS-I
Kirori Safidon
Jind (HVPN) PTPS-II
UTTAR PRADESH
Jind (PG)
Samalkha Dadri
Hisar
Hisar(PG) Masudpur
Hanumangarh IA-Hisar Barhi
(Amarpura) Jindal Steel
Hisar-BBMB Hansi
Badhana Mohana
Sonepat
Sonepat-Pg
Deepalpur
Chirawa Sangwan

Bhiwani(PG) Rohtak Meerut(PG)


Rajgarh Bhiwani(HVPN)
Narela
Sampla Bawana
Isharwal Kabulpur
Bhiwani(BBMB)
DELHI
Nuna Majra Bahadurgarh
Charkhi
Dadri Jhatikra(PG) Maharani
Jhajjar_New Jhajjar Mundka Bamnoli Bagh Greater Noida
(MGSTPS) (IGSTPS) Daulatabad
Badarpur
Sec 20

Phagi Dadhiban
Sec 33
Nawada A-5
FGPS
Gurgaon
Gurgaon(PG) Sec 52
Sec 56
Sec 72 Palli Palla A-4(FARIDABAD)
Manesar(PG) Badshahpur Ballabgarh(BBMB)
Mahendergarh IMT Manesar
RAJASTHAN Mahendergarh HVDC Dhanauda Ballabhgarh(PG)
Samaypur(BBMB)
Mau HR Kanpur
HSIIDC Bawal
Khetri
Lula Ahir Meerapur
Kurali
Rewari
Bhiwadi
Mainpuri
Palwal
Narnaul Rangala Rajpur
Neemrana

CGPL-Mundra
Agra
LEGEND
66kV Transmission Substation 132kV Lline

132kV Transmission Substation 220kV Line

220kV Transmission Substation 400kV Line

400kV Transmission Substation HVDC Line

HVDC Transmission Substation


765kV Line
International Boundary
765kV Transmission Substation
State Boundary
Thermal Generating Station
POWER MAP OF RAJASTHAN PUNJAB

Udyogvihar
Chomu Padampur
Hanuman Garh
Goner
Kukas
Chaksu Vkia PAKISTAN
Suratgarh Suratgarh
Sirsa
Phulera Mansarovar Bassi
Jaipur(PG) Sms Stdm Dausa Amarpura
Kunda Bhadra HARYANA
Sanganer Ki Dhani
Jagatpura/Indira
Bagru Gandhi Bhiwani(PG)
Heerapura
Sitapura Hissar
x

Renwal1
xx

Rajgarh
xx
xx
xx

Sez1 DELHI
x
xx

Nph1 VSLP Hissar


Lalsot Mau Rewari
Kanasar Tehendesar Gurgaon
Hissar
Phagi
Sri Dungargarh Chirawa Charkhi Hissar Bhiwadi
Bhu-Ener Bikaner Ratangarh Jhunjhunu Dadri Manesar
(PG)
Ratangarh Neemrana Bhiwadi UTTAR PRADESH
Bhadla Bikaner Phalodi (PG) Khushkhera
Khetri
Gajner Badnu Nawalgarh-21 Babai Nagar
Behror Neemrana Badarpur
Barsingsar
Laxmangarh Kotputli Kishangarh Bas
Badisid Sujangarh Kotputli Agra
Nokha Sikar(PG) Alwar
Ramgarh(gas) Ramgarh Mia-Alwar
Dhod Bansur
Bap Sikar Alwar GSS
Deedwana Niwana
Reengus
Nagaur Manoharpur Nadbai Bharatpur Agra
Bhu-Ener Tejwa
Phalodi Kuchaman city Chomu
Amarsagar Mandawar
Mada Jajiya Makrana Goner Kukas
Khinwsar Kuchera Vkia Chhonkarwara
Akal Chandan Chaksu Mansarovar
Akal Phulera Sms Stdm
Bassi Sikrai
AAU Jaipur(PG) Kunda
Bhensada Dechu Baithwasia Merta Bagru Ki Dhani
Jagatpura/Indira Dausa Hindaun
Gandhi
Bhawad Heerapura Sanganer Dholpur
Tinwari Kishangarh Hindaun
Bhopalgarh Renwal1

x
xx

xx
Ketukalan

xx
Karwar

xx
Sez1 Dholpur

xx
Nph1 Lalsot
Dendari Pushkar
Barli RAS_2 Phagi
Rajwest Ajmer Gangapur city
Jodhpur
Borunda
Jodhpur Shree Cement
Baytoo Jhalamand Bilara Gwalior
Beawar Sawai
Giral TPS Madhopur Khandar
Balotra
Jodhpur(new)
Jodhpur Gulabpur Duni
Barmer Pali
MPT Sheopur

Jalore Bundi
Bhilwara
Sayla KTPS
Dhauriman Bhilwara
Bali Baman Manda
Tukda lgarh Dahra Anta
Kota(PG)
Bhinmal Kankroli(PG) Kankroli Hamirgarh Sakatpura
Bhinmal A R.P.S. Baran
Chittorgarh B
Sirohi Pindwara
Sanchore Sawa RAPP-C Modak Kawai
J K Lakshmi Amberi Debari Chittorgarh Nimbhera Kawai Stage-2
Cement Factory Bhanpura Jhalawar Chabra
Gandhi
Sagar BADOD
Zerda Shujalpur
132kV Transmission Substation LEGEND Madri
Bhawani Mandi
Kalisindh-4
132kV Lline
220kV Transmission Substation
220kV Line
400kV Transmission Substation 1. Sarna Doongar Aspur
400kV Line 2. Vaishali
HVDC Transmission Substation MADHYA PRADESH
765kV Line(Charged at 400kV) 3. Pwd Bungalow
4. Chambal
Thermal/Coal Generating Station 5. Mansarovar
x x x x x Underground Cable
Hydro Generating Station 6. Mnit-jaipur Banswara
HVDC Line 7. Balawala
Nuclear Generating Station
International Boundary
Wind Generating Station State Boundary
POWER MAP OF DELHI
Panipat
Assandh
Abdullapur Kundli
Deepalpur

Narela
Mandaula

DSIDC Bawana
Bawana
Bhiwani(PG)

Rohini II
Gopalpur UTTAR PRADESH

Kanjhawala Rohini
Rohini Shalimar
HARYANA Bagh Wazirabad
DMRC

Wazirpur Loni Road


Peeragarhi
Bahadurgarh Mundka
Rohtak Road Sabjimandi Kashmiri
Gate Preet
Jhajjar DMRC Vihar Sahibabad
Geeta Colony
Rajghat Patparganj
Parkstreet
Naraina Electric Lane Indraprastha Gazipur
Najafgarh Pappankalan-II Pragati
Praga Noida-Sec 62
Ridge
Valley
Pappankalan-I
Lodhi Road
Maharani
Bhiwani(PG) Bagh Noida-Sec 20

AIIMS Okhla Dadri


Delhi International
Airport Limited
Vasant Kunj Noida-Sec 20
Bamnoli
Masjid Moth Sarita
Jhatikara Vihar Greater Noida
Mehrauli

Badarpur
Kanpur(PG)
Nawada
Agra(PG)

66kV Transmissioin Substation LEGEND


66kV Under Ground Transmissioin Substation 132kV Lline
220kV Under Ground Transmissioin Substation 220kV underground cable
132kV Transmission Substation
Mia-Alwa
220kV Line
220kV Transmission Substation
400kV Line Ballabgarh(BBMB)
400kV Transmission Substation 765kV Line
765kV Transmission Substation State Boundary
Ballabgarh
Thermal/Coal/Gas Generating Station
PUNJAB
Bhagwanpur
POWER MAP OF UTTAR PRADESH
S.R.E.(Ambala Road)
Khodrie
Saharanpur
Saharanpur(PG) Khara Roorkee
INSET MAP
Malerkotla Behat Roorkee Laksar

(PG) Roorkee UTTARAKHAND


Nanauta Koteshwar-Pol Manglore

MuzaffarNagar Charged at 400kV


Kalagarh
Chandak Kiratpur

Dehradun(PG) Shamli Kashipur


Charla Nara Jansath Nehtor
Moga Kaithal Hapur Dham Pur1

HARYANA Baghpat
ModiPuram Sitarganj Sitarganj
Dhauliganga OBRA
Bhiwani Baraut
Khatimah

Tanakpur Pitthorgarh ANPARA-C


Mandaula 5 Meerut(PG) Pant Nagar
Narela BNC (NER)
Gopalpur Muradnagar 6 Gajraula RIHAND
Wazirabad 4 Simbhaoali Moradabad ANPARA-D
ANPARA-C
DELHI Bawana
New

Maharani Patparganj
Bagh Gazipur Dadri G. Noida Sambhal 17
Rampur Pilibhit1
RIHAND
BTPS Sikandrabad
H.Vihar Greater Noida C.B.Ganj Dohana Gharwa Road
Sikandrabad Jahangirabad
Nawada Bareilly(UP) SINGRAULI SoneNagar
Gharbara
RCGreen JPSI Bareilly(PG)
Kaithal Panipat Khurja
Dibai
Bina Anpara A & B
Narora
BALLABGARH Atrauli Badaun
Jhatikra Harduaganj Shahjhanpur Morwa
Chhata Aligarh(UP)
Rosa Nighasan
Bhiwadi Boner Shahjhanpur(PG) Khair
15
Mathura Hathras
Etah
Gokul
Hardoi
Bharatpur (PG)
Agra(UP)
Jaipur Shamsabad Sitapur Gonda
14 Mainpuri(PG)
Sikar Hardoi Road
11 Fatehabad(UP) (UP) BKT
AGRA(PG) Chhibramau Kursi Road
Bassi Firozabad
Saifai (UP)
16 Chinhat
Basti (PG) Gorakhpur2
Lucknow-4(PG) Gomti Nagar Sohawal(UP)
Bharthana Sohawal(PG)
Unnao (UP)
RAJASTHAN Gorakhpur
Bithoor Lucknow-7(PG)
Auraiya 10 Tanda Deoria
Panki Raebareli
Ballabgarh 7 9 Muzaffarpur
Kanpur
Gwalior 8 Sultanpur Veera
Naubasta patti
RLY Barh
Azamgarh
13 Pratapgarh
Fatehpur(PG) Phulpur
Orai
Mau
Fatehpur Unchahar Rasra
Jhatikara Bara Balia(PG)
Patna
Jhansi Orai Varanasi Jaunpur

Dorana Jhunsi Gajokhar


Harhua
Ghazipur
BIHAR
Sirathu
Paricha Banda Allahabad Sasaram Biharshariff
(Cant) Sarnath
Lalitpur TPS Mahoba (Rewa Road)
(Bajaj) Sahupuri Chandauli
Gaya
Bhelpur Karamnasa
Rewa Road Meja Sasaram
Lalitpur Sasaram
Mirzapur
Robertsganj
Churk
Malanpur Mehgaon
LEGEND
132kV Transmission Substation 132kV Lline
220kV Transmission Substation OBRA
220kV Line
ANPARA-C
400kV Transmission Substation 400kV Line RIHAND
ANPARA-D
HVDC Transmission Substation HVDC Line RIHAND
MADHYA PRADESH SINGRAULI Gharwa Road

765kV Transmission Substation 765kV Line Vindhyachal


SoneNagar

International Boundary Vindhyachal-4 Bina Anpara A & B


Nuclear Generating Station Morwa
State Boundary
Thermal/Coal Generating Station
Giri
Kulhal

POWER MAP OF UTTARAKHAND


Chibbro-H

Majri Maneri Vishnu


Bhilanga
Bhali_2 Prayag
(Dharasu)
Khodri
Dhalipur
Maneri
Khodri Bhali_1
Purkulgaon Tehri Charged at 400kV
Dhakrani
Bindal
Chamba
Majra
Saharanpur Koteshwar-Pol Koteshwar
Dehradun Srinagar Alaknanda
Deharadun(PG)
Baghpat Bagwanpur
T-Point Rishikesh Charged at 400kV
Chudiyala Srinagar
Airliqu
Saharanpur Hero Honda Chilla-H
Haridwar Bhupatwala
Saharanpur BHEL ASIGLS
Roorkee
Roorkee(PG) Jwalapur
Satpuli
Roorkee Mohammadpur
Dhauli Ganga
Manglore
RBNS
Laksar Kotdwar

Chandak Ranikhet
Kiratpur Nara
Nazibabad Almora Pithorgarh
Pithorgarh(PG)
Meerut
Kalagarh Pithorgarh
Charged at 400kV
Muzzafarnagar
Ramnagar Bhowali
Afzalgarh Dhampur Danda
Nehtor
Jaspur INDIA GLYCOLS LTD Kathgodam NEPAL
KVS Kashi-Old
Haldwani
Thakurdwara Kashipur
Bazpur
Mahuakhera Plyflex
Nehtaur Gamma (GIPL) Tanakpur
CPP Mahendragarh
Tata Pantnagar
Rudrapur Sitarganj
Moradabad Sitarganj Khatima
Bareilly Kicchha
Bakntpr
Bareilly (UP)
Dohana
Richha
Pilibhit

LEGEND UTTAR CB Ganj

132kV Transmission Substation 132kV Lline PRADESH


220kV Transmission Substation 220kV Line
400kV Transmission Substation 400kV Line
Hydro Generating Station 765kV Line
Thermal/Coal Generating Station International Boundary

State Boundary
POWER MAP OF HIMACHAL PARDESH

JAMMU AND KASHMIR

Kishenpur(PG)

Chamera-3 Chamera-2

Chamera-1 Chamba(Chamera-Pol)
Bathri
Budhil
Bairasul
Jalandhar(PG)
RSD
Mamun Jassor
Pathankot
Shanan
Kandrori
Parbati-II
(PSEB) (HPSEB) Sainj
Kangra Palampur AD Hydro
Malana-I
Joginder Malana-II
Nagar Parbati-3
Pong
Bassi Parbati-PO(Banala)
Fozal
Dasuya Bajaura
Koldam
CHINA
Hamirpur Larji
Amb Kangoo Hamirpur(PG)Mandi Chhaur
Hamirpur
Jahoo
Amritsar(PG) Mandi
Chohal (Bijni)
Dehra Karcham Wangtoo Nathpa Jhakri
Bagha
Jalandhar(PG)
Jalandhar(BBMB) Una Bhakra R
Dehar Rampur
Bhakra L Bhaba Baspa
Sorang
Mahilpur ACC1
ACC2
Kashang
Darlaghat
Jamalpur Ganguwal
Rauri
Uperala Nangal
Jutog
Kunihar
Ludhiana Kotla2
Nalagarh
Nalagarh(PG)

Barotiwa Mandhala Solan


Patiala(PG) Baddi
Madanpuri
PUNJAB Panchkula
Mohali
Madanpur
Chandigarh Panchkula(PG)
Rajpura Kulhal
Panchkula Giri/Majri UTTARAKHAND
CHANDIGARH
HARYANA Kalaamb Khodri
Paonta Sahib

66kV Transmission Substation


LEGEND
132kV Line Abdullapur

132kV Transmission Substation


220kV Line Abdullapur(PG)
220kV Transmission Substation
400kV Line
400kV Transmission Substation International Boundary
Hydro Generating Station
State Boundary
Thermal/Coal Generating Station
POWER MAP OF JAMMU AND KASHMIR

Pattan
Kangan
Wanganpura
Pampore1
Bemina Badampur Chashma-Shahi
PAKISTAN Rawalpora1
Pampore2
Magam
Habbak
Budgam
Khanmoh
Lowr URI-1
Jhelum Upersind-1 Wagoora
Kupwara
Upersind-2
Villgam
Zainkot
URI-2
Pattan
Kangan
Amargarh Wanganpura
Pampore1
Delina Bemina Badampur
Chashma-Shahi
Sheeri Rawalpora1 Pampore2
Zainkot
Magam Habbak Budgam
Khanmoh
URI-1 Wagoora

URI-2
New
Chandak Wanpoh Mattan
Wanpoh
Shopian
New Wanpoh
Draba Kulgam
Lassipore
Tethar Baglihar
2
Rajouri Dulhasti
1
Awantipura Lisser 1 Kishtwar
2
Mirbazar Ramban
Kalakot
Salal Batot
Siot Khellani

Jhajjar Chenani
Kotli
Akhnoor Katra
Barn Udhampur2
Jourian Sidhra
Janipur
Kishenpur
Newcanal Chamera-2
Jammu Samba
Meeransahib
1 2
Bari
Brahmana Mahanpur
Bishnah Samba
Sewa-II
HIMACHAL
Hiranagar
Kathua PRADESH
Jallandhar
Sarna
Sarna
Moga

LEGEND
PUNJAB 132kV Transmission Substation 132kV Line
220kV Line
220kV Transmission Substation
400kV Line
400kV Transmission Substation
765kV charged at 400kV Line
Hydro Generating Station International Boundary
Thermal/Coal Generating Station State Boundary
9
POWER MAP OF CHANDIGARH
Nalagarh

Sector 12

Pinjore
Sector 1(Cvl Secretrait)

Mansa Devi
Dhulkote

x
x
x x

x
Sector 56 x x

x
Sector 39 Kish.Chandigarh Sector 18

x
x
x
x
Ganguwal IT Park

Sector 28 Mani Majra


Ropar (BBMB)
PUNJAB
Sector 52 Sector 32
Kharar Mohali-1
Lalru
HARYANA
Industrial Area PH-I
Derabassi
Mohali-2
Sector 47
Industrial Area PH-II

LEGEND
66kV Line
66kV Transmission Substation 220kV Line
220kV Transmission Substation x x 66kV U/G Line
State Boundary
पावर सटम ऑपरे शन कापरे शन लमटे ड
((भारत सरकार का उधम)
) CORPORATION LIMITED
POWER SYSTEM OPERATION
(A Govt. of India Enterprise))

NORTHERN REGIONAL LOAD DESPATCH CENTRE