PRE ENGINEERED

STEEL BUILDINGS
PRE ENGINEERED BUILDINGS
 Tailor made building based on
client’s requirement & actual
design calculations using tapered
sections.
 A combination of built up section,
hot rolled section, cold formed
elements and profiled sheets
 Designing and Fabrication is done
in factory
 Building components are brought
to site
 Then fixed/jointed at the site
 All connections are bolted.
BRIEF HISTORY
 Steel was very expensive item in USA
 The concept of PEB originate from here.
 The idea was that section should be provided as per
B.M.D.
 This lead to the saving in steel and development of PEB
concept.
Design-Build Method
 Eliminatesmultiple parties to streamline
construction and save time and money
PEB
APPLICATIONS
 Industrial Buildings
 Warehouses
 Commercial Complexes
 Showrooms
 Offices
 Schools
 Indoor Stadiums
 Outdoor Stadiums with canopies
 Gas Stations
 Metro Stations, Bus Terminals, Parking Lots
 Primary Health Centers, Angan wadi’s
 And many more…
PEB CONT….
Industrial Building Indoor Stadiums

Parking lots Railway Station


PEB
Aircraft Hangars Metro Station

Wear house High rise Building


PEB

ADVANTAGES
 Aesthetic Appeal
 Faster Completion
 Economical
 Seismic Resistance
 Ease of Expansion
 Maintenance Free
 Large Clear Spans
 Controlled Quality
 Hassle Free
 Self weight 30%  Self weightMore heavy
lighter  Primary memers are
 Primary Member is Hot rolled “I” section
tapered section  Secondary members
 Secondary members are “I” or “C” section
are light weight rolled which are heavy in
framed “Z” and “C” weight.
section
 Delivery – average 6 to 8  Delivery- average 20 to
weeks 26 weeks
 Foundation-simple  Foundation- expensive,
design, easy to construct heavy foundation
& light wt. required.
 Erection cost and time-  Erection cost and time-
accurately known 20% more than PEB
 Erection process is easy,  Erection process is slow
fast, step by step and extensive field labor
is required.
 Seismic Resistance- low  Seismic Resistance- rigid
weight flexible frames heavy weight structures
offer higher resistance to do not perform well in
seismic forces seismic zones
 Overall price -30%lower  Overall price - Higher
 architecture-achieved at Price per square meter.
low cast  Architecture- achieved at
higher cost
PEB

COMPONENTS
 Main Frame  Sheeting
 Primary Members  Roof
 Columns  Wall
 Rafters  Fascias etc

 Secondary  Accessories
Members  Ventilators
 Purlins  Sky Lights
 Girts  Misc.
OTHER MAJOR COMPONENTS OF PEB

CRANE BRACKETS & MEZZANINE


BEAMS FLOORS

STRUCTURAL
PARTIONS

FASCIAS CANOPIES
PRE-ENGINEERED BUILDINGS NOMENCLATURE –
STANDARD FRAMING SYSTEMS

RF = TAPERED COLUMN CLEAR SPAN

BC-1 = TAPERED COLUMN MULTI-SPAN WITH 1


INTERMEDIATE COLUMN.
SSCS = SINGLE SLOPE CLEAR SPAN.

SSMS-1= SINGLE SLOPE MULTI-SPAN WITH 1


INTERMEDIATE COLUMN
PEB PROCESS FLOW
 SALES
 OMD/PMG/CSD
 DESIGN
 DETAILING
 PURCHASE
 PRODUCTION
 SHIPMENT
 ERECTION
 Forthe success of any PEB business the
primary requirement is that the sales and
Engineering team to be strong enough to
get orders and optimized design.
TYPICAL PEB PLANT
LAYOUT
PEB PROCESSES

PEB

BUILT UP LINE COLD FORM LINE SHEETING

HR SECTIONS
GUTTER,
PRIMARY C & Z PURLINS & ROOF & WALL
FLASHINGS,
MEMBERS LINE MISCELLANEOUS SHEETING
TRIMS, ETC
PARTS

CKD CKD CKD CKD ACCESSORIES

SHIPMENT
ERECTION OF PEB
 PEB are often erected by specialized
Builders with extensive experience in the
erection of PEB’S