Sei sulla pagina 1di 1

GENERAL NOTES:

1. PLEASE DO NOT SCALE. WORK TO WRITTEN DIMENSIONS ONLY.


2. ALL DIMENSIONS ARE IN MM AND LEVELS IN METERS UNLESS
OTHERWISE STATED.
3. IN CASE OF DISCREPANCY BETWEEN THE SPECIFICATIONS AND
DETAILS SHOWN IN THE DRAWING. THE SAME SHALL BE
BROUGHT TO THE NOTICE OF THE ENGINEER INCHARGE FOR
CLARIFICATION PRIOR TO THE CONSTRUCTION.
4. REFERENCE MADE TO ANY DRAWING SHALL REFER TO THE
LATEST REVISION OF THE SAID DRAWING.
1 2 3 4 5 6 7 A 8 5. LEVELS MENTIONED IN STRUCTURAL DRAWINGS PERTAIN TO
TOP LEVEL OF STRUCTURAL CONCRETE UOS.

BR1

BR1
BR1

BR1

BR1

BR1

BR1

BR1

BR1

BR1

BR1

BR1

BR1
1B1 1B1
A

1B11

1B13

1B17
1B12

1B14
1B9
SPECIAL TECHNICAL NOTES:

1B16
S1 S2 S2 S14

1B9
S15
S14
1. USE CONCRETE GRADE M-30 UNO.

1B18
1B4
S3
1B2 1B2 1B3 1B3
1B4A

BR1 S5 S6 S6 S4 S16 S17 S16 BR1

1B5 1B5
B
175THK.
S7
S6 S6 S16
S9 S16 S17 LEGENDS:
S4
BR1 1B19 1B19 1B3 1B3 BR1
1B6
X
S13 S6 S6 S8
175THK. S17 S16
S16

1B9
1B15
1B14
1B9

1B7 1B7
C
S11
1B10

S11 S10

1B10
S12 S11
S11

1B17
1B12

1B18
BR1 1B11

1B13

1B16
1B8 1B8
D

BR1

BR1
BR1
REFERENCE DRAWINGS:

S10 1. FOR GENERAL NOTES & TYPICAL DETAIL DRAWINGS REFER


DRAWING NO. EF-025/CIDCO/GEN/ST/001, 002 & 003.
2. FOR FIRST FLOOR BEAMS DETAILS REFER DWG. NO.
B EF-025/CIDCO/PTR/ST/110 & 111.

SCHEDULE OF SLAB
FIRST FLOOR FRAMING PLAN REINFORCEMENT NOTE-1 THIS DRAWING IS BASED ON THE ARCHITECTURAL DRAWING
NO'S.EF-025-CIDCO-PTR-AR-01-D1, EF-025-CIDCO-PTR-AR-02-D1,
EF-025-CIDCO-PTR-AR-03-D1, EF-025-CIDCO-PTR-AR-04-D1,
EF-025-CIDCO-PTR-AR-05-D1,EF-025-CIDCO-PTR-AR-06-D1,
EF-025-CIDCO-PTR-AR-07-D1, EF-025-CIDCO-PTR-AR-08-D1,

A1

GOOD FOR CONSTRUCTION (GFC)


1 8 DESIGNED & DRAWING BY
A DDC : TCPL - FPPL CONTRACTOR : JKCRTG

D
C
REVIEWED BY ISSUED BY

GC : LBG EMPLOYER : CIDCO

(TYP. SECTION SHOWING


SECTION A1 SECTION B
BAR LAYERING SYSTEM )
SECTION X-X
SECTION A

DESIGN CONSULTANT : CONTRACTOR : GENERAL CONSULTANT: EMPLOYER/AUTHORITY : PROJECT TITLE : DRAWING TITLE :

CREW BOOKING FACILITY & CREW DUTY ROOM


Tandon Consultants Pvt. Ltd.
Tandon Consultants Pvt Ltd
17, Link Road, Jangpura Extension, New Delhi 110014, India
Phone: 91-11-24317684 ; 24319288 ; 24310509 Fax: 91-11-24316057
JKIL - CRTG THE LOUIS BERGER GROUP, INC., USA
Engineers . Planners . Scientists . Economists
CITY & INDUSTRIAL DEVELOPMENT
CORPORATION OF MAHARASHTRA LTD. FIRST FLOOR FRAMING PLAN
E-mail: tandon@tcpl.com

125023rd, St. NW Plot No. B 3-6 , Sector 32 A-615/616, Kohinoor City, Kurla(N),
Washngton, DC 20037, USA. Gurgaon 122001, India Mumbai 400070, India
Frischmann Prabhu India Pvt. Ltd.
P E L L F R I S C H M A N N G R O U P
CIDCO Phase-1, Opp. Sector No.02, Panchnand, Taloja,
NAVI MUMBAI METRO PROJECT SHK DKR VG EF-025-CIDCO-PTR-ST-109 F W
CONSULTANCY, DESIGN, ENGINEERING, PROJECT MANAGEMENT Behind Taloja Railway Station, Navi Mumbai, Maharashtra
Plot 113, 1st Floor, Opposite Skyline Business School,Sector -44,
Gurgaon - 122 003, Haryana, INDIA
Web: www.pellfrischmann.com / www.fpindia.com | Email: pfmumbai@fpindia.com
Phone No.: 0124 427 2728, Fax No.: 0124 427 2191 1:100 @A1 SK 17-JUN-13 EF-025-CIDCO-PTR-ST-109_F .DWG

Potrebbero piacerti anche